Case Study Exercise 7

The document describes a case study exercise involving the production of a new custom designed sport car by Sinar Jaya Company. It includes a table with 11 activities, their predecessors, and durations. The summary is: [1] A PERT network is constructed showing the 11 activities and their dependencies. [2] Earliest and latest event times are calculated for each node. [3] The critical path and critical activities are determined to be activities B, E, F, H, and I. [4] The total float for activity G is calculated to be 8 weeks, and the independent float for activity F is calculated to be 0 weeks.

Uploaded by

Nur Izzahlina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views7 pages

Case Study Exercise 7

The document describes a case study exercise involving the production of a new custom designed sport car by Sinar Jaya Company. It includes a table with 11 activities, their predecessors, and durations. The summary is: [1] A PERT network is constructed showing the 11 activities and their dependencies. [2] Earliest and latest event times are calculated for each node. [3] The critical path and critical activities are determined to be activities B, E, F, H, and I. [4] The total float for activity G is calculated to be 8 weeks, and the independent float for activity F is calculated to be 0 weeks.

Uploaded by

Nur Izzahlina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

MGT345

CASE STUDY EXERCISE 7

PREPARED BY:
GROUP: D1BA111/4F

NO STUDENT’S NAME MATRIC NUMBER


.
1. NUR IZZAHLINA BINTI ZAIDI 2018416718
2. MUHAMMAD IQBAL BIN AZMI 2018231244
3. MOHAMAD ADAM SHAH BIN MOHD ZAID 2018424238
4. NURUL HAMIZA FARINA BINTI ABDUL HADI 2018244342
5. NUR SYAMIMI BINTI GHAZALI 2016654474

PREPARED FOR:
MADAM NORIS FATILLA BINTI ISMAIL

SUBMISSION DATE: 23 MAY 2020


EXERCISE 7
Sinar Jaya Company is contemplating producing a new custom designed sport car. The
activities necessary to build an experimental model and related data are given in the
following table.
Activity Immediate Predecessor Time(week)
A - 8
B - 3
C - 2
D B 8
E B 5
F C,E 6
G A 4
H D,F 4
I H 5
J G 3

a) Construct the PERT network for the project.


b) Compute the earliest event time and latest event time for each event in the network.
c) Determine the critical path and the critical activities for the project.
d) Compute the following:
i) Total Float for activity G.
ii) Independent Float for activity F.
ANSWER:
a) Construct the PERT network for the project.

G,4
2 8
A,8
J,3

B,3 D,8
1 3 5 10
DUMMY
C,2 E,5 I,5

F,6 H,4
4
DUMMY
6 7 9
b) Compute the earliest event time and the latest event time for each event
in the network.

8 12
16 20
G,4
2 8
0 A,8 23
3 23
0 J,3
3
11
B,3 D,8 14
1 3 5 10
DUMMY
C,2 E,5 I,5

F,6 H,4
4
DUMMY
6 7 9

2 8 14 18
8 8 14 18

SOLUTION:
NODE 1 2 3 4 5 6 7 8 9 10
EET 0 8 3 2 11 8 14 12 18 23
LET 0 16 3 8 14 8 14 20 18 23

c) Determine the critical path and the critical activities for the project.
A,8 G,4 J,3
1 2 8 10 = 15

B,3 D,8
1 3 5 = 11

B,3 E,5 F,6 H,4 I,5


1 3 6 7 9 10 = 23

C,2
1 4 =2

Critical Path: 1,3,6,7,9,10

Critical Activites: B, E, F, H, I
d) i) Total Float for activity G

- the free time available if the activities start at the earliest possible time when the
latest finishing time is used.

ANSWER:

FORMULA:

TF= LET (H) - EET (T) - Duration

8 12
16 20
G,4
2 8

TF = 20 - 8 - 4
= 8 weeks
e) ii) Independent Float for activity F.

- the free time available if the activities start at the latest time when the earliest
finishing time is used.

ANSWER:

FORMULA:

IF= EET (H) - LET (T) - Duration

8 14
8 14
F,4
6 7

TF = 14 - 8 - 6
= 0 week