ABSTRACT OF QUANTITIES FOR TRUCK LAYBY
No of Truck laybys 8
UNIT QTY
S.NO DESCRIPTION UNIT TOTAL QUANTITY
Truck Layby
1 Clearing & Grubbing Sqm 1.80 0.22
2 Excavation Cum 0.00 0
3 Embankment Cum 8985 1123
4 Subgrade & Median Filling Cum 10851 1356
5 GSB Cum 4493 562
6 WMM Cum 0 0
7 Sand below Concrete blocks Cum 446 56
8 Cement concrete block Sqm 14850 1856
9 DLC Cum 0 0
10 PQC Cum 0 0
11 M 15 for placing the Chequered Tiles Cum 789 99
12 Chequered tiles Sqm 5258 657
13 Kerb Rm 5120 640
14 Kerb Painting Sqm 1741 218
15 Drain in Truck Laybye m 1280 160
16 Grating Nr 128 16
17 PVC Pipe for discharge of drain water m 256 32
18 Median cuts m 324 41
19 Advance Sign for Laybye Nr 16 2
20 Facilities at Laybye including Toilet block Nr 8 1
21 Lane Marking Sqm 134.0 17
22 Chevran marking Sqm 256.0 32
23 Other marking like arrows, etc Sqm 36.6 4.6
24 Litter bins Nr 16 2
sriniv
25 Water Kiosks Nr 16 2 consid
26 Fencing m 2680 335
27 Lighting Nr 0
28 Highmast Lighting Nr
29 Pedestrain guard rail m 1280 160
QUANTITY CALCULATION FOR TRUCK LAY BYE
Truck Laybyes 1
Description No Length Width Area Depth Qty No. Quantity
Area of Paving sqm 1 100 7.500 750.00
1 35 7.500 262.50
1 25 7.500 187.50
1 70 3.750 262.50
1 105 3.750 393.75
1856.25
Raised Verge 1 100 3.000 300.00
1 35 1.500 52.50
1 25 1.500 37.50
390.00
Clearing & Grubbing 0.22 0.22 1 0.224625
EW Fill cum 2246.25 2246.25 0.5 1123.13 1 1123.125
Median Fill
Verge cum 1 390.00 390.00
Footpath Cum 1 160.00 1.67 267.20
657.20 0.355 233.31 1 233.306
Excavation cum 2246.25 2246.25 0 0.00 1 0
Subgrade cum 2246.25 2246.25
2246.25 0.5 1123.125 1 1123.125
GSB cum 2246.25 2246.25
2246.25 0.25 561.5625 1 561.5625
WMM cum 1856.25 1856.25
1856.25 0.25 0 1 0
Cement concrete block sqm 1856.25 1856.25
1856.25 1856.25 1 1856.25
Sand below blocks cum 1856.25 1856.25
1856.25 0.03 55.6875 1 55.6875
DLC cum 1856.25 1856.25
1856.25 0 0 1 0
PQC cum 1856.25 1856.25
1856.25 0 0 1 0
Chequered tiles sqm 1 160.00 1.67 267.20
1 390.00 390.00
657.20 657.20 1 657.2
Providing and laying M 10 PCC
150 mm Thick for placing the
Chequered Tiles cum 657.20 0.15 98.58 1 98.58
Kerb
Footparth m 2 160.00 320.00
Verge 2 160.00 320.00
640.00 640.00 1 640
Drain in Truck Laybye lm 1 160.00 160.00 160.00 1 160
Grating Nr 16 16 1 16
Page 2 of 3
Median Cuts Lim 10 3.000 30 1 30
4 1.500 6 1 6
3 1.500 4.5 1 5
41
PVC Pipe for discharge of drain
water Lim 32 32 1 32
Road Marking-Broken Line Sqm 335 0.1 167.5 1 16.75
Chevran marking sq.m 2 16 32 1 32
Other marking like arrows, etc Nr 4 1 4 1 4
Kerb Painting Sqm 640.00 0.34 217.60 1 217.6
Truck parking signs 2 1 2
Facilities at Laybye including
Toilet Block Nr 1 1 1
Water Kiosks Nr 2 1 2
Liter Bins Nr 2 1 2
Fencing Lin 335 1 335
Lighting Nr. 10 1 10
Highmast Lighting Nr. 2 1 2
Toilet Blocks Nr. 1 1 1
Ped railing Lim 1 160 1 160