You got 20 of 39 possible points.
Your score was: 51 %
Question Results
Question: Score 1 of 1
What are the possible categories for the Business Partner master data object in
SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Person
Vendor
Customer
Organization
Group
Question: Score 0 of 1
Mode selection is one of the scheduling options available in Advanced Planning
in SAP S/4HANA. When can you use mode selection?
Please choose the correct answer.
Response:
When multiple operations are maintained for one product
When multiple planned orders exist on one resource
When multiple production versions are maintained for one product
https://www.erpprep.com/user/quiz/1664999/userresults 1/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
When alternate resources are used within one operation
Question: Score 1 of 1
You want to create a production order from a planned order. What methods
could you use?
There are 2 correct answers to this question.
Response:
Partial conversion
Full conversion
Individual conversion
Order release
Question: Score 1 of 1
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
HANA Live
Multidimensional Reporting client (MDRC)
ABAP Managed Core Data Services (CDS)
Smart Business Cockpit
Question: Score 0 of 1
The production plan is being disrupted by last minute demands that are entered
in the system. Which is the most efficient way to handle last minute demands
and protect the current production plan?
There are 2 correct answers to this question.
Response:
https://www.erpprep.com/user/quiz/1664999/userresults 2/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
In the material master record, set MRP type to P4 and a planning time fence on the
replenishment lead time of the material
Manually firm all planned orders for materials within the replenishment lead time of
the material
In the material master record, set MRP type to P1 and a planning time fence on the
replenishment lead time of the material
In the stock requirements list, set a manual firming fence for a date based on the
replenishment lead time of the material
Question: Score 0 of 1
Which Kanban master data object controls the relationship between the supply
and demand source?
Please choose the correct answer.
Response:
Production supply area
Control cycle
Kanban container
Rate routing
Question: Score 1 of 1
You are using the document management system (DMS) . Where should the DMS
document links be assigned, to have them automatically copied to production
orders?
There are 2 correct answers to this question.
Response:
Material master
Work center
Routing header
Bill of material
https://www.erpprep.com/user/quiz/1664999/userresults 3/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Question: Score 1 of 1
A production order is created from a planned order. The system should
determine a valid production version. What must you doing the system for the
selection to occur?
Please choose the correct answer.
Response:
Set the customizing setting Manual Selection of Production Version active.
Create several production versions with valid dates.
Set the customizing setting Automatic Selection of Production Version active.
Change the production version assignment in the production order using the Read
Master Data function.
Question: Score 0 of 1
In which of the following master data objects can you define the production
order default storage location for a material component?
There are 2 correct answers to this question.
Response:
Routing, in the component allocation
Material master of the finished product
BOM, in the item for the material
Work center, in the production supply area
Question: Score 1 of 1
What must be used in the system to plan the requirements for different
subcontractors separately?
Response:
Storage locations
https://www.erpprep.com/user/quiz/1664999/userresults 4/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Production versions
MRP areas
Planning plant
Question: Score 0 of 1
Your client is asking for your advice on material master numbering in SAP
S/4HANA. What do you need to consider?
There are 2 correct answers to this question.
Response:
In Customizing you can decide by material type whether to use the long material
number.
The display template for material numbers applies to all clients.
The maximum mater all number length is 40 for external numbers and 18 for
internal numbers
The number of leading zeros for internal numbers is client-specific.
Question: Score 0 of 1
Which actions does the system perform by default when you save a confirmation
for a finished product in repetitive manufacturing?
There are 3 correct answers to this question.
Response:
Material staging for next order in sequence
Posting of goods receipt for the product
Posting of production costs to the production cost collector
Archiving of documents for assembly scrap
Reduction of associated capacity requirements
https://www.erpprep.com/user/quiz/1664999/userresults 5/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Question: Score 0 of 1
You want to represent setup time as a graphical object in the Detailed
Scheduling Planning Board. Which actions are needed?
There are 2 correct answers to this question.
Response:
Create and assign a new graphical object for setup time in the planning board.
Run setup minimization heuristics or optimizer.
Create and assign setup group/setup keys in the production data structure.
Create and assign a setup matrix with setup transition time to the resource
Question: Score 0 of 1
What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question.
Response:
The OLAP system needs to write back the data to the OLTP system
Only the OLAP system has a predefined subset of the data
Multiple copies of the data exist
Only the OLAP system has the latest data
Batch process are required to keep OLTP and OLAP in sync
Question: Score 1 of 1
What are the options for transferring data to SAP S/4HANA with the SAP
S/4HANA Migration Cockpit?
There are 2 correct answers to this question.
Response:
XML files
Staging tables
https://www.erpprep.com/user/quiz/1664999/userresults 6/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
CSV files
Temporary tables
Question: Score 1 of 1
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:
SAP MaxAttention
SAP Best Practices
Premium engagement
Guided Configuration
Question: Score 1 of 1
The settings for MRP can be maintained at different levels. If settings have been
maintained in different places, in which sequence does the system search for the
MRP settings?
Please choose the correct answer.
Response:
Material Master –> Plant Settings –> MRP Group
MRP Group –> Material Master –> Plant Settings
Material Master –> MRP Group –> Plant Settings
Plant Settings –> MRP Group –> Material Master
Question: Score 1 of 1
A resource was created in SAP S/4HANA PP/DS through the internal CIF
integration and named “W1904_1000_001”. What does the suffix 001 in the
resource name represent?
Please choose the correct answer.
https://www.erpprep.com/user/quiz/1664999/userresults 7/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Response:
Capacity category
Number of individual capacities
Available capacity version
Work center category
Question: Score 0 of 1
You want to set up a make-to-order planning scenario for a finished material.
Some components from the bill of materials (BOM) should be procured per sales
order, other components should be procured for various requirements. Fore
casting is NOT possible.
Which settings do you make to achieve this?
Please choose the correct answer.
Response:
Planning strategy 20 (Make-to-Order) and the corresponding individual Collective
indicator
Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
Planning strategy 50 (Planning without final assembly) and the corresponding
Mixed MRP indicator
Planning strategy 50 (Planning without final assembly) and the corresponding
individual Collective indicator
Question: Score 0 of 1
What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question.
Response:
Allowed material type
Default values for the item status
Maximum allowed low-level code
https://www.erpprep.com/user/quiz/1664999/userresults 8/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Default unit of measure
Question: Score 1 of 1
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:
Settlement Management replaces ERP SD Rebates
SAP order Fulfillment replaces ERP SD Availability Checking
SAP GTS replaces ERP SD Foreign Trade
SAP Sales Support replaces SAP CRM
SAP Revenue Accounting replaces ERP SD Revenue Recognition
Question: Score 0 of 1
What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.
Response:
Extract on, transformation, and loading (ETL)
Online analytical processing (OLAP)
Online transaction processing (OLTP)
Pre computed aggregation views
Question: Score 1 of 1
What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.
Response:
https://www.erpprep.com/user/quiz/1664999/userresults 9/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Wait
Full
In use
Empty
Question: Score 0 of 1
Advanced Planning is delivered with standard out-of-the-box order and resource
evaluations. Which evaluations are available?
There are 2 correct answers to this question.
Response:
Resource utilization
Order list
Production list
Resource overview
Question: Score 0 of 1
What is a typical transportation processing SAP Transportation Management?
Please choose the correct answer.
Response:
Transportation Planning, Transportation Execution, Order Management, Freight
Costing and Settlement, Analytics and Reporting
Order Management, Transportation Planning, Transportation Execution, Freight
Costing and Settlement, Analytics and Reporting
Transportation Planning, Order Management, Transportation Execution, Freight
Costing and Settlement, Analytics and Reporting
Order Management, Transportation Planning, Freight Costing and Settlement,
Transportation Execution, Analytics and Reporting
https://www.erpprep.com/user/quiz/1664999/userresults 10/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Question: Score 1 of 1
A planner updated a production order status from partially confirmed “PCNF” to
technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:
The production operator cannot enter additional confirmations
The buyer can still see component reservations
The production manager can still see the capacity requirements
The warehouse clerk still carry out goods issue transactions
Question: Score 0 of 1
What is the difference between co-products and by-products?
Please choose the correct answer.
Response:
Only by-products have a zero inventory valuation.
Only co-products are identified by a special item category in the bill of material
(BOM).
Only co-products appear in the process or production order settlement rule.
Only co-products can be manufactured in isolation from the main product.
Question: Score 1 of 1
What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Test Scripts
Scope Items
https://www.erpprep.com/user/quiz/1664999/userresults 11/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Solution Package
Process Flows
Building Blocks
Question: Score 0 of 1
What is the valid sequence of key activities in production order processing?
Please choose the correct answer.
Response:
Creation, scheduling, release, material withdrawal, confirmation
Creation, staging, release, material withdrawal, confirmation
Creation, release, scheduling, material withdrawal, confirmation
Creation, scheduling, release, variance calculation, confirmation
Question: Score 1 of 1
Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.
Response:
MB02
MIGO
MBNL
MMBE
Question: Score 1 of 1
Where does the system check master data selection settings during the creation
of planned orders and production orders?
There are 3 correct answers to this question.
https://www.erpprep.com/user/quiz/1664999/userresults 12/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Response:
In the MRP controller
In the production order type
In the bill of materials (BOM)
In the routing
In the production version
Question: Score 1 of 1
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
You require an up-to-date inventory for components
When goods issues can wait for final confirmation
For production lines with short lead times
When you need to determine the work in progress
Question: Score 1 of 1
The SAP Kanban procedure could be used to trigger which of the following kinds
of replenishment?
There are 2 correct answers to this question.
Response:
Subcontracting
Vendor consignment
In-house production
Stock transfer
https://www.erpprep.com/user/quiz/1664999/userresults 13/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Question: Score 0 of 1
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:
Comparison of current data with historical data to identify trends
Real time decision support
Automatic update of story boards
Strategic analysis
Question: Score 1 of 1
For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.
Response:
Work center
Material
Production version
Plant
Question: Score 0 of 1
Which of the following objects can you release so that the business transactions
for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:
Individual control recipes
Individual phases
Individual operations
https://www.erpprep.com/user/quiz/1664999/userresults 14/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Individual process instructions
Question: Score 0 of 1
A warehouse manager likes to streamline the goods receipt (GR) process for
production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
Operation control key
Confirmation profile
Scheduling margin key
Production scheduling profile
Question: Score 0 of 1
You produce your material based on a forecast derived from historical sales and
expect it to be in inventory when your customer orders. If customers order more
that the forecasted quantity, you want to increase production to try to meet the
extra demand.
Which is the appropriate planning strategy to use?
Response:
10 – Anonymous make-to-stock
40 – Planning with-final-assembly
50 – Planning without final assembly
20 – Make to order production
Question: Score 1 of 1
Which material-specific information can be transferred to a transportation lane
in PP/DS?
There are 3 correct answers to this question.
Response:
https://www.erpprep.com/user/quiz/1664999/userresults 15/16
8/20/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Mini | ERPPrep
Quota arrangements
Purchasing info records
Outline agreement
Production versions
Special procurement keys