Mega Water Supply Scheme Report, Odisha

This document provides details of a proposed mega piped water supply scheme for 32 gram panchayats across Banki, Damapada, and Baranga blocks in Cuttack district of Odisha. Key details include the project scope, population and water demand projections, proposed source and intake from the Mahanadi River, raw and clear water pumping and rising main details, and specifications for the 29.5 MLD conventional water treatment plant. The treated water will be supplied to a total projected population of over 2.86 lakh people across the 32 gram panchayats by 2053.

Uploaded by

trilok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views331 pages

Mega Water Supply Scheme Report, Odisha

This document provides details of a proposed mega piped water supply scheme for 32 gram panchayats across Banki, Damapada, and Baranga blocks in Cuttack district of Odisha. Key details include the project scope, population and water demand projections, proposed source and intake from the Mahanadi River, raw and clear water pumping and rising main details, and specifications for the 29.5 MLD conventional water treatment plant. The treated water will be supplied to a total projected population of over 2.86 lakh people across the 32 gram panchayats by 2053.

Uploaded by

trilok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

VOLUME- 1

Hydraulic Design,
Financial Estimate,
& Annexure

Details Project Report of Mega Piped Water


Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps.
Of Damapada Block & 2 G.P of Baranga Block
under Cuttack District.

Client:
Executive Engineer
RWS&S Division - Cuttack
Circle - Cuttack, Odisha
MARS PLANNING & ENGINEERING SERVICES PVT. LTD.
BL-166, Salt Lake City, Sector-II, Kolkata 700091
+91 33-40045243| [email protected] | www.marsconsultancy.com
Mega Piped Water Supply Scheme For 13
G.Ps. Of Banki, 17 G.Ps. Of Damapada
Block & 2 G.P of Baranga Block

MaRS Planning Engineering Services Pvt. Ltd.


Introduction & Project at Glance

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Basic Details
Name of the Project Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P
of Baranga Block
State Odisha
District Cuttack
Block Banki, Damapada & Baranga
Panchayats Total 32 Nos. Gram Panchayats of Banki, Damapada & Baranga Block.
Total Population - 2011 croverd (Including 70 LPCD Project)
1,94,938

Total Population Details -Including 70 LPCD for Water Demand


Total
Population of proposed G.P. - 2011 1,80,989

Population of proposed G.P. - Base Year 2023 2,07,663

Population of proposed G.P. - Intermediate Year 2038 2,44,769

Population of proposed G.P. - Design Year 2053 2,86,585

Total Population Details -Excluding 70 LPCD for ESRs & Distribution


Population of proposed G.P. - 2011 1,67,518

Population of proposed G.P. - Base Year 2023 1,92,207

Population of proposed G.P. - Intermediate Year 2038 2,26,551

Population of proposed G.P. - Design Year 2053 2,65,255

Total Water Demand -(Excluding Inrute Village)


Water Demand in MLD - Water Demand in MLD -Intermediate year -2038 Water Demand in MLD -Ultimate year - 2053
Base year 2023
Total 17.651 20.81 24.36

Source Details
Availability Three phase Electricity In Hours/day 20

Source (Ground Water/ Surface Water) Surface Water

Type of Source (River/WRD Reservoir/Check Dam/Pond)


Mahanadi River

Dia of Intake Well (in M.) 10

High Flood Level (in m) 40.869

Water Level (in m) 33.803

Bed Level (in m) 30.385

Raw Water Pump Type Vertical Turbine (V.T.)


Raw Water Pump Discharge in LPM 17,340
Total Head for Raw Water Pump 32
Adopted Standard BHP 220
Nos. of Pump Motor Working 2
Discharge of Each Proposed Pump Motor (lpm) 8,670
Adopted Standard BHP for Each Pump Motor 110
Nos. of Pump Motor Including Stand By (2W + 1S)
G.P.-Pathapur,Vill-Muraripur
Loaction of Intake (Near G.P.,Village)
Lat-20°26'30.31"N,Long-85°37'42.88"E
Raw Water Rising Main Details

MaRS Planning Engineering Services Pvt. Ltd.


Raw Water Pipe - Type DI - K9
Raw Water Pipe - Length in m 600
Raw Water Pipe - Dia in mm 490

WTP Details

Type of Plant (Conventional/Unconventional) Conventional

Clear Water Pump Type Horizontal Centrifugal Pump (HCF)

Plant capacity in MLD 29.50

Ground Level at WTP. (in M.) 44.50

Clear Water Pump Discharge in LPM 17,340


Total Head for Clear Water Pump 175
Clear Water Pump Capacity in HP 1,200
Nos. of Pump Motor Working 6
Discharge of Each Proposed Pump Motor (lpm) 2,890
Adopted Standard BHP for Each Pump Motor 200
Nos. of Pump Motor Including Stand By (6W +3S)
G.P.-Pathapur,Vill-Muraripur
Loaction of WTP (Near G.P.,Village) Lat-20°26'40.22"N,Long-85°37'48.28"E

Clear Water Sumps Details


Sump-A Sump-B
Capacity of Sumps (in KL.) 3,770 180

Clear Water Pump Type Horizontal Centrifugal Pump (HCF)

Ground Level at WTP. (in M.) 48.42 108.20

Clear Water Pump Discharge in LPM 5,360 250

Total Head for Clear Water Pump 110 75

Clear Water Pump Capacity in HP 280 10

Nos. of Pump Motor Working 2 1

Discharge of Each Proposed Pump Motor (lpm) 2,680 250

Adopted Standard BHP for Each Pump Motor 140 10

Nos. of Pump Motor Including Stand By (2W + 1S) (1W + 1S)


G.P.-Durgapur,Vill-Ramchandarpur G.P.-Damapada,Vill-Damapada
Loaction of WTP (Near G.P.,Village) Lat-20°20'22.93"N,Long-85°29'21.99"E Lat-20°23'7.66"N,Long-85°38'9.20"E
Clear Water Rising Main WTP/Sumps to ESRs.

Dia of Pipe. (in mm) Pipe Maiterial Length of Pipe (in M.)

100 3,971
150 34,820

DI K-9

MaRS Planning Engineering Services Pvt. Ltd.


200 41,135
250 12,859
DI K-9
300 6,850
350 8,208
400 7,546
450 52,995
Total (in KM) 168.384

ESRs Details

Banki Block

ESRs Capacity in Liters Staging (in m) G.P.Name Village Name Coordinate


20°20'51.97"N
ESR-1 2,40,000 20 Baideswar Malisahi
85°22'39.38"E
20°19'46.47"N
ESR-2 1,30,000 20 Nuagaon Kendupali
85°22'28.77"E
20°19'42.40"N
ESR-3 4,50,000 20 Jagannathpur Gopinathpur
85°22'47.14"E
20°21'12.28"N
ESR-4 2,30,000 20 Kalapathar Samapurdal
85°26'0.62"E
20°21'20.48"N
ESR-5 1,80,000 20 Balabhadrapur Botalama
85°27'13.08"E
20°19'7.83"N
ESR-6 3,50,000 20 Golaganda Baraput
85°25'51.25"E
20°18'42.37"N
ESR-7 4,20,000 20 Anuary Kumusara
85°28'44.76"E
20°19'54.82"N
ESR-8 3,90,000 20 Baraput Tiarasahi
85°28'35.79"E
20°18'30.39"N
ESR-9 4,70,000 20 Kiapalla Bania
85°25'8.33"E
20°17'34.83"N
ESR-10 3,70,000 20 Barahampur Khajuripada
85°24'26.29"E
20°18'56.16"N
ESR-11 5,90,000 20 Kalipoi Baghei
85°22'26.37"E
Damapada Block

ESRs Capacity in Liters Staging (in m) G.P.Name Village Name Coordinate


20°25'43.82"N
ESR-1 6,10,000 20 Pathapur Charigharia
85°39'11.22"E
20°25'8.08"N
ESR-2 2,90,000 20 Bhagipur Bhagipur
85°43'46.83"E
20°25'59.26"N
ESR-3 3,00,000 20 Banara Banara
85°44'54.39"E
20°23'46.03"N
ESR-4 5,30,000 20 Kusupangi Nistipur
85°36'46.28"E
20°24'4.33"N
ESR-5 3,00,000 20 Similipur Karabara
85°34'55.92"E
20°22'56.51"N
ESR-6 3,10,000 20 Gobindpur Gobindpur
85°36'26.34"E
20°23'18.57"N
ESR-7 3,00,000 20 Harirajpur Harirajpur
85°33'33.53"E
20°22'7.14"N
ESR-8 2,70,000 20 Bilipada Dharas
85°33'59.16"E
20°21'13.10"N
ESR-9 2,90,000 20 Dulanapur Dulanpur
85°36'24.78"E
20°21'39.97"N
ESR-10 7,20,000 20 Gopalpur Singhnathpur
85°31'48.31"E
20°20'14.35"N
ESR-11 8,80,000 20 Talabasta Talabast
85°37'43.55"E

MaRS Planning Engineering Services Pvt. Ltd.


20°21'28.06"N
ESR-12 3,10,000 20 Ragadi Kotadwar
85°31'6.11"E
20°20'21.50"N
ESR-13 2,50,000 20 Durgapur Ramchandarpur
85°29'42.76"E
20°20'1.22"N
ESR-14 4,10,000 20 Dhansar Jamudihi
85°30'37.91"E
20°18'51.08"N
ESR-15 2,70,000 20 Tulasipur Sunapatana
85°30'24.47"E
20°18'51.08"N
ESR-16 3,50,000 20 Naragang Naragang
85°30'24.47"E
20°22'6.09"N
ESR-17 3,90,000 20 Damapada Damapada
85°39'7.89"E
Baranga Block

ESRs Capacity in Liters Staging (in m) G.P.Name Village Name Coordinate


20°25'12.26"N
ESR-1 4,20,000 20 Mundali Chakardharpur
85°47'40.39"E
20°27'38.94"N
ESR-2 4,20,000 20 Ramdaspur Arilo
85°46'47.58"E
Distribution Details

Dia (in MM.) Length (in M)

200 74,982

250 14,932

300 4,844

90 3,58,002

110 72,442

140 19,186

160 32,036

Total (in KM) 576.424

Peak Factor For Distribution 3

Software Used Water GEMS

Cost Details

Total Project Cost 2,69,01,55,535

Project Captal Cost (on Capital Cost) 1,91,06,34,349

Five Years O & M 38,33,67,069

Per capita Cost on Base Year Population 9,201

Per capita Cost on Intermediate Year Population 7,806

Per capita Cost on Ultimate Year Population 6,667

Per capita Cost of O&M 327.49


Cost of Production of water / KL. (in Rs.) (Including Electricity
10.56
Charges)

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga
Block

Put to Tender Cost

Without Electricity Charges

Sl.No. Item Description Amount (in Rs.)

1 Head Works with Rising main, Pump House and Staff Accommodation 5,45,09,518

2 Water treatment plant with Chlorination & Mechanical arrangement 14,23,02,650

3 Distribution system with ancillaries 1,32,78,39,569

4 Elevated Storage reservoir (ESR) 25,45,78,400

5 External Electrification 26,56,673

6 House Connection 9,99,47,539

7 Provision for Soler Power Plant 2,88,00,000

A Sub Total 1,91,06,34,349

8 Survey & Investigation @ 1.0 % (of Sum total of Item No.-A) 1,91,06,343

B Total (A +7) 1,92,97,40,692

9 Labour Cess @ 1.0% (B) 1,92,97,407

C Construction Cost Put to Tender 1,94,90,38,099

10 O & M for five Years (Without Electricity Charges) 12,74,47,203

11 Labour Cess @ 1.0% (9) 12,74,472

D O & M Cost Put to Tender 12,87,21,675

Total project Cost Put to tender (C+D) 2,07,77,59,774


FINANCIAL STATEMENT

MaRS Planning Engineering Services Pvt. Ltd.


Estimate of Components - Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of
Damapada Block & 2 G.P of Baranga Block
With Electricity Charges
Sl.No. Item Description Amount (in Rs.)

1 Head Works with Rising main,Pump House and Staff Accommondation 5,45,09,518

2 Water treatment plant with Chlorination & Mechenical arrangment 14,23,02,650

3 Distribution system with ancillaries 1,32,78,39,569

4 Elevated Storage reservoir (ESR) 25,45,78,400

5 Provision for Soler Power Plant 2,88,00,000

A Total 1,80,80,30,137

6 External Electrification 26,56,673

B Total Cost (B) 1,81,06,86,810

7 House Connection 9,99,47,539

8 O & M for five Years (with Electricity Charges) 38,33,67,069

9 Survey & Investigation 1% on (Item no 1 to 6) 1,91,06,343

C Total Cost excluding GST 2,31,31,07,761

9 GST @ 12% (C ) 27,75,72,931

10 Labour Cess @ 1.0% (C) 2,31,31,078

11 Contegency @1.0% (C) 2,31,31,078


Add Towards Supervision of the project by Authority Engineers
12 3,82,12,687
@ 2% (of B + item no 6 )
13 Cost Towards Land Acquisition 1,50,00,000

Grand Total (Cost of Project Including 5 Years O & M) 2,69,01,55,535

MaRS Planning Engineering Services Pvt. Ltd.


Estimate of Components-Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of
Damapada Block & 2 G.P of Baranga Block

Without Electricity Charges

Sl.No. Item Description Amount (in Rs.)

1 Head Works with Rising main,Pump House and Staff Accommondation 5,45,09,518

2 Water treatment plant with Chlorination & Mechenical arrangment 14,23,02,650

3 Distribution system with ancillaries 1,32,78,39,569

4 Elevated Storage reservoir (ESR) 25,45,78,400

5 Provision for Soler Power Plant 2,88,00,000

A Total 1,80,80,30,137

6 External Electrification 26,56,673

B Total Cost (B) 1,81,06,86,810

7 House Connection 9,99,47,539

8 O & M for five Years (without Electricity Charges) 12,74,47,203

9 Survey & Investigation 1% on (Item no 1 to 6) 1,91,06,343

C Total Cost excluding GST 2,05,71,87,895

9 GST @ 12% (C ) 24,68,62,547

10 Labour Cess @ 1.0% (C) 2,05,71,879

11 Contegency @1.0% (C) 2,05,71,879


Add Towards Supervision of the project by Authority Engineers
12 3,82,12,687
@ 2% (of B + item no 6 )
13 Cost Towards Land Acquisition 1,50,00,000

Grand Total (Cost of Project Including 5 Years O & M) 2,39,84,06,888

MaRS Planning Engineering Services Pvt. Ltd.


ABSTRACT OF COST

MaRS Planning Engineering Services Pvt. Ltd.


Estimate of Components -Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
Item No. Item Description Amount (in Rs.)
1 Intake Well 2,32,14,286
2 Pump and Motor for IW 47,94,194
Head Works With Risng Main,Pump
3 Raw Water Rising Main 57,25,032
House And Staff Accommodation
4 Staff Quarter 12,34,564
5 Compound wall 1,95,41,442
Total 5,45,09,518
6 Water Treatment Plant with Water Treatment Plant 11,85,26,782
7 Chlorination & Mech. Arragment & Pump and Motor for WTP 1,71,51,647
8 Scadda System Pump and Motor for SUMP 66,24,221
Total 14,23,02,650
9 Clear Water Rising Main 74,92,64,806
10 Distribution Clear Water 55,61,09,863
11 Distribution System with Ancillaries Approach Road 6,66,017
12 NH /Rail way Crossing 43,56,419
13 SCADA System 1,74,42,464
Total 1,32,78,39,569
14 Sump and Elevated Service Reservoir 25,23,58,400
15 Elevated Service Reservoir Improvement of Existing Sump and ESR 16,00,000
16 Improvement of Existing Pump and Motor 6,20,000
Total 25,45,78,400
Sub-Total Amount 1,77,92,30,137
17 Intake Well 4,79,420
18 External Electrification Water Treatment Plant 16,14,998
19 Sump 5,62,255
Sub-Total Amount 26,56,673
Total Amount 1,78,18,86,810
Source Sustainability

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada
Block & 2 G.P of Baranga Block
Source Sustainability
Basic Details (Based on survey)
a Type of Source Surface Water
b Source Name Mahanadi River
c High Flood Level (in m) 40.869
d Water Level (in m) 33.803
e Bed Level (in m) 30.385

MaRS Planning Engineering Services Pvt. Ltd.


Population Forecast

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

All Villages List including Inrute Village, 70 LPCD croverd village & Uncroverd Village list

Population Population Population SC_ ST_


S.No Block Name Name of G.P. Name of Village Remaks
in 1991 in 2001 in 2011 Population Population
Bulk water given by
1 Banki Baideswar Baideswar 1,250 1,404 1,506 576 - Khurda Mega PWS (Inrute
Village)
2 Banki Baideswar Ichhapur 340 382 409 - -
3 Banki Baideswar Kota Sahi 256 288 366 63 -
4 Banki Baideswar Kothapatna 456 512 523 245 -
5 Banki Baideswar Kurumupada 544 611 774 10 -
Bulk water given by
6 Banki Baideswar Malbiharpur 344 387 420 7 - Khurda Mega PWS (Inrute
Village)
Bulk water given by
7 Banki Baideswar Malisahi 2,347 2,637 3,148 758 509 Khurda Mega PWS (Inrute
Village)
8 Banki Baideswar Nateri 660 742 938 68 -
9 Banki Baideswar Podapatana 364 409 508 16 -
10 Banki Baideswar Rameswar 2 2 5 - -
1 Banki Sub Total 6,563 7,374 8,597 1,743 509

Bulk water given by


11 Banki Nuagaon Khajuripada 825 927 985 92 - Khurda Mega PWS (Inrute
Village) & 70 LPCD Scheme

12 Banki Nuagaon Nuagaon 914 1,027 1,338 73 - 70 LPCD Scheme


2 Banki Sub Total 1,739 1,954 2,323 165 -
13 Banki Jagannathpur Baghei 2,089 2,347 2,542 269 69 70 LPCD Scheme
14 Banki Jagannathpur Jaganathpur 1,231 1,383 1,909 437 -
15 Banki Jagannathpur Khairapanga 336 377 376 6 - 70 LPCD Scheme
Bulk water given by
16 Banki Jagannathpur Nandahatapalli 376 422 473 - - Khurda Mega PWS (Inrute
Village)
Bulk water given by
17 Banki Jagannathpur Purunapani 403 453 560 82 228 Khurda Mega PWS (Inrute
Village)
3 Banki Sub Total 4,435 4,982 5,860 794 297
18 Banki Kalapathar Gureipalli 290 326 357 - -
19 Banki Kalapathar Jayaramdaspatna 69 78 84 - -
Bulk water given by
20 Banki Kalapathar Kalapathar 2,059 2,313 2,601 291 - Khurda Mega PWS (Inrute
Village)
21 Banki Kalapathar Krushnapali Patna 536 602 801 116 1

22 Banki Kalapathar Kushnapalli 558 627 797 158 27 70 LPCD Scheme

23 Banki Kalapathar Lemberi 1,867 2,098 2,342 50 -


24 Banki Kalapathar Luhagodipatna 192 216 273 87 -
25 Banki Kalapathar Madhupalli 143 161 283 - -
26 Banki Kalapathar Madhupalli Patna 295 331 380 119 -
27 Banki Kalapathar Parsurampur 1,113 1,250 1,363 322 -
4 Banki Sub Total 7,122 8,002 9,281 1,143 28
Bulk water given by
28 Banki Kendupalli Kendupalli 2,558 3,119 4,256 277 306 Khurda Mega PWS (Inrute
Village)
5 Banki Sub Total 2,558 3,119 4,256 277 306
29 Banki Balabhadrapur BalabhadraPur 252 283 335 31 50
30 Banki Balabhadrapur Balipahada 17 19 14 14 -
31 Banki Balabhadrapur Gopinathpur 476 535 571 29 14
32 Banki Balabhadrapur Goudachhali 1,300 1,461 1,818 458 212
33 Banki Balabhadrapur Krushnachandrapur 182 204 11 11 -
34 Banki Balabhadrapur Manapur Patna 341 383 557 140 -
6 Banki Sub Total 2,568 2,885 3,306 683 276
35 Banki Golaganda Andharua 792 890 1,154 309 5
36 Banki Golaganda Golganda 727 817 771 136 -
37 Banki Golaganda Rajiba 1,517 1,704 2,011 35 - 70 LPCD Scheme
38 Banki Golaganda Samapurdal 177 199 217 67 -
39 Banki Golaganda Samapurpatna 321 361 435 315 -
7 Banki Sub Total 3,534 3,971 4,588 862 5
40 Banki Anuary Anuarya 407 457 590 9 -
41 Banki Anuary Baigeni 238 267 275 260 -
42 Banki Anuary Botalama 814 915 1,078 901 -
43 Banki Anuary Gopa 637 716 844 134 -
44 Banki Anuary Kurumchaini 1,113 1,250 1,577 980 -
45 Banki Anuary Maijori 295 331 396 282 -
46 Banki Anuary Mundali 316 355 353 249 -
8 Banki Sub Total 3,820 4,291 5,113 2,815 -
47 Banki Baraput Baraput 1,119 1,257 1,543 130 308
48 Banki Baraput Pasania 1,727 1,940 2,096 121 304
49 Banki Baraput Pathapur 1,784 2,004 2,382 198 - 70 LPCD Scheme
50 Banki Baraput Pathapur Patna 202 227 270 - -
51 Banki Baraput Pathuripada 1,894 2,128 2,283 653 -
9 Banki Sub Total 6,726 7,556 8,574 1,102 612
52 Banki Kiapalla Dengamba 405 455 538 20 256
53 Banki Kiapalla Kiapalla 1,067 1,199 1,173 51 268
54 Banki Kiapalla Kumusara 1,099 1,235 1,474 5 399
55 Banki Kiapalla Naranpur 551 619 823 6 -
56 Banki Kiapalla Nuagaon 1,246 1,400 1,726 73 -
10 Banki Sub Total 4,368 4,908 5,734 155 923
57 Banki Barahampur Bilitentulia 628 706 775 - -
58 Banki Barahampur Brahmapur 2,884 3,240 3,710 503 105
59 Banki Barahampur Haliasahi 807 907 1,014 47 -
60 Banki Barahampur Malabindhar Pur 250 281 393 37 -
61 Banki Barahampur Rajuasahi 325 365 430 103 -
62 Banki Barahampur Tiarasahi 417 468 529 - -
11 Banki Sub Total 5,311 5,967 6,851 690 105
63 Banki Kalipoi Bania 472 530 582 5 24 70 LPCD Scheme
64 Banki Kalipoi Chadheiabndha 391 439 570 9 185
65 Banki Kalipoi Chadheibandha Patna 231 260 337 8 -
66 Banki Kalipoi Jokiladal 611 687 818 16 -
67 Banki Kalipoi Jokiladesh 148 166 210 18 -
68 Banki Kalipoi Kalipoi 929 1,044 1,236 178 68
69 Banki Kalipoi Kantakai 1,345 1,511 1,845 213 -
70 Banki Kalipoi Kantakaipatna 258 290 370 - -
71 Banki Kalipoi Karadapalli 1,510 1,697 1,857 173 569 70 LPCD Scheme
12 Sub Total 5,895 6,624 7,825 620 846
72 Banki Puincha Gahiragadia 489 549 712 98 323
73 Banki Puincha Gahirigadia Patna 376 423 443 - -
74 Banki Puincha Kadhamalla 1,210 1,360 1,673 210 131
75 Banki Puincha Pandalam 1,508 1,694 2,143 237 611
76 Banki Puincha Panigrahipur Patna 206 232 243 - -
77 Banki Puincha Panikorada 1,136 1,276 1,470 63 362
78 Banki Puincha Punicha 652 733 978 78 -
79 Banki Puincha Purbagadia 1,046 1,175 992 98 2
13 Banki Sub Total 6,623 7,442 8,654 784 1,429
Sub Total 61,262 69,075 80,962 11,833 5,336
1 Damapada Pathapur Chakuleswar 626 703 796 191 1
2 Damapada Pathapur Talapathapur 780 876 1,044 154 8
3 Damapada Pathapur Pathapur 3,369 3,785 4,553 1,627 212
4 Damapada Pathapur Amarendrapur 437 491 588 25 -
5 Damapada Pathapur Muraripur 635 714 597 - -
6 Damapada Pathapur Charigharia 1,032 1,159 1,350 310 162
1 Damapada Sub Total 6,879 7,728 8,928 2,307 383
7 Damapada Bhagipur Bhagipur 1,205 1,354 1,448 165 280
8 Damapada Bhagipur Gayalbanka 2,189 2,459 2,850 629 546
2 Damapada Sub Total 3,394 3,813 4,298 794 826
9 Damapada Banara Banara 3,926 4,411 4,456 411 227
3 Damapada Sub Total 3,926 4,411 4,456 411 227
10 Damapada Kusupangi Ghasiput 1,249 1,403 1,500 293 23
11 Damapada Kusupangi Kusupangi 3,041 3,417 3,423 462 182
12 Damapada Kusupangi Nistipur 2,257 2,536 2,807 897 -
4 Damapada Sub Total 6,547 7,356 7,730 1,652 205
13 Damapada Damapada Damapada 4,448 4,998 5,676 1,291 1,963
5 Damapada Sub Total 4,448 4,998 5,676 1,291 1,963
14 Damapada Similipur Karabar 1,181 1,327 1,515 1,001 -
15 Damapada Similipur Mukundpur, Charigharia 1,449 1,628 1,688 285 -
16 Damapada Similipur Similipur 879 988 1,119 275 -
17 Damapada Similipur Sukuakhala 364 409 466 464 2 70 LPCD Scheme
6 Damapada Sub Total 3,873 4,352 4,788 2,025 2
18 Damapada Gobindpur Gobindpur 2,626 2,950 3,583 1,567 168
19 Damapada Gobindpur Ramachandrapur 742 834 966 402 -
7 Damapada Sub Total 3,368 3,784 4,549 1,969 168
20 Damapada Harirajpur Harirajpur 3,705 4,163 4,443 1,248 1
8 Damapada Sub Total 3,705 4,163 4,443 1,248 1
21 Damapada Bilipada Badapadanpur 522 587 681 24 -
22 Damapada Bilipada Bilipada 1,846 2,074 2,346 296 -
23 Damapada Bilipada Rangipur 157 176 244 2 -
24 Damapada Bilipada Dharas 149 167 193 77 -
25 Damapada Bilipada Pakharakhal 347 390 471 32 -
9 Damapada Sub Total 3,021 3,394 3,935 431 -
26 Damapada Dulanapur Dulanapur 2,156 2,422 2,995 155 741
27 Damapada Dulanapur Arapur 878 986 1,203 67 290
10 Damapada Sub Total 3,034 3,408 4,198 222 1,031
28 Damapada Gopalpur Gopalpur 2,201 2,473 2,969 1,069 -
29 Damapada Gopalpur Singhanathpur 2,323 2,610 3,392 642 -
30 Damapada Gopalpur Raghunathpur 182 205 283 29 -
31 Damapada Gopalpur Patapur 3,123 3,509 3,921 1,192 -
11 Damapada Sub Total 7,829 8,797 10,565 2,932 -
32 Damapada Talabasta Padanpur 1,161 1,304 1,366 275 314
33 Damapada Talabasta Talabasta 8,627 9,693 11,361 1,833 1,123
34 Damapada Talabasta Nandapur 138 155 225 51 -
12 Damapada Sub Total 9,926 11,152 12,952 2,159 1,437
35 Damapada Ragadi Ragadipatana 2,845 3,197 3,737 322 362
36 Damapada Ragadi Kotadwar 466 524 853 202 150
13 Damapada Sub Total 3,311 3,721 4,590 524 512
37 Damapada Durgapur Durgapur 1,507 1,693 1,917 624 363 70 LPCD Scheme
38 Damapada Durgapur Ramachandrapur 2,795 3,140 3,585 591 1
14 Damapada Sub Total 4,302 4,833 5,502 1,215 364
39 Damapada Dhansar Dhansar Patana 643 723 778 41 -
40 Damapada Dhansar Hatimara 1,371 1,541 1,839 108 206
41 Damapada Dhansar Tarapur 1,344 1,510 1,825 103 359
42 Damapada Dhansar Khamarpatana 969 1,089 1,058 95 -
43 Damapada Dhansar Jamudihi 457 513 573 46 -
15 Damapada Sub Total 4,784 5,376 6,073 393 565
44 Damapada Tulasipur Tulasipur 1,810 2,034 2,387 336 -
45 Damapada Tulasipur Ranganisahi 271 304 435 - -
46 Damapada Tulasipur Sunapatana 903 1,015 1,063 217 -
16 Damapada Sub Total 2,984 3,353 3,885 553 -
47 Damapada Naragang Naragang 3,963 4,453 5,080 681 355
17 Damapada Sub Total 3,963 4,453 5,080 681 355
Total 79,294 89,092 1,01,648 20,807 8,039
1 Baranga Mundali Mundali 3,411 3,833 5,625 754 284
2 Baranga Mundali Chakradharpur 427 480 550 3 547
1 Baranga Sub Total 3,838 4,313 6,175 757 831
3 Baranga Ramdaspur Ramdaspur 1,982 2,227 2,222 543 159
4 Baranga Ramdaspur Ratagarh 1,600 1,798 2,099 308 561
5 Baranga Ramdaspur Padmanavnagar 598 672 648 368 39
6 Baranga Ramdaspur Govindapur 127 143 184 - -
7 Baranga Ramdaspur Arilo 937 1,053 1,000 - 153
2 Baranga Sub Total 5,244 5,893 6,153 1,219 912
Total 9,082 10,206 12,328 1,976 1,743

All Total 1,49,638 1,68,373 1,94,938 34,616 15,118


Population Calculation as Per CPHEEO Manual Population Calculation as Per CPHEEO Manual
District Wise- Cuttack Block Wise-Banki, Dampada & Baranga
Incremental
Population(Rur Increment Geometric Mean Population(Rur Increment Geometric Mean Incremental Increase
Year Increase Year
al) al)
X (r) Y X (r) Y
1961 958788 1961

1971 1166372 207584 0.217 1971

1981 1368893 202521 0.174 -5063 1981 144547

1991 1567331 198438 0.145 -4083 1991 168563 24016 0.166

2001 1699964 132633 0.085 -65805 2001 1,85,490 16927 0.100 -7089

2011 1888423 188459 0.111 55826 2011 2,14,296 28806 0.155 11879

929635 -19125 4790

Average 185927 0.139 -4781 Average 23250 0.137 2395


Considering 2011 as base year, the Population growth rate is Considering 2011 as base year, the Population growth rate is

Average Increase in Population Average Increase in Population


Arithmetic percentage increase Arithmetic percentage increase
Population in 2011 Population in 2011
9.85% 10.85%

13.86% 13.73%
Geometric percentage increase Geometric percentage increase

Projected Population (13 GPs of Banki & 17 GPs of Dampada & 2 GPs of Projected Population(13 GPs of Banki & 17 GPs of Dampada & 2 GPs of Baranga) -
Baranga)- Considering Growth rate of District Considering Growth rate of Block

Population in 2011 as per Agreement = 194938 Population in 2011 as per Agreement = 194938

Arithmetical Progression Method Arithmetical Progression Method


P2023 = P2011 + (P2011 X Growth rate of District per Decade X 1.2) P2023 = P2011 + (P2011 X Growth rate of District per Decade X 1.2)
217969 220317
P2038 = P2011 + (P2011 X Growth rate of District per Decade X 2.7) P2038 = P2011 + (P2011 X Growth rate of District per Decade X 2.7)
246759 252042
P2053 = P2011 + (P2011 X Growth rate of District per Decade X 4.2) P2053 = P2011 + (P2011 X Growth rate of District per Decade X 4.2)
275548 283766
Geometrical Progression Method Geometrical Progression Method
P2023 = P2011 X (1 + rg)1.2 P2023 = P2011 X (1 + rg)1.2
227791 227493
P2037 = P2011 X (1 + rg)2.7 P2038 = P2011 X (1 + rg)2.7
276749 275936
P2053 = P2011 X (1 + rg)4.2 P2053 = P2011 X (1 + rg)4.2
336230 334695
Incremental Increase Method
Calculation of X and Y
The Average The Average The Average The Average
Year 2011 Increase Incremental Year 2011 Increase Incremental Increase
(X1) Increase (Y1) (X1) (Y1)

For a total Population of 1888423 185927 -4781 For a total Population of 214296 23250 2395

For a total Population of 194938 19193 -494 For a total Population of 194938 21149 2179
9.69 1.10
Pn P1 + nX + (n(n+1)Y)/2 Pn P1 + nX + (n(n+1)Y)/2
P2023 = 217318 P2023 = 223193
P2038 = 244293 P2038 = 262924
P2053 = 270158 P2053 = 307557
Projected Population
Year AI GP IIC Year AI GP IIC
2023 217969 227791 217318 221026 2023 220317 227493 223193 223668
2038 246759 276749 244293 255934 2038 252042 275936 262924 263634
2053 275548 336230 270158 293979 2053 283766 334695 307557 308672

From the above, it is observed that the projected population considering block growth rate is higher, which may please be considered as
follows.
2011 population: 194938
2023 Population: 223668
2038 Population: 263634
2053 Population: 308672
Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

All Villages List including Inrute Village, 70 LPCD croverd village & Uncroverd Village list

Population Population Population SC_ ST_


S.No Block Name Name of G.P. Name of Village Remaks
in 1991 in 2001 in 2011 Population Population
Bulk water given by
1 Banki Baideswar Baideswar 1,250 1,404 1,506 576 - Khurda Mega PWS (Inrute
Village)
Bulk water given by
2 Banki Baideswar Malbiharpur 344 387 420 7 - Khurda Mega PWS (Inrute
Village)
Bulk water given by
3 Banki Baideswar Malisahi 2,347 2,637 3,148 758 509 Khurda Mega PWS (Inrute
Village)

Bulk water given by


4 Banki Nuagaon Khajuripada 825 927 985 92 - Khurda Mega PWS (Inrute
Village) & 70 LPCD Scheme

Bulk water given by


5 Banki Jagannathpur Nandahatapalli 376 422 473 - - Khurda Mega PWS (Inrute
Village)
Bulk water given by
6 Banki Jagannathpur Purunapani 403 453 560 82 228 Khurda Mega PWS (Inrute
Village)
Bulk water given by
7 Banki Kalapathar Kalapathar 2,059 2,313 2,601 291 - Khurda Mega PWS (Inrute
Village)

Bulk water given by


8 Banki Kendupalli Kendupalli 2,558 3,119 4,256 277 306 Khurda Mega PWS (Inrute
Village) & 70 LPCD Scheme

Sub Total 10,162 11,662 13,949 2,083 1,043


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of
Baranga Block
Excluding Inrute village
Population Population Population SC_ ST_
S.No Block Name Name of G.P.
in 1991 in 2001 in 2011 Population Population
1 Banki Baideswar 2,622 2,946 3,523 402 -
2 Banki Nuagaon 914 1,027 1,338 73 -
3 Banki Jagannathpur 3,656 4,107 4,827 712 69
4 Banki Kalapathar 5,063 5,689 6,680 852 28
5 Banki Balabhadrapur 2,568 2,885 3,306 683 276
6 Banki Golaganda 3,534 3,971 4,588 862 5
7 Banki Anuary 3,820 4,291 5,113 2,815 -
8 Banki Baraput 6,726 7,556 8,574 1,102 612
9 Banki Kiapalla 4,368 4,908 5,734 155 923
10 Banki Barahampur 5,311 5,967 6,851 690 105
11 Banki Kalipoi 5,895 6,624 7,825 620 846
12 Banki Puincha 6,623 7,442 8,654 784 1,429
Sub Total 51,100 57,413 67,013 9,750 4,293
1 Damapada Pathapur 6,879 7,728 8,928 2,307 383
2 Damapada Bhagipur 3,394 3,813 4,298 794 826
3 Damapada Banara 3,926 4,411 4,456 411 227
4 Damapada Kusupangi 6,547 7,356 7,730 1,652 205
5 Damapada Damapada 4,448 4,998 5,676 1,291 1,963
6 Damapada Similipur 3,873 4,352 4,788 2,025 2
7 Damapada Gobindpur 3,368 3,784 4,549 1,969 168
8 Damapada Harirajpur 3,705 4,163 4,443 1,248 1
9 Damapada Bilipada 3,021 3,394 3,935 431 -
10 Damapada Dulanapur 3,034 3,408 4,198 222 1,031
11 Damapada Gopalpur 7,829 8,797 10,565 2,932 -
12 Damapada Talabasta 9,926 11,152 12,952 2,159 1,437
13 Damapada Ragadi 3,311 3,721 4,590 524 512
14 Damapada Durgapur 4,302 4,833 5,502 1,215 364
15 Damapada Dhansar 4,784 5,376 6,073 393 565
16 Damapada Tulasipur 2,984 3,353 3,885 553 -
17 Damapada Naragang 3,963 4,453 5,080 681 355
Total 79,294 89,092 1,01,648 20,807 8,039
1 Baranga Mundali 3,838 4,313 6,175 757 831
2 Baranga Ramdaspur 5,244 5,893 6,153 1,219 912
Total 9,082 10,206 12,328 1,976 1,743

All Total 1,39,476 1,56,711 1,80,989 32,533 14,075


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

For Water Demand - Excluding Inrute village & Including 70 LPCD Covered Village

Population Population Population SC_ ST_


S.No Block Name Name of G.P. Name of Village
in 1991 in 2001 in 2011 Population Population
1 Banki Baideswar Ichhapur 340 382 409 - -
2 Banki Baideswar Kota Sahi 256 288 366 63 -
3 Banki Baideswar Kothapatna 456 512 523 245 -
4 Banki Baideswar Kurumupada 544 611 774 10 -
5 Banki Baideswar Nateri 660 742 938 68 -
6 Banki Baideswar Podapatana 364 409 508 16 -
7 Banki Baideswar Rameswar 2 2 5 - -
1 Banki Sub Total 2,622 2,946 3,523 402 -
8 Banki Nuagaon Nuagaon 914 1,027 1,338 73 -
2 Banki Sub Total 914 1,027 1,338 73 -
9 Banki Jagannathpur Baghei 2,089 2,347 2,542 269 69
10 Banki Jagannathpur Jaganathpur 1,231 1,383 1,909 437 -
11 Banki Jagannathpur Khairapanga 336 377 376 6 -
3 Banki Sub Total 3,656 4,107 4,827 712 69
12 Banki Kalapathar Gureipalli 290 326 357 - -
13 Banki Kalapathar Jayaramdaspatna 69 78 84 - -
14 Banki Kalapathar Krushnapali Patna 536 602 801 116 1
15 Banki Kalapathar Lemberi 1,867 2,098 2,342 50 -
16 Banki Kalapathar Luhagodipatna 192 216 273 87 -
17 Banki Kalapathar Madhupalli 143 161 283 - -
18 Banki Kalapathar Madhupalli Patna 295 331 380 119 -
19 Banki Kalapathar Kushnapalli 558 627 797 158 27
20 Banki Kalapathar Parsurampur 1,113 1,250 1,363 322 -
4 Banki Sub Total 5,063 5,689 6,680 852 28
21 Banki Balabhadrapur BalabhadraPur 252 283 335 31 50
22 Banki Balabhadrapur Balipahada 17 19 14 14 -
23 Banki Balabhadrapur Gopinathpur 476 535 571 29 14
24 Banki Balabhadrapur Goudachhali 1,300 1,461 1,818 458 212
25 Banki Balabhadrapur Krushnachandrapur 182 204 11 11 -
26 Banki Balabhadrapur Manapur Patna 341 383 557 140 -
5 Banki Sub Total 2,568 2,885 3,306 683 276
27 Banki Golaganda Andharua 792 890 1,154 309 5
28 Banki Golaganda Golganda 727 817 771 136 -
29 Banki Golaganda Rajiba 1,517 1,704 2,011 35 -
30 Banki Golaganda Samapurdal 177 199 217 67 -
31 Banki Golaganda Samapurpatna 321 361 435 315 -
6 Banki Sub Total 3,534 3,971 4,588 862 5
32 Banki Anuary Anuarya 407 457 590 9 -
33 Banki Anuary Baigeni 238 267 275 260 -
34 Banki Anuary Botalama 814 915 1,078 901 -
35 Banki Anuary Gopa 637 716 844 134 -
36 Banki Anuary Kurumchaini 1,113 1,250 1,577 980 -
37 Banki Anuary Maijori 295 331 396 282 -
38 Banki Anuary Mundali 316 355 353 249 -
7 Banki Sub Total 3,820 4,291 5,113 2,815 -
39 Banki Baraput Baraput 1,119 1,257 1,543 130 308
40 Banki Baraput Pasania 1,727 1,940 2,096 121 304
41 Banki Baraput Pathapur 1,784 2,004 2,382 198 -
42 Banki Baraput Pathapur Patna 202 227 270 - -
43 Banki Baraput Pathuripada 1,894 2,128 2,283 653 -
8 Banki Sub Total 6,726 7,556 8,574 1,102 612
44 Banki Kiapalla Dengamba 405 455 538 20 256
45 Banki Kiapalla Kiapalla 1,067 1,199 1,173 51 268
46 Banki Kiapalla Kumusara 1,099 1,235 1,474 5 399
47 Banki Kiapalla Naranpur 551 619 823 6 -
48 Banki Kiapalla Nuagaon 1,246 1,400 1,726 73 -
9 Banki Sub Total 4,368 4,908 5,734 155 923
49 Banki Barahampur Bilitentulia 628 706 775 - -
50 Banki Barahampur Brahmapur 2,884 3,240 3,710 503 105
51 Banki Barahampur Haliasahi 807 907 1,014 47 -
52 Banki Barahampur Malabindhar Pur 250 281 393 37 -
53 Banki Barahampur Rajuasahi 325 365 430 103 -
54 Banki Barahampur Tiarasahi 417 468 529 - -
10 Banki Sub Total 5,311 5,967 6,851 690 105
55 Banki Kalipoi Bania 472 530 582 5 24
56 Banki Kalipoi Chadheiabndha 391 439 570 9 185
57 Banki Kalipoi Chadheibandha Patna 231 260 337 8 -
58 Banki Kalipoi Jokiladal 611 687 818 16 -
59 Banki Kalipoi Jokiladesh 148 166 210 18 -
60 Banki Kalipoi Kalipoi 929 1,044 1,236 178 68
61 Banki Kalipoi Kantakai 1,345 1,511 1,845 213 -
62 Banki Kalipoi Kantakaipatna 258 290 370 - -
63 Banki Kalipoi Karadapalli 1,510 1,697 1,857 173 569
11 Sub Total 5,895 6,624 7,825 620 846
64 Banki Puincha Gahiragadia 489 549 712 98 323
65 Banki Puincha Gahirigadia Patna 376 423 443 - -
66 Banki Puincha Kadhamalla 1,210 1,360 1,673 210 131
67 Banki Puincha Pandalam 1,508 1,694 2,143 237 611
68 Banki Puincha Panigrahipur Patna 206 232 243 - -
69 Banki Puincha Panikorada 1,136 1,276 1,470 63 362
70 Banki Puincha Punicha 652 733 978 78 -
71 Banki Puincha Purbagadia 1,046 1,175 992 98 2
12 Banki Sub Total 6,623 7,442 8,654 784 1,429
Sub Total 51,100 57,413 67,013 9,750 4,293
1 Damapada Pathapur Chakuleswar 626 703 796 191 1
2 Damapada Pathapur Talapathapur 780 876 1,044 154 8
3 Damapada Pathapur Pathapur 3,369 3,785 4,553 1,627 212
4 Damapada Pathapur Amarendrapur 437 491 588 25 -
5 Damapada Pathapur Muraripur 635 714 597 - -
6 Damapada Pathapur Charigharia 1,032 1,159 1,350 310 162
1 Damapada Sub Total 6,879 7,728 8,928 2,307 383
7 Damapada Bhagipur Bhagipur 1,205 1,354 1,448 165 280
8 Damapada Bhagipur Gayalbanka 2,189 2,459 2,850 629 546
2 Damapada Sub Total 3,394 3,813 4,298 794 826
9 Damapada Banara Banara 3,926 4,411 4,456 411 227
3 Damapada Sub Total 3,926 4,411 4,456 411 227
10 Damapada Kusupangi Ghasiput 1,249 1,403 1,500 293 23
11 Damapada Kusupangi Kusupangi 3,041 3,417 3,423 462 182
12 Damapada Kusupangi Nistipur 2,257 2,536 2,807 897 -
4 Damapada Sub Total 6,547 7,356 7,730 1,652 205
13 Damapada Damapada Damapada 4,448 4,998 5,676 1,291 1,963
5 Damapada Sub Total 4,448 4,998 5,676 1,291 1,963
14 Damapada Similipur Karabar 1,181 1,327 1,515 1,001 -
15 Damapada Similipur Mukundpur, Charigharia 1,449 1,628 1,688 285 -
16 Damapada Similipur Similipur 879 988 1,119 275 -
17 Damapada Similipur Sukuakhala 364 409 466 464 2
6 Damapada Sub Total 3,873 4,352 4,788 2,025 2
18 Damapada Gobindpur Gobindpur 2,626 2,950 3,583 1,567 168
19 Damapada Gobindpur Ramachandrapur 742 834 966 402 -
7 Damapada Sub Total 3,368 3,784 4,549 1,969 168
20 Damapada Harirajpur Harirajpur 3,705 4,163 4,443 1,248 1
8 Damapada Sub Total 3,705 4,163 4,443 1,248 1
21 Damapada Bilipada Badapadanpur 522 587 681 24 -
22 Damapada Bilipada Bilipada 1,846 2,074 2,346 296 -
23 Damapada Bilipada Rangipur 157 176 244 2 -
24 Damapada Bilipada Dharas 149 167 193 77 -
25 Damapada Bilipada Pakharakhal 347 390 471 32 -
9 Damapada Sub Total 3,021 3,394 3,935 431 -
26 Damapada Dulanapur Dulanapur 2,156 2,422 2,995 155 741
27 Damapada Dulanapur Arapur 878 986 1,203 67 290
10 Damapada Sub Total 3,034 3,408 4,198 222 1,031
28 Damapada Gopalpur Gopalpur 2,201 2,473 2,969 1,069 -
29 Damapada Gopalpur Singhanathpur 2,323 2,610 3,392 642 -
30 Damapada Gopalpur Raghunathpur 182 205 283 29 -
31 Damapada Gopalpur Patapur 3,123 3,509 3,921 1,192 -
11 Damapada Sub Total 7,829 8,797 10,565 2,932 -
32 Damapada Talabasta Padanpur 1,161 1,304 1,366 275 314
33 Damapada Talabasta Talabasta 8,627 9,693 11,361 1,833 1,123
34 Damapada Talabasta Nandapur 138 155 225 51 -
12 Damapada Sub Total 9,926 11,152 12,952 2,159 1,437
35 Damapada Ragadi Ragadipatana 2,845 3,197 3,737 322 362
36 Damapada Ragadi Kotadwar 466 524 853 202 150
13 Damapada Sub Total 3,311 3,721 4,590 524 512
37 Damapada Durgapur Durgapur 1,507 1,693 1,917 624 363
38 Damapada Durgapur Ramachandrapur 2,795 3,140 3,585 591 1
14 Damapada Sub Total 4,302 4,833 5,502 1,215 364
39 Damapada Dhansar Dhansar Patana 643 723 778 41 -
40 Damapada Dhansar Hatimara 1,371 1,541 1,839 108 206
41 Damapada Dhansar Tarapur 1,344 1,510 1,825 103 359
42 Damapada Dhansar Khamarpatana 969 1,089 1,058 95 -
43 Damapada Dhansar Jamudihi 457 513 573 46 -
15 Damapada Sub Total 4,784 5,376 6,073 393 565
44 Damapada Tulasipur Tulasipur 1,810 2,034 2,387 336 -
45 Damapada Tulasipur Ranganisahi 271 304 435 - -
46 Damapada Tulasipur Sunapatana 903 1,015 1,063 217 -
16 Damapada Sub Total 2,984 3,353 3,885 553 -
47 Damapada Naragang Naragang 3,963 4,453 5,080 681 355
17 Damapada Sub Total 3,963 4,453 5,080 681 355
Total 79,294 89,092 1,01,648 20,807 8,039
1 Baranga Mundali Mundali 3,411 3,833 5,625 754 284
2 Baranga Mundali Chakradharpur 427 480 550 3 547
1 Baranga Sub Total 3,838 4,313 6,175 757 831
3 Baranga Ramdaspur Ramdaspur 1,982 2,227 2,222 543 159
4 Baranga Ramdaspur Ratagarh 1,600 1,798 2,099 308 561
5 Baranga Ramdaspur Padmanavnagar 598 672 648 368 39
6 Baranga Ramdaspur Govindapur 127 143 184 - -
7 Baranga Ramdaspur Arilo 937 1,053 1,000 - 153
2 Baranga Sub Total 5,244 5,893 6,153 1,219 912
Total 9,082 10,206 12,328 1,976 1,743

All Total 1,39,476 1,56,711 1,80,989 32,533 14,075


For Water Demand - Excluding Inrute village & Including 70 LPCD For Water Demand - Excluding Inrute village & Including 70 LPCD Covered
Covered Village Village
Population Calculation as Per CPHEEO Manual Population Calculation as Per CPHEEO Manual
District Wise- Cuttack Block Wise-Banki, Dampada & Baranga
Incremental Incremental
Population( Increment Geometric Mean Increment Geometric Mean
Year Increase Year Population Increase
Rural)
X (r) Y X (r) Y

1961 958788 1961

1971 1166372 207584 0.217 1971

1981 1368893 202521 0.174 -5063 1981 144547

1991 1567331 198438 0.145 -4083 1991 168563 24016 0.166

2001 1699964 132633 0.085 -65805 2001 1,85,490 16927 0.100 -7089

2011 1888423 188459 0.111 55826 2011 2,14,296 28806 0.155 11879

929635 -19125 4790

Average 185927 0.139 -4781 Average 23250 0.137 2395


Considering 2011 as base year, the Population growth rate is Considering 2011 as base year, the Population growth rate is

Arithmetic percentage Average Increase in Population Arithmetic percentage Average Increase in Population
increase Population in 2011 increase Population in 2011
9.85% 10.85%

Geometric percentage 13.86% Geometric percentage 13.73%


increase increase

Projected Population (13 GPs of Banki & 17 GPs of Dampada & 2 Projected Population(13 GPs of Banki & 17 GPs of Dampada & 2
GPs of Baranga)- Considering Growth rate of District GPs of Baranga) - Considering Growth rate of Block
Population in 2011 as per Agreement = 180989 Population in 2011 as per Agreement = 180989

Arithmetical Progression Method Arithmetical Progression Method


P2023 = P2011 + (P2011 X Growth rate of District per Decade X 1.2) P2023 = P2011 + (P2011 X Growth rate of District per Decade X 1.2)
202372 204552
P2038 = P2011 + (P2011 X Growth rate of District per Decade X 2.7) P2038 = P2011 + (P2011 X Growth rate of District per Decade X 2.7)
229102 234006
P2053 = P2011 + (P2011 X Growth rate of District per Decade X 4.2) P2053 = P2011 + (P2011 X Growth rate of District per Decade X 4.2)
255831 263461
Geometrical Progression Method Geometrical Progression Method
P2023 = P2011 X (1 + rg)1.2 P2023 = P2011 X (1 + rg)1.2
211491 211215
P2037 = P2011 X (1 + rg)2.7 P2038 = P2011 X (1 + rg)2.7
256946 256192
P2053 = P2011 X (1 + rg)4.2 P2053 = P2011 X (1 + rg)4.2
312170 310746
Incremental Increase Method
Calculation of X and Y
The Average The Average The Average The Average
Year 2011 Increase Incremental Year 2011 Increase Incremental
(X1) Increase (Y1) (X1) Increase (Y1)

For a total Population of 1888423 185927 -4781 For a total Population of 214296 23250 2395

For a total Population of 180989 17819 -458 For a total Population of 180989 19636 2023
10.43 1.18
Pn P1 + nX + (n(n+1)Y)/2 Pn P1 + nX + (n(n+1)Y)/2
P2023 = 201768 P2023 = 207222
P2038 = 226813 P2038 = 244110
P2053 = 250827 P2053 = 285549
Projected Population
Year AI GP IIC Year AI GP IIC
2023 202372 211491 201768 205210 2023 204552 211215 207222 207663
2038 229102 256946 226813 237620 2038 234006 256192 244110 244769
2053 255831 312170 250827 272943 2053 263461 310746 285549 286585

From the above, it is observed that the projected population considering block growth rate is higher, which may
please be considered as follows.
2011 population: 180989
2023 Population: 207663
2038 Population: 244769
2053 Population: 286585
Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of
Baranga Block

Excluding Inrute village

Population Population Population SC_ ST_


S.No Block Name Name of G.P.
in 1991 in 2001 in 2011 Population Population
1 Banki Baideswar 2,622 2,946 3,523 402 -
2 Banki Jagannathpur 1,231 1,383 1,909 437 -
3 Banki Kalapathar 5,063 5,689 6,680 852 28
4 Banki Balabhadrapur 2,568 2,885 3,306 683 276
5 Banki Golaganda 2,017 2,267 2,577 827 5
6 Banki Anuary 3,820 4,291 5,113 2,815 -
7 Banki Baraput 4,942 5,552 6,192 904 612
8 Banki Kiapalla 4,368 4,908 5,734 155 923
9 Banki Barahampur 5,311 5,967 6,851 690 105
10 Banki Kalipoi 3,913 4,397 5,386 442 253
11 Banki Puincha 6,623 7,442 8,654 784 1,429
Sub Total 42,478 47,727 55,925 8,991 3,631
1 Damapada Pathapur 6,879 7,728 8,928 2,307 383
2 Damapada Bhagipur 3,394 3,813 4,298 794 826
3 Damapada Banara 3,926 4,411 4,456 411 227
4 Damapada Kusupangi 6,547 7,356 7,730 1,652 205
5 Damapada Similipur 3,509 3,943 4,322 1,561 -
6 Damapada Gobindpur 3,368 3,784 4,549 1,969 168
7 Damapada Harirajpur 3,705 4,163 4,443 1,248 1
8 Damapada Bilipada 3,021 3,394 3,935 431 -
9 Damapada Dulanapur 3,034 3,408 4,198 222 1,031
10 Damapada Gopalpur 7,829 8,797 10,565 2,932 -
11 Damapada Talabasta 9,926 11,152 12,952 2,159 1,437
12 Damapada Ragadi 3,311 3,721 4,590 524 512
13 Damapada Durgapur 2,795 3,140 3,585 591 1
14 Damapada Dhansar 4,784 5,376 6,073 393 565
15 Damapada Tulasipur 2,984 3,353 3,885 553 -
16 Damapada Naragang 3,963 4,453 5,080 681 355
17 Damapada Damapada 4,448 4,998 5,676 1,291 1,963
Total 77,423 86,990 99,265 19,719 7,674
1 Baranga Mundali 3,838 4,313 6,175 757 831
2 Baranga Ramdaspur 5,244 5,893 6,153 1,219 912
Total 9,082 10,206 12,328 1,976 1,743

All Total 1,28,983 1,44,923 1,67,518 30,686 13,048


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

For ESRs & Distribution System - Including Inrute Uncroverd village & Excluding 70 LPCD Covered Village

Population Population Population SC_ ST_


S.No Block Name Name of G.P. Name of Village
in 1991 in 2001 in 2011 Population Population
1 Banki Baideswar Ichhapur 340 382 409 - -
2 Banki Baideswar Kota Sahi 256 288 366 63 -
3 Banki Baideswar Kothapatna 456 512 523 245 -
4 Banki Baideswar Kurumupada 544 611 774 10 -
5 Banki Baideswar Nateri 660 742 938 68 -
6 Banki Baideswar Podapatana 364 409 508 16 -
7 Banki Baideswar Rameswar 2 2 5 - -
1 Banki Sub Total 2,622 2,946 3,523 402 -
8 Banki Jagannathpur Jaganathpur 1,231 1,383 1,909 437 -
2 Banki Sub Total 1,231 1,383 1,909 437 -
9 Banki Kalapathar Gureipalli 290 326 357 - -
10 Banki Kalapathar Jayaramdaspatna 69 78 84 - -
11 Banki Kalapathar Krushnapali Patna 536 602 801 116 1
12 Banki Kalapathar Lemberi 1,867 2,098 2,342 50 -
13 Banki Kalapathar Luhagodipatna 192 216 273 87 -
14 Banki Kalapathar Madhupalli 143 161 283 - -
15 Banki Kalapathar Madhupalli Patna 295 331 380 119 -
16 Banki Kalapathar Kushnapalli 558 627 797 158 27
17 Banki Kalapathar Parsurampur 1,113 1,250 1,363 322 -
3 Banki Sub Total 5,063 5,689 6,680 852 28
18 Banki Balabhadrapur BalabhadraPur 252 283 335 31 50
19 Banki Balabhadrapur Balipahada 17 19 14 14 -
20 Banki Balabhadrapur Gopinathpur 476 535 571 29 14
21 Banki Balabhadrapur Goudachhali 1,300 1,461 1,818 458 212
22 Banki Balabhadrapur Krushnachandrapur 182 204 11 11 -
23 Banki Balabhadrapur Manapur Patna 341 383 557 140 -
4 Banki Sub Total 2,568 2,885 3,306 683 276
24 Banki Golaganda Andharua 792 890 1,154 309 5
25 Banki Golaganda Golganda 727 817 771 136 -
26 Banki Golaganda Samapurdal 177 199 217 67 -
27 Banki Golaganda Samapurpatna 321 361 435 315 -
5 Banki Sub Total 2,017 2,267 2,577 827 5
28 Banki Anuary Anuarya 407 457 590 9 -
29 Banki Anuary Baigeni 238 267 275 260 -
30 Banki Anuary Botalama 814 915 1,078 901 -
31 Banki Anuary Gopa 637 716 844 134 -
32 Banki Anuary Kurumchaini 1,113 1,250 1,577 980 -
33 Banki Anuary Maijori 295 331 396 282 -
34 Banki Anuary Mundali 316 355 353 249 -
6 Banki Sub Total 3,820 4,291 5,113 2,815 -
35 Banki Baraput Baraput 1,119 1,257 1,543 130 308
36 Banki Baraput Pasania 1,727 1,940 2,096 121 304
37 Banki Baraput Pathapur Patna 202 227 270 - -
38 Banki Baraput Pathuripada 1,894 2,128 2,283 653 -
7 Banki Sub Total 4,942 5,552 6,192 904 612
39 Banki Kiapalla Dengamba 405 455 538 20 256
40 Banki Kiapalla Kiapalla 1,067 1,199 1,173 51 268
41 Banki Kiapalla Kumusara 1,099 1,235 1,474 5 399
42 Banki Kiapalla Naranpur 551 619 823 6 -
43 Banki Kiapalla Nuagaon 1,246 1,400 1,726 73 -
8 Banki Sub Total 4,368 4,908 5,734 155 923
44 Banki Barahampur Bilitentulia 628 706 775 - -
45 Banki Barahampur Brahmapur 2,884 3,240 3,710 503 105
46 Banki Barahampur Haliasahi 807 907 1,014 47 -
47 Banki Barahampur Malabindhar Pur 250 281 393 37 -
48 Banki Barahampur Rajuasahi 325 365 430 103 -
49 Banki Barahampur Tiarasahi 417 468 529 - -
9 Banki Sub Total 5,311 5,967 6,851 690 105
50 Banki Kalipoi Chadheiabndha 391 439 570 9 185
51 Banki Kalipoi Chadheibandha Patna 231 260 337 8 -
52 Banki Kalipoi Jokiladal 611 687 818 16 -
53 Banki Kalipoi Jokiladesh 148 166 210 18 -
54 Banki Kalipoi Kalipoi 929 1,044 1,236 178 68
55 Banki Kalipoi Kantakai 1,345 1,511 1,845 213 -
56 Banki Kalipoi Kantakaipatna 258 290 370 - -
10 Sub Total 3,913 4,397 5,386 442 253
57 Banki Puincha Gahiragadia 489 549 712 98 323
58 Banki Puincha Gahirigadia Patna 376 423 443 - -
59 Banki Puincha Kadhamalla 1,210 1,360 1,673 210 131
60 Banki Puincha Pandalam 1,508 1,694 2,143 237 611
61 Banki Puincha Panigrahipur Patna 206 232 243 - -
62 Banki Puincha Panikorada 1,136 1,276 1,470 63 362
63 Banki Puincha Punicha 652 733 978 78 -
64 Banki Puincha Purbagadia 1,046 1,175 992 98 2
11 Banki Sub Total 6,623 7,442 8,654 784 1,429
Sub Total 42,478 47,727 55,925 8,991 3,631
1 Damapada Pathapur Chakuleswar 626 703 796 191 1
2 Damapada Pathapur Talapathapur 780 876 1,044 154 8
3 Damapada Pathapur Pathapur 3,369 3,785 4,553 1,627 212
4 Damapada Pathapur Amarendrapur 437 491 588 25 -
5 Damapada Pathapur Muraripur 635 714 597 - -
6 Damapada Pathapur Charigharia 1,032 1,159 1,350 310 162
1 Damapada Sub Total 6,879 7,728 8,928 2,307 383
7 Damapada Bhagipur Bhagipur 1,205 1,354 1,448 165 280
8 Damapada Bhagipur Gayalbanka 2,189 2,459 2,850 629 546
2 Damapada Sub Total 3,394 3,813 4,298 794 826
9 Damapada Banara Banara 3,926 4,411 4,456 411 227
3 Damapada Sub Total 3,926 4,411 4,456 411 227
10 Damapada Kusupangi Ghasiput 1,249 1,403 1,500 293 23
11 Damapada Kusupangi Kusupangi 3,041 3,417 3,423 462 182
12 Damapada Kusupangi Nistipur 2,257 2,536 2,807 897 -
4 Damapada Sub Total 6,547 7,356 7,730 1,652 205
13 Damapada Similipur Karabar 1,181 1,327 1,515 1,001 -
14 Damapada Similipur Mukundpur, Charigharia 1,449 1,628 1,688 285 -
15 Damapada Similipur Similipur 879 988 1,119 275 -
5 Damapada Sub Total 3,509 3,943 4,322 1,561 -
16 Damapada Gobindpur Gobindpur 2,626 2,950 3,583 1,567 168
17 Damapada Gobindpur Ramachandrapur 742 834 966 402 -
6 Damapada Sub Total 3,368 3,784 4,549 1,969 168
18 Damapada Harirajpur Harirajpur 3,705 4,163 4,443 1,248 1
7 Damapada Sub Total 3,705 4,163 4,443 1,248 1
19 Damapada Bilipada Badapadanpur 522 587 681 24 -
20 Damapada Bilipada Bilipada 1,846 2,074 2,346 296 -
21 Damapada Bilipada Rangipur 157 176 244 2 -
22 Damapada Bilipada Dharas 149 167 193 77 -
23 Damapada Bilipada Pakharakhal 347 390 471 32 -
8 Damapada Sub Total 3,021 3,394 3,935 431 -
24 Damapada Dulanapur Dulanapur 2,156 2,422 2,995 155 741
25 Damapada Dulanapur Arapur 878 986 1,203 67 290
9 Damapada Sub Total 3,034 3,408 4,198 222 1,031
26 Damapada Gopalpur Gopalpur 2,201 2,473 2,969 1,069 -
27 Damapada Gopalpur Singhanathpur 2,323 2,610 3,392 642 -
28 Damapada Gopalpur Raghunathpur 182 205 283 29 -
29 Damapada Gopalpur Patapur 3,123 3,509 3,921 1,192 -
10 Damapada Sub Total 7,829 8,797 10,565 2,932 -
30 Damapada Talabasta Padanpur 1,161 1,304 1,366 275 314
31 Damapada Talabasta Talabasta 8,627 9,693 11,361 1,833 1,123
32 Damapada Talabasta Nandapur 138 155 225 51 -
11 Damapada Sub Total 9,926 11,152 12,952 2,159 1,437
33 Damapada Ragadi Ragadipatana 2,845 3,197 3,737 322 362
34 Damapada Ragadi Kotadwar 466 524 853 202 150
12 Damapada Sub Total 3,311 3,721 4,590 524 512
35 Damapada Durgapur Ramachandrapur 2,795 3,140 3,585 591 1
13 Damapada Sub Total 2,795 3,140 3,585 591 1
36 Damapada Dhansar Dhansar Patana 643 723 778 41 -
37 Damapada Dhansar Hatimara 1,371 1,541 1,839 108 206
38 Damapada Dhansar Tarapur 1,344 1,510 1,825 103 359
39 Damapada Dhansar Khamarpatana 969 1,089 1,058 95 -
40 Damapada Dhansar Jamudihi 457 513 573 46 -
14 Damapada Sub Total 4,784 5,376 6,073 393 565
41 Damapada Tulasipur Tulasipur 1,810 2,034 2,387 336 -
42 Damapada Tulasipur Ranganisahi 271 304 435 - -
43 Damapada Tulasipur Sunapatana 903 1,015 1,063 217 -
15 Damapada Sub Total 2,984 3,353 3,885 553 -
44 Damapada Naragang Naragang 3,963 4,453 5,080 681 355
16 Damapada Sub Total 3,963 4,453 5,080 681 355
45 Damapada Damapada Damapada 4,448 4,998 5,676 1,291 1,963
17 Damapada Sub Total 4,448 4,998 5,676 1,291 1,963
Total 77,423 86,990 99,265 19,719 7,674
1 Baranga Mundali Mundali 3,411 3,833 5,625 754 284
2 Baranga Mundali Chakradharpur 427 480 550 3 547
1 Baranga Sub Total 3,838 4,313 6,175 757 831
3 Baranga Ramdaspur Ramdaspur 1,982 2,227 2,222 543 159
4 Baranga Ramdaspur Ratagarh 1,600 1,798 2,099 308 561
5 Baranga Ramdaspur Padmanavnagar 598 672 648 368 39
6 Baranga Ramdaspur Govindapur 127 143 184 - -
7 Baranga Ramdaspur Arilo 937 1,053 1,000 - 153
2 Baranga Sub Total 5,244 5,893 6,153 1,219 912
Total 9,082 10,206 12,328 1,976 1,743

All Total 1,28,983 1,44,923 1,67,518 30,686 13,048


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of
Baranga Block Baranga Block
For ESRs & Distribution System - Including Inrute Uncroverd village & Excluding 70 LPCD Covered For ESRs & Distribution System - Including Inrute Uncroverd village & Excluding 70 LPCD Covered
Village Village

Population Calculation as Per CPHEEO Manual Population Calculation as Per CPHEEO Manual
District Wise- Cuttack Block Wise-Banki, Dampada & Baranga

Increment Geometric Mean Incremental Increase Increment Geometric Mean Incremental Increase
Year Population(Rural) Year Population
X (r) Y X (r) Y
1961 958788 1961

1971 1166372 207584 0.217 1971


1981 1368893 202521 0.174 -5063 1981 144547

1991 1567331 198438 0.145 -4083 1991 168563 24016 0.166


2001 1699964 132633 0.085 -65805 2001 1,85,490 16927 0.100 -7089

2011 1888423 188459 0.111 55826 2011 2,14,296 28806 0.155 11879

929635 -19125 4790

Average 185927 0.139 -4781 Average 23250 0.137 2395


Considering 2011 as base year, the Population growth rate is Considering 2011 as base year, the Population growth rate is

Average Increase in Population Average Increase in Population


Arithmetic percentage increase Arithmetic percentage increase
Population in 2011 Population in 2011
9.85% 10.85%

13.86% 13.73%
Geometric percentage increase Geometric percentage increase

Projected Population (13 GPs of Banki & 17 GPs of Dampada & 2 GPs of Baranga)- Considering Projected Population(13 GPs of Banki & 17 GPs of Dampada & 2 GPs of Baranga) - Considering
Growth rate of District Growth rate of Block

Population in 2011 as per Agreement = 167518 Population in 2011 as per Agreement = 167518
Arithmetical Progression Method Arithmetical Progression Method
P2023 = P2011 + (P2011 X Growth rate of District per Decade X 1.2) P2023 = P2011 + (P2011 X Growth rate of District per Decade X 1.2)
187310 189327
P2038 = P2011 + (P2011 X Growth rate of District per Decade X 2.7) P2038 = P2011 + (P2011 X Growth rate of District per Decade X 2.7)
212050 216589
P2053 = P2011 + (P2011 X Growth rate of District per Decade X 4.2) P2053 = P2011 + (P2011 X Growth rate of District per Decade X 4.2)
236789 243851
Geometrical Progression Method Geometrical Progression Method
P2023 = P2011 X (1 + rg)1.2 P2023 = P2011 X (1 + rg)1.2
195750 195494
P2037 = P2011 X (1 + rg)2.7 P2038 = P2011 X (1 + rg)2.7
237822 237123
P2053 = P2011 X (1 + rg)4.2 P2053 = P2011 X (1 + rg)4.2
288936 287617
Incremental Increase Method
Calculation of X and Y
The Average
The Average Increase The Average Increase The Average Incremental
Year 2011 Incremental Increase Year 2011
(X1) (X1) Increase (Y1)
(Y1)

For a total Population of 1888423 185927 -4781 For a total Population of 214296 23250 2395

For a total Population of 167518 16493 -424 For a total Population of 167518 18175 1872
11.27 1.28
Pn P1 + nX + (n(n+1)Y)/2 Pn P1 + nX + (n(n+1)Y)/2
P2023 = 186750 P2023 = 191799
P2038 = 209931 P2038 = 225941
P2053 = 232158 P2053 = 264296
Projected Population
Year AI GP IIC Year AI GP IIC
2023 187310 195750 186750 189937 2023 189327 195494 191799 192207
2038 212050 237822 209931 219934 2038 216589 237123 225941 226551
2053 236789 288936 232158 252628 2053 243851 287617 264296 265255

From the above, it is observed that the projected population considering block growth rate is higher, which may please be considered as follows.
2011 population: 167518
2023 Population: 192207
2038 Population: 226551
2053 Population: 265255
Water Demand Calculations

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of
Baranga Block
Water Demand Calculations With Excluding inrute village Population of Banki & Damapada &
Baranga Block for raw Water & WTP
Total Water Demand-Banki+Damapada+Baranga Block
Sr No Description Base Year Intermediate Year Ultimate Year
2023 2038 2053

1 Population 2,07,663 2,44,769 2,86,585

2 Rate of Water Supply 85 85 85

3 Water Demand in Liters 1,76,51,369 2,08,05,395 2,43,59,733

4 Water Demand in KLD 17,651 20,805 24,360

5 Water Demand in MLD 17.651 20.805 24.360

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block
GP wise Population and water demand-for Water Demand

S No. Block G.P. Name in 1991 in 2001 in 2011

1 Banki Baideswar 2,622 2,946 3,523


2 Banki Nuagaon 914 1,027 1,338
3 Banki Jagannathpur 3,656 4,107 4,827
4 Banki Kalapathar 5,063 5,689 6,680
5 Banki Balabhadrapur 2,568 2,885 3,306
6 Banki Golaganda 3,534 3,971 4,588
7 Banki Anuary 3,820 4,291 5,113
8 Banki Baraput 6,726 7,556 8,574
9 Banki Kiapalla 4,368 4,908 5,734
10 Banki Barahampur 5,311 5,967 6,851
11 Banki Kalipoi 5,895 6,624 7,825
12 Banki Puincha 6,623 7,442 8,654
13 Damapada Pathapur 6,879 7,728 8,928
14 Damapada Bhagipur 3,394 3,813 4,298
15 Damapada Banara 3,926 4,411 4,456
16 Damapada Kusupangi 6,547 7,356 7,730
17 Damapada Damapada 4,448 4,998 5,676
18 Damapada Similipur 3,873 4,352 4,788
19 Damapada Gobindpur 3,368 3,784 4,549
20 Damapada Harirajpur 3,705 4,163 4,443
21 Damapada Bilipada 3,021 3,394 3,935
22 Damapada Dulanapur 3,034 3,408 4,198
23 Damapada Gopalpur 7,829 8,797 10,565
24 Damapada Talabasta 9,926 11,152 12,952
25 Damapada Ragadi 3,311 3,721 4,590
26 Damapada Durgapur 4,302 4,833 5,502
27 Damapada Dhansar 4,784 5,376 6,073
28 Damapada Tulasipur 2,984 3,353 3,885
29 Damapada Naragang 3,963 4,453 5,080
30 Baranga Mundali 3,838 4,313 6,175

MaRS Planning Engineering Services Pvt. Ltd.


31 Baranga Ramdaspur 5,244 5,893 6,153
1,39,476 1,56,711 1,80,989
In year 2022 2,07,663 #REF! #REF! #REF!

In year 2037 2,44,769

In year 2052 2,86,585


Total
S No. GP Population Growth Growth Growth Rate of GP wise water GP wise water GP wise water water
Block GP Name in 2011 ratio in ratio in ratio in water population demand in populatio demand in populatio demand in demand in
2023 2038 2053 supply in 2023 MLD in 2023 n in 2038 MLD in 2038 n in 2053 MLD in 2053 LPS in 2053
1 Banki Baideswar 3,523 1.14738 1.35240 1.58344 85 4,042 0.344 4,765 0.405 5,578 0.474 5.488
2 Banki Nuagaon 1,338 1.14738 1.35240 1.58344 85 1,535 0.130 1,810 0.154 2,119 0.180 2.085
3 Banki Jagannathpur 4,827 1.14738 1.35240 1.58344 85 5,538 0.471 6,528 0.555 7,643 0.650 7.519
4 Banki Kalapathar 6,680 1.14738 1.35240 1.58344 85 7,664 0.651 9,034 0.768 10,577 0.899 10.406
5 Banki Balabhadrapur 3,306 1.14738 1.35240 1.58344 85 3,793 0.322 4,471 0.380 5,235 0.445 5.150
6 Banki Golaganda 4,588 1.14738 1.35240 1.58344 85 5,264 0.447 6,205 0.527 7,265 0.618 7.147
7 Banki Anuary 5,113 1.14738 1.35240 1.58344 85 5,867 0.499 6,915 0.588 8,096 0.688 7.965
8 Banki Baraput 8,574 1.14738 1.35240 1.58344 85 9,838 0.836 11,595 0.986 13,576 1.154 13.356
9 Banki Kiapalla 5,734 1.14738 1.35240 1.58344 85 6,579 0.559 7,755 0.659 9,079 0.772 8.932
10 Banki Barahampur 6,851 1.14738 1.35240 1.58344 85 7,861 0.668 9,265 0.788 10,848 0.922 10.672
11 Banki Kalipoi 7,825 1.14738 1.35240 1.58344 85 8,978 0.763 10,583 0.900 12,390 1.053 12.189
12 Banki Puincha 8,654 1.14738 1.35240 1.58344 85 9,929 0.844 11,704 0.995 13,703 1.165 13.481
13 Damapada Pathapur 8,928 1.14738 1.35240 1.58344 85 10,244 0.871 12,074 1.026 14,137 1.202 13.908
14 Damapada Bhagipur 4,298 1.14738 1.35240 1.58344 85 4,931 0.419 5,813 0.494 6,806 0.579 6.696
15 Damapada Banara 4,456 1.14738 1.35240 1.58344 85 5,113 0.435 6,026 0.512 7,056 0.600 6.942
16 Damapada Kusupangi 7,730 1.14738 1.35240 1.58344 85 8,869 0.754 10,454 0.889 12,240 1.040 12.042
17 Damapada Damapada 5,676 1.14738 1.35240 1.58344 85 6,513 0.554 7,676 0.652 8,988 0.764 8.842
18 Damapada Similipur 4,788 1.14738 1.35240 1.58344 85 5,494 0.467 6,475 0.550 7,582 0.644 7.459
19 Damapada Gobindpur 4,549 1.14738 1.35240 1.58344 85 5,219 0.444 6,152 0.523 7,203 0.612 7.086
20 Damapada Harirajpur 4,443 1.14738 1.35240 1.58344 85 5,098 0.433 6,009 0.511 7,035 0.598 6.921
21 Damapada Bilipada 3,935 1.14738 1.35240 1.58344 85 4,515 0.384 5,322 0.452 6,231 0.530 6.130
22 Damapada Dulanapur 4,198 1.14738 1.35240 1.58344 85 4,817 0.409 5,677 0.483 6,647 0.565 6.539
23 Damapada Gopalpur 10,565 1.14738 1.35240 1.58344 85 12,122 1.030 14,288 1.214 16,729 1.422 16.458
24 Damapada Talabasta 12,952 1.14738 1.35240 1.58344 85 14,861 1.263 17,516 1.489 20,509 1.743 20.177
25 Damapada Ragadi 4,590 1.14738 1.35240 1.58344 85 5,266 0.448 6,208 0.528 7,268 0.618 7.150
26 Damapada Durgapur 5,502 1.14738 1.35240 1.58344 85 6,313 0.537 7,441 0.632 8,712 0.741 8.571
27 Damapada Dhansar 6,073 1.14738 1.35240 1.58344 85 6,968 0.592 8,213 0.698 9,616 0.817 9.460

MaRS Planning Engineering Services Pvt. Ltd.


28 Damapada Tulasipur 3,885 1.14738 1.35240 1.58344 85 4,458 0.379 5,254 0.447 6,152 0.523 6.052
29 Damapada Naragang 5,080 1.14738 1.35240 1.58344 85 5,829 0.495 6,870 0.584 8,044 0.684 7.914
30 Baranga Mundali 6,175 1.14738 1.35240 1.58344 85 7,085 0.602 8,351 0.710 9,778 0.831 9.620
31 Baranga Ramdaspur 6,153 1.14738 1.35240 1.58344 85 7,060 0.600 8,321 0.707 9,743 0.828 9.585
Total 1,80,989 2,07,663 17.651 2,44,769 20.805 2,86,585 24.360 281.941

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block
GP wise Population and water demand-for ESRs & Distribution

S No. Block GP Name in 1991 in 2001 in 2011

1 Banki Baideswar 2,622 2,946 3,523


2 Banki Jagannathpur 1,231 1,383 1,909
3 Banki Kalapathar 5,063 5,689 6,680
4 Banki Balabhadrapur 2,568 2,885 3,306
5 Banki Golaganda 2,017 2,267 2,577
6 Banki Anuary 3,820 4,291 5,113
7 Banki Baraput 4,942 5,552 6,192
8 Banki Kiapalla 4,368 4,908 5,734
9 Banki Barahampur 5,311 5,967 6,851
10 Banki Kalipoi 3,913 4,397 5,386
11 Banki Puincha 6,623 7,442 8,654
12 Damapada Pathapur 6,879 7,728 8,928
13 Damapada Bhagipur 3,394 3,813 4,298
14 Damapada Banara 3,926 4,411 4,456
15 Damapada Kusupangi 6,547 7,356 7,730
16 Damapada Similipur 3,509 3,943 4,322
17 Damapada Gobindpur 3,368 3,784 4,549
18 Damapada Harirajpur 3,705 4,163 4,443
19 Damapada Bilipada 3,021 3,394 3,935
20 Damapada Dulanapur 3,034 3,408 4,198
21 Damapada Gopalpur 7,829 8,797 10,565
22 Damapada Talabasta 9,926 11,152 12,952
23 Damapada Ragadi 3,311 3,721 4,590
24 Damapada Durgapur 2,795 3,140 3,585
25 Damapada Dhansar 4,784 5,376 6,073
26 Damapada Tulasipur 2,984 3,353 3,885
27 Damapada Naragang 3,963 4,453 5,080
28 Damapada Damapada 4,448 4,998 5,676
29 Baranga Mundali 3,838 4,313 6,175
30 Baranga Ramdaspur 5,244 5,893 6,153
TOTAl 1,28,983 1,44,923 1,67,518
In year 2023 1,92,207 #REF! #REF! #REF!

In year 2038 2,26,551

In year 2053 2,65,255

MaRS Planning Engineering Services Pvt. Ltd.


Total
S No. Block GP Growth Growth Growth Rate of GP wise water GP wise water GP wise water water
GP Name Population ratio in ratio in ratio in water population demand in population demand in population demand in demand in
in 2011 2023 2038 2053 supply in 2023 MLD in 2023 in 2038 MLD in 2038 in 2053 MLD in 2053 LPS in 2053
1 Banki Baideswar 3,523 1.147380 1.352399 1.583439 85 4,042 0.344 4,765 0.405 5,578 0.474 5.488
2 Banki Jagannathpur 1,909 1.147380 1.352399 1.583439 85 2,190 0.186 2,582 0.219 3,023 0.257 2.974
3 Banki Kalapathar 6,680 1.147380 1.352399 1.583439 85 7,664 0.651 9,034 0.768 10,577 0.899 10.406
4 Banki Balabhadrapur 3,306 1.147380 1.352399 1.583439 85 3,793 0.322 4,471 0.380 5,235 0.445 5.150
5 Banki Golaganda 2,577 1.147380 1.352399 1.583439 85 2,957 0.251 3,485 0.296 4,081 0.347 4.015
6 Banki Anuary 5,113 1.147380 1.352399 1.583439 85 5,867 0.499 6,915 0.588 8,096 0.688 7.965
7 Banki Baraput 6,192 1.147380 1.352399 1.583439 85 7,105 0.604 8,374 0.712 9,805 0.833 9.646
8 Banki Kiapalla 5,734 1.147380 1.352399 1.583439 85 6,579 0.559 7,755 0.659 9,079 0.772 8.932
9 Banki Barahampur 6,851 1.147380 1.352399 1.583439 85 7,861 0.668 9,265 0.788 10,848 0.922 10.672
10 Banki Kalipoi 5,386 1.147380 1.352399 1.583439 85 6,180 0.525 7,284 0.619 8,528 0.725 8.390
11 Banki Puincha 8,654 1.147380 1.352399 1.583439 85 9,929 0.844 11,704 0.995 13,703 1.165 13.481
12 Damapada Pathapur 8,928 1.147380 1.352399 1.583439 85 10,244 0.871 12,074 1.026 14,137 1.202 13.908
13 Damapada Bhagipur 4,298 1.147380 1.352399 1.583439 85 4,931 0.419 5,813 0.494 6,806 0.579 6.696
14 Damapada Banara 4,456 1.147380 1.352399 1.583439 85 5,113 0.435 6,026 0.512 7,056 0.600 6.942
15 Damapada Kusupangi 7,730 1.147380 1.352399 1.583439 85 8,869 0.754 10,454 0.889 12,240 1.040 12.042
16 Damapada Similipur 4,322 1.147380 1.352399 1.583439 85 4,959 0.422 5,845 0.497 6,844 0.582 6.733
17 Damapada Gobindpur 4,549 1.147380 1.352399 1.583439 85 5,219 0.444 6,152 0.523 7,203 0.612 7.086
18 Damapada Harirajpur 4,443 1.147380 1.352399 1.583439 85 5,098 0.433 6,009 0.511 7,035 0.598 6.921
19 Damapada Bilipada 3,935 1.147380 1.352399 1.583439 85 4,515 0.384 5,322 0.452 6,231 0.530 6.130
20 Damapada Dulanapur 4,198 1.147380 1.352399 1.583439 85 4,817 0.409 5,677 0.483 6,647 0.565 6.539
21 Damapada Gopalpur 10,565 1.147380 1.352399 1.583439 85 12,122 1.030 14,288 1.214 16,729 1.422 16.458
22 Damapada Talabasta 12,952 1.147380 1.352399 1.583439 85 14,861 1.263 17,516 1.489 20,509 1.743 20.177
23 Damapada Ragadi 4,590 1.147380 1.352399 1.583439 85 5,266 0.448 6,208 0.528 7,268 0.618 7.150
24 Damapada Durgapur 3,585 1.147380 1.352399 1.583439 85 4,113 0.350 4,848 0.412 5,677 0.483 5.585
25 Damapada Dhansar 6,073 1.147380 1.352399 1.583439 85 6,968 0.592 8,213 0.698 9,616 0.817 9.460
26 Damapada Tulasipur 3,885 1.147380 1.352399 1.583439 85 4,458 0.379 5,254 0.447 6,152 0.523 6.052
27 Damapada Naragang 5,080 1.147380 1.352399 1.583439 85 5,829 0.495 6,870 0.584 8,044 0.684 7.914
28 Damapada Damapada 5,676 1.147380 1.352399 1.583439 85 6,513 0.554 7,676 0.652 8,988 0.764 8.842
29 Baranga Mundali 6,175 1.147380 1.352399 1.583439 85 7,085 0.602 8,351 0.710 9,778 0.831 9.620
30 Baranga Ramdaspur 6,153 1.147380 1.352399 1.583439 85 7,060 0.600 8,321 0.707 9,743 0.828 9.585
Total 1,67,518 1,92,207 16.338 2,26,551 19.257 2,65,255 22.547 260.958

MaRS Planning Engineering Services Pvt. Ltd.


Intake Well
&
Related System
For 100 % Population

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of
Baranga Block
Intake System
Intake Design
1 Total Quantity of Water in MLD at Design Year 24.360

2 Design Volume (1.25 times Water Requirement at Ultimate Year) 30.450

3 Design Volume in Cum/Min 21.146

4 Detention Time (in Minutes) 30

5 Storage Capacity for minimum Detention in Cum 634.37

6 Assumed Internal Dia of the Well in m. 10

7 Cross sectional Area in Sq m. 78.50

8 Required Depth of Water for detention period in M. 8.08

9 Say 8.10

10 Silt Pocket - 0.5m below the required water Depth 0.50

Total Depth 8.60

Design for Inlet Pipe


1 Total Quantity of Water in MLD at Design Year 24.360
2 Design Volume for Intake Well -in MLD 48.72
3 Design Volume for Intake Well - 2 Volumes in Cum/Sec (Q) 0.5639
4 Assumed velocity for inlet design in m/s (V) 0.90
5 Cross Sectional Area of inlet Pipe (Q = AV, A= Q/V) in Sqm 0.6265
6 No of Inlet Openings Provided 4
7 Area of each Inlet Opening 0.1566
8 Dia of the Inlet pipe D = Sqrt(4A/3.142) in M 0.4465
9 Dia of the Inlet pipe in mm 446.550
10 Say 500
Therefore Provide 4 numbers of 500 mm of inlet pipes

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
Intake System
Requirement of Pumping Plant at Intake
Base Year Intermediate Ultimate Year
Sr No Description
2023 Year 2038 2053
1 Water Demand in KLD 17,651.37 20,805.40 24,359.73
2 Water Demand in MLD 17.651 20.805 24.360

3 Pumping Hours at Intake 20 20 20


Water Demand at Intermediate Year
4 2,08,05,395 2,08,05,395 2,08,05,395
Discharge at Pumping Station at Intake Well
5 (LPM) 17,337.83 17,338 17,338
Discharge at Pumping Station at Intake Well
6 (LPM) Rounded 17,340 17,340 17,340

7 Daily Production of Water in KLD 20,808.00 20,808.00 20,808.00

8 Required Number of Pumping Set 0.85 1.00 1.17

9 Proposed Number of Pumping Set 1 1 1

10 Actual Hours of Pumping 16.97 20.00 23.41

11 Actual Hours of Pumping (Round Up) 17 20 24

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
Sr Description Data
1 Bed Level at Itake Well 30.39

2 GL at WTP 44.50

3 Difference between Low Water Level at Itake Well and G.L. of WTP 14.12

4 Height of Foot Valve From G.L. at W.T.P. 5

5 Depth of Water in Intake Well 8.60

6 Terminal Pressure 3

Subtotal 30.72

7 Total Frictional losses in Rising Main including specials and fittings (in
0.74
M.)
Total 31
Say 32
BHP of Motor at Intake Well
1 Discharge of Proposed pumping plant (lpm) 17,340
2 Total Head of Pumping Plant 32
3 Efficiency of Pumping Set 73%
4 Efficiency of Motor 88%
5 Comined Efficiency 64%
6 BHP Required 191.947
7 Add Fluctuation @ 10% 19.195
8 Total BHP 211.142
9 Adopted Standard BHP 220

10 Nos. of Pump Motor Working 2


11 Discharge of Each Proposed Pump Motor (lpm) 8,670
12 Adopted Standard BHP for Each Pump Motor 110
13 Nos. of Pump Motor Including Stand By (2W + 1S)
Therefore(2W + 1S) Pumps Have been taken (Discharge-8670 LPM,Head- 32 M 110 HP.)

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block
Rising Main - Raw Water Design
DESIGN FOR ECONOMIC SIZE OF RAW WATER RISING MAIN - FROM Intake Well To WTP
1 Water Supply Scheme to be pumped Input Data for Pipe
Year Discharge
Initial #REF! 17.65 MLD Dia of pipe Pipe Material Inside C.C. C" value of Cost of pipe (Rs.)
Intermediate #REF! 20.81 MLD (mm) Lining in Gunniting pipe
Ultimate #REF! 24.36 MLD mm.
100 DI 140 1147.92
2 Length of Rising main 490 meter 150 DI 140 1689.14
3 Static head including residual head 30.72 meter 200 DI 140 2320.42
4 Design Period 30 Years 250 DI 140 3113.98
5 Combined efficiency of Pumping set 61 % 300 DI 140 3948.45
6 Cost of Pumping Unit Rs. 16000 Per KW 350 DI 140 4818.80
7 Interest rate 10 % 400 DI 140 5250.85
8 Life of electrical motor & Pump 15 Years 450 DI 140 6873.78
9 Energy charges 5 Rs.per unit 500 DI 140 8030.51
10 Hours of Pumping Average 600 DI 140 10603.41
20 Hours 700 DI 140 13539.99
st
11 Stand by KW 1ndStage 100.00% % 750 DI 140 15199.29
12 Stand by KW 2 Stage 100.00% % 800 DI 140 16803.83
Solution 900 DI 140 20454.42
1st 15 year 2nd15 years
1) Discharge at installation MLD 17.65136884 20.80539503 Mld
2) Discharge at the end of 15 years 20.80539503 24.35973347 Mld
3) Average discharge (MLD) 19.22838193 22.58256425 Mld
4) Hours of pumping for discharge at the end of 15 years 20 20 hrs
5) Average hours for pumping for average discharge 18.48 18.54 hrs
Discharge in pumping hours 24.97 29.23 Mld
6) KW required 4.64 H1 5.44 H2
7) Annual cost of electrical energy 33755.54 KW1 33859.38 KW2
= 156768.42 H1 184114.96 H2
Table1 showing velocity and loss of head for diff pipe size
Sr no Pipe size in Frictional head loss per Velocity in m/sec 1st stage flow 2nd stage flow
mm 1000 meter
1st stage flow 2nd stage 1st stage 2nd stage Frictional loss Other lossses Total losses H1 Frictional Other lossses (in mt.) Total losses H1 including static head
flow flow flow (in mt.) including static head loss

24.97 29.23 10% 30.715 10% 3072%


MLD MLD (in mt.) of friction loss (in mt.) (in mt.) of friction loss (in mt.)
1 100 8427.15 11285.64 36.78 43.06 4129.30 412.93 4572.95 5529.96 553.00 6113.67
2 150 1169.64 1566.38 16.35 19.14 573.12 57.31 661.15 767.52 76.75 874.99
3 200 288.11 385.83 9.20 10.77 141.17 14.12 186.00 189.06 18.91 238.68
4 250 97.18 130.14 5.89 6.89 47.62 4.76 83.09 63.77 6.38 100.86
5 300 39.99 53.55 4.09 4.78 19.59 1.96 52.27 26.24 2.62 59.58
6 350 18.87 25.28 3.00 3.52 9.25 0.92 40.89 12.39 1.24 44.34
7 400 9.85 13.19 2.30 2.69 4.83 0.48 36.02 6.46 0.65 37.82
8 450 5.55 7.43 1.82 2.13 2.72 0.27 33.71 3.64 0.36 34.72
9 500 3.32 4.45 1.47 1.72 1.63 0.16 32.51 2.18 0.22 33.11
10 600 1.37 1.83 1.02 1.20 0.67 0.07 31.45 0.90 0.09 31.70
11 700 0.65 0.86 0.75 0.88 0.32 0.03 31.06 0.42 0.04 31.18
12 750 0.46 0.62 0.65 0.77 0.23 0.02 30.96 0.30 0.03 31.05
13 800 0.34 0.45 0.57 0.67 0.17 0.02 30.90 0.22 0.02 30.96
14 900 0.19 0.25 0.45 0.53 0.09 0.01 30.82 0.12 0.01 30.85

MaRS Planning Engineering Services Pvt. Ltd.


TABLE 2 SHOWING KILOWATTS REQUIRED AND COST OF PUMP SETS FOR DIFFERENT PIPE SIZES
Sr no Pipe size in 1st stage flow 2nd stage flow
mm H1 total head Kw required Cost of H2 total Kw required with Cost of Pump
loss (in m) with stand Pump head loss (in stand by ( Rs. In
by ( Rs. In m) thousand)
thousand)
1 100 4572.95 42475.61 679610 6113.67 66487.84 1063805
2 150 661.15 6141.05 98257 874.99 9515.78 152252
3 200 186.00 1727.69 27643 238.68 2595.69 41531
4 250 83.09 771.81 12349 100.86 1096.88 17550
5 300 52.27 485.49 7768 59.58 647.94 10367
6 350 40.89 379.79 6077 44.34 482.20 7715
7 400 36.02 334.61 5354 37.82 411.36 6582
8 450 33.71 313.08 5009 34.72 377.60 6042
9 500 32.51 301.93 4831 33.11 360.11 5762
10 600 31.45 292.14 4674 31.70 344.77 5516
11 700 31.06 288.53 4616 31.18 339.10 5426
12 750 30.96 287.60 4602 31.05 337.65 5402
13 800 30.90 286.98 4592 30.96 336.68 5387
14 900 30.82 286.24 4580 30.85 335.52 5368
TABLE 3 SHOWING COMPARATIVE STATEMENT OF OVER ALL COST STRUCTURE OF PUMPING MAIN FOR DIFF. PIPE SIZES
Sr no Pipe size in
Total head in (m) Cost of Cost of Annual cost of Energy charges Total capitalized cost Cost of Annual cost Energy Initial capital investment Grand total of
mm Pipeline of Pump energy charges capitalized Pump of energy charges for pumpset & annual capitalized cost
length mts. charges capitalized electrical charges for 30 years
1st stage 2nd stage 490
1 100 4573 6114 562 679610 716894 5452753 6132924 1063805 1125619 8561548 2304233 8437157
2 150 661 875 828 98257 103647 788347 887432 152252 161099 1225332 329783 1217215
3 200 186 239 1137 27643 29160 221793 250573 41531 43944 334242 89957 340530
4 250 83 101 1526 12349 13026 99077 112952 17550 18570 141245 38014 150966
5 300 52 60 1935 7768 8194 62324 72027 10367 10969 83431 22455 94482
6 350 41 44 2361 6077 6410 48755 57193 7715 8163 62088 16710 73903
7 400 36 38 2573 5354 5647 42952 50878 6582 6964 52969 14256 65134
8 450 34 35 3368 5009 5284 40191 48568 6042 6393 48626 13087 61655
9 500 33 33 3935 4831 5096 38761 47526 5762 6097 46374 12481 60007
10 600 31 32 5196 4674 4931 37506 47376 5516 5837 44397 11949 59325
11 700 31 31 6635 4616 4870 37042 48293 5426 5741 43667 11752 60045
12 750 31 31 7448 4602 4854 36920 48970 5402 5716 43476 11701 60671
13 800 31 31 8234 4592 4844 36844 49670 5387 5700 43355 11668 61338
14 900 31 31 10023 4580 4831 36745 51348 5368 5680 43203 11627 62975
Table 3 shows that the most economical size of Main is 600 mm costing Capitalised Rs. 59324564.76
Dia of economical size of rising main 600 mm
DESIGN FOR ECONOMIC SIZE OF PUMPING MAIN 100 150 200 250 300 350…

9.0E+6
Total Cost

8.0E+6 8437157
7.0E+6
6.0E+6
5.0E+6
4.0E+6
3.0E+6
2.0E+6 1217215
1.0E+6 340530
000.0E+0 150966 94482 73903 65134 61655 60007 59325 60045 60671 61338 62975
100 150 200 250 300 350 400 450 500 600 700 750 800 900
Pipe Dia in mm

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada
Block & 2 G.P of Baranga Block
1 No of Pump 1

2 BHP of the Pump 220

3 Include for Lighting and Others 230

4 KW at Intake Well Site ( BHP x 0.746) 171.580

5 KVA (KW/0.80) 214.475

6 Taking 50% extra at Safety Factor 107.238

7 Total KVA 321.713

8 Taking Standard Nearby Manufacturing Range 350

Therefore 1 Nos. Transformer Have been taken 350 KVA.

MaRS Planning Engineering Services Pvt. Ltd.


Water Treatment Plant
&
Related Systems For 100 % Population

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block
& 2 G.P of Baranga Block
Water Treatment Plant & Related Systems

WTP capacity
Total Water Requirement in MLD at Ultimate Year
1 24.360

Total Hours of Power Supply 20


2

Total Capacity of WTP (Requirement x 24)/20 in MLD 29.232


3

4 required capacity in MLD 29.50

MaRS Planning Engineering Services Pvt. Ltd.


WTP Design
Design of Cascade Aerator : -
S. No. Description of Item
1 WTP Capacity in MLD 29.50
2 Design flow cum.\Hr. (Intermediate Year) 1229.17
3 Rate of surface loading taken @ 0.04 Sqm./ Cum / Hr. (as per
CPHEEO manual Appendix No. 7.2.3.3 on page No. 164) 49.17
between 0.015 to 0.045 Sqm. Per cum per Hour)
4 Provide 3 No. Cascade of 0.90 m, 1.50 m, and 1.80 diameter of
respectively each with a drop of 0.25 Metre to be constructed 4.95 > 4.50 ok
with one RCC centra Shaft of 300 inner diameter
5 Velocity of flow water in the channel should be between 0.2 to
0.30 M/Sec. (as per CPHEEO manual Appendix No. 7.5.6 on 0.20
page No. 195)
6 Considering half channel flow in cum/Sec. 0.1707
7 Adopted area of channel (0.40 m x 0.20 m) 0.08
8 Velocity water in the channel in m/Sec. 2.13 < 0.30 ok
Design of Mechanical Rapid Mix Unit : -
S. No. Description of Item
A Determine of Diamention of Tank
1 WTP Capacity in MLD 29.50
2 Design flow cum.\Hr. 1229.17
3 Detention Time 30 Second (as per CPHEEO manual Appendix 30.00
No. 7.2 on page No. 581) between 20 to 60 Second)
4 Tank capacity in Cum. 10.24
5 Ratio of Tank height to diameter (as per CPHEEO manual 1.5:1
Appendix No. 7.2 on page No. 581) between 1-3:1)
6 Diameter of Tank (0.785 x D^2(1.5D) 10.24
7 Diameter of Tank D in mt. 2.04
8 Say 2.10
9 Height of tank in mt. 3.15
10 Total Height of Tank with 0.20 m free board 3.35
B Compute power Requirements
1 Velocity Gradient (as per CPHEEO manual Appendix No. 7.2 on 600S^-1 (300S^-1)
page No. 581)
2 Power spent, P in watts = µ G^2 x (Volume of Tank) (as per 4008.31
CPHEEO manual Appendix No. 7.2 on page No. 581)
3 Power per unit volume in watts /Cum. 391.32
4 Power per unit flow of water in watts /Cum./hr 3.26
C Determine of Diamention of flat blades and impeller
1 Ratio of impeller diameter to Tank diameter in mt. (as per 0.84
CPHEEO manual Appendix No. 7.2 on page No. 581) between
0.2 to 0.4:1) taken as 0.40:1
2 Velocity of the tip of impeller = 2 r.n. / 60 m\sec. (as per 5.28 OK
CPHEEO manual Appendix No. 7.2 on page No. 581)
3 Determine the area of blades Ab of impeller by the equation. Power spent = 0.5 x Cd x pxAxVr^r (as
per CPHEEO manual Appendix No. 7.2 on page No. 581)
4 Assuming Newtons coefficient of drag, Cd = 1.8 for flat blades
and relotive velocity f baddle, Vr as three fourths of the
0.072
tangential velocity of the tip of the blade. (as per CPHEEO
manual Appendix No. 7.2 on page No. 581
5 Provide 6 nos. of blades of size in mt. 0.11 x 0.11
D Provide 4 Nos. of buffles of length 1.6 m and projecting 0.1 m
from the wally of the tank to reduce vortex formation.
E Provide Inlet and out let pipes of mm diameter. 200.00

MaRS Planning Engineering Services Pvt. Ltd.


Design of Clariflocculator : -
S. No. Description of Item
A Determine of Influent Pipe
1 WTP Capacity in MLD 29.50
4 Design flow cum.\Hr. 1229.17
5 Water lost in desludging in % (as per CPHEEO manual Appendix 2.00
No. 7.3 on page No. 583)
6 Design average flow 1254.25
7 Assuming a velocity in m/Sec. (as per CPHEEO manual Appendix 1.00
No. 7.3 on page No. 583)
8 Influent Pipe Diameter in m 0.523
9 Provide an influent pipe of Diameter in mm 600
B Design of Flocculator
1 Detention period in minuts (as per CPHEEO manual Appendix
20.00
No. 7.3 on page No. 583)
2 Average value of velocity gradient G (as per CPHEEO manual 40S^-1
Appendix No. 7.3 on page No. 583)
3 Diamentionless parameter, G.t 48000.00
4 This is acceptable as G.t = 2 to 6 x 10^4 for alum coagulants

5 Volume of flocculator in cum. 418.08


6 Provide a water depth in mt. 2.20
7 Plan area flocculator in Sqm. 190.04
8 Let D be the diameter of flocculator and Dp the diameter of the
190.04
inlet pipe. Then 0.785 (D^2 - Dp^2)
9 Provide a tank diameter in mt. 15.56
Say 15.60
B Design of Clarifier
1 Assume a surface overflow rate of 40 cum/Sqm./Day (as per 40.00
CPHEEO manual Appendix No. 7.3 on page No. 585)
2 Surface area of clarifier Sqm. 752.55
3 Diameter of the clariflocculatorDd is given by 0.785(Dd^2 - 31.22
4.0^2)
4 Length of weir in mt. = 3.14 x Dd 98.03
5 Weir loading in cum / day m 307.07 < 300 cum/day
m O.K.

DESIGN OF RAPID GRAVITY FILTER


1 WTP Capacity in MLD 29.50
2 Over loading @ 20% 5.90
3 WTP Capacity including over loading in MLD 35.40
4 Design flow cum.\Hr. 1475.00
5 Quantity of back wash water use in % (as per CPHEEO manual 3.00
Appendix No. 7.7 on page No. 595)
6 Time last during back washing in minutes(as per CPHEEO 30.00
manual Appendix No. 7.7 on page No. 595)
7 Design rate of filtration in cum/cum / hr. (as per CPHEEO 5.00
manual Appendix No. 7.7 on page No. 595)
8 Length and width ratio (as per CPHEEO manual Appendix No. 1.25 to 1.33:1
7.7 on page No. 595)
9 Under Drainage system (as per CPHEEO manual Appendix No. Central manifold with leterals
7.7 on page No. 595)
10 Size of perforations in mm (as per CPHEEO manual Appendix 9.00
No. 7.7 on page No. 595)

MaRS Planning Engineering Services Pvt. Ltd.


A Filter diamentions
1 Required flow filter water cum.\Hr. 1475.00
2 Design flow for filter after accounting for back wash water and 1807.66
time cum.\Hr.
3 Plan area of filter required in Sqm. 361.53
4 Provide two filter units, two being minimum number to be 180.77
provide length x width
5 Length and width ratio (as per CPHEEO manual Appendix No. 1.3:1
7.7 on page No. 595)
6 Width of the filter in mt. 11.79
7 Length of the filter in mt. 15.33
8 Provide two filter units, each with a diamention in mt. 180.77
B Estimation of Sand
1 Assuming a depth of sand in cm (as per CPHEEO manual 60.00
Appendix No. 7.7 on page No. 596)
2 Effective size of sand in mm (as per CPHEEO manual Appendix 0.50
No. 7.7 on page No. 596)
3 Gravel size in mm
2 mm 9.20 cm.
5 mm 21.30 cm.
10 mm 30.50 cm.
20 mm 40.00 cm.
40 mm 49.00 cm.

DESIGN OF Chemical House


1 WTP Capacity in MLD 29.50
2 Over loading @ 20% 5.90
3 WTP Capacity including over loading in MLD 35.40
4 Design flow cum.\Hr. 1475.00
5 Considering maximum dosing of Ferric Alum during rainy 20 mg/liter for 4 month and 15 mg /
season liter for 8 months

6 Average dosing of alum in mg/liter 16.67


7 Duration of dosing in hr. 24.00
8 Weight of Alum in Kg required per day 491.67
9 Weight of Alum in Kg required per annum 179458.33
Say 180.00 Tonnes/Year
Therefore a two storied chemical house for storing Ferric Allum
for six months storage i.e. 90 Tonne to be provided at Ground
floor

DESIGN OF UNDER DRAINAGE SYSTEM


1 Plan Area of each filter bed in Sqm. 180.77 m2
2 Total Area in Sqm. of Perforation in 0.3% of plan area 0.5423
3 Total Area in Sqcm. of Perforation in 0.3% of plan area 5422.98 cm2
4 Total number of perforation for 8 mm dia (nozzles) 10794.15
5 Total cross sectional area of leterals (3 x area of perforation) 16268.94

6 Area of Control Manifold 32537.87 cm2


7 Dia of the central manifold 204 Cm
8 Provide a Commercially diameter of 600 mm
Assume a spaeing of 15 cm for laterals ,
9 The Number of Laterals 204
10 Cross Sectional area of each laterals 80 cm2
11 Dia of the laterals 10 cm2
Provide Leter of dia of 50mm
12 No. of Perforation per Lateral 53
13 Length of Lateral 5.596 m

MaRS Planning Engineering Services Pvt. Ltd.


14 Spacing of perforation 10.60
15 Provide 52.8104093835302 Perforations of 10.6 mm dia at c/c
Spaeing 90 mm
DESIGN OF CHLORINATING TANK
1 WTP Capacity in MLD 30
2 Over loading @ 20% 5.90
3 WTP Capacity including over loading in MLD 35.40
4 Design flow cum.\Hr. 1475
5 Annual water demand in KLD 12921000.0
6 Average annual water production in KL considering 70% of daily 9044700.0
consumption
7 Chlorine demand in kg assuming 2 mg/liter 18089.40
8 Quantity of bleaching powder in kg per annum assuming 2.5% 723576
chlorine content
9 Quantity of bleaching powder in kg per day assuming 2.5% 1982.40
chlorine content
10 Capacity of chlorinator in liter for @ 2 % strength of solution 99120
Say 99200
DESIGN OF CLEAR WATER RESERVOIR (C.W.R.)
1 WTP Capacity in MLD 30
2 Over loading @ 20% 5.90
3 WTP Capacity including over loading in MLD 35.40
4 Design flow cum.\Hr. 1475.00
5 Design flow cum.\Minut 24.58
6 Detention time period taken as 60 minutes 1475.0
7 Surface area in Sqm. Assuming diameter 26.0 meter 530.66
8 Depth of required water in mt. 2.78
9 Depth of water with considering 20 cm free board in mt. 2.98
Say 3

MaRS Planning Engineering Services Pvt. Ltd.


Water Treatment Plant
&
Related Systems

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
WTP System
Requirement of Pumping Plant at WTP -1 to Sump and other Areas
Base Year Intermediate Ultimate Year
Sr No Description
2023 Year 2038 2053
1 Water Demand in KLD 17,651.37 20,805.40 24,359.73

2 Water Demand in MLD 17.651 20.805 24.360

3 Pumping Hours at WTP. 20 20 20

Water Demand at Intermediate Year 2,08,05,395 2,08,05,395 2,08,05,395


4
Discharge at Pumping Station at WTP(LPM) 17,337.83 17,338 17,338
5
Discharge at Pumping Station at WTP (LPM)
17,340 17,340 17,340
6 Rounded

7 Daily Production of Water in KLD 20,808.00 20,808.00 20,808.00

8 Required Number of Pumping Set 0.85 1.00 1.17

9 Proposed Number of Pumping Set 1 1 1

10 Actual Hours of Pumping 16.97 20.00 23.41

11 Actual Hours of Pumping (Round Up) 17 20 24

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block
& 2 G.P of Baranga Block
Sr Description Data
BHP of Motor at WTP
1 Discharge of Proposed pumping plant (lpm) 17,340
2 Total Head of Pumping Plant (As Per Branch Design) 175
3 Efficiency of Pumping Set 73%
4 Efficiency of Motor 88%
5 Comined Efficiency 64%
6 BHP Required 1049.709
7 Add Fluctuation @ 10% 104.971
8 Total BHP 1154.680
9 Adopted Standard BHP 1200

10 Nos. of Pump Motor Working 6


11 Discharge of Each Proposed Pump Motor (lpm) 2,890
12 Adopted Standard BHP for Each Pump Motor 200
13 Nos. of Pump Motor Including Stand By (6W +3S)

Therefore(6W +3S) Pumps Have been taken (Discharge-2890 LPM,Head- 175 M 200 HP.)

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of
Damapada Block & 2 G.P of Baranga Block
Dia of pipe
S.No. Total Length of Pipe
(in mm)
1 100 -
2 150 21,610
3 200 26,770
4 250 7,523
5 300 1,899
6 350 -
7 400 5,565
8 450 12,385
9 500 4,738
10 600 1,080
Total Length (in M) 81,570
Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
Label Demand (L/s) Elevation (m) Hydraulic Grade (m) Pressure (m H2O)
JA-1 0 43.51 218.47 174.609
JA-2 0 40.56 215.88 174.968
D-1 16.738 98.36 212.67 114.082
JA-3 0 42.66 202.84 159.861
D-2 8.057 74.42 202.28 127.602
JA-4 0 60.07 201.49 141.136
D-3 8.354 75.16 198.35 122.943
JA-5 0 67.56 196.82 129.004
D-4 14.491 91.88 196.78 104.692
JA-6 0 73.49 193.9 120.168
J-8 0 63.2 190.49 127.03
JA-7 0 44.92 189.68 144.467
D-6 8.976 69.1 189.51 120.172
D-7 8.528 92.18 189.07 96.695
SB-D 10.64 108.2 188.17 79.806
J-9 0 52.63 184.45 131.552
D-10 7.87 96.95 181.81 84.688
JA-8 0 42.48 179.16 136.407
D-8 8.329 64.66 178.82 113.928
JA-9 0 43.88 177.67 133.521
D-9 7.377 73.71 173.11 99.203
D-12 24.282 156.27 163.27 6.989
JA-10 0 45.6 161.41 115.574
D-11 19.806 69.84 161.34 91.316
JA-11 0 42.07 159.36 117.051
JA-12 0 43.76 155.19 111.206
D-13 8.605 68.55 154.11 85.392
JA-13 0 42.24 147.75 105.293
JA-14 0 56.97 142.64 85.496
JA-15 0 53.96 142.02 87.88
D-14 10.315 93.52 141.31 47.691
SA-B 151.782 48.42 141.27 92.664
D-15 11.385 92.82 141.23 48.31
D-16 7.283 85.98 140.19 54.102
D-17 9.524 86.38 133.42 46.947

Sensitivity: LNT Construction Internal Use


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P
of Baranga Block
1 Total BHP at WTP

2 For Pumping Plant at WTP. 1,200

3 For Wash Water Pump 20

4 For Air Blower Pump 15

5 For Internal and External Electrification 10

6 For Flash Mixer 15

7 For Alum Mixer 15

8 For Clarifier Bridge 10

9 Total BHP at WTP 1,285

10 KW at WTP Site ( BHP x 0.746) 958.61

11 KVA (KW/0.80) 1,198.26

12 Taking 50% extra at Safety Factor 599.13

13 Total KVA 1,797.39

14 Taking Standard Nearby Manufacturing Range 1,800

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Clear Water Sump-A
&
Related Systems

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage -Sump-A


20 hours of demand (Outflow) satisfied by 20 hours through Pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
2 to 12 10 hours 3 to 13 10 hours
13 to 23 10 hours 14 to 24 10 hours
Total 20 hours of Outflow Total Inflow of 20 hours
Hourly demand = 1.20 a Hourly Supply = 1.20 a
85
Total Demand = 75,27,005 liters / day
Avg. hourly demand, a = 313625 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative
Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

2 to 3 1.20 a 1.2 a 376350 0.00 a 0.00 a 0 -376350 liters


3 to 4 1.20 a 2.4 a 752701 1.20 a 1.20 a 376350 -376350 liters
4 to 5 1.20 a 3.6 a 1129051 1.20 a 2.40 a 752701 -376350 liters
5 to 6 1.20 a 4.8 a 1505401 1.20 a 3.60 a 1129051 -376350 liters
6 to 7 1.20 a 6.0 a 1881751 1.20 a 4.80 a 1505401 -376350 liters
7 to 8 1.20 a 7.2 a 2258102 1.20 a 6.00 a 1881751 -376350 liters
8 to 9 1.20 a 8.4 a 2634452 1.20 a 7.20 a 2258102 -376350 liters
9 to 10 1.20 a 9.6 a 3010802 1.20 a 8.40 a 2634452 -376350 liters
10 to 11 1.20 a 10.8 a 3387152 1.20 a 9.60 a 3010802 -376350 liters
11 to 12 1.20 a 12.0 a 3763503 1.20 a 10.80 a 3387152 -376350 liters
12 to 13 0.00 a 12.0 a 3763503 1.20 a 12.00 a 3763503 0 liters
13 to 14 1.20 a 13.2 a 4139853 0.00 a 12.00 a 3763503 -376350 liters
14 to 15 1.20 a 14.4 a 4516203 1.20 a 13.20 a 4139853 -376350 liters
15 to 16 1.20 a 15.6 a 4892553 1.20 a 14.40 a 4516203 -376350 liters
16 to 17 1.20 a 16.8 a 5268904 1.20 a 15.60 a 4892553 -376350 liters
17 to 18 1.20 a 18.0 a 5645254 1.20 a 16.80 a 5268904 -376350 liters
18 to 19 1.20 a 19.2 a 6021604 1.20 a 18.00 a 5645254 -376350 liters
19 to 20 1.20 a 20.4 a 6397954 1.20 a 19.20 a 6021604 -376350 liters
20 to 21 1.20 a 21.6 a 6774305 1.20 a 20.40 a 6397954 -376350 liters
21 to 22 1.20 a 22.8 a 7150655 1.20 a 21.60 a 6774305 -376350 liters
22 to 23 1.20 a 24.0 a 7527005 1.20 a 22.80 a 7150655 -376350 liters
23 to 24 0.00 a 24.0 a 7527005 1.20 a 24.00 a 7527005 0 liters
0 to 1 0.00 a 24.0 a 7527005 0.00 a 24.00 a 7527005 0 liters
1 to 2 0.00 a 24.0 a 7527005 0.00 a 24.00 a 7527005 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -376350 liters
(Total Surplus + Total Deficit) Total Storage required = 376350 liters
Hence, capacity of ESR required = 380000 liters
Capacity as % of total Demand = 5.05%
Say Capacity @ 50% of Total Demand = 37,70,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
Sump-A System
Requirement of Pumping Plant at Sump-A
Base Year Intermediate Ultimate Year
Sr No Description
2023 Year 2038 2053
1 Water Demand in KLD 5,454.20 6,428.89 7,527.01

2 Water Demand in MLD 5.454 6.429 7.527

3 Pumping Hours at Sump-A. 20 20 20

Water Demand at Intermediate Year 64,28,890 64,28,890 64,28,890


4
Discharge at Pumping Station at Sump-A(LPM) 5,357.41 5,357 5,357
5
Discharge at Pumping Station at Sump-A (LPM)
5,360 5,360 5,360
6 Rounded

7 Daily Production of Water in KLD 6,432.00 6,432.00 6,432.00

8 Required Number of Pumping Set 0.85 1.00 1.17

9 Proposed Number of Pumping Set 1 1 1

10 Actual Hours of Pumping 16.96 19.99 23.40

11 Actual Hours of Pumping (Round Up) 17 20 24

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block
& 2 G.P of Baranga Block
Sr Description Data
BHP of Motor at Sump-A
1 Discharge of Proposed pumping plant (lpm) 5,360
2 Total Head of Pumping Plant (As Per Branch Design) 110
3 Efficiency of Pumping Set 73%
4 Efficiency of Motor 88%
5 Comined Efficiency 64%
6 BHP Required 203.957
7 Add Fluctuation @ 10% 20.396
8 Total BHP 224.353
9 Adopted Standard BHP 280

10 Nos. of Pump Motor Working 2


11 Discharge of Each Proposed Pump Motor (lpm) 2,680
12 Adopted Standard BHP for Each Pump Motor 140
13 Nos. of Pump Motor Including Stand By (2W + 1S)

Therefore(2W + 1S) Pumps Have been taken (Discharge-2680 LPM,Head- 110 M 140 HP.)

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of
Damapada Block & 2 G.P of Baranga Block
Dia of pipe
S.No. Total Length of Pipe
(in mm)
1 100 86
2 150 5,683
3 200 14,365
4 250 5,336
5 300 4,951
6 350 8,208
7 400 1,981
Total Length (in M) 40,610
Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada
Block & 2 G.P of Baranga Block
Label Demand (L/s) Elevation (m) Hydraulic Grade (m) Pressure (m H2O)
PB-1 0 51.56 154.45 102.682
PB-2 0 48.75 154.32 105.354
B-8 12.843 81.74 153.26 71.381
PB-3 0 59.45 150.99 91.355
PB-4 0 46.11 147.13 100.816
B-5 9.585 70.05 147.06 76.859
B-7 10.75 94.14 145.83 51.583
B-4 8.602 69.65 142.95 73.148
PB-5 0 85.31 131.45 46.046
PB-6 0 81.44 129.73 48.19
PB-7 0 81.99 127.94 45.857
B-9 14.67 106.95 127.82 20.826
B-13 16.224 115.05 126.99 11.913
J-4 0 73.25 126.09 52.736
B-10 4.355 98.2 125.8 27.546
B-6 16.074 84.24 125.32 40.996
PB-8 0 75.94 119.44 43.408
B-12 17.399 102.58 118.8 16.183
J-5 0 67.53 109.08 41.47
B-11 10.986 92.24 108.88 16.605
PB-9 0 73.65 102.04 28.331
B-2 7.979 97.47 101.99 4.512
J-6 0 74.69 101.83 27.089
B-3 6.198 91.32 101.27 9.932
B-1 16.117 94.21 98.83 4.613

Sensitivity: LNT Construction Internal Use


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada
Block & 2 G.P of Baranga Block
1 No of Pump 1

2 BHP of the Pump 280

3 Include for Lighting and Others 290

4 KVA (KW/0.80) 362.50

5 Taking 50% extra at Safety Factor 181.25

6 Total KVA 543.75

7 Taking Standard Nearby Manufacturing Range 700

Therefore 1 Nos. Transformer Have been taken 700 KVA.

MaRS Planning Engineering Services Pvt. Ltd.


Clear Water Sump-B
&
Related Systems

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage -Sump-A


20 hours of demand (Outflow) satisfied by 20 hours through Pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
2 to 12 10 hours 3 to 13 10 hours
13 to 23 10 hours 14 to 24 10 hours
Total 20 hours of Outflow Total Inflow of 20 hours
Hourly demand = 1.20 a Hourly Supply = 1.20 a
85
Total Demand = 3,46,885 liters / day
Avg. hourly demand, a = 14454 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative
Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

2 to 3 1.20 a 1.2 a 17344 0.00 a 0.00 a 0 -17344 liters


3 to 4 1.20 a 2.4 a 34689 1.20 a 1.20 a 17344 -17344 liters
4 to 5 1.20 a 3.6 a 52033 1.20 a 2.40 a 34689 -17344 liters
5 to 6 1.20 a 4.8 a 69377 1.20 a 3.60 a 52033 -17344 liters
6 to 7 1.20 a 6.0 a 86721 1.20 a 4.80 a 69377 -17344 liters
7 to 8 1.20 a 7.2 a 104066 1.20 a 6.00 a 86721 -17344 liters
8 to 9 1.20 a 8.4 a 121410 1.20 a 7.20 a 104066 -17344 liters
9 to 10 1.20 a 9.6 a 138754 1.20 a 8.40 a 121410 -17344 liters
10 to 11 1.20 a 10.8 a 156098 1.20 a 9.60 a 138754 -17344 liters
11 to 12 1.20 a 12.0 a 173443 1.20 a 10.80 a 156098 -17344 liters
12 to 13 0.00 a 12.0 a 173443 1.20 a 12.00 a 173443 0 liters
13 to 14 1.20 a 13.2 a 190787 0.00 a 12.00 a 173443 -17344 liters
14 to 15 1.20 a 14.4 a 208131 1.20 a 13.20 a 190787 -17344 liters
15 to 16 1.20 a 15.6 a 225475 1.20 a 14.40 a 208131 -17344 liters
16 to 17 1.20 a 16.8 a 242820 1.20 a 15.60 a 225475 -17344 liters
17 to 18 1.20 a 18.0 a 260164 1.20 a 16.80 a 242820 -17344 liters
18 to 19 1.20 a 19.2 a 277508 1.20 a 18.00 a 260164 -17344 liters
19 to 20 1.20 a 20.4 a 294852 1.20 a 19.20 a 277508 -17344 liters
20 to 21 1.20 a 21.6 a 312197 1.20 a 20.40 a 294852 -17344 liters
21 to 22 1.20 a 22.8 a 329541 1.20 a 21.60 a 312197 -17344 liters
22 to 23 1.20 a 24.0 a 346885 1.20 a 22.80 a 329541 -17344 liters
23 to 24 0.00 a 24.0 a 346885 1.20 a 24.00 a 346885 0 liters
0 to 1 0.00 a 24.0 a 346885 0.00 a 24.00 a 346885 0 liters
1 to 2 0.00 a 24.0 a 346885 0.00 a 24.00 a 346885 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -17344 liters
(Total Surplus + Total Deficit) Total Storage required = 17344 liters
Hence, capacity of ESR required = 20000 liters
Capacity as % of total Demand = 5.77%
Say Capacity @ 50% of Total Demand = 1,80,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
Sump-B System
Requirement of Pumping Plant at Sump-B
Base Year Intermediate Ultimate Year
Sr No Description
2023 Year 2038 2053
1 Water Demand in KLD 251.35 296.23 346.89

2 Water Demand in MLD 0.251 0.296 0.347

3 Pumping Hours at Sump-B. 20 20 20

Water Demand at Intermediate Year 2,96,225 2,96,225 2,96,225


4
Discharge at Pumping Station at Sump-B(LPM) 246.85 247 247
5
Discharge at Pumping Station at Sump-B (LPM)
250 250 250
6 Rounded

7 Daily Production of Water in KLD 300.00 300.00 300.00

8 Required Number of Pumping Set 0.84 0.99 1.16

9 Proposed Number of Pumping Set 1 1 1

10 Actual Hours of Pumping 16.76 19.75 23.13

11 Actual Hours of Pumping (Round Up) 17 20 24

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block
& 2 G.P of Baranga Block
Sr Description Data
BHP of Motor at Sump-B
1 Discharge of Proposed pumping plant (lpm) 250
2 Total Head of Pumping Plant (As Per Branch Design) 75
3 Efficiency of Pumping Set 73%
4 Efficiency of Motor 88%
5 Comined Efficiency 64%
6 BHP Required 6.486
7 Add Fluctuation @ 10% 0.649
8 Total BHP 7.135
9 Adopted Standard BHP 10

10 Nos. of Pump Motor Working 1


11 Discharge of Each Proposed Pump Motor (lpm) 250
12 Adopted Standard BHP for Each Pump Motor 10
13 Nos. of Pump Motor Including Stand By (1W + 1S)

Therefore(1W + 1S) Pumps Have been taken (Discharge-250 LPM,Head- 75 M 10 HP.)

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of
Damapada Block & 2 G.P of Baranga Block
Dia of pipe
S.No. Total Length of Pipe
(in mm)
1 100 -
2 150 3,125
Total Length (in M) 3,125
Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada
Block & 2 G.P of Baranga Block
1 No of Pump 1

2 BHP of the Pump 10

3 Include for Lighting and Others 15

4 KVA (KW/0.80) 18.75

5 Taking 50% extra at Safety Factor 9.38

6 Total KVA 28.13

7 Taking Standard Nearby Manufacturing Range 63

Therefore 1 Nos. Transformer Have been taken 63 KVA.

MaRS Planning Engineering Services Pvt. Ltd.


Elevated Storage Reservoirs

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Elevated Storage Reservoirs


Capacity of Capacity of Staiging Tank Height (in Intereim Year Demand
S.No. Discription G.L. (in M)
ESRs. (in KL.) ESRs. (in Ltr.) (in M) M) (Storage in % )
Banki Block
1 ESR-1 240 2,40,000 70.21 20 4 50%
2 ESR-2 130 1,30,000 73.47 20 4 50%
3 ESR-3 450 4,50,000 67.32 20 4 50%
4 ESR-4 230 2,30,000 45.65 20 4 50%
5 ESR-5 180 1,80,000 46.05 20 4 50%
6 ESR-6 350 3,50,000 60.24 20 4 50%
7 ESR-7 420 4,20,000 70.14 20 4 50%
8 ESR-8 390 3,90,000 57.74 20 4 50%
9 ESR-9 470 4,70,000 82.95 20 4 50%
10 ESR-10 370 3,70,000 74.2 20 4 50%
11 ESR-11 590 5,90,000 68.24 20 4 50%
Damapada Block
1 ESR-1 610 6,10,000 74.36 20 4 50%
2 ESR-2 290 2,90,000 50.42 20 4 50%
3 ESR-3 300 3,00,000 51.16 20 4 50%
4 ESR-4 530 5,30,000 67.88 20 4 50%
5 ESR-5 300 3,00,000 148.49 20 4 50%
6 ESR-6 310 3,10,000 45.10 20 4 50%
7 ESR-7 300 3,00,000 68.18 20 4 50%
8 ESR-8 270 2,70,000 40.66 20 4 50%
9 ESR-9 290 2,90,000 49.71 20 4 50%
10 ESR-10 720 7,20,000 72.95 20 4 50%
11 ESR-11 880 8,80,000 45.84 20 4 50%
12 ESR-12 310 3,10,000 132.27 20 4 50%
13 ESR-13 250 2,50,000 44.55 20 4 50%
14 ESR-14 410 4,10,000 69.52 20 4 50%
15 ESR-15 270 2,70,000 68.82 20 4 50%
16 ESR-16 350 3,50,000 61.98 20 4 50%
17 ESR-17 390 3,90,000 20 4 50%
Baranga Block
1 ESR-1 420 4,20,000 70.21 20 4 50%
2 ESR-2 420 4,20,000 73.47 20 4 50%

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Banki Block

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Baideswar


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 474130 liters / day


Avg. hourly demand, a = 19755 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative
Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 59266 1.20 a 1.20 a 23707 -35560 liters


6 to 7 3 a 6.0 a 118533 1.20 a 2.40 a 47413 -71120 liters
7 to 8 3 a 9.0 a 177799 1.20 a 3.60 a 71120 -106679 liters
8 to 9 3 a 12.0 a 237065 1.20 a 4.80 a 94826 -142239 liters
9 to 10 0 a 12.0 a 237065 1.20 a 6.00 a 118533 -118533 liters
10 to 11 0 a 12.0 a 237065 1.20 a 7.20 a 142239 -94826 liters
11 to 12 0 a 12.0 a 237065 1.20 a 8.40 a 165946 -71120 liters
12 to 13 0 a 12.0 a 237065 0.00 a 8.40 a 165946 -71120 liters
13 to 14 0 a 12.0 a 237065 1.20 a 9.60 a 189652 -47413 liters
14 to 15 0 a 12.0 a 237065 1.20 a 10.80 a 213359 -23707 liters
15 to 16 3 a 15.0 a 296331 1.20 a 12.00 a 237065 -59266 liters
16 to 17 3 a 18.0 a 355598 1.20 a 13.20 a 260772 -94826 liters
17 to 18 3 a 21.0 a 414864 1.20 a 14.40 a 284478 -130386 liters
18 to 19 3 a 24.0 a 474130 1.20 a 15.60 a 308185 -165946 liters
19 to 20 0 a 24.0 a 474130 1.20 a 16.80 a 331891 -142239 liters
20 to 21 0 a 24.0 a 474130 1.20 a 18.00 a 355598 -118533 liters
21 to 22 0 a 24.0 a 474130 1.20 a 19.20 a 379304 -94826 liters
22 to 23 0 a 24.0 a 474130 1.20 a 20.40 a 403011 -71120 liters
23 to 24 0 a 24.0 a 474130 0.00 a 20.40 a 403011 -71120 liters
0 to 1 0 a 24.0 a 474130 0.00 a 20.40 a 403011 -71120 liters
1 to 2 0 a 24.0 a 474130 0.00 a 20.40 a 403011 -71120 liters
2 to 3 0 a 24.0 a 474130 1.20 a 21.60 a 426717 -47413 liters
3 to 4 0 a 24.0 a 474130 1.20 a 22.80 a 450424 -23707 liters
4 to 5 0 a 24.0 a 474130 1.20 a 24.00 a 474130 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -165946 liters
(Total Surplus + Total Deficit) Total Storage required = 165946 liters
Hence, capacity of ESR required = 170000 liters
Capacity as % of total Demand = 35.86%
Capacity as 50% of total Demand = 2,40,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Jagannathpur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 256955 liters / day


Avg. hourly demand, a = 10706 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 32119 1.20 a 1.20 a 12848 -19272 liters


6 to 7 3 a 6.0 a 64239 1.20 a 2.40 a 25696 -38543 liters
7 to 8 3 a 9.0 a 96358 1.20 a 3.60 a 38543 -57815 liters
8 to 9 3 a 12.0 a 128478 1.20 a 4.80 a 51391 -77087 liters
9 to 10 0 a 12.0 a 128478 1.20 a 6.00 a 64239 -64239 liters
10 to 11 0 a 12.0 a 128478 1.20 a 7.20 a 77087 -51391 liters
11 to 12 0 a 12.0 a 128478 1.20 a 8.40 a 89934 -38543 liters
12 to 13 0 a 12.0 a 128478 0.00 a 8.40 a 89934 -38543 liters
13 to 14 0 a 12.0 a 128478 1.20 a 9.60 a 102782 -25696 liters
14 to 15 0 a 12.0 a 128478 1.20 a 10.80 a 115630 -12848 liters
15 to 16 3 a 15.0 a 160597 1.20 a 12.00 a 128478 -32119 liters
16 to 17 3 a 18.0 a 192716 1.20 a 13.20 a 141325 -51391 liters
17 to 18 3 a 21.0 a 224836 1.20 a 14.40 a 154173 -70663 liters
18 to 19 3 a 24.0 a 256955 1.20 a 15.60 a 167021 -89934 liters
19 to 20 0 a 24.0 a 256955 1.20 a 16.80 a 179869 -77087 liters
20 to 21 0 a 24.0 a 256955 1.20 a 18.00 a 192716 -64239 liters
21 to 22 0 a 24.0 a 256955 1.20 a 19.20 a 205564 -51391 liters
22 to 23 0 a 24.0 a 256955 1.20 a 20.40 a 218412 -38543 liters
23 to 24 0 a 24.0 a 256955 0.00 a 20.40 a 218412 -38543 liters
0 to 1 0 a 24.0 a 256955 0.00 a 20.40 a 218412 -38543 liters
1 to 2 0 a 24.0 a 256955 0.00 a 20.40 a 218412 -38543 liters
2 to 3 0 a 24.0 a 256955 1.20 a 21.60 a 231260 -25696 liters
3 to 4 0 a 24.0 a 256955 1.20 a 22.80 a 244107 -12848 liters
4 to 5 0 a 24.0 a 256955 1.20 a 24.00 a 256955 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -89934 liters
(Total Surplus + Total Deficit) Total Storage required = 89934 liters
Hence, capacity of ESR required = 90000 liters
Capacity as % of total Demand = 35.03%
Capacity as 50% of total Demand = 1,30,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Kalapathar


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 899045 liters / day


Avg. hourly demand, a = 37460 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 112381 1.20 a 1.20 a 44952 -67428 liters


6 to 7 3 a 6.0 a 224761 1.20 a 2.40 a 89905 -134857 liters
7 to 8 3 a 9.0 a 337142 1.20 a 3.60 a 134857 -202285 liters
8 to 9 3 a 12.0 a 449523 1.20 a 4.80 a 179809 -269714 liters
9 to 10 0 a 12.0 a 449523 1.20 a 6.00 a 224761 -224761 liters
10 to 11 0 a 12.0 a 449523 1.20 a 7.20 a 269714 -179809 liters
11 to 12 0 a 12.0 a 449523 1.20 a 8.40 a 314666 -134857 liters
12 to 13 0 a 12.0 a 449523 0.00 a 8.40 a 314666 -134857 liters
13 to 14 0 a 12.0 a 449523 1.20 a 9.60 a 359618 -89905 liters
14 to 15 0 a 12.0 a 449523 1.20 a 10.80 a 404570 -44952 liters
15 to 16 3 a 15.0 a 561903 1.20 a 12.00 a 449523 -112381 liters
16 to 17 3 a 18.0 a 674284 1.20 a 13.20 a 494475 -179809 liters
17 to 18 3 a 21.0 a 786664 1.20 a 14.40 a 539427 -247237 liters
18 to 19 3 a 24.0 a 899045 1.20 a 15.60 a 584379 -314666 liters
19 to 20 0 a 24.0 a 899045 1.20 a 16.80 a 629332 -269714 liters
20 to 21 0 a 24.0 a 899045 1.20 a 18.00 a 674284 -224761 liters
21 to 22 0 a 24.0 a 899045 1.20 a 19.20 a 719236 -179809 liters
22 to 23 0 a 24.0 a 899045 1.20 a 20.40 a 764188 -134857 liters
23 to 24 0 a 24.0 a 899045 0.00 a 20.40 a 764188 -134857 liters
0 to 1 0 a 24.0 a 899045 0.00 a 20.40 a 764188 -134857 liters
1 to 2 0 a 24.0 a 899045 0.00 a 20.40 a 764188 -134857 liters
2 to 3 0 a 24.0 a 899045 1.20 a 21.60 a 809141 -89905 liters
3 to 4 0 a 24.0 a 899045 1.20 a 22.80 a 854093 -44952 liters
4 to 5 0 a 24.0 a 899045 1.20 a 24.00 a 899045 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -314666 liters
(Total Surplus + Total Deficit) Total Storage required = 314666 liters
Hence, capacity of ESR required = 320000 liters
Capacity as % of total Demand = 35.59%
Capacity as 50% of total Demand = 4,50,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Balabhadrapur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 444975 liters / day


Avg. hourly demand, a = 18541 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 55622 1.20 a 1.20 a 22249 -33373 liters


6 to 7 3 a 6.0 a 111244 1.20 a 2.40 a 44498 -66746 liters
7 to 8 3 a 9.0 a 166866 1.20 a 3.60 a 66746 -100119 liters
8 to 9 3 a 12.0 a 222488 1.20 a 4.80 a 88995 -133493 liters
9 to 10 0 a 12.0 a 222488 1.20 a 6.00 a 111244 -111244 liters
10 to 11 0 a 12.0 a 222488 1.20 a 7.20 a 133493 -88995 liters
11 to 12 0 a 12.0 a 222488 1.20 a 8.40 a 155741 -66746 liters
12 to 13 0 a 12.0 a 222488 0.00 a 8.40 a 155741 -66746 liters
13 to 14 0 a 12.0 a 222488 1.20 a 9.60 a 177990 -44498 liters
14 to 15 0 a 12.0 a 222488 1.20 a 10.80 a 200239 -22249 liters
15 to 16 3 a 15.0 a 278109 1.20 a 12.00 a 222488 -55622 liters
16 to 17 3 a 18.0 a 333731 1.20 a 13.20 a 244736 -88995 liters
17 to 18 3 a 21.0 a 389353 1.20 a 14.40 a 266985 -122368 liters
18 to 19 3 a 24.0 a 444975 1.20 a 15.60 a 289234 -155741 liters
19 to 20 0 a 24.0 a 444975 1.20 a 16.80 a 311483 -133493 liters
20 to 21 0 a 24.0 a 444975 1.20 a 18.00 a 333731 -111244 liters
21 to 22 0 a 24.0 a 444975 1.20 a 19.20 a 355980 -88995 liters
22 to 23 0 a 24.0 a 444975 1.20 a 20.40 a 378229 -66746 liters
23 to 24 0 a 24.0 a 444975 0.00 a 20.40 a 378229 -66746 liters
0 to 1 0 a 24.0 a 444975 0.00 a 20.40 a 378229 -66746 liters
1 to 2 0 a 24.0 a 444975 0.00 a 20.40 a 378229 -66746 liters
2 to 3 0 a 24.0 a 444975 1.20 a 21.60 a 400478 -44498 liters
3 to 4 0 a 24.0 a 444975 1.20 a 22.80 a 422726 -22249 liters
4 to 5 0 a 24.0 a 444975 1.20 a 24.00 a 444975 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -155741 liters
(Total Surplus + Total Deficit) Total Storage required = 155741 liters
Hence, capacity of ESR required = 160000 liters
Capacity as % of total Demand = 35.96%
Capacity as 50% of total Demand = 2,30,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Golaganda


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 346885 liters / day


Avg. hourly demand, a = 14454 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 43361 1.20 a 1.20 a 17344 -26016 liters


6 to 7 3 a 6.0 a 86721 1.20 a 2.40 a 34689 -52033 liters
7 to 8 3 a 9.0 a 130082 1.20 a 3.60 a 52033 -78049 liters
8 to 9 3 a 12.0 a 173443 1.20 a 4.80 a 69377 -104066 liters
9 to 10 0 a 12.0 a 173443 1.20 a 6.00 a 86721 -86721 liters
10 to 11 0 a 12.0 a 173443 1.20 a 7.20 a 104066 -69377 liters
11 to 12 0 a 12.0 a 173443 1.20 a 8.40 a 121410 -52033 liters
12 to 13 0 a 12.0 a 173443 0.00 a 8.40 a 121410 -52033 liters
13 to 14 0 a 12.0 a 173443 1.20 a 9.60 a 138754 -34689 liters
14 to 15 0 a 12.0 a 173443 1.20 a 10.80 a 156098 -17344 liters
15 to 16 3 a 15.0 a 216803 1.20 a 12.00 a 173443 -43361 liters
16 to 17 3 a 18.0 a 260164 1.20 a 13.20 a 190787 -69377 liters
17 to 18 3 a 21.0 a 303524 1.20 a 14.40 a 208131 -95393 liters
18 to 19 3 a 24.0 a 346885 1.20 a 15.60 a 225475 -121410 liters
19 to 20 0 a 24.0 a 346885 1.20 a 16.80 a 242820 -104066 liters
20 to 21 0 a 24.0 a 346885 1.20 a 18.00 a 260164 -86721 liters
21 to 22 0 a 24.0 a 346885 1.20 a 19.20 a 277508 -69377 liters
22 to 23 0 a 24.0 a 346885 1.20 a 20.40 a 294852 -52033 liters
23 to 24 0 a 24.0 a 346885 0.00 a 20.40 a 294852 -52033 liters
0 to 1 0 a 24.0 a 346885 0.00 a 20.40 a 294852 -52033 liters
1 to 2 0 a 24.0 a 346885 0.00 a 20.40 a 294852 -52033 liters
2 to 3 0 a 24.0 a 346885 1.20 a 21.60 a 312197 -34689 liters
3 to 4 0 a 24.0 a 346885 1.20 a 22.80 a 329541 -17344 liters
4 to 5 0 a 24.0 a 346885 1.20 a 24.00 a 346885 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -121410 liters
(Total Surplus + Total Deficit) Total Storage required = 121410 liters
Hence, capacity of ESR required = 130000 liters
Capacity as % of total Demand = 37.48%
Capacity as 50% of total Demand = 1,80,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Anuary


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 688160 liters / day


Avg. hourly demand, a = 28673 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 86020 1.20 a 1.20 a 34408 -51612 liters


6 to 7 3 a 6.0 a 172040 1.20 a 2.40 a 68816 -103224 liters
7 to 8 3 a 9.0 a 258060 1.20 a 3.60 a 103224 -154836 liters
8 to 9 3 a 12.0 a 344080 1.20 a 4.80 a 137632 -206448 liters
9 to 10 0 a 12.0 a 344080 1.20 a 6.00 a 172040 -172040 liters
10 to 11 0 a 12.0 a 344080 1.20 a 7.20 a 206448 -137632 liters
11 to 12 0 a 12.0 a 344080 1.20 a 8.40 a 240856 -103224 liters
12 to 13 0 a 12.0 a 344080 0.00 a 8.40 a 240856 -103224 liters
13 to 14 0 a 12.0 a 344080 1.20 a 9.60 a 275264 -68816 liters
14 to 15 0 a 12.0 a 344080 1.20 a 10.80 a 309672 -34408 liters
15 to 16 3 a 15.0 a 430100 1.20 a 12.00 a 344080 -86020 liters
16 to 17 3 a 18.0 a 516120 1.20 a 13.20 a 378488 -137632 liters
17 to 18 3 a 21.0 a 602140 1.20 a 14.40 a 412896 -189244 liters
18 to 19 3 a 24.0 a 688160 1.20 a 15.60 a 447304 -240856 liters
19 to 20 0 a 24.0 a 688160 1.20 a 16.80 a 481712 -206448 liters
20 to 21 0 a 24.0 a 688160 1.20 a 18.00 a 516120 -172040 liters
21 to 22 0 a 24.0 a 688160 1.20 a 19.20 a 550528 -137632 liters
22 to 23 0 a 24.0 a 688160 1.20 a 20.40 a 584936 -103224 liters
23 to 24 0 a 24.0 a 688160 0.00 a 20.40 a 584936 -103224 liters
0 to 1 0 a 24.0 a 688160 0.00 a 20.40 a 584936 -103224 liters
1 to 2 0 a 24.0 a 688160 0.00 a 20.40 a 584936 -103224 liters
2 to 3 0 a 24.0 a 688160 1.20 a 21.60 a 619344 -68816 liters
3 to 4 0 a 24.0 a 688160 1.20 a 22.80 a 653752 -34408 liters
4 to 5 0 a 24.0 a 688160 1.20 a 24.00 a 688160 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -240856 liters
(Total Surplus + Total Deficit) Total Storage required = 240856 liters
Hence, capacity of ESR required = 250000 liters
Capacity as % of total Demand = 36.33%
Capacity as 50% of total Demand = 3,50,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Baraput


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 833425 liters / day


Avg. hourly demand, a = 34726 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 104178 1.20 a 1.20 a 41671 -62507 liters


6 to 7 3 a 6.0 a 208356 1.20 a 2.40 a 83343 -125014 liters
7 to 8 3 a 9.0 a 312534 1.20 a 3.60 a 125014 -187521 liters
8 to 9 3 a 12.0 a 416713 1.20 a 4.80 a 166685 -250028 liters
9 to 10 0 a 12.0 a 416713 1.20 a 6.00 a 208356 -208356 liters
10 to 11 0 a 12.0 a 416713 1.20 a 7.20 a 250028 -166685 liters
11 to 12 0 a 12.0 a 416713 1.20 a 8.40 a 291699 -125014 liters
12 to 13 0 a 12.0 a 416713 0.00 a 8.40 a 291699 -125014 liters
13 to 14 0 a 12.0 a 416713 1.20 a 9.60 a 333370 -83343 liters
14 to 15 0 a 12.0 a 416713 1.20 a 10.80 a 375041 -41671 liters
15 to 16 3 a 15.0 a 520891 1.20 a 12.00 a 416713 -104178 liters
16 to 17 3 a 18.0 a 625069 1.20 a 13.20 a 458384 -166685 liters
17 to 18 3 a 21.0 a 729247 1.20 a 14.40 a 500055 -229192 liters
18 to 19 3 a 24.0 a 833425 1.20 a 15.60 a 541726 -291699 liters
19 to 20 0 a 24.0 a 833425 1.20 a 16.80 a 583398 -250028 liters
20 to 21 0 a 24.0 a 833425 1.20 a 18.00 a 625069 -208356 liters
21 to 22 0 a 24.0 a 833425 1.20 a 19.20 a 666740 -166685 liters
22 to 23 0 a 24.0 a 833425 1.20 a 20.40 a 708411 -125014 liters
23 to 24 0 a 24.0 a 833425 0.00 a 20.40 a 708411 -125014 liters
0 to 1 0 a 24.0 a 833425 0.00 a 20.40 a 708411 -125014 liters
1 to 2 0 a 24.0 a 833425 0.00 a 20.40 a 708411 -125014 liters
2 to 3 0 a 24.0 a 833425 1.20 a 21.60 a 750083 -83343 liters
3 to 4 0 a 24.0 a 833425 1.20 a 22.80 a 791754 -41671 liters
4 to 5 0 a 24.0 a 833425 1.20 a 24.00 a 833425 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -291699 liters
(Total Surplus + Total Deficit) Total Storage required = 291699 liters
Hence, capacity of ESR required = 300000 liters
Capacity as % of total Demand = 36.00%
Capacity as 50% of total Demand = 4,20,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Kiapalla


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 771715 liters / day


Avg. hourly demand, a = 32155 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 96464 1.20 a 1.20 a 38586 -57879 liters


6 to 7 3 a 6.0 a 192929 1.20 a 2.40 a 77172 -115757 liters
7 to 8 3 a 9.0 a 289393 1.20 a 3.60 a 115757 -173636 liters
8 to 9 3 a 12.0 a 385858 1.20 a 4.80 a 154343 -231515 liters
9 to 10 0 a 12.0 a 385858 1.20 a 6.00 a 192929 -192929 liters
10 to 11 0 a 12.0 a 385858 1.20 a 7.20 a 231515 -154343 liters
11 to 12 0 a 12.0 a 385858 1.20 a 8.40 a 270100 -115757 liters
12 to 13 0 a 12.0 a 385858 0.00 a 8.40 a 270100 -115757 liters
13 to 14 0 a 12.0 a 385858 1.20 a 9.60 a 308686 -77172 liters
14 to 15 0 a 12.0 a 385858 1.20 a 10.80 a 347272 -38586 liters
15 to 16 3 a 15.0 a 482322 1.20 a 12.00 a 385858 -96464 liters
16 to 17 3 a 18.0 a 578786 1.20 a 13.20 a 424443 -154343 liters
17 to 18 3 a 21.0 a 675251 1.20 a 14.40 a 463029 -212222 liters
18 to 19 3 a 24.0 a 771715 1.20 a 15.60 a 501615 -270100 liters
19 to 20 0 a 24.0 a 771715 1.20 a 16.80 a 540201 -231515 liters
20 to 21 0 a 24.0 a 771715 1.20 a 18.00 a 578786 -192929 liters
21 to 22 0 a 24.0 a 771715 1.20 a 19.20 a 617372 -154343 liters
22 to 23 0 a 24.0 a 771715 1.20 a 20.40 a 655958 -115757 liters
23 to 24 0 a 24.0 a 771715 0.00 a 20.40 a 655958 -115757 liters
0 to 1 0 a 24.0 a 771715 0.00 a 20.40 a 655958 -115757 liters
1 to 2 0 a 24.0 a 771715 0.00 a 20.40 a 655958 -115757 liters
2 to 3 0 a 24.0 a 771715 1.20 a 21.60 a 694544 -77172 liters
3 to 4 0 a 24.0 a 771715 1.20 a 22.80 a 733129 -38586 liters
4 to 5 0 a 24.0 a 771715 1.20 a 24.00 a 771715 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -270100 liters
(Total Surplus + Total Deficit) Total Storage required = 270100 liters
Hence, capacity of ESR required = 280000 liters
Capacity as % of total Demand = 36.28%
Capacity as 50% of total Demand = 3,90,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Barahampur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 922080 liters / day


Avg. hourly demand, a = 38420 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 115260 1.20 a 1.20 a 46104 -69156 liters


6 to 7 3 a 6.0 a 230520 1.20 a 2.40 a 92208 -138312 liters
7 to 8 3 a 9.0 a 345780 1.20 a 3.60 a 138312 -207468 liters
8 to 9 3 a 12.0 a 461040 1.20 a 4.80 a 184416 -276624 liters
9 to 10 0 a 12.0 a 461040 1.20 a 6.00 a 230520 -230520 liters
10 to 11 0 a 12.0 a 461040 1.20 a 7.20 a 276624 -184416 liters
11 to 12 0 a 12.0 a 461040 1.20 a 8.40 a 322728 -138312 liters
12 to 13 0 a 12.0 a 461040 0.00 a 8.40 a 322728 -138312 liters
13 to 14 0 a 12.0 a 461040 1.20 a 9.60 a 368832 -92208 liters
14 to 15 0 a 12.0 a 461040 1.20 a 10.80 a 414936 -46104 liters
15 to 16 3 a 15.0 a 576300 1.20 a 12.00 a 461040 -115260 liters
16 to 17 3 a 18.0 a 691560 1.20 a 13.20 a 507144 -184416 liters
17 to 18 3 a 21.0 a 806820 1.20 a 14.40 a 553248 -253572 liters
18 to 19 3 a 24.0 a 922080 1.20 a 15.60 a 599352 -322728 liters
19 to 20 0 a 24.0 a 922080 1.20 a 16.80 a 645456 -276624 liters
20 to 21 0 a 24.0 a 922080 1.20 a 18.00 a 691560 -230520 liters
21 to 22 0 a 24.0 a 922080 1.20 a 19.20 a 737664 -184416 liters
22 to 23 0 a 24.0 a 922080 1.20 a 20.40 a 783768 -138312 liters
23 to 24 0 a 24.0 a 922080 0.00 a 20.40 a 783768 -138312 liters
0 to 1 0 a 24.0 a 922080 0.00 a 20.40 a 783768 -138312 liters
1 to 2 0 a 24.0 a 922080 0.00 a 20.40 a 783768 -138312 liters
2 to 3 0 a 24.0 a 922080 1.20 a 21.60 a 829872 -92208 liters
3 to 4 0 a 24.0 a 922080 1.20 a 22.80 a 875976 -46104 liters
4 to 5 0 a 24.0 a 922080 1.20 a 24.00 a 922080 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -322728 liters
(Total Surplus + Total Deficit) Total Storage required = 322728 liters
Hence, capacity of ESR required = 330000 liters
Capacity as % of total Demand = 35.79%
Capacity as 50% of total Demand = 4,70,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Kalipoi


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 724880 liters / day


Avg. hourly demand, a = 30203 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 90610 1.20 a 1.20 a 36244 -54366 liters


6 to 7 3 a 6.0 a 181220 1.20 a 2.40 a 72488 -108732 liters
7 to 8 3 a 9.0 a 271830 1.20 a 3.60 a 108732 -163098 liters
8 to 9 3 a 12.0 a 362440 1.20 a 4.80 a 144976 -217464 liters
9 to 10 0 a 12.0 a 362440 1.20 a 6.00 a 181220 -181220 liters
10 to 11 0 a 12.0 a 362440 1.20 a 7.20 a 217464 -144976 liters
11 to 12 0 a 12.0 a 362440 1.20 a 8.40 a 253708 -108732 liters
12 to 13 0 a 12.0 a 362440 0.00 a 8.40 a 253708 -108732 liters
13 to 14 0 a 12.0 a 362440 1.20 a 9.60 a 289952 -72488 liters
14 to 15 0 a 12.0 a 362440 1.20 a 10.80 a 326196 -36244 liters
15 to 16 3 a 15.0 a 453050 1.20 a 12.00 a 362440 -90610 liters
16 to 17 3 a 18.0 a 543660 1.20 a 13.20 a 398684 -144976 liters
17 to 18 3 a 21.0 a 634270 1.20 a 14.40 a 434928 -199342 liters
18 to 19 3 a 24.0 a 724880 1.20 a 15.60 a 471172 -253708 liters
19 to 20 0 a 24.0 a 724880 1.20 a 16.80 a 507416 -217464 liters
20 to 21 0 a 24.0 a 724880 1.20 a 18.00 a 543660 -181220 liters
21 to 22 0 a 24.0 a 724880 1.20 a 19.20 a 579904 -144976 liters
22 to 23 0 a 24.0 a 724880 1.20 a 20.40 a 616148 -108732 liters
23 to 24 0 a 24.0 a 724880 0.00 a 20.40 a 616148 -108732 liters
0 to 1 0 a 24.0 a 724880 0.00 a 20.40 a 616148 -108732 liters
1 to 2 0 a 24.0 a 724880 0.00 a 20.40 a 616148 -108732 liters
2 to 3 0 a 24.0 a 724880 1.20 a 21.60 a 652392 -72488 liters
3 to 4 0 a 24.0 a 724880 1.20 a 22.80 a 688636 -36244 liters
4 to 5 0 a 24.0 a 724880 1.20 a 24.00 a 724880 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -253708 liters
(Total Surplus + Total Deficit) Total Storage required = 253708 liters
Hence, capacity of ESR required = 260000 liters
Capacity as % of total Demand = 35.87%
Capacity as 50% of total Demand = 3,70,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Puincha


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 1164755 liters / day


Avg. hourly demand, a = 48531 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative
Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 145594 1.20 a 1.20 a 58238 -87357 liters


6 to 7 3 a 6.0 a 291189 1.20 a 2.40 a 116476 -174713 liters
7 to 8 3 a 9.0 a 436783 1.20 a 3.60 a 174713 -262070 liters
8 to 9 3 a 12.0 a 582378 1.20 a 4.80 a 232951 -349427 liters
9 to 10 0 a 12.0 a 582378 1.20 a 6.00 a 291189 -291189 liters
10 to 11 0 a 12.0 a 582378 1.20 a 7.20 a 349427 -232951 liters
11 to 12 0 a 12.0 a 582378 1.20 a 8.40 a 407664 -174713 liters
12 to 13 0 a 12.0 a 582378 0.00 a 8.40 a 407664 -174713 liters
13 to 14 0 a 12.0 a 582378 1.20 a 9.60 a 465902 -116476 liters
14 to 15 0 a 12.0 a 582378 1.20 a 10.80 a 524140 -58238 liters
15 to 16 3 a 15.0 a 727972 1.20 a 12.00 a 582378 -145594 liters
16 to 17 3 a 18.0 a 873566 1.20 a 13.20 a 640615 -232951 liters
17 to 18 3 a 21.0 a 1019161 1.20 a 14.40 a 698853 -320308 liters
18 to 19 3 a 24.0 a 1164755 1.20 a 15.60 a 757091 -407664 liters
19 to 20 0 a 24.0 a 1164755 1.20 a 16.80 a 815329 -349427 liters
20 to 21 0 a 24.0 a 1164755 1.20 a 18.00 a 873566 -291189 liters
21 to 22 0 a 24.0 a 1164755 1.20 a 19.20 a 931804 -232951 liters
22 to 23 0 a 24.0 a 1164755 1.20 a 20.40 a 990042 -174713 liters
23 to 24 0 a 24.0 a 1164755 0.00 a 20.40 a 990042 -174713 liters
0 to 1 0 a 24.0 a 1164755 0.00 a 20.40 a 990042 -174713 liters
1 to 2 0 a 24.0 a 1164755 0.00 a 20.40 a 990042 -174713 liters
2 to 3 0 a 24.0 a 1164755 1.20 a 21.60 a 1048280 -116476 liters
3 to 4 0 a 24.0 a 1164755 1.20 a 22.80 a 1106517 -58238 liters
4 to 5 0 a 24.0 a 1164755 1.20 a 24.00 a 1164755 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -407664 liters
(Total Surplus + Total Deficit) Total Storage required = 407664 liters
Hence, capacity of ESR required = 410000 liters
Capacity as % of total Demand = 35.20%
Capacity as 50% of total Demand = 5,90,000

MaRS Planning Engineering Services Pvt. Ltd.


Damapada Block

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Pathapur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 1201645 liters / day


Avg. hourly demand, a = 50069 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 150206 1.20 a 1.20 a 60082 -90123 liters


6 to 7 3 a 6.0 a 300411 1.20 a 2.40 a 120165 -180247 liters
7 to 8 3 a 9.0 a 450617 1.20 a 3.60 a 180247 -270370 liters
8 to 9 3 a 12.0 a 600823 1.20 a 4.80 a 240329 -360494 liters
9 to 10 0 a 12.0 a 600823 1.20 a 6.00 a 300411 -300411 liters
10 to 11 0 a 12.0 a 600823 1.20 a 7.20 a 360494 -240329 liters
11 to 12 0 a 12.0 a 600823 1.20 a 8.40 a 420576 -180247 liters
12 to 13 0 a 12.0 a 600823 0.00 a 8.40 a 420576 -180247 liters
13 to 14 0 a 12.0 a 600823 1.20 a 9.60 a 480658 -120165 liters
14 to 15 0 a 12.0 a 600823 1.20 a 10.80 a 540740 -60082 liters
15 to 16 3 a 15.0 a 751028 1.20 a 12.00 a 600823 -150206 liters
16 to 17 3 a 18.0 a 901234 1.20 a 13.20 a 660905 -240329 liters
17 to 18 3 a 21.0 a 1051439 1.20 a 14.40 a 720987 -330452 liters
18 to 19 3 a 24.0 a 1201645 1.20 a 15.60 a 781069 -420576 liters
19 to 20 0 a 24.0 a 1201645 1.20 a 16.80 a 841152 -360494 liters
20 to 21 0 a 24.0 a 1201645 1.20 a 18.00 a 901234 -300411 liters
21 to 22 0 a 24.0 a 1201645 1.20 a 19.20 a 961316 -240329 liters
22 to 23 0 a 24.0 a 1201645 1.20 a 20.40 a 1021398 -180247 liters
23 to 24 0 a 24.0 a 1201645 0.00 a 20.40 a 1021398 -180247 liters
0 to 1 0 a 24.0 a 1201645 0.00 a 20.40 a 1021398 -180247 liters
1 to 2 0 a 24.0 a 1201645 0.00 a 20.40 a 1021398 -180247 liters
2 to 3 0 a 24.0 a 1201645 1.20 a 21.60 a 1081481 -120165 liters
3 to 4 0 a 24.0 a 1201645 1.20 a 22.80 a 1141563 -60082 liters
4 to 5 0 a 24.0 a 1201645 1.20 a 24.00 a 1201645 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -420576 liters
(Total Surplus + Total Deficit) Total Storage required = 420576 liters
Hence, capacity of ESR required = 430000 liters
Capacity as % of total Demand = 35.78%
Capacity as 50% of total Demand = 6,10,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Bhagipur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 578510 liters / day


Avg. hourly demand, a = 24105 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 72314 1.20 a 1.20 a 28926 -43388 liters


6 to 7 3 a 6.0 a 144628 1.20 a 2.40 a 57851 -86777 liters
7 to 8 3 a 9.0 a 216941 1.20 a 3.60 a 86777 -130165 liters
8 to 9 3 a 12.0 a 289255 1.20 a 4.80 a 115702 -173553 liters
9 to 10 0 a 12.0 a 289255 1.20 a 6.00 a 144628 -144628 liters
10 to 11 0 a 12.0 a 289255 1.20 a 7.20 a 173553 -115702 liters
11 to 12 0 a 12.0 a 289255 1.20 a 8.40 a 202479 -86777 liters
12 to 13 0 a 12.0 a 289255 0.00 a 8.40 a 202479 -86777 liters
13 to 14 0 a 12.0 a 289255 1.20 a 9.60 a 231404 -57851 liters
14 to 15 0 a 12.0 a 289255 1.20 a 10.80 a 260330 -28926 liters
15 to 16 3 a 15.0 a 361569 1.20 a 12.00 a 289255 -72314 liters
16 to 17 3 a 18.0 a 433883 1.20 a 13.20 a 318181 -115702 liters
17 to 18 3 a 21.0 a 506196 1.20 a 14.40 a 347106 -159090 liters
18 to 19 3 a 24.0 a 578510 1.20 a 15.60 a 376032 -202479 liters
19 to 20 0 a 24.0 a 578510 1.20 a 16.80 a 404957 -173553 liters
20 to 21 0 a 24.0 a 578510 1.20 a 18.00 a 433883 -144628 liters
21 to 22 0 a 24.0 a 578510 1.20 a 19.20 a 462808 -115702 liters
22 to 23 0 a 24.0 a 578510 1.20 a 20.40 a 491734 -86777 liters
23 to 24 0 a 24.0 a 578510 0.00 a 20.40 a 491734 -86777 liters
0 to 1 0 a 24.0 a 578510 0.00 a 20.40 a 491734 -86777 liters
1 to 2 0 a 24.0 a 578510 0.00 a 20.40 a 491734 -86777 liters
2 to 3 0 a 24.0 a 578510 1.20 a 21.60 a 520659 -57851 liters
3 to 4 0 a 24.0 a 578510 1.20 a 22.80 a 549585 -28926 liters
4 to 5 0 a 24.0 a 578510 1.20 a 24.00 a 578510 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -202479 liters
(Total Surplus + Total Deficit) Total Storage required = 202479 liters
Hence, capacity of ESR required = 210000 liters
Capacity as % of total Demand = 36.30%
Capacity as 50% of total Demand = 2,90,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Banara


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 599760 liters / day


Avg. hourly demand, a = 24990 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 74970 1.20 a 1.20 a 29988 -44982 liters


6 to 7 3 a 6.0 a 149940 1.20 a 2.40 a 59976 -89964 liters
7 to 8 3 a 9.0 a 224910 1.20 a 3.60 a 89964 -134946 liters
8 to 9 3 a 12.0 a 299880 1.20 a 4.80 a 119952 -179928 liters
9 to 10 0 a 12.0 a 299880 1.20 a 6.00 a 149940 -149940 liters
10 to 11 0 a 12.0 a 299880 1.20 a 7.20 a 179928 -119952 liters
11 to 12 0 a 12.0 a 299880 1.20 a 8.40 a 209916 -89964 liters
12 to 13 0 a 12.0 a 299880 0.00 a 8.40 a 209916 -89964 liters
13 to 14 0 a 12.0 a 299880 1.20 a 9.60 a 239904 -59976 liters
14 to 15 0 a 12.0 a 299880 1.20 a 10.80 a 269892 -29988 liters
15 to 16 3 a 15.0 a 374850 1.20 a 12.00 a 299880 -74970 liters
16 to 17 3 a 18.0 a 449820 1.20 a 13.20 a 329868 -119952 liters
17 to 18 3 a 21.0 a 524790 1.20 a 14.40 a 359856 -164934 liters
18 to 19 3 a 24.0 a 599760 1.20 a 15.60 a 389844 -209916 liters
19 to 20 0 a 24.0 a 599760 1.20 a 16.80 a 419832 -179928 liters
20 to 21 0 a 24.0 a 599760 1.20 a 18.00 a 449820 -149940 liters
21 to 22 0 a 24.0 a 599760 1.20 a 19.20 a 479808 -119952 liters
22 to 23 0 a 24.0 a 599760 1.20 a 20.40 a 509796 -89964 liters
23 to 24 0 a 24.0 a 599760 0.00 a 20.40 a 509796 -89964 liters
0 to 1 0 a 24.0 a 599760 0.00 a 20.40 a 509796 -89964 liters
1 to 2 0 a 24.0 a 599760 0.00 a 20.40 a 509796 -89964 liters
2 to 3 0 a 24.0 a 599760 1.20 a 21.60 a 539784 -59976 liters
3 to 4 0 a 24.0 a 599760 1.20 a 22.80 a 569772 -29988 liters
4 to 5 0 a 24.0 a 599760 1.20 a 24.00 a 599760 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -209916 liters
(Total Surplus + Total Deficit) Total Storage required = 209916 liters
Hence, capacity of ESR required = 210000 liters
Capacity as % of total Demand = 35.01%
Capacity as 50% of total Demand = 3,00,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Kusupangi


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 1040400 liters / day


Avg. hourly demand, a = 43350 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 130050 1.20 a 1.20 a 52020 -78030 liters


6 to 7 3 a 6.0 a 260100 1.20 a 2.40 a 104040 -156060 liters
7 to 8 3 a 9.0 a 390150 1.20 a 3.60 a 156060 -234090 liters
8 to 9 3 a 12.0 a 520200 1.20 a 4.80 a 208080 -312120 liters
9 to 10 0 a 12.0 a 520200 1.20 a 6.00 a 260100 -260100 liters
10 to 11 0 a 12.0 a 520200 1.20 a 7.20 a 312120 -208080 liters
11 to 12 0 a 12.0 a 520200 1.20 a 8.40 a 364140 -156060 liters
12 to 13 0 a 12.0 a 520200 0.00 a 8.40 a 364140 -156060 liters
13 to 14 0 a 12.0 a 520200 1.20 a 9.60 a 416160 -104040 liters
14 to 15 0 a 12.0 a 520200 1.20 a 10.80 a 468180 -52020 liters
15 to 16 3 a 15.0 a 650250 1.20 a 12.00 a 520200 -130050 liters
16 to 17 3 a 18.0 a 780300 1.20 a 13.20 a 572220 -208080 liters
17 to 18 3 a 21.0 a 910350 1.20 a 14.40 a 624240 -286110 liters
18 to 19 3 a 24.0 a 1040400 1.20 a 15.60 a 676260 -364140 liters
19 to 20 0 a 24.0 a 1040400 1.20 a 16.80 a 728280 -312120 liters
20 to 21 0 a 24.0 a 1040400 1.20 a 18.00 a 780300 -260100 liters
21 to 22 0 a 24.0 a 1040400 1.20 a 19.20 a 832320 -208080 liters
22 to 23 0 a 24.0 a 1040400 1.20 a 20.40 a 884340 -156060 liters
23 to 24 0 a 24.0 a 1040400 0.00 a 20.40 a 884340 -156060 liters
0 to 1 0 a 24.0 a 1040400 0.00 a 20.40 a 884340 -156060 liters
1 to 2 0 a 24.0 a 1040400 0.00 a 20.40 a 884340 -156060 liters
2 to 3 0 a 24.0 a 1040400 1.20 a 21.60 a 936360 -104040 liters
3 to 4 0 a 24.0 a 1040400 1.20 a 22.80 a 988380 -52020 liters
4 to 5 0 a 24.0 a 1040400 1.20 a 24.00 a 1040400 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -364140 liters
(Total Surplus + Total Deficit) Total Storage required = 364140 liters
Hence, capacity of ESR required = 370000 liters
Capacity as % of total Demand = 35.56%
Capacity as 50% of total Demand = 5,30,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Similipur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 581740 liters / day


Avg. hourly demand, a = 24239 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 72718 1.20 a 1.20 a 29087 -43631 liters


6 to 7 3 a 6.0 a 145435 1.20 a 2.40 a 58174 -87261 liters
7 to 8 3 a 9.0 a 218153 1.20 a 3.60 a 87261 -130892 liters
8 to 9 3 a 12.0 a 290870 1.20 a 4.80 a 116348 -174522 liters
9 to 10 0 a 12.0 a 290870 1.20 a 6.00 a 145435 -145435 liters
10 to 11 0 a 12.0 a 290870 1.20 a 7.20 a 174522 -116348 liters
11 to 12 0 a 12.0 a 290870 1.20 a 8.40 a 203609 -87261 liters
12 to 13 0 a 12.0 a 290870 0.00 a 8.40 a 203609 -87261 liters
13 to 14 0 a 12.0 a 290870 1.20 a 9.60 a 232696 -58174 liters
14 to 15 0 a 12.0 a 290870 1.20 a 10.80 a 261783 -29087 liters
15 to 16 3 a 15.0 a 363588 1.20 a 12.00 a 290870 -72718 liters
16 to 17 3 a 18.0 a 436305 1.20 a 13.20 a 319957 -116348 liters
17 to 18 3 a 21.0 a 509023 1.20 a 14.40 a 349044 -159979 liters
18 to 19 3 a 24.0 a 581740 1.20 a 15.60 a 378131 -203609 liters
19 to 20 0 a 24.0 a 581740 1.20 a 16.80 a 407218 -174522 liters
20 to 21 0 a 24.0 a 581740 1.20 a 18.00 a 436305 -145435 liters
21 to 22 0 a 24.0 a 581740 1.20 a 19.20 a 465392 -116348 liters
22 to 23 0 a 24.0 a 581740 1.20 a 20.40 a 494479 -87261 liters
23 to 24 0 a 24.0 a 581740 0.00 a 20.40 a 494479 -87261 liters
0 to 1 0 a 24.0 a 581740 0.00 a 20.40 a 494479 -87261 liters
1 to 2 0 a 24.0 a 581740 0.00 a 20.40 a 494479 -87261 liters
2 to 3 0 a 24.0 a 581740 1.20 a 21.60 a 523566 -58174 liters
3 to 4 0 a 24.0 a 581740 1.20 a 22.80 a 552653 -29087 liters
4 to 5 0 a 24.0 a 581740 1.20 a 24.00 a 581740 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -203609 liters
(Total Surplus + Total Deficit) Total Storage required = 203609 liters
Hence, capacity of ESR required = 210000 liters
Capacity as % of total Demand = 36.10%
Capacity as 50% of total Demand = 3,00,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Gobindpur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 612255 liters / day


Avg. hourly demand, a = 25511 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 76532 1.20 a 1.20 a 30613 -45919 liters


6 to 7 3 a 6.0 a 153064 1.20 a 2.40 a 61226 -91838 liters
7 to 8 3 a 9.0 a 229596 1.20 a 3.60 a 91838 -137757 liters
8 to 9 3 a 12.0 a 306128 1.20 a 4.80 a 122451 -183677 liters
9 to 10 0 a 12.0 a 306128 1.20 a 6.00 a 153064 -153064 liters
10 to 11 0 a 12.0 a 306128 1.20 a 7.20 a 183677 -122451 liters
11 to 12 0 a 12.0 a 306128 1.20 a 8.40 a 214289 -91838 liters
12 to 13 0 a 12.0 a 306128 0.00 a 8.40 a 214289 -91838 liters
13 to 14 0 a 12.0 a 306128 1.20 a 9.60 a 244902 -61226 liters
14 to 15 0 a 12.0 a 306128 1.20 a 10.80 a 275515 -30613 liters
15 to 16 3 a 15.0 a 382659 1.20 a 12.00 a 306128 -76532 liters
16 to 17 3 a 18.0 a 459191 1.20 a 13.20 a 336740 -122451 liters
17 to 18 3 a 21.0 a 535723 1.20 a 14.40 a 367353 -168370 liters
18 to 19 3 a 24.0 a 612255 1.20 a 15.60 a 397966 -214289 liters
19 to 20 0 a 24.0 a 612255 1.20 a 16.80 a 428579 -183677 liters
20 to 21 0 a 24.0 a 612255 1.20 a 18.00 a 459191 -153064 liters
21 to 22 0 a 24.0 a 612255 1.20 a 19.20 a 489804 -122451 liters
22 to 23 0 a 24.0 a 612255 1.20 a 20.40 a 520417 -91838 liters
23 to 24 0 a 24.0 a 612255 0.00 a 20.40 a 520417 -91838 liters
0 to 1 0 a 24.0 a 612255 0.00 a 20.40 a 520417 -91838 liters
1 to 2 0 a 24.0 a 612255 0.00 a 20.40 a 520417 -91838 liters
2 to 3 0 a 24.0 a 612255 1.20 a 21.60 a 551030 -61226 liters
3 to 4 0 a 24.0 a 612255 1.20 a 22.80 a 581642 -30613 liters
4 to 5 0 a 24.0 a 612255 1.20 a 24.00 a 612255 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -214289 liters
(Total Surplus + Total Deficit) Total Storage required = 214289 liters
Hence, capacity of ESR required = 220000 liters
Capacity as % of total Demand = 35.93%
Capacity as 50% of total Demand = 3,10,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Harirajpur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 597975 liters / day


Avg. hourly demand, a = 24916 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 74747 1.20 a 1.20 a 29899 -44848 liters


6 to 7 3 a 6.0 a 149494 1.20 a 2.40 a 59798 -89696 liters
7 to 8 3 a 9.0 a 224241 1.20 a 3.60 a 89696 -134544 liters
8 to 9 3 a 12.0 a 298988 1.20 a 4.80 a 119595 -179393 liters
9 to 10 0 a 12.0 a 298988 1.20 a 6.00 a 149494 -149494 liters
10 to 11 0 a 12.0 a 298988 1.20 a 7.20 a 179393 -119595 liters
11 to 12 0 a 12.0 a 298988 1.20 a 8.40 a 209291 -89696 liters
12 to 13 0 a 12.0 a 298988 0.00 a 8.40 a 209291 -89696 liters
13 to 14 0 a 12.0 a 298988 1.20 a 9.60 a 239190 -59798 liters
14 to 15 0 a 12.0 a 298988 1.20 a 10.80 a 269089 -29899 liters
15 to 16 3 a 15.0 a 373734 1.20 a 12.00 a 298988 -74747 liters
16 to 17 3 a 18.0 a 448481 1.20 a 13.20 a 328886 -119595 liters
17 to 18 3 a 21.0 a 523228 1.20 a 14.40 a 358785 -164443 liters
18 to 19 3 a 24.0 a 597975 1.20 a 15.60 a 388684 -209291 liters
19 to 20 0 a 24.0 a 597975 1.20 a 16.80 a 418583 -179393 liters
20 to 21 0 a 24.0 a 597975 1.20 a 18.00 a 448481 -149494 liters
21 to 22 0 a 24.0 a 597975 1.20 a 19.20 a 478380 -119595 liters
22 to 23 0 a 24.0 a 597975 1.20 a 20.40 a 508279 -89696 liters
23 to 24 0 a 24.0 a 597975 0.00 a 20.40 a 508279 -89696 liters
0 to 1 0 a 24.0 a 597975 0.00 a 20.40 a 508279 -89696 liters
1 to 2 0 a 24.0 a 597975 0.00 a 20.40 a 508279 -89696 liters
2 to 3 0 a 24.0 a 597975 1.20 a 21.60 a 538178 -59798 liters
3 to 4 0 a 24.0 a 597975 1.20 a 22.80 a 568076 -29899 liters
4 to 5 0 a 24.0 a 597975 1.20 a 24.00 a 597975 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -209291 liters
(Total Surplus + Total Deficit) Total Storage required = 209291 liters
Hence, capacity of ESR required = 210000 liters
Capacity as % of total Demand = 35.12%
Capacity as 50% of total Demand = 3,00,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Bilipada


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 529635 liters / day


Avg. hourly demand, a = 22068 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 66204 1.20 a 1.20 a 26482 -39723 liters


6 to 7 3 a 6.0 a 132409 1.20 a 2.40 a 52964 -79445 liters
7 to 8 3 a 9.0 a 198613 1.20 a 3.60 a 79445 -119168 liters
8 to 9 3 a 12.0 a 264818 1.20 a 4.80 a 105927 -158891 liters
9 to 10 0 a 12.0 a 264818 1.20 a 6.00 a 132409 -132409 liters
10 to 11 0 a 12.0 a 264818 1.20 a 7.20 a 158891 -105927 liters
11 to 12 0 a 12.0 a 264818 1.20 a 8.40 a 185372 -79445 liters
12 to 13 0 a 12.0 a 264818 0.00 a 8.40 a 185372 -79445 liters
13 to 14 0 a 12.0 a 264818 1.20 a 9.60 a 211854 -52964 liters
14 to 15 0 a 12.0 a 264818 1.20 a 10.80 a 238336 -26482 liters
15 to 16 3 a 15.0 a 331022 1.20 a 12.00 a 264818 -66204 liters
16 to 17 3 a 18.0 a 397226 1.20 a 13.20 a 291299 -105927 liters
17 to 18 3 a 21.0 a 463431 1.20 a 14.40 a 317781 -145650 liters
18 to 19 3 a 24.0 a 529635 1.20 a 15.60 a 344263 -185372 liters
19 to 20 0 a 24.0 a 529635 1.20 a 16.80 a 370745 -158891 liters
20 to 21 0 a 24.0 a 529635 1.20 a 18.00 a 397226 -132409 liters
21 to 22 0 a 24.0 a 529635 1.20 a 19.20 a 423708 -105927 liters
22 to 23 0 a 24.0 a 529635 1.20 a 20.40 a 450190 -79445 liters
23 to 24 0 a 24.0 a 529635 0.00 a 20.40 a 450190 -79445 liters
0 to 1 0 a 24.0 a 529635 0.00 a 20.40 a 450190 -79445 liters
1 to 2 0 a 24.0 a 529635 0.00 a 20.40 a 450190 -79445 liters
2 to 3 0 a 24.0 a 529635 1.20 a 21.60 a 476672 -52964 liters
3 to 4 0 a 24.0 a 529635 1.20 a 22.80 a 503153 -26482 liters
4 to 5 0 a 24.0 a 529635 1.20 a 24.00 a 529635 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -185372 liters
(Total Surplus + Total Deficit) Total Storage required = 185372 liters
Hence, capacity of ESR required = 190000 liters
Capacity as % of total Demand = 35.87%
Capacity as 50% of total Demand = 2,70,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Dulanapur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 564995 liters / day


Avg. hourly demand, a = 23541 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 70624 1.20 a 1.20 a 28250 -42375 liters


6 to 7 3 a 6.0 a 141249 1.20 a 2.40 a 56500 -84749 liters
7 to 8 3 a 9.0 a 211873 1.20 a 3.60 a 84749 -127124 liters
8 to 9 3 a 12.0 a 282498 1.20 a 4.80 a 112999 -169499 liters
9 to 10 0 a 12.0 a 282498 1.20 a 6.00 a 141249 -141249 liters
10 to 11 0 a 12.0 a 282498 1.20 a 7.20 a 169499 -112999 liters
11 to 12 0 a 12.0 a 282498 1.20 a 8.40 a 197748 -84749 liters
12 to 13 0 a 12.0 a 282498 0.00 a 8.40 a 197748 -84749 liters
13 to 14 0 a 12.0 a 282498 1.20 a 9.60 a 225998 -56500 liters
14 to 15 0 a 12.0 a 282498 1.20 a 10.80 a 254248 -28250 liters
15 to 16 3 a 15.0 a 353122 1.20 a 12.00 a 282498 -70624 liters
16 to 17 3 a 18.0 a 423746 1.20 a 13.20 a 310747 -112999 liters
17 to 18 3 a 21.0 a 494371 1.20 a 14.40 a 338997 -155374 liters
18 to 19 3 a 24.0 a 564995 1.20 a 15.60 a 367247 -197748 liters
19 to 20 0 a 24.0 a 564995 1.20 a 16.80 a 395497 -169499 liters
20 to 21 0 a 24.0 a 564995 1.20 a 18.00 a 423746 -141249 liters
21 to 22 0 a 24.0 a 564995 1.20 a 19.20 a 451996 -112999 liters
22 to 23 0 a 24.0 a 564995 1.20 a 20.40 a 480246 -84749 liters
23 to 24 0 a 24.0 a 564995 0.00 a 20.40 a 480246 -84749 liters
0 to 1 0 a 24.0 a 564995 0.00 a 20.40 a 480246 -84749 liters
1 to 2 0 a 24.0 a 564995 0.00 a 20.40 a 480246 -84749 liters
2 to 3 0 a 24.0 a 564995 1.20 a 21.60 a 508496 -56500 liters
3 to 4 0 a 24.0 a 564995 1.20 a 22.80 a 536745 -28250 liters
4 to 5 0 a 24.0 a 564995 1.20 a 24.00 a 564995 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -197748 liters
(Total Surplus + Total Deficit) Total Storage required = 197748 liters
Hence, capacity of ESR required = 200000 liters
Capacity as % of total Demand = 35.40%
Capacity as 50% of total Demand = 2,90,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Gopalpur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 1421965 liters / day


Avg. hourly demand, a = 59249 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative
Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 177746 1.20 a 1.20 a 71098 -106647 liters


6 to 7 3 a 6.0 a 355491 1.20 a 2.40 a 142197 -213295 liters
7 to 8 3 a 9.0 a 533237 1.20 a 3.60 a 213295 -319942 liters
8 to 9 3 a 12.0 a 710983 1.20 a 4.80 a 284393 -426590 liters
9 to 10 0 a 12.0 a 710983 1.20 a 6.00 a 355491 -355491 liters
10 to 11 0 a 12.0 a 710983 1.20 a 7.20 a 426590 -284393 liters
11 to 12 0 a 12.0 a 710983 1.20 a 8.40 a 497688 -213295 liters
12 to 13 0 a 12.0 a 710983 0.00 a 8.40 a 497688 -213295 liters
13 to 14 0 a 12.0 a 710983 1.20 a 9.60 a 568786 -142197 liters
14 to 15 0 a 12.0 a 710983 1.20 a 10.80 a 639884 -71098 liters
15 to 16 3 a 15.0 a 888728 1.20 a 12.00 a 710983 -177746 liters
16 to 17 3 a 18.0 a 1066474 1.20 a 13.20 a 782081 -284393 liters
17 to 18 3 a 21.0 a 1244219 1.20 a 14.40 a 853179 -391040 liters
18 to 19 3 a 24.0 a 1421965 1.20 a 15.60 a 924277 -497688 liters
19 to 20 0 a 24.0 a 1421965 1.20 a 16.80 a 995376 -426590 liters
20 to 21 0 a 24.0 a 1421965 1.20 a 18.00 a 1066474 -355491 liters
21 to 22 0 a 24.0 a 1421965 1.20 a 19.20 a 1137572 -284393 liters
22 to 23 0 a 24.0 a 1421965 1.20 a 20.40 a 1208670 -213295 liters
23 to 24 0 a 24.0 a 1421965 0.00 a 20.40 a 1208670 -213295 liters
0 to 1 0 a 24.0 a 1421965 0.00 a 20.40 a 1208670 -213295 liters
1 to 2 0 a 24.0 a 1421965 0.00 a 20.40 a 1208670 -213295 liters
2 to 3 0 a 24.0 a 1421965 1.20 a 21.60 a 1279769 -142197 liters
3 to 4 0 a 24.0 a 1421965 1.20 a 22.80 a 1350867 -71098 liters
4 to 5 0 a 24.0 a 1421965 1.20 a 24.00 a 1421965 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -497688 liters
(Total Surplus + Total Deficit) Total Storage required = 497688 liters
Hence, capacity of ESR required = 500000 liters
Capacity as % of total Demand = 35.16%
Capacity as 50% of total Demand = 7,20,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Talabasta


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 1743265 liters / day


Avg. hourly demand, a = 72636 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 217908 1.20 a 1.20 a 87163 -130745 liters


6 to 7 3 a 6.0 a 435816 1.20 a 2.40 a 174327 -261490 liters
7 to 8 3 a 9.0 a 653724 1.20 a 3.60 a 261490 -392235 liters
8 to 9 3 a 12.0 a 871633 1.20 a 4.80 a 348653 -522980 liters
9 to 10 0 a 12.0 a 871633 1.20 a 6.00 a 435816 -435816 liters
10 to 11 0 a 12.0 a 871633 1.20 a 7.20 a 522980 -348653 liters
11 to 12 0 a 12.0 a 871633 1.20 a 8.40 a 610143 -261490 liters
12 to 13 0 a 12.0 a 871633 0.00 a 8.40 a 610143 -261490 liters
13 to 14 0 a 12.0 a 871633 1.20 a 9.60 a 697306 -174327 liters
14 to 15 0 a 12.0 a 871633 1.20 a 10.80 a 784469 -87163 liters
15 to 16 3 a 15.0 a 1089541 1.20 a 12.00 a 871633 -217908 liters
16 to 17 3 a 18.0 a 1307449 1.20 a 13.20 a 958796 -348653 liters
17 to 18 3 a 21.0 a 1525357 1.20 a 14.40 a 1045959 -479398 liters
18 to 19 3 a 24.0 a 1743265 1.20 a 15.60 a 1133122 -610143 liters
19 to 20 0 a 24.0 a 1743265 1.20 a 16.80 a 1220286 -522980 liters
20 to 21 0 a 24.0 a 1743265 1.20 a 18.00 a 1307449 -435816 liters
21 to 22 0 a 24.0 a 1743265 1.20 a 19.20 a 1394612 -348653 liters
22 to 23 0 a 24.0 a 1743265 1.20 a 20.40 a 1481775 -261490 liters
23 to 24 0 a 24.0 a 1743265 0.00 a 20.40 a 1481775 -261490 liters
0 to 1 0 a 24.0 a 1743265 0.00 a 20.40 a 1481775 -261490 liters
1 to 2 0 a 24.0 a 1743265 0.00 a 20.40 a 1481775 -261490 liters
2 to 3 0 a 24.0 a 1743265 1.20 a 21.60 a 1568939 -174327 liters
3 to 4 0 a 24.0 a 1743265 1.20 a 22.80 a 1656102 -87163 liters
4 to 5 0 a 24.0 a 1743265 1.20 a 24.00 a 1743265 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -610143 liters
(Total Surplus + Total Deficit) Total Storage required = 610143 liters
Hence, capacity of ESR required = 620000 liters
Capacity as % of total Demand = 35.57%
Capacity as 50% of total Demand = 8,80,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Ragadi


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 617780 liters / day


Avg. hourly demand, a = 25741 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 77223 1.20 a 1.20 a 30889 -46334 liters


6 to 7 3 a 6.0 a 154445 1.20 a 2.40 a 61778 -92667 liters
7 to 8 3 a 9.0 a 231668 1.20 a 3.60 a 92667 -139001 liters
8 to 9 3 a 12.0 a 308890 1.20 a 4.80 a 123556 -185334 liters
9 to 10 0 a 12.0 a 308890 1.20 a 6.00 a 154445 -154445 liters
10 to 11 0 a 12.0 a 308890 1.20 a 7.20 a 185334 -123556 liters
11 to 12 0 a 12.0 a 308890 1.20 a 8.40 a 216223 -92667 liters
12 to 13 0 a 12.0 a 308890 0.00 a 8.40 a 216223 -92667 liters
13 to 14 0 a 12.0 a 308890 1.20 a 9.60 a 247112 -61778 liters
14 to 15 0 a 12.0 a 308890 1.20 a 10.80 a 278001 -30889 liters
15 to 16 3 a 15.0 a 386113 1.20 a 12.00 a 308890 -77223 liters
16 to 17 3 a 18.0 a 463335 1.20 a 13.20 a 339779 -123556 liters
17 to 18 3 a 21.0 a 540558 1.20 a 14.40 a 370668 -169890 liters
18 to 19 3 a 24.0 a 617780 1.20 a 15.60 a 401557 -216223 liters
19 to 20 0 a 24.0 a 617780 1.20 a 16.80 a 432446 -185334 liters
20 to 21 0 a 24.0 a 617780 1.20 a 18.00 a 463335 -154445 liters
21 to 22 0 a 24.0 a 617780 1.20 a 19.20 a 494224 -123556 liters
22 to 23 0 a 24.0 a 617780 1.20 a 20.40 a 525113 -92667 liters
23 to 24 0 a 24.0 a 617780 0.00 a 20.40 a 525113 -92667 liters
0 to 1 0 a 24.0 a 617780 0.00 a 20.40 a 525113 -92667 liters
1 to 2 0 a 24.0 a 617780 0.00 a 20.40 a 525113 -92667 liters
2 to 3 0 a 24.0 a 617780 1.20 a 21.60 a 556002 -61778 liters
3 to 4 0 a 24.0 a 617780 1.20 a 22.80 a 586891 -30889 liters
4 to 5 0 a 24.0 a 617780 1.20 a 24.00 a 617780 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -216223 liters
(Total Surplus + Total Deficit) Total Storage required = 216223 liters
Hence, capacity of ESR required = 220000 liters
Capacity as % of total Demand = 35.61%
Capacity as 50% of total Demand = 3,10,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Damapada


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 763980 liters / day


Avg. hourly demand, a = 31833 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 95498 1.20 a 1.20 a 38199 -57299 liters


6 to 7 3 a 6.0 a 190995 1.20 a 2.40 a 76398 -114597 liters
7 to 8 3 a 9.0 a 286493 1.20 a 3.60 a 114597 -171896 liters
8 to 9 3 a 12.0 a 381990 1.20 a 4.80 a 152796 -229194 liters
9 to 10 0 a 12.0 a 381990 1.20 a 6.00 a 190995 -190995 liters
10 to 11 0 a 12.0 a 381990 1.20 a 7.20 a 229194 -152796 liters
11 to 12 0 a 12.0 a 381990 1.20 a 8.40 a 267393 -114597 liters
12 to 13 0 a 12.0 a 381990 0.00 a 8.40 a 267393 -114597 liters
13 to 14 0 a 12.0 a 381990 1.20 a 9.60 a 305592 -76398 liters
14 to 15 0 a 12.0 a 381990 1.20 a 10.80 a 343791 -38199 liters
15 to 16 3 a 15.0 a 477488 1.20 a 12.00 a 381990 -95498 liters
16 to 17 3 a 18.0 a 572985 1.20 a 13.20 a 420189 -152796 liters
17 to 18 3 a 21.0 a 668483 1.20 a 14.40 a 458388 -210095 liters
18 to 19 3 a 24.0 a 763980 1.20 a 15.60 a 496587 -267393 liters
19 to 20 0 a 24.0 a 763980 1.20 a 16.80 a 534786 -229194 liters
20 to 21 0 a 24.0 a 763980 1.20 a 18.00 a 572985 -190995 liters
21 to 22 0 a 24.0 a 763980 1.20 a 19.20 a 611184 -152796 liters
22 to 23 0 a 24.0 a 763980 1.20 a 20.40 a 649383 -114597 liters
23 to 24 0 a 24.0 a 763980 0.00 a 20.40 a 649383 -114597 liters
0 to 1 0 a 24.0 a 763980 0.00 a 20.40 a 649383 -114597 liters
1 to 2 0 a 24.0 a 763980 0.00 a 20.40 a 649383 -114597 liters
2 to 3 0 a 24.0 a 763980 1.20 a 21.60 a 687582 -76398 liters
3 to 4 0 a 24.0 a 763980 1.20 a 22.80 a 725781 -38199 liters
4 to 5 0 a 24.0 a 763980 1.20 a 24.00 a 763980 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -267393 liters
(Total Surplus + Total Deficit) Total Storage required = 267393 liters
Hence, capacity of ESR required = 270000 liters
Capacity as % of total Demand = 35.34%
Capacity as 50% of total Demand = 3,90,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Durgapur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 482545 liters / day


Avg. hourly demand, a = 20106 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 60318 1.20 a 1.20 a 24127 -36191 liters


6 to 7 3 a 6.0 a 120636 1.20 a 2.40 a 48255 -72382 liters
7 to 8 3 a 9.0 a 180954 1.20 a 3.60 a 72382 -108573 liters
8 to 9 3 a 12.0 a 241273 1.20 a 4.80 a 96509 -144764 liters
9 to 10 0 a 12.0 a 241273 1.20 a 6.00 a 120636 -120636 liters
10 to 11 0 a 12.0 a 241273 1.20 a 7.20 a 144764 -96509 liters
11 to 12 0 a 12.0 a 241273 1.20 a 8.40 a 168891 -72382 liters
12 to 13 0 a 12.0 a 241273 0.00 a 8.40 a 168891 -72382 liters
13 to 14 0 a 12.0 a 241273 1.20 a 9.60 a 193018 -48255 liters
14 to 15 0 a 12.0 a 241273 1.20 a 10.80 a 217145 -24127 liters
15 to 16 3 a 15.0 a 301591 1.20 a 12.00 a 241273 -60318 liters
16 to 17 3 a 18.0 a 361909 1.20 a 13.20 a 265400 -96509 liters
17 to 18 3 a 21.0 a 422227 1.20 a 14.40 a 289527 -132700 liters
18 to 19 3 a 24.0 a 482545 1.20 a 15.60 a 313654 -168891 liters
19 to 20 0 a 24.0 a 482545 1.20 a 16.80 a 337782 -144764 liters
20 to 21 0 a 24.0 a 482545 1.20 a 18.00 a 361909 -120636 liters
21 to 22 0 a 24.0 a 482545 1.20 a 19.20 a 386036 -96509 liters
22 to 23 0 a 24.0 a 482545 1.20 a 20.40 a 410163 -72382 liters
23 to 24 0 a 24.0 a 482545 0.00 a 20.40 a 410163 -72382 liters
0 to 1 0 a 24.0 a 482545 0.00 a 20.40 a 410163 -72382 liters
1 to 2 0 a 24.0 a 482545 0.00 a 20.40 a 410163 -72382 liters
2 to 3 0 a 24.0 a 482545 1.20 a 21.60 a 434291 -48255 liters
3 to 4 0 a 24.0 a 482545 1.20 a 22.80 a 458418 -24127 liters
4 to 5 0 a 24.0 a 482545 1.20 a 24.00 a 482545 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -168891 liters
(Total Surplus + Total Deficit) Total Storage required = 168891 liters
Hence, capacity of ESR required = 170000 liters
Capacity as % of total Demand = 35.23%
Capacity as 50% of total Demand = 2,50,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Dhansar


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 817360 liters / day


Avg. hourly demand, a = 34057 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 102170 1.20 a 1.20 a 40868 -61302 liters


6 to 7 3 a 6.0 a 204340 1.20 a 2.40 a 81736 -122604 liters
7 to 8 3 a 9.0 a 306510 1.20 a 3.60 a 122604 -183906 liters
8 to 9 3 a 12.0 a 408680 1.20 a 4.80 a 163472 -245208 liters
9 to 10 0 a 12.0 a 408680 1.20 a 6.00 a 204340 -204340 liters
10 to 11 0 a 12.0 a 408680 1.20 a 7.20 a 245208 -163472 liters
11 to 12 0 a 12.0 a 408680 1.20 a 8.40 a 286076 -122604 liters
12 to 13 0 a 12.0 a 408680 0.00 a 8.40 a 286076 -122604 liters
13 to 14 0 a 12.0 a 408680 1.20 a 9.60 a 326944 -81736 liters
14 to 15 0 a 12.0 a 408680 1.20 a 10.80 a 367812 -40868 liters
15 to 16 3 a 15.0 a 510850 1.20 a 12.00 a 408680 -102170 liters
16 to 17 3 a 18.0 a 613020 1.20 a 13.20 a 449548 -163472 liters
17 to 18 3 a 21.0 a 715190 1.20 a 14.40 a 490416 -224774 liters
18 to 19 3 a 24.0 a 817360 1.20 a 15.60 a 531284 -286076 liters
19 to 20 0 a 24.0 a 817360 1.20 a 16.80 a 572152 -245208 liters
20 to 21 0 a 24.0 a 817360 1.20 a 18.00 a 613020 -204340 liters
21 to 22 0 a 24.0 a 817360 1.20 a 19.20 a 653888 -163472 liters
22 to 23 0 a 24.0 a 817360 1.20 a 20.40 a 694756 -122604 liters
23 to 24 0 a 24.0 a 817360 0.00 a 20.40 a 694756 -122604 liters
0 to 1 0 a 24.0 a 817360 0.00 a 20.40 a 694756 -122604 liters
1 to 2 0 a 24.0 a 817360 0.00 a 20.40 a 694756 -122604 liters
2 to 3 0 a 24.0 a 817360 1.20 a 21.60 a 735624 -81736 liters
3 to 4 0 a 24.0 a 817360 1.20 a 22.80 a 776492 -40868 liters
4 to 5 0 a 24.0 a 817360 1.20 a 24.00 a 817360 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -286076 liters
(Total Surplus + Total Deficit) Total Storage required = 286076 liters
Hence, capacity of ESR required = 290000 liters
Capacity as % of total Demand = 35.48%
Capacity as 50% of total Demand = 4,10,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Tulasipur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 522920 liters / day


Avg. hourly demand, a = 21788 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 65365 1.20 a 1.20 a 26146 -39219 liters


6 to 7 3 a 6.0 a 130730 1.20 a 2.40 a 52292 -78438 liters
7 to 8 3 a 9.0 a 196095 1.20 a 3.60 a 78438 -117657 liters
8 to 9 3 a 12.0 a 261460 1.20 a 4.80 a 104584 -156876 liters
9 to 10 0 a 12.0 a 261460 1.20 a 6.00 a 130730 -130730 liters
10 to 11 0 a 12.0 a 261460 1.20 a 7.20 a 156876 -104584 liters
11 to 12 0 a 12.0 a 261460 1.20 a 8.40 a 183022 -78438 liters
12 to 13 0 a 12.0 a 261460 0.00 a 8.40 a 183022 -78438 liters
13 to 14 0 a 12.0 a 261460 1.20 a 9.60 a 209168 -52292 liters
14 to 15 0 a 12.0 a 261460 1.20 a 10.80 a 235314 -26146 liters
15 to 16 3 a 15.0 a 326825 1.20 a 12.00 a 261460 -65365 liters
16 to 17 3 a 18.0 a 392190 1.20 a 13.20 a 287606 -104584 liters
17 to 18 3 a 21.0 a 457555 1.20 a 14.40 a 313752 -143803 liters
18 to 19 3 a 24.0 a 522920 1.20 a 15.60 a 339898 -183022 liters
19 to 20 0 a 24.0 a 522920 1.20 a 16.80 a 366044 -156876 liters
20 to 21 0 a 24.0 a 522920 1.20 a 18.00 a 392190 -130730 liters
21 to 22 0 a 24.0 a 522920 1.20 a 19.20 a 418336 -104584 liters
22 to 23 0 a 24.0 a 522920 1.20 a 20.40 a 444482 -78438 liters
23 to 24 0 a 24.0 a 522920 0.00 a 20.40 a 444482 -78438 liters
0 to 1 0 a 24.0 a 522920 0.00 a 20.40 a 444482 -78438 liters
1 to 2 0 a 24.0 a 522920 0.00 a 20.40 a 444482 -78438 liters
2 to 3 0 a 24.0 a 522920 1.20 a 21.60 a 470628 -52292 liters
3 to 4 0 a 24.0 a 522920 1.20 a 22.80 a 496774 -26146 liters
4 to 5 0 a 24.0 a 522920 1.20 a 24.00 a 522920 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -183022 liters
(Total Surplus + Total Deficit) Total Storage required = 183022 liters
Hence, capacity of ESR required = 190000 liters
Capacity as % of total Demand = 36.33%
Capacity as 50% of total Demand = 2,70,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Naragang


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 683740 liters / day


Avg. hourly demand, a = 28489 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 85468 1.20 a 1.20 a 34187 -51281 liters


6 to 7 3 a 6.0 a 170935 1.20 a 2.40 a 68374 -102561 liters
7 to 8 3 a 9.0 a 256403 1.20 a 3.60 a 102561 -153842 liters
8 to 9 3 a 12.0 a 341870 1.20 a 4.80 a 136748 -205122 liters
9 to 10 0 a 12.0 a 341870 1.20 a 6.00 a 170935 -170935 liters
10 to 11 0 a 12.0 a 341870 1.20 a 7.20 a 205122 -136748 liters
11 to 12 0 a 12.0 a 341870 1.20 a 8.40 a 239309 -102561 liters
12 to 13 0 a 12.0 a 341870 0.00 a 8.40 a 239309 -102561 liters
13 to 14 0 a 12.0 a 341870 1.20 a 9.60 a 273496 -68374 liters
14 to 15 0 a 12.0 a 341870 1.20 a 10.80 a 307683 -34187 liters
15 to 16 3 a 15.0 a 427338 1.20 a 12.00 a 341870 -85468 liters
16 to 17 3 a 18.0 a 512805 1.20 a 13.20 a 376057 -136748 liters
17 to 18 3 a 21.0 a 598273 1.20 a 14.40 a 410244 -188029 liters
18 to 19 3 a 24.0 a 683740 1.20 a 15.60 a 444431 -239309 liters
19 to 20 0 a 24.0 a 683740 1.20 a 16.80 a 478618 -205122 liters
20 to 21 0 a 24.0 a 683740 1.20 a 18.00 a 512805 -170935 liters
21 to 22 0 a 24.0 a 683740 1.20 a 19.20 a 546992 -136748 liters
22 to 23 0 a 24.0 a 683740 1.20 a 20.40 a 581179 -102561 liters
23 to 24 0 a 24.0 a 683740 0.00 a 20.40 a 581179 -102561 liters
0 to 1 0 a 24.0 a 683740 0.00 a 20.40 a 581179 -102561 liters
1 to 2 0 a 24.0 a 683740 0.00 a 20.40 a 581179 -102561 liters
2 to 3 0 a 24.0 a 683740 1.20 a 21.60 a 615366 -68374 liters
3 to 4 0 a 24.0 a 683740 1.20 a 22.80 a 649553 -34187 liters
4 to 5 0 a 24.0 a 683740 1.20 a 24.00 a 683740 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -239309 liters
(Total Surplus + Total Deficit) Total Storage required = 239309 liters
Hence, capacity of ESR required = 240000 liters
Capacity as % of total Demand = 35.10%
Capacity as 50% of total Demand = 3,50,000

MaRS Planning Engineering Services Pvt. Ltd.


Baranga Block

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Mundali


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 831130 liters / day


Avg. hourly demand, a = 34630 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 103891 1.20 a 1.20 a 41557 -62335 liters


6 to 7 3 a 6.0 a 207783 1.20 a 2.40 a 83113 -124670 liters
7 to 8 3 a 9.0 a 311674 1.20 a 3.60 a 124670 -187004 liters
8 to 9 3 a 12.0 a 415565 1.20 a 4.80 a 166226 -249339 liters
9 to 10 0 a 12.0 a 415565 1.20 a 6.00 a 207783 -207783 liters
10 to 11 0 a 12.0 a 415565 1.20 a 7.20 a 249339 -166226 liters
11 to 12 0 a 12.0 a 415565 1.20 a 8.40 a 290896 -124670 liters
12 to 13 0 a 12.0 a 415565 0.00 a 8.40 a 290896 -124670 liters
13 to 14 0 a 12.0 a 415565 1.20 a 9.60 a 332452 -83113 liters
14 to 15 0 a 12.0 a 415565 1.20 a 10.80 a 374009 -41557 liters
15 to 16 3 a 15.0 a 519456 1.20 a 12.00 a 415565 -103891 liters
16 to 17 3 a 18.0 a 623348 1.20 a 13.20 a 457122 -166226 liters
17 to 18 3 a 21.0 a 727239 1.20 a 14.40 a 498678 -228561 liters
18 to 19 3 a 24.0 a 831130 1.20 a 15.60 a 540235 -290896 liters
19 to 20 0 a 24.0 a 831130 1.20 a 16.80 a 581791 -249339 liters
20 to 21 0 a 24.0 a 831130 1.20 a 18.00 a 623348 -207783 liters
21 to 22 0 a 24.0 a 831130 1.20 a 19.20 a 664904 -166226 liters
22 to 23 0 a 24.0 a 831130 1.20 a 20.40 a 706461 -124670 liters
23 to 24 0 a 24.0 a 831130 0.00 a 20.40 a 706461 -124670 liters
0 to 1 0 a 24.0 a 831130 0.00 a 20.40 a 706461 -124670 liters
1 to 2 0 a 24.0 a 831130 0.00 a 20.40 a 706461 -124670 liters
2 to 3 0 a 24.0 a 831130 1.20 a 21.60 a 748017 -83113 liters
3 to 4 0 a 24.0 a 831130 1.20 a 22.80 a 789574 -41557 liters
4 to 5 0 a 24.0 a 831130 1.20 a 24.00 a 831130 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -290896 liters
(Total Surplus + Total Deficit) Total Storage required = 290896 liters
Hence, capacity of ESR required = 300000 liters
Capacity as % of total Demand = 36.10%
Capacity as 50% of total Demand = 4,20,000

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block

Mass Curve for Storage - G.P.- Ramdaspur


8 hours of demand (Outflow) satisfied by 20 hours of pumping
Demand Supply Supply
Demand
(Outflow) (inflow) (inflow)
(Outflow) time
hours time hours
5 to 9 4 hours 2 to 12 10 hours
15 to 19 4 hours 13 to 23 10 hours
Total 8 hours of Outflow Total Inflow of 20 hours
Hourly demand = 3.00 a Hourly Supply = 1.20 a

Total Demand = 828155 liters / day


Avg. hourly demand, a = 34506 liters / hour

Demand (Out-

water in liters
Cummulative

Cummulative
Flow) in liters
Cummulative

Cummulative

Amount of
Surplus or
(out-flow)

Deficit(-)
(in-flow)
Demand

Demand

in liters
Supply

Supply
Hourly

Hourly
Supply
Timings

5 to 6 3 a 3.0 a 103519 1.20 a 1.20 a 41408 -62112 liters


6 to 7 3 a 6.0 a 207039 1.20 a 2.40 a 82816 -124223 liters
7 to 8 3 a 9.0 a 310558 1.20 a 3.60 a 124223 -186335 liters
8 to 9 3 a 12.0 a 414078 1.20 a 4.80 a 165631 -248447 liters
9 to 10 0 a 12.0 a 414078 1.20 a 6.00 a 207039 -207039 liters
10 to 11 0 a 12.0 a 414078 1.20 a 7.20 a 248447 -165631 liters
11 to 12 0 a 12.0 a 414078 1.20 a 8.40 a 289854 -124223 liters
12 to 13 0 a 12.0 a 414078 0.00 a 8.40 a 289854 -124223 liters
13 to 14 0 a 12.0 a 414078 1.20 a 9.60 a 331262 -82816 liters
14 to 15 0 a 12.0 a 414078 1.20 a 10.80 a 372670 -41408 liters
15 to 16 3 a 15.0 a 517597 1.20 a 12.00 a 414078 -103519 liters
16 to 17 3 a 18.0 a 621116 1.20 a 13.20 a 455485 -165631 liters
17 to 18 3 a 21.0 a 724636 1.20 a 14.40 a 496893 -227743 liters
18 to 19 3 a 24.0 a 828155 1.20 a 15.60 a 538301 -289854 liters
19 to 20 0 a 24.0 a 828155 1.20 a 16.80 a 579709 -248447 liters
20 to 21 0 a 24.0 a 828155 1.20 a 18.00 a 621116 -207039 liters
21 to 22 0 a 24.0 a 828155 1.20 a 19.20 a 662524 -165631 liters
22 to 23 0 a 24.0 a 828155 1.20 a 20.40 a 703932 -124223 liters
23 to 24 0 a 24.0 a 828155 0.00 a 20.40 a 703932 -124223 liters
0 to 1 0 a 24.0 a 828155 0.00 a 20.40 a 703932 -124223 liters
1 to 2 0 a 24.0 a 828155 0.00 a 20.40 a 703932 -124223 liters
2 to 3 0 a 24.0 a 828155 1.20 a 21.60 a 745340 -82816 liters
3 to 4 0 a 24.0 a 828155 1.20 a 22.80 a 786747 -41408 liters
4 to 5 0 a 24.0 a 828155 1.20 a 24.00 a 828155 0 liters
Total Demand= 24.0 24.0 Total surplus= 0.0 liters
Total deficit= -289854 liters
(Total Surplus + Total Deficit) Total Storage required = 289854 liters
Hence, capacity of ESR required = 290000 liters
Capacity as % of total Demand = 35.02%
Capacity as 50% of total Demand = 4,20,000

MaRS Planning Engineering Services Pvt. Ltd.


Distribution System

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of
Baranga Block
Distribution System

Dia (in MM) Material of Pipe Length ( in m)

200 74,982

250 14,932
DI K-7
300 4,844

350 -

90 3,58,002

110 72,442

125 HDPE -

140 19,186

160 32,036

Total Length (in Km.) 576.424

Peak Factor For Distribution 3

Software Used Water GEMS

Zoning in the distribution system ensures equalization of supply of water throughout the area. The
zoning depends upon (a) density of population (b) type of locality (c) topography (d) facility for isolating
for assessment of waste and leak detection. Project Area is divided in 43 G.Ps.
Banki Block

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block
TB.-1
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB1-1 31 JB-1 TB-1 250 DI-K7 140 -40.029 0.82 2.498
PB1-2 126 JB-1 JB-2 90 HDPE 145 0.263 0.06 0.072
PB1-3 85 JB-3 JB-4 90 HDPE 145 0.79 0.17 0.553
PB1-4 333 JB-3 JB-1 250 DI-K7 140 -39.502 0.8 2.438
PB1-5 25 JB-4 JB-5 90 HDPE 145 0.263 0.06 0.073
PB1-6 197 JB-4 JB-6 90 HDPE 145 0.263 0.06 0.072
PB1-7 297 JB-7 JB-3 250 DI-K7 140 -38.449 0.78 2.319
PB1-8 325 JB-7 JB-8 200 DI-K7 140 12.114 0.39 0.81
PB1-9 34 JB-8 JB-10 200 DI-K7 140 11.587 0.37 0.746
PB1-10 72 JB-8 JB-9 90 HDPE 145 0.263 0.06 0.072
PB1-11 29 JB-10 JB-11 200 DI-K7 140 10.007 0.32 0.568
PB1-12 288 JB-10 JB-16 90 HDPE 145 1.317 0.29 1.424
PB1-13 292 JB-11 JB-13 90 HDPE 145 0.527 0.11 0.261
PB1-14 410 JB-11 JB-35 160 HDPE 145 9.217 0.63 3.171
PB1-15 92 JB-12 JB-7 200 DI-K7 140 -26.071 0.83 3.348
PB1-16 165 JB-12 JB-15 200 DI-K7 140 17.381 0.55 1.58
PB1-17 321 JB-13 JB-14 90 HDPE 145 0.263 0.06 0.072
PB1-18 182 JB-15 JB-21 200 DI-K7 140 17.118 0.54 1.536
PB1-19 30 JB-16 JB-18 90 HDPE 145 0.79 0.17 0.553
PB1-20 117 JB-16 JB-17 90 HDPE 145 0.263 0.06 0.072
PB1-21 125 JB-18 JB-19 90 HDPE 145 0.263 0.06 0.072
PB1-22 312 JB-18 JB-20 90 HDPE 145 0.263 0.06 0.072
PB1-23 243 JB-21 JB-26 200 DI-K7 140 16.854 0.54 1.493
PB1-24 121 JB-22 JB-23 90 HDPE 145 0.263 0.06 0.072
PB1-25 209 JB-22 JB-12 160 HDPE 145 -8.427 0.58 2.686
PB1-26 29 JB-24 JB-22 160 HDPE 145 -7.9 0.54 2.384
PB1-27 135 JB-24 JB-25 90 HDPE 145 1.58 0.34 1.997
PB1-28 184 JB-25 JB-27 90 HDPE 145 0.263 0.06 0.072
PB1-29 250 JB-26 JB-34 200 DI-K7 140 16.591 0.53 1.45
PB1-30 19 JB-28 JB-25 90 HDPE 145 -1.053 0.23 0.942
PB1-31 162 JB-28 JB-29 90 HDPE 145 0.263 0.06 0.072
PB1-32 152 JB-30 JB-28 90 HDPE 145 -0.527 0.11 0.261
PB1-33 219 JB-31 JB-30 90 HDPE 145 -0.263 0.06 0.072
PB1-34 209 JB-32 JB-33 90 HDPE 145 0.263 0.06 0.072
PB1-35 189 JB-32 JB-24 140 HDPE 145 -6.057 0.54 2.79
PB1-36 67 JB-34 JB-37 200 DI-K7 140 11.748 0.37 0.765
PB1-37 310 JB-34 JB-58 140 HDPE 145 4.58 0.41 1.663
PB1-38 152 JB-35 JB-52 160 HDPE 145 8.69 0.6 2.844
PB1-39 195 JB-35 JB-36 90 HDPE 145 0.263 0.06 0.072
PB1-40 58 JB-37 JB-38 90 HDPE 145 0.263 0.06 0.072
PB1-41 70 JB-39 JB-32 140 HDPE 145 -5.53 0.5 2.357
PB1-42 71 JB-40 JB-41 90 HDPE 145 0.263 0.06 0.072

MaRS Planning Engineering Services Pvt. Ltd.


PB1-43 263 JB-40 JB-37 200 DI-K7 140 -11.221 0.36 0.703
PB1-44 149 JB-42 JB-39 110 HDPE 145 -2.342 0.34 1.559
PB1-45 200 JB-42 JB-43 90 HDPE 145 0.527 0.11 0.261
PB1-46 230 JB-43 JB-44 90 HDPE 145 0.263 0.06 0.072
PB1-47 40 JB-45 JB-42 90 HDPE 145 -1.552 0.34 1.931
PB1-48 131 JB-45 JB-39 110 HDPE 145 -2.925 0.43 2.353
PB1-49 10 JB-46 JB-45 110 HDPE 145 -4.214 0.47 2.478
PB1-50 241 JB-46 JB-51 90 HDPE 145 0.527 0.11 0.261
PB1-51 1 JB-47 JB-48 90 HDPE 145 0.79 0.17 0.555
PB1-52 258 JB-47 JB-40 200 DI-K7 140 -10.694 0.34 0.643
PB1-53 62 JB-48 JB-49 90 HDPE 145 0.263 0.06 0.072
PB1-54 81 JB-48 JB-50 90 HDPE 145 0.263 0.06 0.072
PB1-55 226 JB-51 JB-53 90 HDPE 145 0.263 0.06 0.072
PB1-56 10 JB-52 JB-55 160 HDPE 145 8.164 0.56 2.533
PB1-57 156 JB-52 JB-54 90 HDPE 145 0.263 0.06 0.072
PB1-58 20 JB-55 JB-59 160 HDPE 145 7.374 0.51 2.098
PB1-59 73 JB-55 JB-56 90 HDPE 145 0.263 0.06 0.072
PB1-60 154 JB-55 JB-57 90 HDPE 145 0.263 0.06 0.072
PB1-61 255 JB-58 JB-61 140 HDPE 145 4.317 0.39 1.49
PB1-62 250 JB-59 JB-60 90 HDPE 145 0.263 0.06 0.072
PB1-63 214 JB-59 JB-62 160 HDPE 145 6.847 0.47 1.829
PB1-64 243 JB-61 JB-67 140 HDPE 145 4.053 0.36 1.326
PB1-65 12 JB-62 JB-64 110 HDPE 145 4.214 0.47 2.477
PB1-66 120 JB-62 JB-71 90 HDPE 145 2.107 0.46 3.402
PB1-67 70 JB-63 JB-62 90 HDPE 145 -0.263 0.06 0.072
PB1-68 74 JB-64 JB-65 90 HDPE 145 0.263 0.06 0.072
PB1-69 112 JB-64 JB-66 110 HDPE 145 3.687 0.41 1.935
PB1-70 138 JB-66 JB-77 110 HDPE 145 3.424 0.5 3.149
PB1-71 246 JB-67 JB-76 140 HDPE 145 3.79 0.34 1.171
PB1-72 244 JB-68 JB-47 160 HDPE 145 -9.641 0.66 3.447
PB1-73 53 JB-69 JB-70 90 HDPE 145 0.263 0.06 0.072
PB1-74 278 JB-69 JB-46 110 HDPE 145 -3.424 0.5 3.149
PB1-75 24 JB-71 JB-72 90 HDPE 145 0.79 0.17 0.553
PB1-76 137 JB-71 JB-75 90 HDPE 145 1.053 0.23 0.942
PB1-77 74 JB-72 JB-73 90 HDPE 145 0.263 0.06 0.072
PB1-78 106 JB-72 JB-74 90 HDPE 145 0.263 0.06 0.072
PB1-79 274 JB-75 JB-79 90 HDPE 145 0.79 0.17 0.553
PB1-80 246 JB-76 JB-82 140 HDPE 145 3.526 0.32 1.025
PB1-81 28 JB-77 JB-78 90 HDPE 145 0.263 0.06 0.072
PB1-82 285 JB-77 JB-91 110 HDPE 145 2.897 0.42 2.311
PB1-83 124 JB-79 JB-80 90 HDPE 145 0.527 0.11 0.261
PB1-84 153 JB-80 JB-81 90 HDPE 145 0.263 0.06 0.072
PB1-85 258 JB-82 JB-84 140 HDPE 145 3.263 0.29 0.887
PB1-86 248 JB-83 JB-69 110 HDPE 145 -2.897 0.42 2.311
PB1-87 235 JB-84 JB-93 110 HDPE 145 3 0.34 1.321
PB1-88 226 JB-85 JB-88 90 HDPE 145 0.79 0.17 0.553
PB1-89 258 JB-85 JB-68 160 HDPE 145 -9.377 0.64 3.274
PB1-90 12 JB-86 JB-85 160 HDPE 145 -8.324 0.57 2.626

MaRS Planning Engineering Services Pvt. Ltd.


PB1-91 270 JB-86 JB-87 90 HDPE 145 0.263 0.06 0.072
PB1-92 33 JB-88 JB-89 90 HDPE 145 0.263 0.06 0.072
PB1-93 48 JB-88 JB-90 90 HDPE 145 0.263 0.06 0.072
PB1-94 97 JB-91 JB-92 90 HDPE 145 0.263 0.06 0.072
PB1-95 149 JB-91 JB-95 110 HDPE 145 2.37 0.34 1.594
PB1-96 250 JB-93 JB-100 110 HDPE 145 2.736 0.31 1.114
PB1-97 249 JB-94 JB-83 110 HDPE 145 -2.633 0.38 1.937
PB1-98 14 JB-95 JB-96 90 HDPE 145 0.79 0.17 0.553
PB1-99 60 JB-95 JB-101 90 HDPE 145 1.317 0.29 1.424
PB1-100 77 JB-96 JB-97 90 HDPE 145 0.263 0.06 0.072
PB1-101 134 JB-96 JB-98 90 HDPE 145 0.263 0.06 0.072
PB1-102 164 JB-99 JB-108 110 HDPE 145 3.057 0.44 2.553
PB1-103 176 JB-99 JB-86 160 HDPE 145 -7.797 0.54 2.327
PB1-104 295 JB-99 JB-112 110 HDPE 145 4.477 0.5 2.772
PB1-105 247 JB-100 JB-107 110 HDPE 145 2.473 0.28 0.924
PB1-106 10 JB-101 JB-103 90 HDPE 145 0.79 0.17 0.553
PB1-107 61 JB-101 JB-102 90 HDPE 145 0.263 0.06 0.072
PB1-108 26 JB-103 JB-104 90 HDPE 145 0.263 0.06 0.072
PB1-109 64 JB-103 JB-105 90 HDPE 145 0.263 0.06 0.072
PB1-110 253 JB-106 JB-94 110 HDPE 145 -2.37 0.34 1.594
PB1-111 253 JB-107 JB-110 110 HDPE 145 2.21 0.25 0.75
PB1-112 83 JB-108 JB-109 90 HDPE 145 0.263 0.06 0.072
PB1-113 225 JB-108 JB-113 110 HDPE 145 2.53 0.37 1.799
PB1-114 251 JB-110 JB-111 110 HDPE 145 1.946 0.22 0.593
PB1-115 251 JB-111 JB-113 110 HDPE 145 1.683 0.24 0.845
PB1-116 246 JB-112 JB-130 110 HDPE 145 4.214 0.47 2.478
PB1-117 10 JB-113 JB-114 110 HDPE 145 3.95 0.44 2.198
PB1-118 51 JB-114 JB-119 110 HDPE 145 2.633 0.38 1.937
PB1-119 11 JB-115 JB-114 90 HDPE 145 -1.053 0.23 0.942
PB1-120 52 JB-115 JB-116 90 HDPE 145 0.263 0.06 0.072
PB1-121 242 JB-117 JB-115 90 HDPE 145 -0.527 0.11 0.261
PB1-122 260 JB-118 JB-117 90 HDPE 145 -0.263 0.06 0.072
PB1-123 11 JB-119 JB-121 90 HDPE 145 2.107 0.46 3.402
PB1-124 115 JB-119 JB-120 90 HDPE 145 0.263 0.06 0.072
PB1-125 123 JB-121 JB-122 90 HDPE 145 0.263 0.06 0.072
PB1-126 155 JB-121 JB-128 90 HDPE 145 1.58 0.34 1.997
PB1-127 239 JB-123 JB-106 90 HDPE 145 -2.107 0.46 3.401
PB1-128 248 JB-123 JB-127 90 HDPE 145 1.053 0.23 0.942
PB1-129 253 JB-124 JB-123 90 HDPE 145 -0.79 0.17 0.553
PB1-130 248 JB-125 JB-124 90 HDPE 145 -0.527 0.11 0.261
PB1-131 170 JB-126 JB-125 90 HDPE 145 -0.263 0.06 0.072
PB1-132 253 JB-127 JB-129 90 HDPE 145 0.79 0.17 0.553
PB1-133 158 JB-128 JB-133 90 HDPE 145 1.317 0.29 1.424
PB1-134 250 JB-129 JB-131 90 HDPE 145 0.527 0.11 0.261
PB1-135 246 JB-130 JB-138 110 HDPE 145 3.95 0.44 2.198
PB1-136 248 JB-131 JB-132 90 HDPE 145 0.263 0.06 0.072
PB1-137 241 JB-133 JB-134 90 HDPE 145 1.053 0.23 0.942
PB1-138 36 JB-134 JB-135 90 HDPE 145 0.263 0.06 0.072

MaRS Planning Engineering Services Pvt. Ltd.


PB1-139 147 JB-134 JB-136 90 HDPE 145 0.527 0.11 0.261
PB1-140 133 JB-136 JB-137 90 HDPE 145 0.263 0.06 0.072
PB1-141 248 JB-138 JB-139 110 HDPE 145 3.687 0.41 1.935
PB1-142 10 JB-139 JB-140 90 HDPE 145 1.053 0.23 0.942
PB1-143 92 JB-139 JB-144 110 HDPE 145 2.37 0.34 1.594
PB1-144 82 JB-140 JB-141 90 HDPE 145 0.263 0.06 0.072
PB1-145 345 JB-140 JB-143 90 HDPE 145 0.263 0.06 0.072
PB1-146 242 JB-142 JB-140 90 HDPE 145 -0.263 0.06 0.072
PB1-147 10 JB-144 JB-145 90 HDPE 145 1.053 0.23 0.943
PB1-148 318 JB-144 JB-149 90 HDPE 145 1.053 0.23 0.942
PB1-149 224 JB-145 JB-147 90 HDPE 145 0.527 0.11 0.261
PB1-150 410 JB-145 JB-146 90 HDPE 145 0.263 0.06 0.072
PB1-151 258 JB-147 JB-148 90 HDPE 145 0.263 0.06 0.072
PB1-152 55 JB-149 JB-150 90 HDPE 145 0.263 0.06 0.072
PB1-153 76 JB-149 JB-151 90 HDPE 145 0.263 0.06 0.072
PB1-154 126 JB-149 JB-152 90 HDPE 145 0.263 0.06 0.072
TB-2
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB2-1 31 JB2-1 TB-2 200 DI-K7 140 -19.948 0.63 2.039
PB2-2 77 JB2-1 JB2-6 200 DI-K7 140 18.313 0.58 1.741
PB2-3 186 JB2-1 JB2-4 90 HDPE 145 0.327 0.07 0.108
PB2-4 10 JB2-2 JB2-1 90 HDPE 145 -0.981 0.21 0.826
PB2-5 192 JB2-2 JB2-5 90 HDPE 145 0.327 0.07 0.108
PB2-6 74 JB2-3 JB2-2 90 HDPE 145 -0.327 0.07 0.108
PB2-7 97 JB2-6 JB2-7 90 HDPE 145 0.327 0.07 0.108
PB2-8 191 JB2-6 JB2-8 200 DI-K7 140 17.659 0.56 1.627
PB2-9 285 JB2-8 JB2-9 90 HDPE 145 0.327 0.07 0.108
PB2-10 295 JB2-10 JB2-8 200 DI-K7 140 -17.005 0.54 1.517
PB2-11 268 JB2-11 JB2-10 90 HDPE 145 -0.654 0.14 0.39
PB2-12 272 JB2-12 JB2-11 90 HDPE 145 -0.327 0.07 0.108
PB2-13 246 JB2-13 JB2-15 200 DI-K7 140 13.735 0.44 1.022
PB2-14 74 JB2-14 JB2-13 90 HDPE 145 -0.327 0.07 0.108
PB2-15 224 JB2-15 JB2-16 200 DI-K7 140 13.408 0.43 0.977
PB2-16 112 JB2-16 JB2-17 90 HDPE 145 0.981 0.21 0.826
PB2-17 84 JB2-17 JB2-19 90 HDPE 145 0.327 0.07 0.108
PB2-18 102 JB2-17 JB2-20 90 HDPE 145 0.327 0.07 0.108
PB2-19 123 JB2-18 JB2-16 200 DI-K7 140 -12.1 0.39 0.808
PB2-20 12 JB2-21 JB2-18 140 HDPE 145 -5.365 0.48 2.228
PB2-21 319 JB2-21 JB2-23 90 HDPE 145 0.327 0.07 0.108
PB2-22 84 JB2-22 JB2-21 90 HDPE 145 -0.327 0.07 0.108
PB2-23 241 JB2-24 JB2-21 110 HDPE 145 -4.384 0.49 2.666
PB2-24 245 JB2-25 JB2-18 140 HDPE 145 -6.408 0.57 3.097
PB2-25 172 JB2-26 JB2-24 110 HDPE 145 -4.057 0.46 2.309
PB2-26 112 JB2-27 JB2-26 90 HDPE 145 -0.981 0.21 0.826
PB2-27 49 JB2-28 JB2-27 90 HDPE 145 -0.327 0.07 0.108
PB2-28 74 JB2-29 JB2-27 90 HDPE 145 -0.327 0.07 0.108

MaRS Planning Engineering Services Pvt. Ltd.


PB2-29 189 JB2-30 JB2-25 140 HDPE 145 -6.081 0.54 2.81
PB2-30 62 JB2-31 JB2-30 90 HDPE 145 -1.635 0.35 2.127
PB2-31 190 JB2-31 JB2-33 90 HDPE 145 0.59 0.13 0.322
PB2-32 88 JB2-32 JB2-33 90 HDPE 145 0.064 0.01 0.005
PB2-33 131 JB2-32 JB2-31 90 HDPE 145 -0.718 0.16 0.463
PB2-34 121 JB2-33 JB2-35 90 HDPE 145 0.327 0.07 0.108
PB2-35 47 JB2-34 JB2-32 90 HDPE 145 -0.327 0.07 0.108
PB2-36 44 JB2-36 JB2-38 90 HDPE 145 2.106 0.46 3.399
PB2-37 148 JB2-36 JB2-30 110 HDPE 145 -4.119 0.46 2.375
PB2-38 276 JB2-37 JB2-26 110 HDPE 145 -2.749 0.4 2.097
PB2-39 89 JB2-38 JB2-39 90 HDPE 145 0.654 0.14 0.39
PB2-40 117 JB2-39 JB2-40 90 HDPE 145 0.327 0.07 0.108
PB2-41 113 JB2-41 JB2-36 90 HDPE 145 -1.686 0.37 2.251
PB2-42 43 JB2-42 JB2-41 90 HDPE 145 -0.553 0.12 0.286
PB2-43 108 JB2-42 JB2-38 90 HDPE 145 -1.125 0.24 1.064
PB2-44 18 JB2-43 JB2-42 90 HDPE 145 -1.351 0.29 1.493
PB2-45 173 JB2-44 JB2-43 90 HDPE 145 -0.327 0.07 0.108
PB2-46 83 JB2-45 JB2-43 90 HDPE 145 -0.697 0.15 0.438
PB2-47 259 JB2-45 JB2-50 90 HDPE 145 0.327 0.07 0.108
PB2-48 98 JB2-46 JB2-45 90 HDPE 145 -0.043 0.01 0.002
PB2-49 132 JB2-46 JB2-41 90 HDPE 145 -0.806 0.17 0.574
PB2-50 11 JB2-47 JB2-48 90 HDPE 145 0.787 0.17 0.548
PB2-51 205 JB2-47 JB2-37 110 HDPE 145 -2.422 0.35 1.658
PB2-52 70 JB2-48 JB2-46 90 HDPE 145 -0.522 0.11 0.256
PB2-53 114 JB2-49 JB2-47 90 HDPE 145 -0.327 0.07 0.108
PB2-54 202 JB2-51 JB2-47 90 HDPE 145 -0.981 0.21 0.826
PB2-55 206 JB2-52 JB2-48 90 HDPE 145 -0.981 0.21 0.826
PB2-56 200 JB2-53 JB2-52 90 HDPE 145 -0.654 0.14 0.39
PB2-57 226 JB2-54 JB2-51 90 HDPE 145 -0.654 0.14 0.39
PB2-58 210 JB2-55 JB2-53 90 HDPE 145 -0.327 0.07 0.108
PB2-59 212 JB2-56 JB2-54 90 HDPE 145 -0.327 0.07 0.108
TB.-3
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB3-1 30 JB3-1 TB-3 200 DI-K7 140 -15.495 0.49 1.277
PB3-2 150 JB3-1 JB3-4 200 DI-K7 140 14.733 0.47 1.163
PB3-3 117 JB3-2 JB3-1 90 HDPE 145 -0.508 0.11 0.244
PB3-4 142 JB3-3 JB3-2 90 HDPE 145 -0.254 0.06 0.068
PB3-5 150 JB3-4 JB3-5 200 DI-K7 140 14.479 0.46 1.127
PB3-6 239 JB3-5 JB3-9 160 HDPE 145 8.738 0.6 2.873
PB3-7 235 JB3-5 JB3-6 140 HDPE 145 5.487 0.49 2.323
PB3-8 218 JB3-6 JB3-7 90 HDPE 145 0.508 0.11 0.244
PB3-9 185 JB3-7 JB3-8 90 HDPE 145 0.254 0.06 0.068
PB3-10 48 JB3-9 JB3-10 200 DI-K7 140 13.209 0.42 0.951
PB3-11 79 JB3-9 JB3-6 140 HDPE 145 -4.725 0.42 1.761
PB3-12 188 JB3-10 JB3-13 90 HDPE 145 0.508 0.11 0.244
PB3-13 10 JB3-11 JB3-10 200 DI-K7 140 -12.447 0.4 0.852

MaRS Planning Engineering Services Pvt. Ltd.


PB3-14 297 JB3-12 JB3-11 90 HDPE 145 -0.254 0.06 0.068
PB3-15 204 JB3-13 JB3-14 90 HDPE 145 0.254 0.06 0.068
PB3-16 10 JB3-15 JB3-17 110 HDPE 145 2.286 0.33 1.491
PB3-17 152 JB3-15 JB3-11 200 DI-K7 140 -11.939 0.38 0.788
PB3-18 95 JB3-16 JB3-15 90 HDPE 145 -0.254 0.06 0.068
PB3-19 70 JB3-17 JB3-21 90 HDPE 145 1.27 0.28 1.332
PB3-20 150 JB3-17 JB3-19 90 HDPE 145 0.762 0.17 0.517
PB3-21 10 JB3-18 JB3-15 160 HDPE 145 -9.145 0.63 3.125
PB3-22 24 JB3-18 JB3-20 110 HDPE 145 4.598 0.52 2.913
PB3-23 79 JB3-18 JB3-32 110 HDPE 145 3.128 0.45 2.664
PB3-24 176 JB3-19 JB3-22 90 HDPE 145 0.508 0.11 0.244
PB3-25 60 JB3-20 JB3-27 90 HDPE 145 1.27 0.28 1.332
PB3-26 82 JB3-20 JB3-32 110 HDPE 145 2.461 0.36 1.708
PB3-27 176 JB3-21 JB3-33 90 HDPE 145 1.016 0.22 0.881
PB3-28 204 JB3-22 JB3-24 90 HDPE 145 0.254 0.06 0.068
PB3-29 93 JB3-23 JB3-18 90 HDPE 145 -1.165 0.25 1.135
PB3-30 106 JB3-23 JB3-20 90 HDPE 145 -0.613 0.13 0.346
PB3-31 9 JB3-25 JB3-23 90 HDPE 145 -1.524 0.33 1.867
PB3-32 40 JB3-25 JB3-26 90 HDPE 145 0.254 0.06 0.068
PB3-33 15 JB3-27 JB3-28 90 HDPE 145 0.762 0.17 0.517
PB3-34 195 JB3-27 JB3-30 90 HDPE 145 0.254 0.06 0.068
PB3-35 60 JB3-28 JB3-29 90 HDPE 145 0.254 0.06 0.068
PB3-36 125 JB3-28 JB3-31 90 HDPE 145 0.254 0.06 0.068
PB3-37 176 JB3-32 JB3-41 140 HDPE 145 5.334 0.48 2.205
PB3-38 201 JB3-33 JB3-35 90 HDPE 145 0.762 0.17 0.517
PB3-39 155 JB3-34 JB3-25 90 HDPE 145 -1.016 0.22 0.881
PB3-40 50 JB3-35 JB3-36 90 HDPE 145 0.254 0.06 0.068
PB3-41 194 JB3-35 JB3-37 90 HDPE 145 0.254 0.06 0.068
PB3-42 178 JB3-38 JB3-34 90 HDPE 145 -0.762 0.17 0.517
PB3-43 246 JB3-39 JB3-38 90 HDPE 145 -0.508 0.11 0.244
PB3-44 247 JB3-40 JB3-39 90 HDPE 145 -0.254 0.06 0.068
PB3-45 196 JB3-41 JB3-42 140 HDPE 145 5.08 0.46 2.015
PB3-46 197 JB3-42 JB3-43 110 HDPE 145 4.826 0.54 3.186
PB3-47 93 JB3-43 JB3-44 90 HDPE 145 0.254 0.06 0.068
PB3-48 197 JB3-43 JB3-45 110 HDPE 145 4.318 0.49 2.593
PB3-49 245 JB3-46 JB3-45 110 HDPE 145 -4.064 0.46 2.317
PB3-50 246 JB3-47 JB3-46 110 HDPE 145 -3.81 0.43 2.056
PB3-51 249 JB3-48 JB3-47 110 HDPE 145 -3.556 0.52 3.379
PB3-52 200 JB3-49 JB3-48 110 HDPE 145 -3.302 0.48 2.945
PB3-53 217 JB3-50 JB3-49 110 HDPE 145 -3.048 0.44 2.54
PB3-54 114 JB3-51 JB3-52 90 HDPE 145 0.254 0.06 0.068
PB3-55 165 JB3-51 JB3-50 110 HDPE 145 -2.794 0.41 2.162
PB3-56 244 JB3-53 JB3-51 110 HDPE 145 -2.286 0.33 1.491
PB3-57 253 JB3-54 JB3-53 90 HDPE 145 -2.032 0.44 3.182
PB3-58 237 JB3-55 JB3-54 90 HDPE 145 -1.778 0.39 2.485
PB3-59 10 JB3-56 JB3-57 90 HDPE 145 1.016 0.22 0.882
PB3-60 226 JB3-56 JB3-55 90 HDPE 145 -1.524 0.33 1.868
PB3-61 25 JB3-57 JB3-58 90 HDPE 145 0.254 0.06 0.068

MaRS Planning Engineering Services Pvt. Ltd.


PB3-62 200 JB3-57 JB3-60 90 HDPE 145 0.254 0.06 0.068
PB3-63 269 JB3-59 JB3-56 90 HDPE 145 -0.254 0.06 0.068
PB3-64 253 JB3-61 JB3-57 90 HDPE 145 -0.254 0.06 0.068
TB.-4
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB4-1 32 JB4-1 TB-4 200 DI-K7 140 -21.767 0.69 2.397
PB4-2 185 JB4-1 JB4-2 90 HDPE 145 0.418 0.09 0.17
PB4-3 241 JB4-2 JB4-3 90 HDPE 145 0.209 0.05 0.047
PB4-4 193 JB4-4 JB4-1 200 DI-K7 140 -21.141 0.67 2.271
PB4-5 197 JB4-4 JB4-10 140 HDPE 145 5.637 0.51 2.442
PB4-6 378 JB4-5 JB4-4 200 DI-K7 140 -12.372 0.39 0.842
PB4-7 130 JB4-6 JB4-7 90 HDPE 145 0.209 0.05 0.047
PB4-8 144 JB4-6 JB4-4 110 HDPE 145 -2.923 0.42 2.35
PB4-9 41 JB4-8 JB4-6 110 HDPE 145 -2.505 0.36 1.766
PB4-10 82 JB4-8 JB4-9 90 HDPE 145 0.209 0.05 0.047
PB4-11 129 JB4-10 JB4-11 90 HDPE 145 0.209 0.05 0.047
PB4-12 181 JB4-10 JB4-35 140 HDPE 145 5.219 0.47 2.118
PB4-13 295 JB4-12 JB4-14 90 HDPE 145 0.209 0.05 0.047
PB4-14 332 JB4-12 JB4-5 200 DI-K7 140 -12.164 0.39 0.816
PB4-15 11 JB4-13 JB4-12 200 DI-K7 140 -11.746 0.37 0.765
PB4-16 42 JB4-13 JB4-17 90 HDPE 145 1.044 0.23 0.927
PB4-17 62 JB4-15 JB4-8 90 HDPE 145 -2.088 0.45 3.345
PB4-18 44 JB4-16 JB4-15 90 HDPE 145 -0.209 0.05 0.047
PB4-19 324 JB4-17 JB4-19 90 HDPE 145 0.209 0.05 0.047
PB4-20 36 JB4-18 JB4-17 90 HDPE 145 -0.626 0.14 0.36
PB4-21 168 JB4-18 JB4-20 90 HDPE 145 0.209 0.05 0.047
PB4-22 366 JB4-21 JB4-18 90 HDPE 145 -0.209 0.05 0.047
PB4-23 190 JB4-22 JB4-13 200 DI-K7 140 -10.493 0.33 0.621
PB4-24 67 JB4-23 JB4-15 90 HDPE 145 -1.67 0.36 2.213
PB4-25 11 JB4-24 JB4-23 90 HDPE 145 -0.835 0.18 0.613
PB4-26 79 JB4-24 JB4-25 90 HDPE 145 0.209 0.05 0.047
PB4-27 174 JB4-26 JB4-24 90 HDPE 145 -0.418 0.09 0.17
PB4-28 276 JB4-27 JB4-26 90 HDPE 145 -0.209 0.05 0.047
PB4-29 94 JB4-28 JB4-29 90 HDPE 145 0.209 0.05 0.047
PB4-30 177 JB4-28 JB4-23 90 HDPE 145 -0.626 0.14 0.36
PB4-31 210 JB4-30 JB4-22 200 DI-K7 140 -10.285 0.33 0.598
PB4-32 247 JB4-31 JB4-28 90 HDPE 145 -0.209 0.05 0.047
PB4-33 10 JB4-32 JB4-30 200 DI-K7 140 -9.867 0.31 0.554
PB4-34 176 JB4-33 JB4-30 90 HDPE 145 -0.209 0.05 0.047
PB4-35 159 JB4-34 JB4-32 90 HDPE 145 -0.209 0.05 0.047
PB4-36 49 JB4-35 JB4-36 90 HDPE 145 0.209 0.05 0.047
PB4-37 57 JB4-35 JB4-37 110 HDPE 145 4.802 0.54 3.156
PB4-38 53 JB4-37 JB4-38 90 HDPE 145 0.209 0.05 0.047
PB4-39 160 JB4-37 JB4-39 110 HDPE 145 4.384 0.49 2.667
PB4-40 79 JB4-39 JB4-41 110 HDPE 145 2.714 0.39 2.048
PB4-41 266 JB4-39 JB4-54 90 HDPE 145 1.461 0.32 1.728

MaRS Planning Engineering Services Pvt. Ltd.


PB4-42 204 JB4-40 JB4-32 160 HDPE 145 -9.45 0.65 3.321
PB4-43 102 JB4-41 JB4-46 90 HDPE 145 1.67 0.36 2.213
PB4-44 178 JB4-41 JB4-42 90 HDPE 145 0.835 0.18 0.613
PB4-45 122 JB4-42 JB4-43 90 HDPE 145 0.626 0.14 0.36
PB4-46 243 JB4-43 JB4-44 90 HDPE 145 0.418 0.09 0.17
PB4-47 95 JB4-44 JB4-45 90 HDPE 145 0.209 0.05 0.047
PB4-48 35 JB4-46 JB4-48 90 HDPE 145 1.253 0.27 1.299
PB4-49 81 JB4-46 JB4-47 90 HDPE 145 0.209 0.05 0.047
PB4-50 215 JB4-48 JB4-52 90 HDPE 145 0.209 0.05 0.047
PB4-51 10 JB4-49 JB4-48 90 HDPE 145 -0.835 0.18 0.613
PB4-52 236 JB4-49 JB4-53 90 HDPE 145 0.209 0.05 0.047
PB4-53 37 JB4-50 JB4-49 90 HDPE 145 -0.209 0.05 0.047
PB4-54 40 JB4-51 JB4-49 90 HDPE 145 -0.209 0.05 0.047
PB4-55 63 JB4-54 JB4-55 90 HDPE 145 0.209 0.05 0.047
PB4-56 170 JB4-54 JB4-56 90 HDPE 145 1.044 0.23 0.927
PB4-57 41 JB4-56 JB4-58 90 HDPE 145 0.626 0.14 0.36
PB4-58 57 JB4-56 JB4-57 90 HDPE 145 0.209 0.05 0.047
PB4-59 51 JB4-58 JB4-59 90 HDPE 145 0.209 0.05 0.047
PB4-60 267 JB4-58 JB4-60 90 HDPE 145 0.209 0.05 0.047
PB4-61 44 JB4-61 JB4-62 90 HDPE 145 0.626 0.14 0.36
PB4-62 252 JB4-61 JB4-40 160 HDPE 145 -9.241 0.63 3.187
PB4-63 60 JB4-62 JB4-64 90 HDPE 145 0.209 0.05 0.047
PB4-64 45 JB4-63 JB4-62 90 HDPE 145 -0.209 0.05 0.047
PB4-65 11 JB4-65 JB4-66 90 HDPE 145 1.461 0.32 1.728
PB4-66 155 JB4-65 JB4-74 90 HDPE 145 1.044 0.23 0.927
PB4-67 151 JB4-65 JB4-61 160 HDPE 145 -8.406 0.58 2.674
PB4-68 101 JB4-66 JB4-69 90 HDPE 145 0.626 0.14 0.36
PB4-69 144 JB4-66 JB4-68 90 HDPE 145 0.209 0.05 0.047
PB4-70 10 JB4-67 JB4-65 140 HDPE 145 -5.692 0.51 2.486
PB4-71 89 JB4-67 JB4-79 110 HDPE 145 2.714 0.39 2.048
PB4-72 174 JB4-69 JB4-70 90 HDPE 145 0.209 0.05 0.047
PB4-73 209 JB4-71 JB4-69 90 HDPE 145 -0.209 0.05 0.047
PB4-74 362 JB4-72 JB4-66 90 HDPE 145 -0.418 0.09 0.17
PB4-75 160 JB4-73 JB4-72 90 HDPE 145 -0.209 0.05 0.047
PB4-76 66 JB4-74 JB4-75 90 HDPE 145 0.209 0.05 0.047
PB4-77 146 JB4-74 JB4-76 90 HDPE 145 0.626 0.14 0.36
PB4-78 70 JB4-76 JB4-77 90 HDPE 145 0.209 0.05 0.047
PB4-79 123 JB4-76 JB4-78 90 HDPE 145 0.209 0.05 0.047
PB4-80 302 JB4-79 JB4-80 90 HDPE 145 0.209 0.05 0.047
PB4-81 74 JB4-81 JB4-82 90 HDPE 145 0.209 0.05 0.047
PB4-82 268 JB4-81 JB4-67 110 HDPE 145 -2.769 0.4 2.125
PB4-83 302 JB4-83 JB4-79 110 HDPE 145 -2.297 0.33 1.503
PB4-84 79 JB4-84 JB4-81 110 HDPE 145 -2.351 0.34 1.57
PB4-85 146 JB4-85 JB4-84 110 HDPE 145 -2.142 0.31 1.322
PB4-86 217 JB4-86 JB4-83 90 HDPE 145 -2.088 0.45 3.345
PB4-87 211 JB4-87 JB4-88 90 HDPE 145 0.209 0.05 0.047
PB4-88 167 JB4-87 JB4-85 90 HDPE 145 -1.934 0.42 2.902
PB4-89 10 JB4-89 JB4-87 90 HDPE 145 -1.516 0.33 1.849

MaRS Planning Engineering Services Pvt. Ltd.


PB4-90 16 JB4-89 JB4-90 90 HDPE 145 1.044 0.23 0.927
PB4-91 184 JB4-90 JB4-93 90 HDPE 145 0.626 0.14 0.36
PB4-92 82 JB4-91 JB4-90 90 HDPE 145 -0.209 0.05 0.047
PB4-93 278 JB4-92 JB4-89 90 HDPE 145 -0.263 0.06 0.072
PB4-94 178 JB4-93 JB4-95 90 HDPE 145 0.209 0.05 0.047
PB4-95 66 JB4-94 JB4-93 90 HDPE 145 -0.209 0.05 0.047
PB4-96 259 JB4-96 JB4-86 90 HDPE 145 -1.879 0.41 2.752
PB4-97 224 JB4-97 JB4-96 90 HDPE 145 -1.67 0.36 2.213
PB4-98 243 JB4-98 JB4-97 90 HDPE 145 -1.461 0.32 1.728
PB4-99 237 JB4-99 JB4-98 90 HDPE 145 -1.253 0.27 1.299
PB4-100 170 JB4-100 JB4-101 90 HDPE 145 0.835 0.18 0.613
PB4-101 240 JB4-100 JB4-99 90 HDPE 145 -1.044 0.23 0.927
PB4-102 152 JB4-101 JB4-102 90 HDPE 145 0.626 0.14 0.36
PB4-103 148 JB4-102 JB4-103 90 HDPE 145 0.209 0.05 0.047
PB4-104 156 JB4-102 JB4-104 90 HDPE 145 0.209 0.05 0.047
TB.-5
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB5-1 10 JB5-1 JB5-2 200 DI-K7 140 16.26 0.52 1.396
PB5-2 31 JB5-1 TB-5 200 DI-K7 140 -23.962 0.76 2.864
PB5-3 55 JB5-2 JB5-5 200 DI-K7 140 15.404 0.49 1.264
PB5-4 295 JB5-3 JB5-1 90 HDPE 145 -0.428 0.09 0.178
PB5-5 300 JB5-4 JB5-2 90 HDPE 145 -0.428 0.09 0.178
PB5-6 10 JB5-5 JB5-6 200 DI-K7 140 14.548 0.46 1.137
PB5-7 412 JB5-5 JB5-7 90 HDPE 145 0.428 0.09 0.178
PB5-8 194 JB5-6 JB5-9 160 HDPE 145 8.558 0.59 2.764
PB5-9 424 JB5-6 JB5-13 140 HDPE 145 5.563 0.5 2.383
PB5-10 155 JB5-8 JB5-1 160 HDPE 145 -6.846 0.47 1.828
PB5-11 180 JB5-9 JB5-12 160 HDPE 145 8.13 0.56 2.514
PB5-12 231 JB5-10 JB5-8 140 HDPE 145 -6.418 0.58 3.106
PB5-13 386 JB5-10 JB5-11 90 HDPE 145 0.428 0.09 0.178
PB5-14 225 JB5-12 JB5-25 160 HDPE 145 7.702 0.53 2.274
PB5-15 278 JB5-13 JB5-26 110 HDPE 145 2.567 0.37 1.848
PB5-16 99 JB5-14 JB5-10 140 HDPE 145 -5.563 0.5 2.383
PB5-17 41 JB5-15 JB5-14 110 HDPE 145 -4.707 0.53 3.041
PB5-18 10 JB5-16 JB5-15 110 HDPE 145 -2.842 0.41 2.231
PB5-19 93 JB5-17 JB5-16 90 HDPE 145 -0.965 0.21 0.8
PB5-20 52 JB5-18 JB5-16 90 HDPE 145 -1.45 0.31 1.702
PB5-21 52 JB5-18 JB5-17 90 HDPE 145 -0.537 0.12 0.27
PB5-22 72 JB5-19 JB5-15 90 HDPE 145 -1.437 0.31 1.674
PB5-23 100 JB5-19 JB5-22 90 HDPE 145 0.428 0.09 0.178
PB5-24 10 JB5-20 JB5-18 90 HDPE 145 -1.558 0.34 1.946
PB5-25 63 JB5-20 JB5-21 90 HDPE 145 0.275 0.06 0.078
PB5-26 50 JB5-21 JB5-19 90 HDPE 145 -0.581 0.13 0.313
PB5-27 31 JB5-23 JB5-21 90 HDPE 145 -0.428 0.09 0.178
PB5-28 236 JB5-24 JB5-13 110 HDPE 145 -2.567 0.37 1.848
PB5-29 248 JB5-24 JB5-35 90 HDPE 145 2.139 0.46 3.5

MaRS Planning Engineering Services Pvt. Ltd.


PB5-30 235 JB5-25 JB5-29 160 HDPE 145 7.274 0.5 2.046
PB5-31 272 JB5-26 JB5-40 90 HDPE 145 2.139 0.46 3.5
PB5-32 224 JB5-27 JB5-20 90 HDPE 145 -0.856 0.19 0.641
PB5-33 209 JB5-28 JB5-27 90 HDPE 145 -0.428 0.09 0.178
PB5-34 10 JB5-29 JB5-30 110 HDPE 145 2.567 0.37 1.848
PB5-35 86 JB5-29 JB5-33 110 HDPE 145 4.279 0.48 2.549
PB5-36 78 JB5-30 JB5-31 90 HDPE 145 1.061 0.23 0.954
PB5-37 167 JB5-30 JB5-32 90 HDPE 145 1.079 0.23 0.985
PB5-38 247 JB5-32 JB5-31 90 HDPE 145 -0.633 0.14 0.366
PB5-39 179 JB5-32 JB5-37 90 HDPE 145 1.284 0.28 1.359
PB5-40 78 JB5-34 JB5-33 90 HDPE 145 -0.428 0.09 0.178
PB5-41 260 JB5-35 JB5-43 90 HDPE 145 1.284 0.28 1.359
PB5-42 53 JB5-36 JB5-35 90 HDPE 145 -0.428 0.09 0.178
PB5-43 206 JB5-37 JB5-38 90 HDPE 145 0.428 0.09 0.178
PB5-44 221 JB5-37 JB5-39 90 HDPE 145 0.428 0.09 0.178
PB5-45 68 JB5-40 JB5-42 90 HDPE 145 1.284 0.28 1.359
PB5-46 211 JB5-40 JB5-41 90 HDPE 145 0.428 0.09 0.178
PB5-47 241 JB5-42 JB5-44 90 HDPE 145 0.856 0.19 0.641
PB5-48 176 JB5-44 JB5-45 90 HDPE 145 0.428 0.09 0.178
PB5-49 278 JB5-46 JB5-43 90 HDPE 145 -0.856 0.19 0.641
PB5-50 234 JB5-47 JB5-46 90 HDPE 145 -0.428 0.09 0.178
PB5-51 313 JB5-48 JB5-49 110 HDPE 145 2.995 0.44 2.459
PB5-52 412 JB5-48 JB5-33 110 HDPE 145 -3.423 0.5 3.148
PB5-53 11 JB5-50 JB5-53 90 HDPE 145 1.284 0.28 1.359
PB5-54 76 JB5-50 JB5-52 90 HDPE 145 0.428 0.09 0.178
PB5-55 176 JB5-50 JB5-49 110 HDPE 145 -2.567 0.37 1.848
PB5-56 42 JB5-51 JB5-50 90 HDPE 145 -0.428 0.09 0.178
PB5-57 75 JB5-53 JB5-55 90 HDPE 145 0.428 0.09 0.178
PB5-58 41 JB5-54 JB5-53 90 HDPE 145 -0.428 0.09 0.178
TB.-6
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB6-1 45 JB6-1 TB-6 250 DI-K7 140 -39.833 0.81 2.476
PB6-2 162 JB6-1 JB6-2 90 HDPE 145 0.353 0.08 0.124
PB6-3 130 JB6-3 JB6-1 250 DI-K7 140 -39.128 0.8 2.395
PB6-4 162 JB6-3 JB6-4 90 HDPE 145 0.353 0.08 0.124
PB6-5 83 JB6-5 JB6-6 90 HDPE 145 0.705 0.15 0.448
PB6-6 135 JB6-5 JB6-3 250 DI-K7 140 -38.423 0.78 2.316
PB6-7 105 JB6-6 JB6-7 90 HDPE 145 0.353 0.08 0.124
PB6-8 173 JB6-8 JB6-9 90 HDPE 145 0.353 0.08 0.124
PB6-9 163 JB6-8 JB6-5 250 DI-K7 140 -37.366 0.76 2.199
PB6-10 34 JB6-10 JB6-8 250 DI-K7 140 -36.661 0.75 2.123
PB6-11 220 JB6-10 JB6-11 90 HDPE 145 0.705 0.15 0.448
PB6-12 229 JB6-11 JB6-12 90 HDPE 145 0.353 0.08 0.124
PB6-13 265 JB6-13 JB6-10 250 DI-K7 140 -35.603 0.73 2.011
PB6-14 60 JB6-14 JB6-15 90 HDPE 145 0.353 0.08 0.124
PB6-15 268 JB6-14 JB6-13 250 DI-K7 140 -35.251 0.72 1.974

MaRS Planning Engineering Services Pvt. Ltd.


PB6-16 69 JB6-16 JB6-14 250 DI-K7 140 -34.546 0.7 1.902
PB6-17 234 JB6-16 JB6-17 200 DI-K7 140 26.086 0.83 3.352
PB6-18 327 JB6-16 JB6-20 160 HDPE 145 8.108 0.56 2.501
PB6-19 10 JB6-17 JB6-19 200 DI-K7 140 25.381 0.81 3.186
PB6-20 171 JB6-17 JB6-18 90 HDPE 145 0.353 0.08 0.124
PB6-21 23 JB6-19 JB6-22 200 DI-K7 140 17.567 0.56 1.612
PB6-22 161 JB6-19 JB6-21 90 HDPE 145 0.353 0.08 0.124
PB6-23 280 JB6-20 JB6-32 160 HDPE 145 7.755 0.53 2.303
PB6-24 67 JB6-22 JB6-23 90 HDPE 145 0.353 0.08 0.124
PB6-25 333 JB6-22 JB6-30 200 DI-K7 140 16.862 0.54 1.494
PB6-26 133 JB6-24 JB6-25 90 HDPE 145 0.353 0.08 0.124
PB6-27 404 JB6-24 JB6-19 200 DI-K7 140 -7.108 0.23 0.302
PB6-28 118 JB6-26 JB6-24 160 HDPE 145 -6.403 0.44 1.615
PB6-29 150 JB6-26 JB6-27 90 HDPE 145 0.353 0.08 0.124
PB6-30 92 JB6-28 JB6-26 160 HDPE 145 -5.698 0.39 1.301
PB6-31 117 JB6-28 JB6-29 90 HDPE 145 0.353 0.08 0.124
PB6-32 102 JB6-30 JB6-28 160 HDPE 145 -4.993 0.34 1.018
PB6-33 38 JB6-31 JB6-30 200 DI-K7 140 -21.503 0.68 2.343
PB6-34 371 JB6-31 JB6-33 90 HDPE 145 0.353 0.08 0.124
PB6-35 275 JB6-32 JB6-38 160 HDPE 145 7.403 0.51 2.113
PB6-36 80 JB6-34 JB6-31 200 DI-K7 140 -20.798 0.66 2.203
PB6-37 100 JB6-34 JB6-35 90 HDPE 145 0.353 0.08 0.124
PB6-38 50 JB6-36 JB6-34 200 DI-K7 140 -20.093 0.64 2.067
PB6-39 185 JB6-36 JB6-39 160 HDPE 145 7.467 0.51 2.147
PB6-40 55 JB6-37 JB6-36 200 DI-K7 140 -12.273 0.39 0.83
PB6-41 204 JB6-38 JB6-46 160 HDPE 145 7.05 0.48 1.931
PB6-42 147 JB6-39 JB6-37 110 HDPE 145 -4.138 0.47 2.396
PB6-43 25 JB6-40 JB6-39 200 DI-K7 140 -11.253 0.36 0.706
PB6-44 119 JB6-40 JB6-41 90 HDPE 145 0.353 0.08 0.124
PB6-45 397 JB6-42 JB6-40 90 HDPE 145 -0.353 0.08 0.124
PB6-46 54 JB6-43 JB6-44 90 HDPE 145 0.353 0.08 0.124
PB6-47 94 JB6-43 JB6-40 200 DI-K7 140 -10.196 0.32 0.588
PB6-48 263 JB6-45 JB6-37 160 HDPE 145 -7.782 0.53 2.318
PB6-49 28 JB6-46 JB6-48 140 HDPE 145 6.345 0.57 3.041
PB6-50 127 JB6-46 JB6-47 90 HDPE 145 0.353 0.08 0.124
PB6-51 21 JB6-48 JB6-52 110 HDPE 145 4.935 0.56 3.32
PB6-52 42 JB6-48 JB6-49 90 HDPE 145 1.058 0.23 0.949
PB6-53 32 JB6-49 JB6-50 90 HDPE 145 0.353 0.08 0.124
PB6-54 39 JB6-49 JB6-51 90 HDPE 145 0.353 0.08 0.124
PB6-55 65 JB6-52 JB6-54 90 HDPE 145 1.058 0.23 0.949
PB6-56 305 JB6-52 JB6-53 90 HDPE 145 0.353 0.08 0.124
PB6-57 309 JB6-52 JB6-63 110 HDPE 145 3.173 0.46 2.735
PB6-58 61 JB6-54 JB6-55 90 HDPE 145 0.353 0.08 0.124
PB6-59 78 JB6-54 JB6-56 90 HDPE 145 0.353 0.08 0.124
PB6-60 212 JB6-57 JB6-45 160 HDPE 145 -7.43 0.51 2.128
PB6-61 282 JB6-58 JB6-43 160 HDPE 145 -9.491 0.65 3.348
PB6-62 341 JB6-58 JB6-60 90 HDPE 145 0.353 0.08 0.124
PB6-63 11 JB6-59 JB6-58 160 HDPE 145 -8.786 0.6 2.902

MaRS Planning Engineering Services Pvt. Ltd.


PB6-64 340 JB6-59 JB6-61 90 HDPE 145 0.353 0.08 0.124
PB6-65 33 JB6-62 JB6-59 160 HDPE 145 -8.081 0.55 2.485
PB6-66 216 JB6-62 JB6-57 160 HDPE 145 -7.077 0.49 1.944
PB6-67 80 JB6-63 JB6-66 110 HDPE 145 2.468 0.36 1.717
PB6-68 99 JB6-63 JB6-64 90 HDPE 145 0.353 0.08 0.124
PB6-69 240 JB6-65 JB6-62 200 DI-K7 140 -14.805 0.47 1.174
PB6-70 53 JB6-66 JB6-68 90 HDPE 145 1.763 0.38 2.444
PB6-71 99 JB6-66 JB6-67 90 HDPE 145 0.353 0.08 0.124
PB6-72 44 JB6-68 JB6-69 90 HDPE 145 0.353 0.08 0.124
PB6-73 89 JB6-68 JB6-70 90 HDPE 145 1.058 0.23 0.949
PB6-74 48 JB6-70 JB6-71 90 HDPE 145 0.353 0.08 0.124
PB6-75 150 JB6-70 JB6-73 90 HDPE 145 0.353 0.08 0.124
PB6-76 14 JB6-72 JB6-74 160 HDPE 145 7.869 0.54 2.366
PB6-77 248 JB6-72 JB6-65 200 DI-K7 140 -14.453 0.46 1.123
PB6-78 10 JB6-74 JB6-76 110 HDPE 145 3.173 0.46 2.735
PB6-79 50 JB6-74 JB6-77 110 HDPE 145 3.991 0.45 2.241
PB6-80 117 JB6-74 JB6-75 90 HDPE 145 0.353 0.08 0.124
PB6-81 40 JB6-76 JB6-78 90 HDPE 145 1.769 0.38 2.46
PB6-82 49 JB6-77 JB6-79 90 HDPE 145 1.058 0.23 0.949
PB6-83 82 JB6-77 JB6-83 110 HDPE 145 2.581 0.38 1.866
PB6-84 80 JB6-78 JB6-82 90 HDPE 145 1.416 0.31 1.63
PB6-85 35 JB6-79 JB6-80 90 HDPE 145 0.353 0.08 0.124
PB6-86 113 JB6-79 JB6-81 90 HDPE 145 0.353 0.08 0.124
PB6-87 61 JB6-82 JB6-86 90 HDPE 145 1.064 0.23 0.959
PB6-88 95 JB6-83 JB6-84 90 HDPE 145 0.353 0.08 0.124
PB6-89 165 JB6-83 JB6-91 110 HDPE 145 1.876 0.27 1.034
PB6-90 110 JB6-85 JB6-88 90 HDPE 145 0.353 0.08 0.124
PB6-91 301 JB6-85 JB6-76 90 HDPE 145 -1.051 0.23 0.939
PB6-92 41 JB6-86 JB6-87 90 HDPE 145 0.353 0.08 0.124
PB6-93 142 JB6-86 JB6-89 90 HDPE 145 0.359 0.08 0.128
PB6-94 49 JB6-89 JB6-90 90 HDPE 145 0.353 0.08 0.124
PB6-95 188 JB6-89 JB6-85 90 HDPE 145 -0.346 0.08 0.12
PB6-96 12 JB6-91 JB6-93 90 HDPE 145 1.171 0.25 1.146
PB6-97 82 JB6-91 JB6-92 90 HDPE 145 0.353 0.08 0.124
PB6-98 162 JB6-93 JB6-94 90 HDPE 145 0.353 0.08 0.124
PB6-99 190 JB6-93 JB6-96 90 HDPE 145 0.466 0.1 0.208
PB6-100 173 JB6-95 JB6-72 140 HDPE 145 -6.232 0.56 2.941
PB6-101 195 JB6-95 JB6-98 140 HDPE 145 5.64 0.51 2.445
PB6-102 205 JB6-96 JB6-95 90 HDPE 145 -0.239 0.05 0.06
PB6-103 63 JB6-97 JB6-96 90 HDPE 145 -0.353 0.08 0.124
PB6-104 243 JB6-98 JB6-99 140 HDPE 145 5.288 0.47 2.169
PB6-105 244 JB6-99 JB6-100 110 HDPE 145 4.935 0.56 3.32
PB6-106 251 JB6-100 JB6-101 110 HDPE 145 4.583 0.52 2.894
PB6-107 245 JB6-101 JB6-102 110 HDPE 145 4.23 0.48 2.496
PB6-108 250 JB6-102 JB6-103 110 HDPE 145 3.878 0.44 2.124
PB6-109 248 JB6-103 JB6-104 110 HDPE 145 3.525 0.51 3.324
PB6-110 247 JB6-104 JB6-105 110 HDPE 145 3.173 0.46 2.735
PB6-111 265 JB6-105 JB6-106 110 HDPE 145 2.82 0.41 2.199

MaRS Planning Engineering Services Pvt. Ltd.


PB6-112 167 JB6-106 JB6-108 90 HDPE 145 1.269 0.28 1.329
PB6-113 174 JB6-106 JB6-107 90 HDPE 145 1.199 0.26 1.198
PB6-114 116 JB6-107 JB6-109 90 HDPE 145 0.477 0.1 0.217
PB6-115 14 JB6-108 JB6-110 90 HDPE 145 1.058 0.23 0.949
PB6-116 98 JB6-108 JB6-107 90 HDPE 145 -0.37 0.08 0.135
PB6-117 214 JB6-108 JB6-109 90 HDPE 145 0.228 0.05 0.055
PB6-118 30 JB6-109 JB6-111 90 HDPE 145 0.353 0.08 0.124
PB6-119 173 JB6-110 JB6-113 90 HDPE 145 0.283 0.06 0.082
PB6-120 80 JB6-112 JB6-110 90 HDPE 145 -0.422 0.09 0.172
PB6-121 96 JB6-113 JB6-112 90 HDPE 145 -0.069 0.01 0.005
TB.-7
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB7-1 30 JB7-1 TB-7 250 DI-K7 140 -26.875 0.55 1.194
PB7-2 215 JB7-1 JB7-2 90 HDPE 145 1.55 0.34 1.928
PB7-3 94 JB7-2 JB7-5 90 HDPE 145 0.775 0.17 0.534
PB7-4 141 JB7-2 JB7-3 90 HDPE 145 0.517 0.11 0.252
PB7-5 180 JB7-3 JB7-4 90 HDPE 145 0.258 0.06 0.07
PB7-6 68 JB7-5 JB7-6 90 HDPE 145 0.258 0.06 0.07
PB7-7 304 JB7-5 JB7-7 90 HDPE 145 0.258 0.06 0.07
PB7-8 96 JB7-8 JB7-9 90 HDPE 145 0.775 0.17 0.534
PB7-9 205 JB7-8 JB7-1 200 DI-K7 140 -25.066 0.8 3.113
PB7-10 232 JB7-9 JB7-11 90 HDPE 145 0.258 0.06 0.07
PB7-11 105 JB7-10 JB7-9 90 HDPE 145 -0.258 0.06 0.07
PB7-12 73 JB7-12 JB7-8 200 DI-K7 140 -24.032 0.76 2.88
PB7-13 146 JB7-12 JB7-14 90 HDPE 145 1.809 0.39 2.565
PB7-14 281 JB7-13 JB7-12 90 HDPE 145 -0.258 0.06 0.07
PB7-15 87 JB7-14 JB7-18 90 HDPE 145 0.775 0.17 0.534
PB7-16 54 JB7-15 JB7-16 90 HDPE 145 0.258 0.06 0.07
PB7-17 166 JB7-15 JB7-12 200 DI-K7 140 -21.707 0.69 2.385
PB7-18 10 JB7-17 JB7-15 90 HDPE 145 -1.55 0.34 1.929
PB7-19 40 JB7-17 JB7-22 90 HDPE 145 1.034 0.22 0.91
PB7-20 86 JB7-18 JB7-20 90 HDPE 145 0.258 0.06 0.07
PB7-21 79 JB7-19 JB7-18 90 HDPE 145 -0.258 0.06 0.07
PB7-22 152 JB7-21 JB7-17 90 HDPE 145 -0.258 0.06 0.07
PB7-23 119 JB7-22 JB7-27 90 HDPE 145 0.517 0.11 0.252
PB7-24 59 JB7-23 JB7-26 90 HDPE 145 0.258 0.06 0.07
PB7-25 154 JB7-23 JB7-14 90 HDPE 145 -0.775 0.17 0.534
PB7-26 71 JB7-24 JB7-22 90 HDPE 145 -0.258 0.06 0.07
PB7-27 52 JB7-25 JB7-23 90 HDPE 145 -0.258 0.06 0.07
PB7-28 273 JB7-28 JB7-27 90 HDPE 145 -0.258 0.06 0.07
PB7-29 276 JB7-29 JB7-15 200 DI-K7 140 -19.639 0.63 1.981
PB7-30 283 JB7-30 JB7-29 200 DI-K7 140 -19.381 0.62 1.933
PB7-31 232 JB7-31 JB7-30 200 DI-K7 140 -19.123 0.61 1.886
PB7-32 128 JB7-32 JB7-33 90 HDPE 145 0.258 0.06 0.07
PB7-33 402 JB7-32 JB7-31 200 DI-K7 140 -18.864 0.6 1.839
PB7-34 214 JB7-34 JB7-37 90 HDPE 145 1.292 0.28 1.375

MaRS Planning Engineering Services Pvt. Ltd.


PB7-35 292 JB7-34 JB7-32 200 DI-K7 140 -18.347 0.58 1.747
PB7-36 91 JB7-35 JB7-34 200 DI-K7 140 -11.887 0.38 0.782
PB7-37 120 JB7-36 JB7-35 90 HDPE 145 -0.258 0.06 0.07
PB7-38 124 JB7-37 JB7-38 90 HDPE 145 0.661 0.14 0.397
PB7-39 415 JB7-37 JB7-40 90 HDPE 145 0.373 0.08 0.138
PB7-40 112 JB7-38 JB7-39 90 HDPE 145 0.258 0.06 0.07
PB7-41 132 JB7-40 JB7-41 90 HDPE 145 0.258 0.06 0.07
PB7-42 340 JB7-40 JB7-38 90 HDPE 145 -0.144 0.03 0.024
PB7-43 416 JB7-42 JB7-35 200 DI-K7 140 -11.37 0.36 0.72
PB7-44 10 JB7-43 JB7-42 200 DI-K7 140 -10.337 0.33 0.603
PB7-45 10 JB7-44 JB7-43 110 HDPE 145 -2.843 0.41 2.231
PB7-46 354 JB7-45 JB7-44 90 HDPE 145 -0.258 0.06 0.07
PB7-47 117 JB7-46 JB7-42 90 HDPE 145 -0.775 0.17 0.534
PB7-48 320 JB7-46 JB7-48 90 HDPE 145 0.258 0.06 0.07
PB7-49 253 JB7-47 JB7-46 90 HDPE 145 -0.258 0.06 0.07
PB7-50 77 JB7-49 JB7-43 160 HDPE 145 -7.236 0.5 2.026
PB7-51 155 JB7-49 JB7-50 90 HDPE 145 0.258 0.06 0.07
PB7-52 113 JB7-51 JB7-44 110 HDPE 145 -2.326 0.34 1.539
PB7-53 86 JB7-52 JB7-51 90 HDPE 145 -0.258 0.06 0.07
PB7-54 11 JB7-53 JB7-54 90 HDPE 145 1.292 0.28 1.375
PB7-55 329 JB7-53 JB7-55 90 HDPE 145 0.258 0.06 0.07
PB7-56 207 JB7-53 JB7-51 90 HDPE 145 -1.809 0.39 2.565
PB7-57 273 JB7-54 JB7-57 90 HDPE 145 0.775 0.17 0.534
PB7-58 174 JB7-56 JB7-54 90 HDPE 145 -0.258 0.06 0.07
PB7-59 83 JB7-57 JB7-58 90 HDPE 145 0.258 0.06 0.07
PB7-60 97 JB7-59 JB7-57 90 HDPE 145 -0.258 0.06 0.07
PB7-61 447 JB7-60 JB7-34 110 HDPE 145 -4.91 0.55 3.289
PB7-62 281 JB7-61 JB7-60 90 HDPE 145 -1.034 0.22 0.91
PB7-63 49 JB7-62 JB7-63 90 HDPE 145 0.258 0.06 0.07
PB7-64 279 JB7-62 JB7-61 90 HDPE 145 -0.775 0.17 0.534
PB7-65 136 JB7-64 JB7-62 90 HDPE 145 -0.258 0.06 0.07
PB7-66 427 JB7-65 JB7-49 140 HDPE 145 -6.719 0.6 3.381
PB7-67 212 JB7-66 JB7-65 140 HDPE 145 -6.46 0.58 3.144
PB7-68 130 JB7-67 JB7-68 90 HDPE 145 0.775 0.17 0.534
PB7-69 361 JB7-67 JB7-60 110 HDPE 145 -3.618 0.53 3.488
PB7-70 238 JB7-68 JB7-70 90 HDPE 145 0.258 0.06 0.07
PB7-71 142 JB7-69 JB7-68 90 HDPE 145 -0.258 0.06 0.07
PB7-72 80 JB7-71 JB7-67 110 HDPE 145 -2.584 0.38 1.87
PB7-73 82 JB7-72 JB7-71 90 HDPE 145 -0.258 0.06 0.07
PB7-74 262 JB7-73 JB7-66 140 HDPE 145 -6.202 0.56 2.915
PB7-75 238 JB7-74 JB7-73 140 HDPE 145 -5.944 0.53 2.694
PB7-76 80 JB7-75 JB7-76 90 HDPE 145 0.258 0.06 0.07
PB7-77 358 JB7-75 JB7-71 90 HDPE 145 -2.067 0.45 3.284
PB7-78 10 JB7-77 JB7-79 90 HDPE 145 1.034 0.22 0.91
PB7-79 48 JB7-77 JB7-75 90 HDPE 145 -1.55 0.34 1.928
PB7-80 57 JB7-78 JB7-77 90 HDPE 145 -0.258 0.06 0.07
PB7-81 77 JB7-79 JB7-81 90 HDPE 145 0.258 0.06 0.07
PB7-82 225 JB7-79 JB7-82 90 HDPE 145 0.258 0.06 0.07

MaRS Planning Engineering Services Pvt. Ltd.


PB7-83 57 JB7-80 JB7-79 90 HDPE 145 -0.258 0.06 0.07
PB7-84 279 JB7-83 JB7-74 140 HDPE 145 -5.685 0.51 2.481
PB7-85 11 JB7-84 JB7-83 90 HDPE 145 -0.775 0.17 0.534
PB7-86 274 JB7-84 JB7-85 90 HDPE 145 0.258 0.06 0.07
PB7-87 352 JB7-86 JB7-84 90 HDPE 145 -0.258 0.06 0.07
PB7-88 101 JB7-87 JB7-83 110 HDPE 145 -4.651 0.52 2.975
PB7-89 11 JB7-88 JB7-87 90 HDPE 145 -0.775 0.17 0.534
PB7-90 441 JB7-88 JB7-90 90 HDPE 145 0.258 0.06 0.07
PB7-91 285 JB7-89 JB7-88 90 HDPE 145 -0.258 0.06 0.07
PB7-92 216 JB7-91 JB7-87 110 HDPE 145 -3.618 0.53 3.488
PB7-93 11 JB7-92 JB7-91 90 HDPE 145 -1.034 0.22 0.91
PB7-94 480 JB7-92 JB7-95 90 HDPE 145 0.258 0.06 0.07
PB7-95 178 JB7-93 JB7-92 90 HDPE 145 -0.258 0.06 0.07
PB7-96 296 JB7-94 JB7-92 90 HDPE 145 -0.258 0.06 0.07
PB7-97 63 JB7-96 JB7-99 90 HDPE 145 1.55 0.34 1.928
PB7-98 292 JB7-96 JB7-91 110 HDPE 145 -2.326 0.34 1.539
PB7-99 347 JB7-97 JB7-96 90 HDPE 145 -0.517 0.11 0.252
PB7-100 212 JB7-98 JB7-97 90 HDPE 145 -0.258 0.06 0.07
PB7-101 11 JB7-99 JB7-100 90 HDPE 145 1.034 0.22 0.91
PB7-102 208 JB7-99 JB7-102 90 HDPE 145 0.258 0.06 0.07
PB7-103 179 JB7-100 JB7-103 90 HDPE 145 0.258 0.06 0.07
PB7-104 201 JB7-100 JB7-104 90 HDPE 145 0.258 0.06 0.07
PB7-105 65 JB7-101 JB7-100 90 HDPE 145 -0.258 0.06 0.07
TB.-8
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB8-1 31 JB8-1 TB-8 250 DI-K7 140 -32.108 0.65 1.661
PB8-2 56 JB8-1 JB8-2 90 HDPE 145 0.479 0.1 0.219
PB8-3 55 JB8-3 JB8-1 250 DI-K7 140 -31.15 0.63 1.57
PB8-4 124 JB8-3 JB8-4 90 HDPE 145 0.479 0.1 0.219
PB8-5 61 JB8-5 JB8-6 90 HDPE 145 0.479 0.1 0.219
PB8-6 95 JB8-5 JB8-3 250 DI-K7 140 -30.191 0.62 1.482
PB8-7 52 JB8-7 JB8-9 200 DI-K7 140 13.897 0.44 1.044
PB8-8 142 JB8-7 JB8-5 250 DI-K7 140 -29.233 0.6 1.396
PB8-9 11 JB8-8 JB8-7 200 DI-K7 140 -14.856 0.47 1.182
PB8-10 134 JB8-8 JB8-11 90 HDPE 145 0.958 0.21 0.791
PB8-11 114 JB8-9 JB8-10 90 HDPE 145 0.479 0.1 0.219
PB8-12 210 JB8-9 JB8-13 200 DI-K7 140 12.939 0.41 0.915
PB8-13 208 JB8-11 JB8-12 90 HDPE 145 0.479 0.1 0.219
PB8-14 131 JB8-13 JB8-14 90 HDPE 145 0.479 0.1 0.219
PB8-15 369 JB8-13 JB8-16 200 DI-K7 140 11.981 0.38 0.793
PB8-16 367 JB8-15 JB8-8 200 DI-K7 140 -13.418 0.43 0.979
PB8-17 72 JB8-16 JB8-17 200 DI-K7 140 11.501 0.37 0.736
PB8-18 11 JB8-17 JB8-18 200 DI-K7 140 10.543 0.34 0.626
PB8-19 173 JB8-17 JB8-19 90 HDPE 145 0.479 0.1 0.219
PB8-20 113 JB8-18 JB8-23 160 HDPE 145 9.584 0.66 3.41
PB8-21 183 JB8-18 JB8-20 90 HDPE 145 0.479 0.1 0.219

MaRS Planning Engineering Services Pvt. Ltd.


PB8-22 11 JB8-21 JB8-22 200 DI-K7 140 12.46 0.4 0.853
PB8-23 456 JB8-21 JB8-15 200 DI-K7 140 -12.939 0.41 0.915
PB8-24 278 JB8-22 JB8-27 140 HDPE 145 6.763 0.61 3.422
PB8-25 392 JB8-22 JB8-25 140 HDPE 145 5.217 0.47 2.116
PB8-26 40 JB8-23 JB8-24 90 HDPE 145 0.479 0.1 0.219
PB8-27 312 JB8-23 JB8-29 160 HDPE 145 8.626 0.59 2.805
PB8-28 163 JB8-25 JB8-26 90 HDPE 145 0.479 0.1 0.219
PB8-29 115 JB8-27 JB8-28 90 HDPE 145 0.479 0.1 0.219
PB8-30 164 JB8-27 JB8-43 140 HDPE 145 5.805 0.52 2.579
PB8-31 37 JB8-29 JB8-32 140 HDPE 145 5.271 0.47 2.157
PB8-32 10 JB8-30 JB8-29 110 HDPE 145 -2.875 0.42 2.28
PB8-33 216 JB8-30 JB8-37 90 HDPE 145 0.761 0.17 0.516
PB8-34 116 JB8-31 JB8-25 110 HDPE 145 -4.259 0.48 2.527
PB8-35 155 JB8-31 JB8-33 90 HDPE 145 0.479 0.1 0.219
PB8-36 200 JB8-31 JB8-34 90 HDPE 145 0.479 0.1 0.219
PB8-37 65 JB8-32 JB8-41 110 HDPE 145 4.313 0.49 2.587
PB8-38 190 JB8-32 JB8-35 90 HDPE 145 0.479 0.1 0.219
PB8-39 49 JB8-36 JB8-30 90 HDPE 145 -1.635 0.35 2.127
PB8-40 94 JB8-36 JB8-38 90 HDPE 145 0.479 0.1 0.219
PB8-41 71 JB8-39 JB8-36 90 HDPE 145 -0.676 0.15 0.415
PB8-42 94 JB8-39 JB8-40 90 HDPE 145 0.479 0.1 0.219
PB8-43 263 JB8-39 JB8-37 90 HDPE 145 -0.282 0.06 0.082
PB8-44 60 JB8-41 JB8-44 110 HDPE 145 3.355 0.49 3.032
PB8-45 166 JB8-41 JB8-42 90 HDPE 145 0.479 0.1 0.219
PB8-46 116 JB8-43 JB8-31 110 HDPE 145 -2.821 0.41 2.201
PB8-47 176 JB8-43 JB8-48 160 HDPE 145 8.147 0.56 2.523
PB8-48 51 JB8-44 JB8-46 110 HDPE 145 2.396 0.35 1.626
PB8-49 121 JB8-44 JB8-45 90 HDPE 145 0.479 0.1 0.219
PB8-50 96 JB8-46 JB8-47 90 HDPE 145 0.479 0.1 0.219
PB8-51 172 JB8-46 JB8-49 90 HDPE 145 1.438 0.31 1.676
PB8-52 205 JB8-48 JB8-52 160 HDPE 145 7.668 0.53 2.255
PB8-53 58 JB8-49 JB8-50 90 HDPE 145 0.479 0.1 0.219
PB8-54 120 JB8-49 JB8-51 90 HDPE 145 0.479 0.1 0.219
PB8-55 254 JB8-52 JB8-56 140 HDPE 145 5.751 0.52 2.534
PB8-56 121 JB8-53 JB8-55 90 HDPE 145 0.479 0.1 0.219
PB8-57 172 JB8-53 JB8-52 90 HDPE 145 -1.438 0.31 1.676
PB8-58 116 JB8-54 JB8-53 90 HDPE 145 -0.479 0.1 0.219
PB8-59 364 JB8-56 JB8-57 140 HDPE 145 5.271 0.47 2.157
PB8-60 22 JB8-57 JB8-58 110 HDPE 145 4.792 0.54 3.144
PB8-61 29 JB8-58 JB8-59 110 HDPE 145 4.313 0.49 2.587
PB8-62 162 JB8-59 JB8-60 110 HDPE 145 3.834 0.43 2.08
PB8-63 12 JB8-60 JB8-62 110 HDPE 145 2.875 0.42 2.279
PB8-64 34 JB8-60 JB8-61 90 HDPE 145 0.479 0.1 0.219
PB8-65 55 JB8-62 JB8-63 90 HDPE 145 0.479 0.1 0.219
PB8-66 165 JB8-64 JB8-62 90 HDPE 145 -1.917 0.42 2.856
PB8-67 162 JB8-64 JB8-65 90 HDPE 145 1.438 0.31 1.676
PB8-68 50 JB8-65 JB8-66 90 HDPE 145 0.479 0.1 0.219
PB8-69 373 JB8-65 JB8-67 90 HDPE 145 0.479 0.1 0.219

MaRS Planning Engineering Services Pvt. Ltd.


TB.-9
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB9-1 23 JB9-1 TB-9 250 DI-K7 140 -37.027 0.75 2.162
PB9-2 82 JB9-1 JB9-3 250 DI-K7 140 36.467 0.74 2.102
PB9-3 217 JB9-2 JB9-1 90 HDPE 145 -0.28 0.06 0.081
PB9-4 89 JB9-3 JB9-4 90 HDPE 145 1.12 0.24 1.055
PB9-5 171 JB9-4 JB9-6 90 HDPE 145 0.56 0.12 0.292
PB9-6 91 JB9-5 JB9-4 90 HDPE 145 -0.28 0.06 0.081
PB9-7 266 JB9-6 JB9-7 90 HDPE 145 0.28 0.06 0.081
PB9-8 156 JB9-8 JB9-3 250 DI-K7 140 -35.067 0.71 1.955
PB9-9 264 JB9-9 JB9-8 250 DI-K7 140 -34.787 0.71 1.926
PB9-10 230 JB9-10 JB9-9 250 DI-K7 140 -34.507 0.7 1.898
PB9-11 245 JB9-11 JB9-10 250 DI-K7 140 -34.227 0.7 1.869
PB9-12 271 JB9-12 JB9-11 250 DI-K7 140 -33.947 0.69 1.841
PB9-13 244 JB9-13 JB9-12 250 DI-K7 140 -33.667 0.69 1.813
PB9-14 242 JB9-14 JB9-13 250 DI-K7 140 -33.387 0.68 1.785
PB9-15 246 JB9-15 JB9-14 250 DI-K7 140 -33.107 0.67 1.758
PB9-16 254 JB9-16 JB9-15 250 DI-K7 140 -32.827 0.67 1.73
PB9-17 257 JB9-17 JB9-16 90 HDPE 145 -0.28 0.06 0.081
PB9-18 344 JB9-18 JB9-16 250 DI-K7 140 -32.267 0.66 1.676
PB9-19 290 JB9-19 JB9-20 90 HDPE 145 0.28 0.06 0.081
PB9-20 243 JB9-19 JB9-18 250 DI-K7 140 -31.987 0.65 1.649
PB9-21 167 JB9-21 JB9-19 250 DI-K7 140 -31.427 0.64 1.596
PB9-22 93 JB9-22 JB9-21 90 HDPE 145 -0.28 0.06 0.081
PB9-23 252 JB9-23 JB9-21 250 DI-K7 140 -30.868 0.63 1.544
PB9-24 252 JB9-24 JB9-23 250 DI-K7 140 -30.588 0.62 1.518
PB9-25 244 JB9-25 JB9-24 250 DI-K7 140 -30.308 0.62 1.492
PB9-26 262 JB9-26 JB9-25 250 DI-K7 140 -30.028 0.61 1.467
PB9-27 14 JB9-27 JB9-26 250 DI-K7 140 -26.948 0.55 1.201
PB9-28 32 JB9-28 JB9-29 90 HDPE 145 0.28 0.06 0.081
PB9-29 114 JB9-28 JB9-27 90 HDPE 145 -0.84 0.18 0.619
PB9-30 60 JB9-30 JB9-26 90 HDPE 145 -1.4 0.3 1.595
PB9-31 130 JB9-31 JB9-30 90 HDPE 145 -0.28 0.06 0.081
PB9-32 254 JB9-32 JB9-28 90 HDPE 145 -0.28 0.06 0.081
PB9-33 101 JB9-33 JB9-30 90 HDPE 145 -0.84 0.18 0.619
PB9-34 50 JB9-34 JB9-33 90 HDPE 145 -0.28 0.06 0.081
PB9-35 134 JB9-35 JB9-33 90 HDPE 145 -0.28 0.06 0.081
PB9-36 270 JB9-36 JB9-26 90 HDPE 145 -1.4 0.3 1.595
PB9-37 89 JB9-37 JB9-36 90 HDPE 145 -0.28 0.06 0.081
PB9-38 12 JB9-38 JB9-36 90 HDPE 145 -0.84 0.18 0.62
PB9-39 77 JB9-39 JB9-38 90 HDPE 145 -0.28 0.06 0.081
PB9-40 79 JB9-40 JB9-38 90 HDPE 145 -0.28 0.06 0.081
PB9-41 232 JB9-41 JB9-27 200 DI-K7 140 -25.828 0.82 3.291
PB9-42 300 JB9-42 JB9-41 200 DI-K7 140 -25.548 0.81 3.225
PB9-43 90 JB9-43 JB9-42 90 HDPE 145 -0.84 0.18 0.619
PB9-44 107 JB9-43 JB9-45 90 HDPE 145 0.28 0.06 0.081

MaRS Planning Engineering Services Pvt. Ltd.


PB9-45 59 JB9-44 JB9-43 90 HDPE 145 -0.28 0.06 0.081
PB9-46 58 JB9-46 JB9-42 200 DI-K7 140 -24.429 0.78 2.968
PB9-47 246 JB9-46 JB9-50 90 HDPE 145 1.12 0.24 1.055
PB9-48 13 JB9-47 JB9-46 200 DI-K7 140 -23.029 0.73 2.661
PB9-49 244 JB9-47 JB9-48 90 HDPE 145 0.56 0.12 0.292
PB9-50 164 JB9-48 JB9-49 90 HDPE 145 0.28 0.06 0.081
PB9-51 206 JB9-50 JB9-51 90 HDPE 145 0.28 0.06 0.081
PB9-52 169 JB9-50 JB9-52 90 HDPE 145 0.56 0.12 0.292
PB9-53 176 JB9-52 JB9-53 90 HDPE 145 0.28 0.06 0.081
PB9-54 175 JB9-54 JB9-47 200 DI-K7 140 -22.189 0.71 2.484
PB9-55 250 JB9-55 JB9-54 200 DI-K7 140 -21.909 0.7 2.426
PB9-56 242 JB9-56 JB9-55 200 DI-K7 140 -21.629 0.69 2.369
PB9-57 215 JB9-57 JB9-59 200 DI-K7 140 15.75 0.5 1.317
PB9-58 250 JB9-57 JB9-56 200 DI-K7 140 -21.349 0.68 2.313
PB9-59 328 JB9-57 JB9-58 90 HDPE 145 0.28 0.06 0.081
PB9-60 258 JB9-59 JB9-60 200 DI-K7 140 15.47 0.49 1.274
PB9-61 238 JB9-60 JB9-62 200 DI-K7 140 15.19 0.48 1.231
PB9-62 198 JB9-61 JB9-57 110 HDPE 145 -5.039 0.57 3.451
PB9-63 254 JB9-62 JB9-64 200 DI-K7 140 14.91 0.47 1.19
PB9-64 122 JB9-63 JB9-61 110 HDPE 145 -4.759 0.54 3.104
PB9-65 151 JB9-63 JB9-68 110 HDPE 145 2.24 0.33 1.435
PB9-66 242 JB9-64 JB9-81 200 DI-K7 140 14.63 0.47 1.148
PB9-67 20 JB9-65 JB9-66 90 HDPE 145 0.84 0.18 0.619
PB9-68 128 JB9-65 JB9-63 110 HDPE 145 -2.24 0.33 1.435
PB9-69 116 JB9-66 JB9-67 90 HDPE 145 0.28 0.06 0.081
PB9-70 12 JB9-68 JB9-72 90 HDPE 145 1.4 0.3 1.595
PB9-71 223 JB9-68 JB9-76 90 HDPE 145 0.56 0.12 0.292
PB9-72 471 JB9-69 JB9-65 90 HDPE 145 -0.28 0.06 0.081
PB9-73 70 JB9-70 JB9-65 90 HDPE 145 -0.84 0.18 0.619
PB9-74 122 JB9-70 JB9-74 90 HDPE 145 0.28 0.06 0.081
PB9-75 438 JB9-71 JB9-66 90 HDPE 145 -0.28 0.06 0.081
PB9-76 126 JB9-72 JB9-75 90 HDPE 145 0.56 0.12 0.292
PB9-77 231 JB9-72 JB9-79 90 HDPE 145 0.56 0.12 0.292
PB9-78 107 JB9-73 JB9-70 90 HDPE 145 -0.28 0.06 0.081
PB9-79 126 JB9-75 JB9-77 90 HDPE 145 0.28 0.06 0.081
PB9-80 203 JB9-76 JB9-78 90 HDPE 145 0.28 0.06 0.081
PB9-81 190 JB9-79 JB9-80 90 HDPE 145 0.28 0.06 0.081
PB9-82 134 JB9-81 JB9-82 200 DI-K7 140 13.23 0.42 0.953
PB9-83 234 JB9-82 JB9-87 200 DI-K7 140 12.95 0.41 0.916
PB9-84 129 JB9-83 JB9-81 90 HDPE 145 -1.12 0.24 1.055
PB9-85 130 JB9-84 JB9-86 90 HDPE 145 0.28 0.06 0.081
PB9-86 184 JB9-84 JB9-83 90 HDPE 145 -0.84 0.18 0.619
PB9-87 103 JB9-85 JB9-84 90 HDPE 145 -0.28 0.06 0.081
PB9-88 148 JB9-87 JB9-88 200 DI-K7 140 10.991 0.35 0.676
PB9-89 140 JB9-88 JB9-91 200 DI-K7 140 10.711 0.34 0.645
PB9-90 45 JB9-89 JB9-90 90 HDPE 145 0.28 0.06 0.081
PB9-91 53 JB9-89 JB9-87 90 HDPE 145 -1.68 0.36 2.236
PB9-92 181 JB9-91 JB9-96 140 HDPE 145 5.319 0.48 2.193

MaRS Planning Engineering Services Pvt. Ltd.


PB9-93 251 JB9-91 JB9-97 140 HDPE 145 5.112 0.46 2.038
PB9-94 225 JB9-92 JB9-89 90 HDPE 145 -1.12 0.24 1.055
PB9-95 159 JB9-93 JB9-92 90 HDPE 145 -0.84 0.18 0.619
PB9-96 64 JB9-94 JB9-93 90 HDPE 145 -0.28 0.06 0.081
PB9-97 111 JB9-95 JB9-93 90 HDPE 145 -0.28 0.06 0.081
PB9-98 177 JB9-96 JB9-99 110 HDPE 145 5.039 0.57 3.451
PB9-99 140 JB9-97 JB9-98 110 HDPE 145 4.832 0.54 3.193
PB9-100 237 JB9-98 JB9-103 110 HDPE 145 4.552 0.51 2.858
PB9-101 62 JB9-99 JB9-101 110 HDPE 145 4.479 0.5 2.775
PB9-102 114 JB9-100 JB9-99 90 HDPE 145 -0.28 0.06 0.081
PB9-103 216 JB9-101 JB9-104 110 HDPE 145 3.919 0.44 2.167
PB9-104 131 JB9-102 JB9-101 90 HDPE 145 -0.28 0.06 0.081
PB9-105 265 JB9-103 JB9-111 110 HDPE 145 4.272 0.48 2.541
PB9-106 203 JB9-104 JB9-105 110 HDPE 145 3.639 0.41 1.889
PB9-107 37 JB9-105 JB9-107 110 HDPE 145 3.079 0.45 2.588
PB9-108 247 JB9-106 JB9-105 90 HDPE 145 -0.28 0.06 0.081
PB9-109 10 JB9-107 JB9-108 90 HDPE 145 0.84 0.18 0.62
PB9-110 137 JB9-107 JB9-112 90 HDPE 145 1.96 0.43 2.975
PB9-111 231 JB9-108 JB9-109 90 HDPE 145 0.28 0.06 0.081
PB9-112 294 JB9-108 JB9-110 90 HDPE 145 0.28 0.06 0.081
PB9-113 144 JB9-111 JB9-114 110 HDPE 145 3.992 0.45 2.242
PB9-114 154 JB9-112 JB9-121 90 HDPE 145 1.4 0.3 1.595
PB9-115 163 JB9-113 JB9-112 90 HDPE 145 -0.28 0.06 0.081
PB9-116 10 JB9-114 JB9-115 90 HDPE 145 1.68 0.36 2.236
PB9-117 304 JB9-114 JB9-126 90 HDPE 145 2.032 0.44 3.182
PB9-118 71 JB9-115 JB9-117 90 HDPE 145 0.84 0.18 0.619
PB9-119 141 JB9-116 JB9-115 90 HDPE 145 -0.56 0.12 0.292
PB9-120 149 JB9-117 JB9-119 90 HDPE 145 0.28 0.06 0.081
PB9-121 81 JB9-118 JB9-117 90 HDPE 145 -0.28 0.06 0.081
PB9-122 273 JB9-120 JB9-116 90 HDPE 145 -0.28 0.06 0.081
PB9-123 16 JB9-121 JB9-123 90 HDPE 145 0.84 0.18 0.619
PB9-124 90 JB9-122 JB9-121 90 HDPE 145 -0.28 0.06 0.081
PB9-125 218 JB9-123 JB9-125 90 HDPE 145 0.28 0.06 0.081
PB9-126 71 JB9-124 JB9-123 90 HDPE 145 -0.28 0.06 0.081
PB9-127 251 JB9-126 JB9-127 90 HDPE 145 1.752 0.38 2.418
PB9-128 234 JB9-127 JB9-128 90 HDPE 145 1.472 0.32 1.752
PB9-129 139 JB9-128 JB9-129 90 HDPE 145 1.192 0.26 1.185
PB9-130 91 JB9-129 JB9-131 90 HDPE 145 0.353 0.08 0.124
PB9-131 238 JB9-129 JB9-132 90 HDPE 145 0.28 0.06 0.081
PB9-132 100 JB9-130 JB9-129 90 HDPE 145 -0.28 0.06 0.081
TB.-10
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB10-1 21 JB10-1 TB-10 200 DI-K7 140 -10.888 0.35 0.665
PB10-2 308 JB10-1 JB10-3 90 HDPE 145 1.613 0.35 2.074
PB10-3 47 JB10-2 JB10-1 160 HDPE 145 -8.872 0.61 2.955
PB10-4 90 JB10-3 JB10-4 90 HDPE 145 0.403 0.09 0.159

MaRS Planning Engineering Services Pvt. Ltd.


PB10-5 68 JB10-5 JB10-3 90 HDPE 145 -0.807 0.18 0.575
PB10-6 100 JB10-6 JB10-5 90 HDPE 145 -0.403 0.09 0.159
PB10-7 338 JB10-7 JB10-2 110 HDPE 145 -4.119 0.46 2.375
PB10-8 68 JB10-8 JB10-7 110 HDPE 145 -3.715 0.42 1.963
PB10-9 257 JB10-8 JB10-10 110 HDPE 145 2.909 0.42 2.329
PB10-10 100 JB10-9 JB10-8 90 HDPE 145 -0.403 0.09 0.159
PB10-11 585 JB10-10 JB10-2 110 HDPE 145 -4.35 0.49 2.628
PB10-12 10 JB10-11 JB10-12 110 HDPE 145 4.033 0.45 2.284
PB10-13 244 JB10-11 JB10-17 90 HDPE 145 1.21 0.26 1.218
PB10-14 10 JB10-11 JB10-10 160 HDPE 145 -6.855 0.47 1.833
PB10-15 160 JB10-12 JB10-16 110 HDPE 145 2.42 0.35 1.656
PB10-16 247 JB10-12 JB10-19 90 HDPE 145 1.21 0.26 1.218
PB10-17 92 JB10-13 JB10-11 90 HDPE 145 -1.21 0.26 1.218
PB10-18 222 JB10-14 JB10-13 90 HDPE 145 -0.403 0.09 0.159
PB10-19 234 JB10-15 JB10-13 90 HDPE 145 -0.403 0.09 0.159
PB10-20 102 JB10-16 JB10-24 90 HDPE 145 1.613 0.35 2.074
PB10-21 204 JB10-16 JB10-18 90 HDPE 145 0.403 0.09 0.159
PB10-22 290 JB10-17 JB10-20 90 HDPE 145 0.807 0.18 0.575
PB10-23 249 JB10-19 JB10-21 90 HDPE 145 0.807 0.18 0.575
PB10-24 153 JB10-20 JB10-22 90 HDPE 145 0.403 0.09 0.159
PB10-25 152 JB10-21 JB10-23 90 HDPE 145 0.403 0.09 0.159
PB10-26 112 JB10-24 JB10-25 90 HDPE 145 0.403 0.09 0.159
PB10-27 234 JB10-24 JB10-26 90 HDPE 145 0.403 0.09 0.159
PB10-28 353 JB10-24 JB10-27 90 HDPE 145 0.403 0.09 0.159
TB.-11
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB11-1 35 JB11-1 TB-11 250 DI-K7 140 -27.466 0.56 1.244
PB11-2 245 JB11-1 JB11-7 160 HDPE 145 6.595 0.45 1.706
PB11-3 40 JB11-2 JB11-1 200 DI-K7 140 -20.495 0.65 2.144
PB11-4 173 JB11-2 JB11-10 110 HDPE 145 5.069 0.57 3.489
PB11-5 12 JB11-3 JB11-2 200 DI-K7 140 -15.05 0.48 1.21
PB11-6 291 JB11-3 JB11-4 90 HDPE 145 0.752 0.16 0.505
PB11-7 302 JB11-4 JB11-6 90 HDPE 145 0.376 0.08 0.14
PB11-8 176 JB11-5 JB11-3 200 DI-K7 140 -13.921 0.44 1.048
PB11-9 158 JB11-7 JB11-13 110 HDPE 145 2.634 0.38 1.937
PB11-10 186 JB11-7 JB11-16 110 HDPE 145 3.585 0.4 1.837
PB11-11 212 JB11-8 JB11-5 200 DI-K7 140 -13.545 0.43 0.996
PB11-12 245 JB11-8 JB11-20 90 HDPE 145 1.505 0.33 1.824
PB11-13 11 JB11-9 JB11-8 200 DI-K7 140 -11.664 0.37 0.755
PB11-14 249 JB11-9 JB11-11 110 HDPE 145 2.374 0.27 0.856
PB11-15 125 JB11-10 JB11-23 110 HDPE 145 4.316 0.49 2.591
PB11-16 213 JB11-10 JB11-12 90 HDPE 145 0.376 0.08 0.14
PB11-17 63 JB11-11 JB11-17 110 HDPE 145 1.622 0.24 0.789
PB11-18 158 JB11-11 JB11-14 90 HDPE 145 0.376 0.08 0.14
PB11-19 138 JB11-13 JB11-15 90 HDPE 145 0.376 0.08 0.14
PB11-20 286 JB11-13 JB11-27 90 HDPE 145 1.881 0.41 2.758

MaRS Planning Engineering Services Pvt. Ltd.


PB11-21 169 JB11-16 JB11-23 110 HDPE 145 3.209 0.36 1.496
PB11-22 86 JB11-17 JB11-18 90 HDPE 145 0.376 0.08 0.14
PB11-23 114 JB11-19 JB11-9 160 HDPE 145 -8.913 0.61 2.98
PB11-24 315 JB11-19 JB11-17 110 HDPE 145 -0.869 0.13 0.249
PB11-25 29 JB11-20 JB11-21 90 HDPE 145 1.129 0.24 1.071
PB11-26 116 JB11-21 JB11-22 90 HDPE 145 0.376 0.08 0.14
PB11-27 275 JB11-21 JB11-24 90 HDPE 145 0.376 0.08 0.14
PB11-28 229 JB11-23 JB11-26 160 HDPE 145 7.149 0.49 1.981
PB11-29 115 JB11-25 JB11-28 110 HDPE 145 3.01 0.44 2.481
PB11-30 182 JB11-25 JB11-19 160 HDPE 145 -9.406 0.65 3.293
PB11-31 238 JB11-26 JB11-41 140 HDPE 145 6.772 0.61 3.431
PB11-32 251 JB11-27 JB11-33 90 HDPE 145 1.505 0.33 1.824
PB11-33 255 JB11-28 JB11-29 90 HDPE 145 0.752 0.16 0.505
PB11-34 259 JB11-28 JB11-34 90 HDPE 145 1.129 0.24 1.071
PB11-35 297 JB11-28 JB11-30 90 HDPE 145 0.752 0.16 0.505
PB11-36 229 JB11-29 JB11-31 90 HDPE 145 0.376 0.08 0.14
PB11-37 236 JB11-30 JB11-32 90 HDPE 145 0.376 0.08 0.14
PB11-38 224 JB11-33 JB11-40 90 HDPE 145 1.129 0.24 1.071
PB11-39 144 JB11-34 JB11-35 90 HDPE 145 0.376 0.08 0.14
PB11-40 220 JB11-34 JB11-37 90 HDPE 145 0.376 0.08 0.14
PB11-41 212 JB11-36 JB11-25 140 HDPE 145 -6.02 0.54 2.758
PB11-42 273 JB11-36 JB11-38 90 HDPE 145 0.752 0.16 0.505
PB11-43 276 JB11-38 JB11-39 90 HDPE 145 0.376 0.08 0.14
PB11-44 241 JB11-40 JB11-42 90 HDPE 145 0.752 0.16 0.505
PB11-45 229 JB11-41 JB11-45 140 HDPE 145 6.396 0.57 3.086
PB11-46 233 JB11-42 JB11-43 90 HDPE 145 0.376 0.08 0.14
PB11-47 199 JB11-44 JB11-36 110 HDPE 145 -4.891 0.55 3.266
PB11-48 309 JB11-45 JB11-49 140 HDPE 145 6.02 0.54 2.758
PB11-49 218 JB11-46 JB11-44 110 HDPE 145 -4.515 0.51 2.816
PB11-50 292 JB11-46 JB11-47 90 HDPE 145 0.376 0.08 0.14
PB11-51 165 JB11-48 JB11-46 110 HDPE 145 -3.762 0.42 2.009
PB11-52 232 JB11-49 JB11-54 140 HDPE 145 5.644 0.51 2.448
PB11-53 145 JB11-50 JB11-51 90 HDPE 145 1.129 0.24 1.071
PB11-54 165 JB11-50 JB11-48 110 HDPE 145 -3.386 0.49 3.086
PB11-55 102 JB11-51 JB11-52 90 HDPE 145 0.376 0.08 0.14
PB11-56 243 JB11-51 JB11-53 90 HDPE 145 0.376 0.08 0.14
PB11-57 227 JB11-54 JB11-60 140 HDPE 145 5.267 0.47 2.154
PB11-58 45 JB11-55 JB11-57 90 HDPE 145 1.129 0.24 1.071
PB11-59 213 JB11-55 JB11-50 90 HDPE 145 -1.881 0.41 2.758
PB11-60 85 JB11-56 JB11-55 90 HDPE 145 -0.376 0.08 0.14
PB11-61 49 JB11-57 JB11-58 90 HDPE 145 0.376 0.08 0.14
PB11-62 67 JB11-57 JB11-59 90 HDPE 145 0.376 0.08 0.14
PB11-63 230 JB11-60 JB11-61 110 HDPE 145 4.891 0.55 3.266
PB11-64 225 JB11-61 JB11-62 110 HDPE 145 4.515 0.51 2.816
PB11-65 241 JB11-62 JB11-63 110 HDPE 145 4.139 0.47 2.397
PB11-66 223 JB11-63 JB11-64 110 HDPE 145 3.762 0.42 2.009
PB11-67 230 JB11-64 JB11-65 110 HDPE 145 3.386 0.49 3.086
PB11-68 80 JB11-65 JB11-68 90 HDPE 145 1.129 0.24 1.071

MaRS Planning Engineering Services Pvt. Ltd.


PB11-69 108 JB11-65 JB11-66 90 HDPE 145 0.376 0.08 0.14
PB11-70 224 JB11-65 JB11-67 90 HDPE 145 0.376 0.08 0.14
PB11-71 109 JB11-68 JB11-70 90 HDPE 145 0.376 0.08 0.14
PB11-72 93 JB11-68 JB11-69 90 HDPE 145 0.376 0.08 0.14
TB.-12
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB12-1 28 JB12-1 TB-12 250 DI-K7 140 -43.498 0.89 2.914
PB12-2 92 JB12-1 JB12-2 250 DI-K7 140 43.331 0.88 2.893
PB12-3 117 JB12-2 JB12-6 250 DI-K7 140 30.857 0.63 1.543
PB12-4 78 JB12-3 JB12-2 200 DI-K7 140 -12.308 0.39 0.834
PB12-5 42 JB12-4 JB12-3 200 DI-K7 140 -12.141 0.39 0.813
PB12-6 75 JB12-5 JB12-4 200 DI-K7 140 -11.974 0.38 0.792
PB12-7 70 JB12-6 JB12-10 250 DI-K7 140 30.19 0.62 1.482
PB12-8 66 JB12-7 JB12-6 90 HDPE 145 -0.5 0.11 0.237
PB12-9 75 JB12-7 JB12-8 90 HDPE 145 0.167 0.04 0.031
PB12-10 144 JB12-9 JB12-7 90 HDPE 145 -0.167 0.04 0.031
PB12-11 11 JB12-10 JB12-11 250 DI-K7 140 28.642 0.58 1.343
PB12-12 86 JB12-11 JB12-12 250 DI-K7 140 27.69 0.56 1.263
PB12-13 13 JB12-12 JB12-13 200 DI-K7 140 17.92 0.57 1.672
PB12-14 100 JB12-13 JB12-27 160 HDPE 145 8.331 0.57 2.63
PB12-15 371 JB12-14 JB12-5 200 DI-K7 140 -11.808 0.38 0.772
PB12-16 10 JB12-15 JB12-16 110 HDPE 145 0.715 0.1 0.174
PB12-17 403 JB12-15 JB12-10 110 HDPE 145 -1.382 0.2 0.587
PB12-18 410 JB12-16 JB12-11 90 HDPE 145 -0.785 0.17 0.546
PB12-19 263 JB12-17 JB12-15 90 HDPE 145 -0.245 0.05 0.063
PB12-20 99 JB12-18 JB12-17 90 HDPE 145 -0.078 0.02 0.008
PB12-21 255 JB12-18 JB12-15 90 HDPE 145 -0.255 0.06 0.068
PB12-22 110 JB12-19 JB12-31 140 HDPE 145 4.701 0.42 1.745
PB12-23 128 JB12-19 JB12-14 200 DI-K7 140 -11.641 0.37 0.752
PB12-24 3,278 JB12-19 JB12-175 160 HDPE 145 6.774 0.46 1.793
PB12-25 202 JB12-20 JB12-18 90 HDPE 145 -0.167 0.04 0.031
PB12-26 277 JB12-21 JB12-16 90 HDPE 145 -0.667 0.14 0.404
PB12-27 133 JB12-22 JB12-21 90 HDPE 145 -0.167 0.04 0.031
PB12-28 117 JB12-23 JB12-21 90 HDPE 145 -0.333 0.07 0.112
PB12-29 186 JB12-24 JB12-23 90 HDPE 145 -0.167 0.04 0.031
PB12-30 268 JB12-25 JB12-28 90 HDPE 145 0.333 0.07 0.112
PB12-31 355 JB12-25 JB12-16 90 HDPE 145 -0.667 0.14 0.404
PB12-32 107 JB12-26 JB12-25 90 HDPE 145 -0.167 0.04 0.031
PB12-33 126 JB12-27 JB12-37 110 HDPE 145 3.199 0.36 1.488
PB12-34 11 JB12-27 JB12-30 110 HDPE 145 4.965 0.56 3.358
PB12-35 227 JB12-28 JB12-29 90 HDPE 145 0.167 0.04 0.031
PB12-36 121 JB12-30 JB12-33 90 HDPE 145 0.5 0.11 0.237
PB12-37 218 JB12-30 JB12-32 90 HDPE 145 0.167 0.04 0.031
PB12-38 47 JB12-31 JB12-36 140 HDPE 145 3.705 0.33 1.123
PB12-39 442 JB12-31 JB12-40 90 HDPE 145 0.829 0.18 0.604
PB12-40 115 JB12-33 JB12-34 90 HDPE 145 0.333 0.07 0.112

MaRS Planning Engineering Services Pvt. Ltd.


PB12-41 119 JB12-34 JB12-35 90 HDPE 145 0.167 0.04 0.031
PB12-42 195 JB12-36 JB12-42 110 HDPE 145 2.868 0.32 1.215
PB12-43 117 JB12-37 JB12-41 110 HDPE 145 2.866 0.32 1.214
PB12-44 242 JB12-38 JB12-37 90 HDPE 145 -0.167 0.04 0.031
PB12-45 113 JB12-39 JB12-30 110 HDPE 145 -4.132 0.46 2.39
PB12-46 423 JB12-39 JB12-58 90 HDPE 145 0.833 0.18 0.61
PB12-47 37 JB12-40 JB12-48 90 HDPE 145 1.333 0.29 1.458
PB12-48 526 JB12-40 JB12-36 90 HDPE 145 -0.671 0.15 0.409
PB12-49 125 JB12-41 JB12-56 110 HDPE 145 2.533 0.28 0.965
PB12-50 116 JB12-42 JB12-43 90 HDPE 145 0.167 0.04 0.031
PB12-51 285 JB12-42 JB12-60 110 HDPE 145 2.534 0.29 0.966
PB12-52 229 JB12-44 JB12-41 90 HDPE 145 -0.167 0.04 0.031
PB12-53 423 JB12-45 JB12-67 90 HDPE 145 1.132 0.25 1.077
PB12-54 13 JB12-45 JB12-39 110 HDPE 145 -3.132 0.46 2.67
PB12-55 184 JB12-46 JB12-13 160 HDPE 145 -9.422 0.65 3.304
PB12-56 189 JB12-47 JB12-12 160 HDPE 145 -9.603 0.66 3.422
PB12-57 102 JB12-48 JB12-49 90 HDPE 145 0.167 0.04 0.031
PB12-58 135 JB12-48 JB12-51 90 HDPE 145 0.568 0.12 0.3
PB12-59 207 JB12-48 JB12-50 90 HDPE 145 0.432 0.09 0.181
PB12-60 437 JB12-50 JB12-52 90 HDPE 145 0.167 0.04 0.031
PB12-61 76 JB12-51 JB12-53 90 HDPE 145 0.5 0.11 0.237
PB12-62 252 JB12-51 JB12-50 90 HDPE 145 -0.099 0.02 0.012
PB12-63 213 JB12-53 JB12-54 90 HDPE 145 0.167 0.04 0.031
PB12-64 329 JB12-53 JB12-55 90 HDPE 145 0.167 0.04 0.031
PB12-65 150 JB12-56 JB12-57 90 HDPE 145 0.167 0.04 0.031
PB12-66 180 JB12-58 JB12-61 90 HDPE 145 0.5 0.11 0.237
PB12-67 350 JB12-58 JB12-59 90 HDPE 145 0.167 0.04 0.031
PB12-68 96 JB12-61 JB12-63 90 HDPE 145 0.167 0.04 0.031
PB12-69 293 JB12-61 JB12-64 90 HDPE 145 0.167 0.04 0.031
PB12-70 218 JB12-62 JB12-56 110 HDPE 145 -2.199 0.25 0.743
PB12-71 182 JB12-65 JB12-66 90 HDPE 145 0.167 0.04 0.031
PB12-72 156 JB12-65 JB12-45 90 HDPE 145 -1.833 0.4 2.629
PB12-73 176 JB12-67 JB12-69 90 HDPE 145 0.966 0.21 0.802
PB12-74 231 JB12-68 JB12-62 110 HDPE 145 -2.033 0.3 1.199
PB12-75 404 JB12-69 JB12-76 90 HDPE 145 0.799 0.17 0.565
PB12-76 158 JB12-70 JB12-68 110 HDPE 145 -1.866 0.27 1.023
PB12-77 220 JB12-70 JB12-46 160 HDPE 145 -9.256 0.64 3.196
PB12-78 4 JB12-71 JB12-70 200 DI-K7 140 -10.955 0.35 0.672
PB12-79 98 JB12-72 JB12-73 90 HDPE 145 0.167 0.04 0.031
PB12-80 196 JB12-72 JB12-65 90 HDPE 145 -1.5 0.33 1.813
PB12-81 37 JB12-74 JB12-75 90 HDPE 145 0.167 0.04 0.031
PB12-82 41 JB12-74 JB12-72 90 HDPE 145 -1.167 0.25 1.138
PB12-83 659 JB12-76 JB12-60 110 HDPE 145 -2.368 0.27 0.852
PB12-84 66 JB12-77 JB12-78 90 HDPE 145 0.167 0.04 0.031
PB12-85 73 JB12-77 JB12-74 90 HDPE 145 -0.833 0.18 0.61
PB12-86 142 JB12-79 JB12-81 90 HDPE 145 0.167 0.04 0.031
PB12-87 371 JB12-79 JB12-77 90 HDPE 145 -0.5 0.11 0.237
PB12-88 130 JB12-80 JB12-79 90 HDPE 145 -0.167 0.04 0.031

MaRS Planning Engineering Services Pvt. Ltd.


PB12-89 242 JB12-82 JB12-71 90 HDPE 145 -1.167 0.25 1.138
PB12-90 250 JB12-83 JB12-82 90 HDPE 145 -1 0.22 0.856
PB12-91 200 JB12-84 JB12-76 110 HDPE 145 -3 0.44 2.466
PB12-92 244 JB12-85 JB12-83 90 HDPE 145 -0.833 0.18 0.61
PB12-93 45 JB12-86 JB12-84 90 HDPE 145 -1.244 0.27 1.282
PB12-94 151 JB12-86 JB12-87 90 HDPE 145 0.167 0.04 0.031
PB12-95 187 JB12-86 JB12-88 90 HDPE 145 0.167 0.04 0.031
PB12-96 45 JB12-89 JB12-84 90 HDPE 145 -1.589 0.34 2.018
PB12-97 96 JB12-89 JB12-102 90 HDPE 145 1.167 0.25 1.138
PB12-98 87 JB12-90 JB12-86 90 HDPE 145 -0.744 0.16 0.495
PB12-99 151 JB12-90 JB12-89 90 HDPE 145 -0.256 0.06 0.069
PB12-100 160 JB12-91 JB12-92 90 HDPE 145 0.167 0.04 0.031
PB12-101 216 JB12-91 JB12-85 90 HDPE 145 -0.667 0.14 0.404
PB12-102 189 JB12-93 JB12-91 90 HDPE 145 -0.333 0.07 0.112
PB12-103 143 JB12-94 JB12-93 90 HDPE 145 -0.167 0.04 0.031
PB12-104 440 JB12-95 JB12-47 160 HDPE 145 -9.437 0.65 3.313
PB12-105 239 JB12-96 JB12-95 90 HDPE 145 -0.167 0.04 0.031
PB12-106 118 JB12-97 JB12-90 90 HDPE 145 -0.833 0.18 0.61
PB12-107 171 JB12-97 JB12-98 90 HDPE 145 0.167 0.04 0.031
PB12-108 40 JB12-99 JB12-97 90 HDPE 145 -0.5 0.11 0.237
PB12-109 150 JB12-99 JB12-101 90 HDPE 145 0.167 0.04 0.031
PB12-110 102 JB12-100 JB12-99 90 HDPE 145 -0.167 0.04 0.031
PB12-111 105 JB12-102 JB12-103 90 HDPE 145 0.167 0.04 0.031
PB12-112 113 JB12-102 JB12-104 90 HDPE 145 0.833 0.18 0.61
PB12-113 44 JB12-104 JB12-106 90 HDPE 145 0.5 0.11 0.237
PB12-114 176 JB12-104 JB12-105 90 HDPE 145 0.167 0.04 0.031
PB12-115 82 JB12-106 JB12-107 90 HDPE 145 0.167 0.04 0.031
PB12-116 104 JB12-106 JB12-108 90 HDPE 145 0.167 0.04 0.031
PB12-117 159 JB12-109 JB12-95 160 HDPE 145 -9.103 0.62 3.099
PB12-118 115 JB12-110 JB12-118 90 HDPE 145 1.667 0.36 2.204
PB12-119 387 JB12-110 JB12-71 160 HDPE 145 -9.622 0.66 3.434
PB12-120 12 JB12-111 JB12-110 160 HDPE 145 -7.789 0.53 2.322
PB12-121 335 JB12-111 JB12-112 90 HDPE 145 0.167 0.04 0.031
PB12-122 86 JB12-113 JB12-123 110 HDPE 145 2.248 0.33 1.445
PB12-123 138 JB12-113 JB12-114 90 HDPE 145 0.167 0.04 0.031
PB12-124 170 JB12-113 JB12-109 110 HDPE 145 -3.082 0.35 1.388
PB12-125 65 JB12-115 JB12-113 90 HDPE 145 -0.5 0.11 0.237
PB12-126 47 JB12-116 JB12-115 90 HDPE 145 -0.167 0.04 0.031
PB12-127 53 JB12-117 JB12-115 90 HDPE 145 -0.167 0.04 0.031
PB12-128 21 JB12-118 JB12-119 90 HDPE 145 0.5 0.11 0.237
PB12-129 93 JB12-118 JB12-124 90 HDPE 145 1 0.22 0.856
PB12-130 96 JB12-119 JB12-120 90 HDPE 145 0.167 0.04 0.031
PB12-131 156 JB12-119 JB12-121 90 HDPE 145 0.167 0.04 0.031
PB12-132 121 JB12-122 JB12-111 160 HDPE 145 -7.455 0.51 2.141
PB12-133 137 JB12-123 JB12-109 140 HDPE 145 -5.855 0.52 2.62
PB12-134 42 JB12-124 JB12-125 90 HDPE 145 0.167 0.04 0.031
PB12-135 86 JB12-124 JB12-126 90 HDPE 145 0.667 0.14 0.404
PB12-136 224 JB12-126 JB12-127 90 HDPE 145 0.5 0.11 0.237

MaRS Planning Engineering Services Pvt. Ltd.


PB12-137 91 JB12-127 JB12-129 90 HDPE 145 0.167 0.04 0.031
PB12-138 151 JB12-127 JB12-131 90 HDPE 145 0.167 0.04 0.031
PB12-139 54 JB12-128 JB12-123 160 HDPE 145 -7.937 0.54 2.404
PB12-140 38 JB12-130 JB12-128 90 HDPE 145 -0.167 0.04 0.031
PB12-141 67 JB12-132 JB12-122 160 HDPE 145 -7.289 0.5 2.053
PB12-142 94 JB12-132 JB12-138 90 HDPE 145 2 0.43 3.089
PB12-143 10 JB12-133 JB12-132 140 HDPE 145 -5.122 0.46 2.046
PB12-144 10 JB12-133 JB12-128 160 HDPE 145 -7.603 0.52 2.22
PB12-145 63 JB12-134 JB12-135 90 HDPE 145 0.167 0.04 0.031
PB12-146 192 JB12-134 JB12-133 200 DI-K7 140 -12.559 0.4 0.866
PB12-147 16 JB12-136 JB12-134 200 DI-K7 140 -12.226 0.39 0.823
PB12-148 220 JB12-137 JB12-136 90 HDPE 145 -0.167 0.04 0.031
PB12-149 10 JB12-138 JB12-139 90 HDPE 145 1.333 0.29 1.457
PB12-150 219 JB12-138 JB12-142 90 HDPE 145 0.5 0.11 0.237
PB12-151 20 JB12-139 JB12-140 90 HDPE 145 0.785 0.17 0.547
PB12-152 286 JB12-139 JB12-145 90 HDPE 145 0.381 0.08 0.143
PB12-153 65 JB12-140 JB12-141 90 HDPE 145 0.167 0.04 0.031
PB12-154 157 JB12-140 JB12-146 90 HDPE 145 0.452 0.1 0.197
PB12-155 65 JB12-142 JB12-143 90 HDPE 145 0.177 0.04 0.034
PB12-156 82 JB12-142 JB12-144 90 HDPE 145 0.157 0.03 0.028
PB12-157 120 JB12-143 JB12-144 90 HDPE 145 0.01 0 0
PB12-158 64 JB12-145 JB12-148 90 HDPE 145 0.215 0.05 0.049
PB12-159 45 JB12-146 JB12-147 90 HDPE 145 0.167 0.04 0.031
PB12-160 132 JB12-148 JB12-149 90 HDPE 145 0.167 0.04 0.031
PB12-161 164 JB12-148 JB12-146 90 HDPE 145 -0.119 0.03 0.017
PB12-162 77 JB12-150 JB12-151 110 HDPE 145 2.333 0.34 1.548
PB12-163 325 JB12-150 JB12-136 200 DI-K7 140 -11.892 0.38 0.782
PB12-164 46 JB12-151 JB12-156 90 HDPE 145 1.265 0.27 1.322
PB12-165 99 JB12-151 JB12-158 90 HDPE 145 0.902 0.2 0.706
PB12-166 42 JB12-152 JB12-150 160 HDPE 145 -9.392 0.64 3.284
PB12-167 341 JB12-153 JB12-152 90 HDPE 145 -0.167 0.04 0.031
PB12-168 10 JB12-154 JB12-152 160 HDPE 145 -9.059 0.62 3.072
PB12-169 322 JB12-155 JB12-154 90 HDPE 145 -0.167 0.04 0.031
PB12-170 34 JB12-156 JB12-157 90 HDPE 145 0.167 0.04 0.031
PB12-171 49 JB12-156 JB12-159 90 HDPE 145 0.5 0.11 0.237
PB12-172 50 JB12-158 JB12-156 90 HDPE 145 -0.432 0.09 0.18
PB12-173 179 JB12-158 JB12-162 90 HDPE 145 1.167 0.25 1.138
PB12-174 30 JB12-159 JB12-161 90 HDPE 145 0.167 0.04 0.031
PB12-175 26 JB12-160 JB12-159 90 HDPE 145 -0.167 0.04 0.031
PB12-176 59 JB12-162 JB12-163 90 HDPE 145 0.527 0.11 0.261
PB12-177 153 JB12-163 JB12-164 90 HDPE 145 0.36 0.08 0.129
PB12-178 86 JB12-164 JB12-166 90 HDPE 145 0.5 0.11 0.237
PB12-179 164 JB12-164 JB12-162 90 HDPE 145 -0.473 0.1 0.214
PB12-180 72 JB12-165 JB12-164 90 HDPE 145 -0.167 0.04 0.031
PB12-181 215 JB12-166 JB12-168 90 HDPE 145 0.167 0.04 0.031
PB12-182 94 JB12-167 JB12-166 90 HDPE 145 -0.167 0.04 0.031
PB12-183 308 JB12-169 JB12-154 160 HDPE 145 -8.726 0.6 2.865
PB12-184 59 JB12-170 JB12-169 90 HDPE 145 -0.167 0.04 0.031

MaRS Planning Engineering Services Pvt. Ltd.


PB12-185 70 JB12-171 JB12-169 160 HDPE 145 -8.392 0.58 2.666
PB12-186 269 JB12-172 JB12-171 110 HDPE 145 -4.666 0.52 2.993
PB12-187 323 JB12-173 JB12-171 110 HDPE 145 -3.559 0.52 3.384
PB12-188 152 JB12-174 JB12-173 90 HDPE 145 -0.167 0.04 0.031
PB12-189 7 JB12-175 JB12-176 110 HDPE 145 3.5 0.51 3.28
PB12-190 117 JB12-175 JB12-178 110 HDPE 145 3.107 0.35 1.409
PB12-191 455 JB12-176 JB12-180 90 HDPE 145 0.833 0.18 0.61
PB12-192 515 JB12-176 JB12-192 110 HDPE 145 2.5 0.36 1.759
PB12-193 206 JB12-177 JB12-172 110 HDPE 145 -4.5 0.51 2.798
PB12-194 110 JB12-178 JB12-185 110 HDPE 145 2.774 0.4 2.132
PB12-195 145 JB12-178 JB12-179 90 HDPE 145 0.167 0.04 0.031
PB12-196 46 JB12-180 JB12-182 90 HDPE 145 0.5 0.11 0.237
PB12-197 69 JB12-180 JB12-181 90 HDPE 145 0.167 0.04 0.031
PB12-198 32 JB12-182 JB12-183 90 HDPE 145 0.167 0.04 0.031
PB12-199 303 JB12-182 JB12-184 90 HDPE 145 0.167 0.04 0.031
PB12-200 295 JB12-185 JB12-186 90 HDPE 145 0.167 0.04 0.031
PB12-201 241 JB12-185 JB12-190 110 HDPE 145 2.44 0.35 1.682
PB12-202 264 JB12-187 JB12-173 110 HDPE 145 -3.226 0.47 2.821
PB12-203 272 JB12-187 JB12-188 90 HDPE 145 0.167 0.04 0.031
PB12-204 217 JB12-189 JB12-177 110 HDPE 145 -4.333 0.49 2.609
PB12-205 345 JB12-190 JB12-191 90 HDPE 145 0.167 0.04 0.031
PB12-206 347 JB12-190 JB12-197 110 HDPE 145 2.107 0.31 1.282
PB12-207 60 JB12-192 JB12-193 90 HDPE 145 0.167 0.04 0.031
PB12-208 136 JB12-192 JB12-194 110 HDPE 145 2.167 0.31 1.35
PB12-209 71 JB12-194 JB12-195 90 HDPE 145 0.167 0.04 0.031
PB12-210 190 JB12-194 JB12-224 90 HDPE 145 1.833 0.4 2.629
PB12-211 277 JB12-196 JB12-187 110 HDPE 145 -2.893 0.42 2.305
PB12-212 94 JB12-197 JB12-210 110 HDPE 145 1.607 0.23 0.776
PB12-213 180 JB12-197 JB12-198 90 HDPE 145 0.167 0.04 0.031
PB12-214 484 JB12-197 JB12-199 90 HDPE 145 0.167 0.04 0.031
PB12-215 10 JB12-200 JB12-196 90 HDPE 145 -1.667 0.36 2.204
PB12-216 185 JB12-200 JB12-203 90 HDPE 145 0.333 0.07 0.112
PB12-217 266 JB12-200 JB12-204 90 HDPE 145 0.333 0.07 0.112
PB12-218 10 JB12-201 JB12-200 90 HDPE 145 -0.833 0.18 0.61
PB12-219 192 JB12-201 JB12-202 90 HDPE 145 0.167 0.04 0.031
PB12-220 368 JB12-203 JB12-205 90 HDPE 145 0.167 0.04 0.031
PB12-221 264 JB12-204 JB12-208 90 HDPE 145 0.167 0.04 0.031
PB12-222 81 JB12-206 JB12-207 90 HDPE 145 0.167 0.04 0.031
PB12-223 110 JB12-206 JB12-201 90 HDPE 145 -0.5 0.11 0.237
PB12-224 320 JB12-209 JB12-206 90 HDPE 145 -0.167 0.04 0.031
PB12-225 110 JB12-210 JB12-212 90 HDPE 145 1.167 0.25 1.138
PB12-226 112 JB12-211 JB12-196 90 HDPE 145 -1.059 0.23 0.952
PB12-227 176 JB12-212 JB12-213 90 HDPE 145 0.167 0.04 0.031
PB12-228 242 JB12-212 JB12-222 90 HDPE 145 0.833 0.18 0.61
PB12-229 152 JB12-214 JB12-211 90 HDPE 145 -0.893 0.19 0.694
PB12-230 195 JB12-215 JB12-216 90 HDPE 145 0.107 0.02 0.014
PB12-231 1,773 JB12-215 JB12-210 90 HDPE 145 -0.274 0.06 0.078
PB12-232 38 JB12-216 JB12-214 90 HDPE 145 -0.393 0.09 0.151

MaRS Planning Engineering Services Pvt. Ltd.


PB12-233 162 JB12-216 JB12-219 90 HDPE 145 0.333 0.07 0.112
PB12-234 115 JB12-217 JB12-214 90 HDPE 145 -0.333 0.07 0.112
PB12-235 170 JB12-218 JB12-217 90 HDPE 145 -0.167 0.04 0.031
PB12-236 148 JB12-219 JB12-220 90 HDPE 145 0.167 0.04 0.031
PB12-237 112 JB12-221 JB12-232 90 HDPE 145 1.167 0.25 1.138
PB12-238 355 JB12-221 JB12-189 110 HDPE 145 -4.166 0.47 2.427
PB12-239 260 JB12-222 JB12-229 90 HDPE 145 0.5 0.11 0.237
PB12-240 605 JB12-222 JB12-225 90 HDPE 145 0.167 0.04 0.031
PB12-241 12 JB12-223 JB12-221 110 HDPE 145 -2.833 0.41 2.218
PB12-242 113 JB12-223 JB12-235 90 HDPE 145 1.333 0.29 1.458
PB12-243 187 JB12-224 JB12-226 90 HDPE 145 0.167 0.04 0.031
PB12-244 546 JB12-224 JB12-247 90 HDPE 145 1.5 0.33 1.813
PB12-245 144 JB12-227 JB12-223 90 HDPE 145 -0.333 0.07 0.112
PB12-246 242 JB12-228 JB12-227 90 HDPE 145 -0.167 0.04 0.031
PB12-247 41 JB12-229 JB12-230 90 HDPE 145 0.167 0.04 0.031
PB12-248 77 JB12-229 JB12-231 90 HDPE 145 0.167 0.04 0.031
PB12-249 83 JB12-232 JB12-234 90 HDPE 145 0.833 0.18 0.61
PB12-250 90 JB12-232 JB12-233 90 HDPE 145 0.167 0.04 0.031
PB12-251 128 JB12-234 JB12-236 90 HDPE 145 0.667 0.14 0.404
PB12-252 85 JB12-235 JB12-240 90 HDPE 145 1.167 0.25 1.138
PB12-253 52 JB12-236 JB12-237 90 HDPE 145 0.167 0.04 0.031
PB12-254 64 JB12-236 JB12-238 90 HDPE 145 0.333 0.07 0.112
PB12-255 124 JB12-238 JB12-239 90 HDPE 145 0.167 0.04 0.031
PB12-256 127 JB12-240 JB12-242 90 HDPE 145 0.833 0.18 0.61
PB12-257 102 JB12-241 JB12-240 90 HDPE 145 -0.167 0.04 0.031
PB12-258 81 JB12-242 JB12-244 90 HDPE 145 0.5 0.11 0.237
PB12-259 111 JB12-242 JB12-243 90 HDPE 145 0.167 0.04 0.031
PB12-260 81 JB12-244 JB12-245 90 HDPE 145 0.167 0.04 0.031
PB12-261 128 JB12-244 JB12-246 90 HDPE 145 0.167 0.04 0.031
PB12-262 69 JB12-247 JB12-249 90 HDPE 145 1.167 0.25 1.138
PB12-263 322 JB12-247 JB12-248 90 HDPE 145 0.167 0.04 0.031
PB12-264 49 JB12-249 JB12-251 90 HDPE 145 0.833 0.18 0.61
PB12-265 150 JB12-249 JB12-250 90 HDPE 145 0.167 0.04 0.031
PB12-266 48 JB12-251 JB12-253 90 HDPE 145 0.5 0.11 0.237
PB12-267 130 JB12-251 JB12-252 90 HDPE 145 0.167 0.04 0.031
PB12-268 244 JB12-253 JB12-255 90 HDPE 145 0.167 0.04 0.031
PB12-269 123 JB12-253 JB12-254 90 HDPE 145 0.167 0.04 0.031
TB.-13
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PB13-1 40 JB13-1 TB-13 250 DI-K7 140 -40.561 0.83 2.56
PB13-2 209 JB13-1 JB13-2 200 DI-K7 140 15.055 0.48 1.211
PB13-3 196 JB13-2 JB13-4 200 DI-K7 140 14.878 0.47 1.185
PB13-4 94 JB13-3 JB13-1 200 DI-K7 140 -25.328 0.81 3.174
PB13-5 233 JB13-4 JB13-6 200 DI-K7 140 14.701 0.47 1.159
PB13-6 264 JB13-5 JB13-3 200 DI-K7 140 -16.295 0.52 1.402
PB13-7 179 JB13-6 JB13-9 200 DI-K7 140 14.524 0.46 1.133

MaRS Planning Engineering Services Pvt. Ltd.


PB13-8 210 JB13-7 JB13-3 160 HDPE 145 -8.856 0.61 2.945
PB13-9 191 JB13-8 JB13-5 200 DI-K7 140 -16.118 0.51 1.374
PB13-10 283 JB13-9 JB13-16 200 DI-K7 140 14.347 0.46 1.108
PB13-11 116 JB13-10 JB13-8 200 DI-K7 140 -15.941 0.51 1.346
PB13-12 202 JB13-11 JB13-10 90 HDPE 145 -0.354 0.08 0.125
PB13-13 174 JB13-12 JB13-11 90 HDPE 145 -0.177 0.04 0.035
PB13-14 43 JB13-13 JB13-10 200 DI-K7 140 -15.41 0.49 1.264
PB13-15 280 JB13-13 JB13-14 90 HDPE 145 0.354 0.08 0.125
PB13-16 280 JB13-14 JB13-15 90 HDPE 145 0.177 0.04 0.035
PB13-17 159 JB13-16 JB13-20 200 DI-K7 140 14.17 0.45 1.082
PB13-18 154 JB13-17 JB13-13 200 DI-K7 140 -14.878 0.47 1.185
PB13-19 11 JB13-18 JB13-17 110 HDPE 145 -2.303 0.33 1.511
PB13-20 149 JB13-18 JB13-25 90 HDPE 145 1.948 0.42 2.943
PB13-21 176 JB13-19 JB13-18 90 HDPE 145 -0.177 0.04 0.035
PB13-22 192 JB13-20 JB13-23 200 DI-K7 140 13.993 0.45 1.058
PB13-23 211 JB13-21 JB13-7 160 HDPE 145 -8.679 0.6 2.837
PB13-24 323 JB13-22 JB13-17 200 DI-K7 140 -12.399 0.39 0.845
PB13-25 220 JB13-23 JB13-26 200 DI-K7 140 13.816 0.44 1.033
PB13-26 208 JB13-24 JB13-22 200 DI-K7 140 -12.221 0.39 0.823
PB13-27 88 JB13-25 JB13-28 90 HDPE 145 1.771 0.38 2.467
PB13-28 350 JB13-26 JB13-32 200 DI-K7 140 13.638 0.43 1.008
PB13-29 207 JB13-27 JB13-24 200 DI-K7 140 -12.044 0.38 0.801
PB13-30 185 JB13-28 JB13-33 90 HDPE 145 1.417 0.31 1.632
PB13-31 123 JB13-29 JB13-28 90 HDPE 145 -0.177 0.04 0.035
PB13-32 219 JB13-30 JB13-21 160 HDPE 145 -8.502 0.58 2.731
PB13-33 251 JB13-31 JB13-27 200 DI-K7 140 -11.867 0.38 0.779
PB13-34 175 JB13-32 JB13-36 200 DI-K7 140 13.461 0.43 0.984
PB13-35 74 JB13-33 JB13-34 90 HDPE 145 0.177 0.04 0.035
PB13-36 260 JB13-33 JB13-54 90 HDPE 145 1.063 0.23 0.958
PB13-37 233 JB13-35 JB13-31 200 DI-K7 140 -11.69 0.37 0.758
PB13-38 22 JB13-36 JB13-37 200 DI-K7 140 12.93 0.41 0.914
PB13-39 177 JB13-36 JB13-38 90 HDPE 145 0.354 0.08 0.125
PB13-40 14 JB13-37 JB13-39 200 DI-K7 140 11.513 0.37 0.737
PB13-41 21 JB13-37 JB13-41 90 HDPE 145 1.24 0.27 1.274
PB13-42 329 JB13-38 JB13-40 90 HDPE 145 0.177 0.04 0.035
PB13-43 144 JB13-39 JB13-53 200 DI-K7 140 10.982 0.35 0.675
PB13-44 172 JB13-39 JB13-42 90 HDPE 145 0.354 0.08 0.125
PB13-45 46 JB13-41 JB13-45 90 HDPE 145 0.708 0.15 0.452
PB13-46 160 JB13-41 JB13-44 90 HDPE 145 0.354 0.08 0.125
PB13-47 247 JB13-42 JB13-43 90 HDPE 145 0.177 0.04 0.035
PB13-48 229 JB13-44 JB13-47 90 HDPE 145 0.177 0.04 0.035
PB13-49 46 JB13-45 JB13-46 90 HDPE 145 0.177 0.04 0.035
PB13-50 213 JB13-45 JB13-49 90 HDPE 145 0.354 0.08 0.125
PB13-51 143 JB13-48 JB13-51 90 HDPE 145 0.354 0.08 0.125
PB13-52 250 JB13-48 JB13-35 200 DI-K7 140 -11.513 0.37 0.737
PB13-53 176 JB13-50 JB13-49 90 HDPE 145 -0.177 0.04 0.035
PB13-54 149 JB13-51 JB13-52 90 HDPE 145 0.177 0.04 0.035
PB13-55 51 JB13-53 JB13-62 90 HDPE 145 1.417 0.31 1.632

MaRS Planning Engineering Services Pvt. Ltd.


PB13-56 319 JB13-53 JB13-83 160 HDPE 145 9.387 0.64 3.281
PB13-57 10 JB13-54 JB13-55 90 HDPE 145 0.708 0.15 0.452
PB13-58 284 JB13-55 JB13-58 90 HDPE 145 0.354 0.08 0.125
PB13-59 205 JB13-56 JB13-54 90 HDPE 145 -0.177 0.04 0.035
PB13-60 221 JB13-57 JB13-55 90 HDPE 145 -0.177 0.04 0.035
PB13-61 184 JB13-59 JB13-30 160 HDPE 145 -8.325 0.57 2.626
PB13-62 240 JB13-59 JB13-61 90 HDPE 145 0.177 0.04 0.035
PB13-63 300 JB13-60 JB13-58 90 HDPE 145 -0.177 0.04 0.035
PB13-64 34 JB13-62 JB13-63 90 HDPE 145 0.177 0.04 0.035
PB13-65 47 JB13-62 JB13-66 90 HDPE 145 1.063 0.23 0.958
PB13-66 191 JB13-64 JB13-48 200 DI-K7 140 -10.982 0.35 0.675
PB13-67 212 JB13-64 JB13-65 90 HDPE 145 0.354 0.08 0.125
PB13-68 283 JB13-65 JB13-67 90 HDPE 145 0.177 0.04 0.035
PB13-69 116 JB13-66 JB13-68 90 HDPE 145 0.177 0.04 0.035
PB13-70 209 JB13-66 JB13-70 90 HDPE 145 0.354 0.08 0.125
PB13-71 204 JB13-66 JB13-69 90 HDPE 145 0.354 0.08 0.125
PB13-72 164 JB13-69 JB13-72 90 HDPE 145 0.177 0.04 0.035
PB13-73 141 JB13-70 JB13-71 90 HDPE 145 0.177 0.04 0.035
PB13-74 211 JB13-73 JB13-64 200 DI-K7 140 -10.45 0.33 0.616
PB13-75 161 JB13-74 JB13-73 200 DI-K7 140 -10.273 0.33 0.597
PB13-76 255 JB13-75 JB13-74 200 DI-K7 140 -10.096 0.32 0.578
PB13-77 173 JB13-76 JB13-75 200 DI-K7 140 -9.919 0.32 0.559
PB13-78 255 JB13-77 JB13-59 160 HDPE 145 -7.971 0.55 2.423
PB13-79 264 JB13-78 JB13-76 200 DI-K7 140 -9.742 0.31 0.541
PB13-80 27 JB13-79 JB13-78 160 HDPE 145 -7.793 0.53 2.324
PB13-81 142 JB13-80 JB13-79 90 HDPE 145 -0.177 0.04 0.035
PB13-82 30 JB13-81 JB13-79 160 HDPE 145 -7.439 0.51 2.133
PB13-83 50 JB13-82 JB13-81 90 HDPE 145 -0.177 0.04 0.035
PB13-84 256 JB13-83 JB13-101 160 HDPE 145 9.033 0.62 3.055
PB13-85 155 JB13-84 JB13-77 160 HDPE 145 -7.793 0.53 2.324
PB13-86 64 JB13-85 JB13-83 90 HDPE 145 -0.177 0.04 0.035
PB13-87 177 JB13-86 JB13-95 160 HDPE 145 6.908 0.47 1.859
PB13-88 220 JB13-86 JB13-81 160 HDPE 145 -7.085 0.49 1.948
PB13-89 229 JB13-87 JB13-78 90 HDPE 145 -1.771 0.38 2.467
PB13-90 122 JB13-88 JB13-84 160 HDPE 145 -7.616 0.52 2.227
PB13-91 195 JB13-89 JB13-88 90 HDPE 145 -0.177 0.04 0.035
PB13-92 10 JB13-90 JB13-92 90 HDPE 145 1.24 0.27 1.274
PB13-93 148 JB13-90 JB13-87 90 HDPE 145 -1.594 0.35 2.03
PB13-94 114 JB13-91 JB13-90 90 HDPE 145 -0.177 0.04 0.035
PB13-95 143 JB13-92 JB13-96 90 HDPE 145 0.708 0.15 0.452
PB13-96 178 JB13-92 JB13-94 90 HDPE 145 0.177 0.04 0.035
PB13-97 115 JB13-93 JB13-92 90 HDPE 145 -0.177 0.04 0.035
PB13-98 356 JB13-95 JB13-113 140 HDPE 145 6.731 0.6 3.392
PB13-99 237 JB13-96 JB13-98 90 HDPE 145 0.354 0.08 0.125
PB13-100 58 JB13-97 JB13-96 90 HDPE 145 -0.177 0.04 0.035
PB13-101 134 JB13-98 JB13-99 90 HDPE 145 0.177 0.04 0.035
PB13-102 221 JB13-100 JB13-88 160 HDPE 145 -7.262 0.5 2.039
PB13-103 273 JB13-101 JB13-110 160 HDPE 145 8.856 0.61 2.945

MaRS Planning Engineering Services Pvt. Ltd.


PB13-104 69 JB13-102 JB13-103 90 HDPE 145 0.177 0.04 0.035
PB13-105 185 JB13-102 JB13-100 160 HDPE 145 -7.085 0.49 1.948
PB13-106 24 JB13-104 JB13-102 140 HDPE 145 -6.731 0.6 3.392
PB13-107 77 JB13-105 JB13-104 90 HDPE 145 -0.886 0.19 0.683
PB13-108 170 JB13-105 JB13-107 90 HDPE 145 0.531 0.12 0.265
PB13-109 50 JB13-106 JB13-105 90 HDPE 145 -0.177 0.04 0.035
PB13-110 21 JB13-107 JB13-108 90 HDPE 145 0.354 0.08 0.125
PB13-111 68 JB13-108 JB13-109 90 HDPE 145 0.177 0.04 0.035
PB13-112 316 JB13-110 JB13-116 160 HDPE 145 8.679 0.6 2.837
PB13-113 92 JB13-111 JB13-112 90 HDPE 145 0.177 0.04 0.035
PB13-114 212 JB13-111 JB13-104 140 HDPE 145 -5.668 0.51 2.467
PB13-115 263 JB13-113 JB13-117 140 HDPE 145 6.554 0.59 3.228
PB13-116 174 JB13-114 JB13-111 140 HDPE 145 -5.314 0.48 2.189
PB13-117 112 JB13-115 JB13-118 110 HDPE 145 4.959 0.56 3.351
PB13-118 145 JB13-115 JB13-114 140 HDPE 145 -5.137 0.46 2.056
PB13-119 308 JB13-116 JB13-124 160 HDPE 145 8.502 0.58 2.731
PB13-120 179 JB13-117 JB13-120 140 HDPE 145 6.376 0.57 3.069
PB13-121 129 JB13-118 JB13-119 90 HDPE 145 0.177 0.04 0.035
PB13-122 185 JB13-118 JB13-121 110 HDPE 145 4.605 0.52 2.921
PB13-123 201 JB13-120 JB13-134 140 HDPE 145 6.199 0.56 2.913
PB13-124 9 JB13-121 JB13-123 110 HDPE 145 4.251 0.48 2.518
PB13-125 104 JB13-121 JB13-122 90 HDPE 145 0.177 0.04 0.035
PB13-126 23 JB13-123 JB13-128 110 HDPE 145 3.542 0.51 3.355
PB13-127 99 JB13-123 JB13-125 90 HDPE 145 0.531 0.12 0.265
PB13-128 148 JB13-124 JB13-132 160 HDPE 145 8.325 0.57 2.626
PB13-129 103 JB13-125 JB13-127 90 HDPE 145 0.177 0.04 0.035
PB13-130 91 JB13-125 JB13-126 90 HDPE 145 0.177 0.04 0.035
PB13-131 70 JB13-128 JB13-130 110 HDPE 145 3.188 0.46 2.76
PB13-132 108 JB13-128 JB13-129 90 HDPE 145 0.177 0.04 0.035
PB13-133 238 JB13-130 JB13-131 90 HDPE 145 0.177 0.04 0.035
PB13-134 1,077 JB13-130 JB13-180 110 HDPE 145 2.834 0.41 2.219
PB13-135 225 JB13-132 JB13-137 160 HDPE 145 7.971 0.55 2.423
PB13-136 149 JB13-133 JB13-132 90 HDPE 145 -0.177 0.04 0.035
PB13-137 139 JB13-135 JB13-134 140 HDPE 145 -6.022 0.54 2.76
PB13-138 21 JB13-136 JB13-135 110 HDPE 145 -3.223 0.47 2.816
PB13-139 162 JB13-136 JB13-138 90 HDPE 145 1.53 0.33 1.881
PB13-140 210 JB13-137 JB13-147 160 HDPE 145 7.793 0.53 2.324
PB13-141 100 JB13-138 JB13-141 90 HDPE 145 1.176 0.26 1.155
PB13-142 165 JB13-139 JB13-138 90 HDPE 145 -0.177 0.04 0.035
PB13-143 173 JB13-140 JB13-155 90 HDPE 145 1.736 0.38 2.378
PB13-144 199 JB13-140 JB13-135 110 HDPE 145 -2.622 0.38 1.922
PB13-145 227 JB13-141 JB13-136 90 HDPE 145 -1.516 0.33 1.849
PB13-146 230 JB13-142 JB13-140 90 HDPE 145 -0.708 0.15 0.452
PB13-147 315 JB13-143 JB13-142 90 HDPE 145 -0.531 0.12 0.265
PB13-148 259 JB13-144 JB13-143 90 HDPE 145 -0.354 0.08 0.125
PB13-149 72 JB13-145 JB13-141 110 HDPE 145 -2.514 0.37 1.778
PB13-150 185 JB13-146 JB13-144 90 HDPE 145 -0.177 0.04 0.035
PB13-151 139 JB13-147 JB13-150 90 HDPE 145 0.886 0.19 0.683

MaRS Planning Engineering Services Pvt. Ltd.


PB13-152 195 JB13-148 JB13-145 90 HDPE 145 -0.354 0.08 0.125
PB13-153 140 JB13-149 JB13-148 90 HDPE 145 -0.177 0.04 0.035
PB13-154 58 JB13-150 JB13-152 90 HDPE 145 0.531 0.12 0.265
PB13-155 272 JB13-151 JB13-150 90 HDPE 145 -0.177 0.04 0.035
PB13-156 82 JB13-152 JB13-153 90 HDPE 145 0.177 0.04 0.035
PB13-157 155 JB13-154 JB13-152 90 HDPE 145 -0.177 0.04 0.035
PB13-158 145 JB13-155 JB13-159 90 HDPE 145 1.559 0.34 1.948
PB13-159 10 JB13-156 JB13-157 110 HDPE 145 4.428 0.5 2.715
PB13-160 117 JB13-156 JB13-147 140 HDPE 145 -6.731 0.6 3.392
PB13-161 119 JB13-157 JB13-158 90 HDPE 145 0.177 0.04 0.035
PB13-162 130 JB13-157 JB13-169 110 HDPE 145 2.834 0.41 2.219
PB13-163 127 JB13-159 JB13-163 90 HDPE 145 0.851 0.18 0.634
PB13-164 20 JB13-160 JB13-159 90 HDPE 145 -0.531 0.12 0.265
PB13-165 55 JB13-161 JB13-160 90 HDPE 145 -0.177 0.04 0.035
PB13-166 118 JB13-162 JB13-160 90 HDPE 145 -0.177 0.04 0.035
PB13-167 10 JB13-163 JB13-164 90 HDPE 145 0.886 0.19 0.683
PB13-168 181 JB13-163 JB13-145 90 HDPE 145 -1.983 0.43 3.041
PB13-169 54 JB13-164 JB13-165 90 HDPE 145 0.177 0.04 0.035
PB13-170 98 JB13-166 JB13-167 90 HDPE 145 0.177 0.04 0.035
PB13-171 284 JB13-166 JB13-164 90 HDPE 145 -0.531 0.12 0.265
PB13-172 238 JB13-168 JB13-166 90 HDPE 145 -0.177 0.04 0.035
PB13-173 155 JB13-169 JB13-178 110 HDPE 145 2.657 0.39 1.969
PB13-174 271 JB13-170 JB13-171 90 HDPE 145 0.177 0.04 0.035
PB13-175 302 JB13-170 JB13-157 90 HDPE 145 -1.24 0.27 1.274
PB13-176 157 JB13-172 JB13-156 90 HDPE 145 -2.125 0.46 3.458
PB13-177 41 JB13-173 JB13-175 90 HDPE 145 0.531 0.12 0.265
PB13-178 250 JB13-173 JB13-170 90 HDPE 145 -0.886 0.19 0.683
PB13-179 193 JB13-174 JB13-173 90 HDPE 145 -0.177 0.04 0.035
PB13-180 165 JB13-175 JB13-176 90 HDPE 145 0.177 0.04 0.035
PB13-181 313 JB13-175 JB13-177 90 HDPE 145 0.177 0.04 0.035
PB13-182 192 JB13-178 JB13-186 110 HDPE 145 2.48 0.36 1.733
PB13-183 246 JB13-179 JB13-163 90 HDPE 145 -1.771 0.38 2.467
PB13-184 91 JB13-180 JB13-190 90 HDPE 145 1.771 0.38 2.467
PB13-185 110 JB13-180 JB13-182 90 HDPE 145 0.708 0.15 0.452
PB13-186 315 JB13-181 JB13-180 90 HDPE 145 -0.177 0.04 0.035
PB13-187 51 JB13-182 JB13-183 90 HDPE 145 0.177 0.04 0.035
PB13-188 85 JB13-182 JB13-184 90 HDPE 145 0.177 0.04 0.035
PB13-189 1,073 JB13-182 JB13-185 90 HDPE 145 0.177 0.04 0.035
PB13-190 163 JB13-186 JB13-202 110 HDPE 145 2.303 0.33 1.511
PB13-191 143 JB13-187 JB13-172 90 HDPE 145 -1.948 0.42 2.943
PB13-192 26 JB13-188 JB13-187 90 HDPE 145 -1.771 0.38 2.467
PB13-193 124 JB13-189 JB13-188 90 HDPE 145 -0.177 0.04 0.035
PB13-194 39 JB13-190 JB13-194 90 HDPE 145 1.063 0.23 0.958
PB13-195 112 JB13-190 JB13-191 90 HDPE 145 0.531 0.12 0.265
PB13-196 42 JB13-191 JB13-192 90 HDPE 145 0.177 0.04 0.035
PB13-197 56 JB13-191 JB13-193 90 HDPE 145 0.177 0.04 0.035
PB13-198 48 JB13-194 JB13-196 90 HDPE 145 0.708 0.15 0.452
PB13-199 471 JB13-194 JB13-195 90 HDPE 145 0.177 0.04 0.035

MaRS Planning Engineering Services Pvt. Ltd.


PB13-200 126 JB13-196 JB13-198 90 HDPE 145 0.177 0.04 0.035
PB13-201 198 JB13-196 JB13-199 90 HDPE 145 0.177 0.04 0.035
PB13-202 237 JB13-196 JB13-200 90 HDPE 145 0.177 0.04 0.035
PB13-203 51 JB13-197 JB13-188 90 HDPE 145 -1.417 0.31 1.632
PB13-204 137 JB13-201 JB13-197 90 HDPE 145 -0.177 0.04 0.035
PB13-205 157 JB13-202 JB13-211 90 HDPE 145 2.125 0.46 3.458
PB13-206 243 JB13-203 JB13-179 90 HDPE 145 -1.594 0.35 2.029
PB13-207 135 JB13-204 JB13-197 90 HDPE 145 -1.063 0.23 0.958
PB13-208 82 JB13-205 JB13-204 90 HDPE 145 -0.177 0.04 0.035
PB13-209 54 JB13-206 JB13-204 90 HDPE 145 -0.708 0.15 0.452
PB13-210 54 JB13-207 JB13-206 90 HDPE 145 -0.531 0.12 0.265
PB13-211 59 JB13-208 JB13-207 90 HDPE 145 -0.177 0.04 0.035
PB13-212 141 JB13-209 JB13-207 90 HDPE 145 -0.177 0.04 0.035
PB13-213 205 JB13-210 JB13-203 90 HDPE 145 -1.417 0.31 1.632
PB13-214 157 JB13-211 JB13-219 90 HDPE 145 1.948 0.42 2.943
PB13-215 274 JB13-212 JB13-210 90 HDPE 145 -1.24 0.27 1.274
PB13-216 233 JB13-213 JB13-212 90 HDPE 145 -0.531 0.12 0.265
PB13-217 240 JB13-214 JB13-212 90 HDPE 145 -0.531 0.12 0.265
PB13-218 235 JB13-215 JB13-213 90 HDPE 145 -0.354 0.08 0.125
PB13-219 238 JB13-216 JB13-214 90 HDPE 145 -0.354 0.08 0.125
PB13-220 194 JB13-217 JB13-215 90 HDPE 145 -0.177 0.04 0.035
PB13-221 193 JB13-218 JB13-216 90 HDPE 145 -0.177 0.04 0.035
PB13-222 201 JB13-219 JB13-220 90 HDPE 145 1.771 0.38 2.467
PB13-223 174 JB13-220 JB13-221 90 HDPE 145 1.594 0.35 2.029
PB13-224 145 JB13-221 JB13-222 90 HDPE 145 0.177 0.04 0.035
PB13-225 182 JB13-223 JB13-225 90 HDPE 145 0.531 0.12 0.265
PB13-226 212 JB13-223 JB13-221 90 HDPE 145 -1.24 0.27 1.274
PB13-227 168 JB13-224 JB13-223 90 HDPE 145 -0.531 0.12 0.265
PB13-228 89 JB13-225 JB13-228 90 HDPE 145 0.177 0.04 0.035
PB13-229 35 JB13-226 JB13-225 90 HDPE 145 -0.177 0.04 0.035
PB13-230 143 JB13-227 JB13-224 90 HDPE 145 -0.177 0.04 0.035
PB13-231 211 JB13-229 JB13-224 90 HDPE 145 -0.177 0.04 0.035

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
TB-1
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB-1 0.263 68.32 90.33 21.97
JB-2 0.263 64.23 90.32 26.04
JB-3 0.263 60.14 89.52 29.32
JB-4 0.263 57.44 89.48 31.97
JB-5 0.263 58.32 89.47 31.09
JB-6 0.263 58.32 89.46 31.08
JB-7 0.263 52.03 88.83 36.73
JB-8 0.263 51.24 88.57 37.26
JB-9 0.263 53.69 88.57 34.81
JB-10 0.263 50.26 88.55 38.21
JB-11 0.263 50.64 88.53 37.81
JB-12 0.263 50.31 88.53 38.14
JB-13 0.263 55.59 88.45 32.8
JB-14 0.263 56.37 88.43 32
JB-15 0.263 48.25 88.27 39.94
JB-16 0.263 52.68 88.14 35.38
JB-17 0.263 61.24 88.13 26.83
JB-18 0.263 55.69 88.12 32.36
JB-19 0.263 64.28 88.11 23.78
JB-20 0.263 56.39 88.1 31.64
JB-21 0.263 46.32 87.99 41.58
JB-22 0.263 60.21 87.97 27.7
JB-23 0.263 59.68 87.96 28.22
JB-24 0.263 58.66 87.89 29.18
JB-25 0.263 59.36 87.63 28.21
JB-26 0.263 43.25 87.62 44.28
JB-27 0.263 62.58 87.61 24.98
JB-28 0.263 60.53 87.61 27.02
JB-29 0.263 56.88 87.6 30.65
JB-30 0.263 56.88 87.57 30.63
JB-31 0.263 55.88 87.55 31.61
JB-32 0.263 62.33 87.37 24.99
JB-33 0.263 59.66 87.35 27.64
JB-34 0.263 44.25 87.26 42.93
JB-35 0.263 46.32 87.23 40.82
JB-36 0.263 44.25 87.21 42.88
JB-37 0.263 42.58 87.21 44.54
JB-38 0.263 45.89 87.21 41.23
JB-39 0.263 59.63 87.2 27.52
JB-40 0.263 50.26 87.03 36.69
JB-41 0.263 49.68 87.02 37.27
JB-42 0.263 57.24 86.97 29.67
JB-43 0.263 57.88 86.92 28.98

MaRS Planning Engineering Services Pvt. Ltd.


JB-44 0.263 50.69 86.9 36.14
JB-45 0.263 55.88 86.89 30.95
JB-46 0.263 55.52 86.87 31.29
JB-47 0.263 53.54 86.86 33.25
JB-48 0.263 52.69 86.86 34.1
JB-49 0.263 53.66 86.85 33.13
JB-50 0.263 56.99 86.85 29.8
JB-51 0.263 57.56 86.81 29.19
JB-52 0.263 49.86 86.79 36.86
JB-53 0.263 50.23 86.79 36.49
JB-54 0.263 48.77 86.78 37.94
JB-55 0.263 49.88 86.77 36.81
JB-56 0.263 50.23 86.76 36.46
JB-57 0.263 48.77 86.76 37.91
JB-58 0.263 46.39 86.75 40.28
JB-59 0.263 48.73 86.73 37.92
JB-60 0.263 47.21 86.71 39.42
JB-61 0.263 44.28 86.37 42
JB-62 0.263 47.56 86.34 38.7
JB-63 0.263 46.69 86.33 39.56
JB-64 0.263 47.25 86.31 38.98
JB-65 0.263 46.55 86.3 39.67
JB-66 0.263 49.36 86.09 36.65
JB-67 0.263 45.25 86.05 40.71
JB-68 0.263 50.32 86.02 35.63
JB-69 0.263 51.44 85.99 34.48
JB-70 0.263 54.88 85.99 31.05
JB-71 0.263 49.63 85.93 36.23
JB-72 0.263 50.21 85.91 35.63
JB-73 0.263 48.36 85.91 37.47
JB-74 0.263 49.36 85.91 36.47
JB-75 0.263 49.52 85.8 36.21
JB-76 0.263 42.11 85.76 43.56
JB-77 0.263 49.35 85.65 36.23
JB-78 0.263 48.32 85.65 37.26
JB-79 0.263 50.26 85.65 35.32
JB-80 0.263 51.26 85.61 34.29
JB-81 0.263 47.59 85.6 37.94
JB-82 0.263 44.28 85.5 41.14
JB-83 0.263 54.77 85.42 30.59
JB-84 0.263 43.69 85.28 41.5
JB-85 0.263 49.77 85.17 35.33
JB-86 0.263 49.53 85.14 35.54
JB-87 0.263 46.63 85.12 38.41
JB-88 0.263 47.11 85.05 37.86
JB-89 0.263 46.32 85.05 38.65
JB-90 0.263 46.88 85.04 38.09
JB-91 0.263 50.32 85 34.61

MaRS Planning Engineering Services Pvt. Ltd.


JB-92 0.263 61.39 84.99 23.55
JB-93 0.263 44.77 84.96 40.11
JB-94 0.263 56.32 84.94 28.56
JB-95 0.263 51.24 84.76 33.45
JB-96 0.263 50.26 84.75 34.42
JB-97 0.263 49.55 84.75 35.13
JB-98 0.263 47.36 84.74 37.31
JB-99 0.263 48.36 84.73 36.3
JB-100 0.263 47.28 84.69 37.33
JB-101 0.263 50.36 84.67 34.24
JB-102 0.263 59.66 84.67 24.96
JB-103 0.263 50.24 84.67 34.36
JB-104 0.263 49.68 84.67 34.92
JB-105 0.263 59.27 84.66 25.34
JB-106 0.263 55.88 84.53 28.59
JB-107 0.263 43.69 84.46 40.69
JB-108 0.263 47.25 84.31 36.99
JB-109 0.263 48.36 84.31 35.88
JB-110 0.263 41.05 84.27 43.13
JB-111 0.263 46.88 84.12 37.16
JB-112 0.263 52.36 83.92 31.49
JB-113 0.263 48.36 83.91 35.48
JB-114 0.263 48.05 83.89 35.76
JB-115 0.263 48.36 83.88 35.44
JB-116 0.263 47.25 83.87 36.55
JB-117 0.263 46.35 83.81 37.39
JB-118 0.263 41.56 83.79 42.15
JB-119 0.263 47.32 83.79 36.39
JB-120 0.263 45.88 83.78 37.82
JB-121 0.263 47.52 83.75 36.16
JB-122 0.263 45.52 83.74 38.15
JB-123 0.263 54.77 83.72 28.89
JB-124 0.263 48.11 83.58 35.4
JB-125 0.263 53.22 83.52 30.24
JB-126 0.263 55.88 83.5 27.57
JB-127 0.263 55.56 83.49 27.87
JB-128 0.263 43.25 83.44 40.11
JB-129 0.263 56.63 83.35 26.66
JB-130 0.263 56.98 83.3 26.27
JB-131 0.263 54.53 83.28 28.69
JB-132 0.263 51.25 83.26 31.95
JB-133 0.263 45.28 83.22 37.86
JB-134 0.263 46.39 82.99 36.53
JB-135 0.263 45.88 82.99 37.03
JB-136 0.263 47.25 82.95 35.63
JB-137 0.263 46.35 82.94 36.52
JB-138 0.263 64.32 82.76 18.41
JB-139 0.263 68.99 82.29 13.27

MaRS Planning Engineering Services Pvt. Ltd.


JB-140 0.263 68.21 82.28 14.04
JB-141 0.263 66.33 82.27 15.91
JB-142 0.263 64.53 82.26 17.69
JB-143 0.263 69.33 82.25 12.89
JB-144 0.263 67.58 82.14 14.53
JB-145 0.263 67.85 82.13 14.25
JB-146 0.263 62.56 82.1 19.5
JB-147 0.263 69.35 82.07 12.7
JB-148 0.263 70.88 82.05 11.15
JB-149 0.263 63.25 81.84 18.55
JB-150 0.263 65.99 81.84 15.81
JB-151 0.263 62.39 81.83 19.41
JB-152 0.263 60.25 81.83 21.54
TB.-2
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB2-1 0.327 73.65 93.61 19.92
JB2-2 0.327 73.69 93.6 19.87
JB2-3 0.327 74.69 93.59 18.86
JB2-4 0.327 70.15 93.59 23.39
JB2-5 0.327 70.52 93.58 23.01
JB2-6 0.327 71.34 93.47 22.09
JB2-7 0.327 72.49 93.46 20.93
JB2-8 0.327 68.72 93.16 24.39
JB2-9 0.327 67.28 93.13 25.8
JB2-10 0.327 69.31 92.71 23.36
JB2-11 0.327 69.78 92.61 22.78
JB2-12 0.327 64.65 92.58 27.87
JB2-13 0.327 69.14 92.57 23.38
JB2-14 0.327 68.38 92.56 24.13
JB2-15 0.327 68.15 92.32 24.12
JB2-16 0.327 68.39 92.1 23.66
JB2-17 0.327 67.46 92.01 24.5
JB2-18 0.327 66.79 92 25.16
JB2-19 0.327 66.24 92 25.71
JB2-20 0.327 68.65 92 23.3
JB2-21 0.327 66.54 91.97 25.38
JB2-22 0.327 68.57 91.96 23.35
JB2-23 0.327 66.69 91.94 25.2
JB2-24 0.327 59.22 91.33 32.04
JB2-25 0.327 59.22 91.24 31.96
JB2-26 0.327 61.25 90.93 29.62
JB2-27 0.327 60.43 90.84 30.35
JB2-28 0.327 61.35 90.84 29.43
JB2-29 0.327 61.39 90.83 29.38
JB2-30 0.327 61.21 90.71 29.44
JB2-31 0.327 60.35 90.58 30.17
JB2-32 0.327 62.39 90.52 28.07

MaRS Planning Engineering Services Pvt. Ltd.


JB2-33 0.327 59.64 90.52 30.81
JB2-34 0.327 62.12 90.51 28.33
JB2-35 0.327 54.63 90.5 35.8
JB2-36 0.327 62.12 90.36 28.18
JB2-37 0.327 63.64 90.36 26.66
JB2-38 0.327 62.26 90.21 27.89
JB2-39 0.327 59.46 90.17 30.65
JB2-40 0.327 54.87 90.16 35.22
JB2-41 0.327 63.11 90.1 26.94
JB2-42 0.327 63.19 90.09 26.85
JB2-43 0.327 62.14 90.06 27.87
JB2-44 0.327 55.64 90.05 34.34
JB2-45 0.327 62.84 90.03 27.13
JB2-46 0.327 62.56 90.03 27.41
JB2-47 0.327 61.59 90.02 28.37
JB2-48 0.327 61.38 90.01 28.57
JB2-49 0.327 58.29 90 31.65
JB2-50 0.327 56.44 90 33.49
JB2-51 0.327 60.25 89.85 29.54
JB2-52 0.327 60.17 89.84 29.61
JB2-53 0.327 54.69 89.76 35
JB2-54 0.327 54.56 89.76 35.13
JB2-55 0.327 59.33 89.74 30.35
JB2-56 0.327 59.63 89.74 30.05
TB.-3
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB3-1 0.254 66.31 87.48 21.13
JB3-2 0.254 66.99 87.45 20.42
JB3-3 0.254 65.89 87.44 21.51
JB3-4 0.254 64.99 87.31 22.27
JB3-5 0.254 63.98 87.14 23.11
JB3-6 0.254 59.68 86.59 26.86
JB3-7 0.254 54.28 86.54 32.19
JB3-8 0.254 53.62 86.53 32.84
JB3-9 0.254 62.35 86.45 24.05
JB3-10 0.254 60.33 86.41 26.02
JB3-11 0.254 60.24 86.4 26.11
JB3-12 0.254 63.55 86.38 22.78
JB3-13 0.254 59.88 86.36 26.43
JB3-14 0.254 56.32 86.35 29.97
JB3-15 0.254 60.24 86.28 25.99
JB3-16 0.254 59.53 86.27 26.69
JB3-17 0.254 60.32 86.26 25.89
JB3-18 0.254 60.21 86.25 25.98
JB3-19 0.254 60.29 86.19 25.84
JB3-20 0.254 58.64 86.18 27.48
JB3-21 0.254 59.88 86.17 26.24

MaRS Planning Engineering Services Pvt. Ltd.


JB3-22 0.254 59.44 86.14 26.65
JB3-23 0.254 59.68 86.14 26.41
JB3-24 0.254 56.35 86.13 29.72
JB3-25 0.254 58.88 86.12 27.19
JB3-26 0.254 60.32 86.12 25.75
JB3-27 0.254 57.21 86.1 28.83
JB3-28 0.254 58.66 86.09 27.38
JB3-29 0.254 56.99 86.09 29.04
JB3-30 0.254 56.39 86.08 29.63
JB3-31 0.254 57.21 86.08 28.81
JB3-32 0.254 59.88 86.04 26.1
JB3-33 0.254 60.21 86.02 25.75
JB3-34 0.254 55.28 85.99 30.65
JB3-35 0.254 56.63 85.91 29.22
JB3-36 0.254 56.28 85.91 29.57
JB3-37 0.254 52.26 85.9 33.57
JB3-38 0.254 56.33 85.9 29.51
JB3-39 0.254 61.58 85.84 24.21
JB3-40 0.254 64.28 85.82 21.5
JB3-41 0.254 60.21 85.65 25.39
JB3-42 0.254 56.88 85.25 28.32
JB3-43 0.254 52.64 84.63 31.92
JB3-44 0.254 49.87 84.62 34.68
JB3-45 0.254 46.35 84.12 37.69
JB3-46 0.254 44.12 83.55 39.35
JB3-47 0.254 50.24 83.04 32.73
JB3-48 0.254 54.27 82.2 27.87
JB3-49 0.254 57.88 81.61 23.68
JB3-50 0.254 54.69 81.06 26.32
JB3-51 0.254 51.69 80.7 28.96
JB3-52 0.254 47.25 80.7 33.38
JB3-53 0.254 48.63 80.34 31.65
JB3-54 0.254 45.66 79.54 33.81
JB3-55 0.254 46.88 78.95 32
JB3-56 0.254 48.77 78.53 29.7
JB3-57 0.254 48.57 78.52 29.89
JB3-58 0.254 49.66 78.52 28.8
JB3-59 0.254 50.22 78.51 28.23
JB3-60 0.254 46.63 78.5 31.81
JB3-61 0.254 50.26 78.5 28.18
TB.-4
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB4-1 0.209 45.52 65.77 20.21
JB4-2 0.209 47.52 65.74 18.18
JB4-3 0.209 45.63 65.73 20.06
JB4-4 0.209 42.85 65.34 22.44
JB4-5 0.209 44.58 65.02 20.4

MaRS Planning Engineering Services Pvt. Ltd.


JB4-6 0.209 45.63 65 19.33
JB4-7 0.209 44.74 64.99 20.21
JB4-8 0.209 46.36 64.92 18.53
JB4-9 0.209 45.36 64.92 19.52
JB4-10 0.209 42.52 64.85 22.29
JB4-11 0.209 44.52 64.85 20.29
JB4-12 0.209 43.36 64.75 21.34
JB4-13 0.209 43.23 64.74 21.46
JB4-14 0.209 44.23 64.73 20.46
JB4-15 0.209 46.32 64.72 18.36
JB4-16 0.209 47.41 64.71 17.27
JB4-17 0.209 44.52 64.7 20.14
JB4-18 0.209 44.63 64.69 20.02
JB4-19 0.209 44.85 64.68 19.79
JB4-20 0.209 45.38 64.68 19.26
JB4-21 0.209 43.28 64.67 21.35
JB4-22 0.209 45.23 64.62 19.35
JB4-23 0.209 45.22 64.57 19.31
JB4-24 0.209 45.25 64.56 19.27
JB4-25 0.209 45.52 64.56 19
JB4-26 0.209 44.52 64.53 19.97
JB4-27 0.209 45.25 64.52 19.23
JB4-28 0.209 44.52 64.5 19.94
JB4-29 0.209 46.52 64.5 17.94
JB4-30 0.209 43.52 64.49 20.93
JB4-31 0.209 45.21 64.49 19.24
JB4-32 0.209 43.33 64.49 21.12
JB4-33 0.209 43.32 64.49 21.12
JB4-34 0.209 43.34 64.48 21.1
JB4-35 0.209 44.63 64.47 19.8
JB4-36 0.209 43.23 64.47 21.2
JB4-37 0.209 44.12 64.29 20.13
JB4-38 0.209 44.1 64.29 20.15
JB4-39 0.209 44.13 63.87 19.7
JB4-40 0.209 42.23 63.81 21.54
JB4-41 0.209 44.56 63.7 19.11
JB4-42 0.209 42.52 63.6 21.03
JB4-43 0.209 43.52 63.55 19.99
JB4-44 0.209 43.51 63.51 19.96
JB4-45 0.209 42.12 63.51 21.34
JB4-46 0.209 46.52 63.48 16.92
JB4-47 0.209 46.56 63.47 16.88
JB4-48 0.209 47.55 63.43 15.85
JB4-49 0.209 47.59 63.43 15.8
JB4-50 0.209 46.36 63.43 17.03
JB4-51 0.209 46.33 63.42 17.06
JB4-52 0.209 44.1 63.42 19.28
JB4-53 0.209 44.25 63.42 19.13

MaRS Planning Engineering Services Pvt. Ltd.


JB4-54 0.209 43.28 63.41 20.09
JB4-55 0.209 44.1 63.4 19.26
JB4-56 0.209 42.56 63.25 20.65
JB4-57 0.209 43.58 63.25 19.63
JB4-58 0.209 43.23 63.23 19.96
JB4-59 0.209 43.63 63.23 19.56
JB4-60 0.209 44.78 63.22 18.4
JB4-61 0.209 45.36 63.01 17.61
JB4-62 0.209 45.63 62.99 17.33
JB4-63 0.209 46.12 62.99 16.84
JB4-64 0.209 44.15 62.99 18.8
JB4-65 0.209 45.36 62.6 17.21
JB4-66 0.209 45.28 62.58 17.27
JB4-67 0.209 45.33 62.58 17.21
JB4-68 0.209 45.23 62.58 17.31
JB4-69 0.209 43.23 62.55 19.28
JB4-70 0.209 45.69 62.54 16.82
JB4-71 0.209 45.23 62.54 17.27
JB4-72 0.209 42.26 62.52 20.23
JB4-73 0.209 45.69 62.52 16.79
JB4-74 0.209 46.52 62.46 15.91
JB4-75 0.209 47.52 62.46 14.91
JB4-76 0.209 44.74 62.41 17.63
JB4-77 0.209 43.28 62.4 19.09
JB4-78 0.209 43.23 62.4 19.13
JB4-79 0.209 45.47 62.4 16.89
JB4-80 0.209 43.41 62.38 18.93
JB4-81 0.209 43.25 62.01 18.72
JB4-82 0.209 42.85 62.01 19.12
JB4-83 0.209 42.82 61.94 19.08
JB4-84 0.209 42.78 61.89 19.07
JB4-85 0.209 42.56 61.69 19.09
JB4-86 0.209 42.69 61.22 18.49
JB4-87 0.209 43.36 61.21 17.81
JB4-88 0.209 45.58 61.2 15.59
JB4-89 0.209 43.28 61.19 17.87
JB4-90 0.209 43.65 61.17 17.49
JB4-91 0.209 44.28 61.17 16.86
JB4-92 0.263 43.58 61.17 17.55
JB4-93 0.209 45.63 61.11 15.45
JB4-94 0.209 45.23 61.1 15.84
JB4-95 0.209 46.11 61.1 14.96
JB4-96 0.209 42.63 60.5 17.84
JB4-97 0.209 40.36 60.01 19.61
JB4-98 0.209 41.23 59.59 18.32
JB4-99 0.209 41.75 59.28 17.5
JB4-100 0.209 47.52 59.06 11.52
JB4-101 0.209 49.63 58.95 9.31

MaRS Planning Engineering Services Pvt. Ltd.


JB4-102 0.209 48.56 58.9 10.32
JB4-103 0.209 46.36 58.89 12.51
JB4-104 0.209 44.12 58.89 14.74
TB.-5
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB5-1 0.428 46.11 66.16 20.01
JB5-2 0.428 46.62 66.15 19.49
JB5-3 0.428 42.64 66.11 23.42
JB5-4 0.428 47.18 66.09 18.88
JB5-5 0.428 44.28 66.08 21.75
JB5-6 0.428 44.16 66.07 21.86
JB5-7 0.428 42.52 66 23.44
JB5-8 0.428 45.14 65.88 20.7
JB5-9 0.428 40.84 65.53 24.64
JB5-10 0.428 44.75 65.16 20.37
JB5-11 0.428 42.55 65.09 22.5
JB5-12 0.428 41.36 65.08 23.67
JB5-13 0.428 42.15 65.05 22.86
JB5-14 0.428 45.64 64.92 19.25
JB5-15 0.428 46.52 64.8 18.24
JB5-16 0.428 46.36 64.78 18.38
JB5-17 0.428 46.15 64.7 18.52
JB5-18 0.428 45.25 64.69 19.4
JB5-19 0.428 46.21 64.68 18.43
JB5-20 0.428 45.47 64.67 19.16
JB5-21 0.428 46.19 64.66 18.44
JB5-22 0.428 44.11 64.66 20.51
JB5-23 0.428 45.13 64.66 19.49
JB5-24 0.428 41.24 64.62 23.33
JB5-25 0.428 41.89 64.57 22.63
JB5-26 0.428 41.54 64.54 22.95
JB5-27 0.428 44.79 64.53 19.7
JB5-28 0.428 43.55 64.49 20.9
JB5-29 0.428 42.59 64.09 21.45
JB5-30 0.428 42.68 64.07 21.34
JB5-31 0.428 46.71 63.99 17.25
JB5-32 0.428 44.57 63.9 19.29
JB5-33 0.428 46.39 63.87 17.44
JB5-34 0.428 44.69 63.85 19.12
JB5-35 0.428 44.55 63.75 19.16
JB5-36 0.428 44.61 63.74 19.09
JB5-37 0.428 43.65 63.66 19.97
JB5-38 0.428 41.32 63.62 22.26
JB5-39 0.428 41.15 63.62 22.42
JB5-40 0.428 43.69 63.59 19.86
JB5-41 0.428 42.78 63.55 20.73
JB5-42 0.428 43.87 63.5 19.59

MaRS Planning Engineering Services Pvt. Ltd.


JB5-43 0.428 42.79 63.4 20.57
JB5-44 0.428 43.71 63.34 19.59
JB5-45 0.428 41.59 63.31 21.68
JB5-46 0.428 40.67 63.22 22.5
JB5-47 0.428 41.82 63.18 21.31
JB5-48 0.428 43.32 62.57 19.21
JB5-49 0.428 44.79 61.8 16.97
JB5-50 0.428 45.42 61.47 16.02
JB5-51 0.428 45.51 61.46 15.92
JB5-52 0.428 44.85 61.46 16.58
JB5-53 0.428 45.63 61.46 15.8
JB5-54 0.428 45.33 61.45 16.09
JB5-55 0.428 44.59 61.44 16.82
TB.-6
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB6-1 0.353 60.42 80.33 19.87
JB6-2 0.353 63.14 80.31 17.13
JB6-3 0.353 60.28 80.02 19.7
JB6-4 0.353 63.44 80 16.52
JB6-5 0.353 58.17 79.71 21.49
JB6-6 0.353 58.45 79.67 21.18
JB6-7 0.353 60.69 79.66 18.93
JB6-8 0.353 57.38 79.35 21.92
JB6-9 0.353 55.79 79.33 23.49
JB6-10 0.353 57.46 79.28 21.77
JB6-11 0.353 59.78 79.18 19.36
JB6-12 0.353 62.11 79.15 17
JB6-13 0.353 53.67 78.74 25.02
JB6-14 0.353 52.27 78.21 25.89
JB6-15 0.353 52.34 78.21 25.81
JB6-16 0.353 52.11 78.08 25.92
JB6-17 0.353 50.19 77.3 27.05
JB6-18 0.353 49.52 77.28 27.7
JB6-19 0.353 50.17 77.27 27.04
JB6-20 0.353 50.64 77.26 26.57
JB6-21 0.353 49.45 77.25 27.74
JB6-22 0.353 51.26 77.23 25.92
JB6-23 0.353 52.14 77.22 25.03
JB6-24 0.353 52.88 77.15 24.22
JB6-25 0.353 50.6 77.13 26.48
JB6-26 0.353 53.64 76.96 23.27
JB6-27 0.353 54.39 76.94 22.5
JB6-28 0.353 52.16 76.84 24.63
JB6-29 0.353 51.49 76.82 25.28
JB6-30 0.353 51.22 76.73 25.46
JB6-31 0.353 50.34 76.64 26.25
JB6-32 0.353 43.38 76.62 33.17

MaRS Planning Engineering Services Pvt. Ltd.


JB6-33 0.353 48.59 76.6 27.95
JB6-34 0.353 49.46 76.47 26.95
JB6-35 0.353 48.85 76.45 27.55
JB6-36 0.353 48.55 76.36 27.76
JB6-37 0.353 47.65 76.32 28.61
JB6-38 0.353 47.76 76.04 28.22
JB6-39 0.353 49.26 75.97 26.65
JB6-40 0.353 49.34 75.95 26.55
JB6-41 0.353 47.45 75.93 28.43
JB6-42 0.353 45.11 75.9 30.73
JB6-43 0.353 49.15 75.89 26.69
JB6-44 0.353 48.26 75.89 27.57
JB6-45 0.353 42.18 75.71 33.46
JB6-46 0.353 48.22 75.64 27.37
JB6-47 0.353 45.51 75.63 30.06
JB6-48 0.353 48.38 75.56 27.13
JB6-49 0.353 48.46 75.52 27.01
JB6-50 0.353 48.36 75.52 27.1
JB6-51 0.353 47.29 75.52 28.17
JB6-52 0.353 48.54 75.49 26.9
JB6-53 0.353 47.03 75.45 28.36
JB6-54 0.353 47.49 75.43 27.88
JB6-55 0.353 45.26 75.42 30.1
JB6-56 0.353 45.87 75.42 29.49
JB6-57 0.353 44.39 75.26 30.8
JB6-58 0.353 45.14 74.95 29.75
JB6-59 0.353 45.23 74.92 29.63
JB6-60 0.353 46.58 74.91 28.27
JB6-61 0.353 46.53 74.87 28.29
JB6-62 0.353 43.26 74.84 31.51
JB6-63 0.353 47.11 74.64 27.48
JB6-64 0.353 47.32 74.63 27.26
JB6-65 0.353 40.82 74.55 33.67
JB6-66 0.353 47.29 74.51 27.16
JB6-67 0.353 47.53 74.49 26.91
JB6-68 0.353 47.46 74.38 26.86
JB6-69 0.353 47.69 74.37 26.63
JB6-70 0.353 47.78 74.29 26.46
JB6-71 0.353 47.64 74.29 26.59
JB6-72 0.353 43.68 74.27 30.53
JB6-73 0.353 44.89 74.27 29.33
JB6-74 0.353 43.71 74.24 30.47
JB6-75 0.353 44.62 74.23 29.55
JB6-76 0.353 43.7 74.21 30.45
JB6-77 0.353 45.35 74.13 28.72
JB6-78 0.353 64.32 74.12 9.78
JB6-79 0.353 45.49 74.08 28.54
JB6-80 0.353 45.57 74.08 28.45

MaRS Planning Engineering Services Pvt. Ltd.


JB6-81 0.353 43.64 74.07 30.37
JB6-82 0.353 46.58 73.99 27.35
JB6-83 0.353 46.58 73.98 27.34
JB6-84 0.353 44.89 73.96 29.02
JB6-85 0.353 45.69 73.93 28.18
JB6-86 0.353 46.72 73.93 27.15
JB6-87 0.353 47.44 73.92 26.43
JB6-88 0.353 46.52 73.92 27.34
JB6-89 0.353 45.78 73.91 28.07
JB6-90 0.353 46.64 73.9 27.21
JB6-91 0.353 45.59 73.81 28.16
JB6-92 0.353 44.38 73.8 29.36
JB6-93 0.353 45.67 73.79 28.07
JB6-94 0.353 42.67 73.77 31.04
JB6-95 0.353 44.69 73.77 29.02
JB6-96 0.353 45.54 73.75 28.16
JB6-97 0.353 44.71 73.75 28.98
JB6-98 0.353 43.55 73.29 29.68
JB6-99 0.353 41.37 72.76 31.33
JB6-100 0.353 44.78 71.95 27.12
JB6-101 0.353 43.62 71.23 27.55
JB6-102 0.353 45.54 70.61 25.02
JB6-103 0.353 46.31 70.08 23.73
JB6-104 0.353 50.47 69.26 18.75
JB6-105 0.353 53.24 68.58 15.31
JB6-106 0.353 51.15 68 16.82
JB6-107 0.353 51.44 67.79 16.32
JB6-108 0.353 52.78 67.78 14.97
JB6-109 0.353 49.31 67.77 18.42
JB6-110 0.353 52.75 67.77 14.99
JB6-111 0.353 48.65 67.76 19.07
JB6-112 0.353 50.37 67.75 17.35
JB6-113 0.353 49.27 67.75 18.44
TB.-7
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB7-1 0.258 70.5 90.3 19.76
JB7-2 0.258 69.18 89.89 20.67
JB7-3 0.258 66.78 89.85 23.03
JB7-4 0.258 66.25 89.84 23.54
JB7-5 0.258 67.49 89.84 22.3
JB7-6 0.258 69.05 89.84 20.74
JB7-7 0.258 65.11 89.82 24.66
JB7-8 0.258 67.29 89.67 22.33
JB7-9 0.258 66.76 89.62 22.81
JB7-10 0.258 62.8 89.61 26.75
JB7-11 0.258 63.49 89.6 26.06
JB7-12 0.258 65.43 89.46 23.98

MaRS Planning Engineering Services Pvt. Ltd.


JB7-13 0.258 57.24 89.44 32.13
JB7-14 0.258 66.53 89.08 22.51
JB7-15 0.258 62.21 89.06 26.8
JB7-16 0.258 61.35 89.06 27.65
JB7-17 0.258 62.24 89.04 26.75
JB7-18 0.258 65.48 89.04 23.51
JB7-19 0.258 63.97 89.03 25.01
JB7-20 0.258 65.1 89.03 23.88
JB7-21 0.258 60.49 89.03 28.48
JB7-22 0.258 62.24 89 26.71
JB7-23 0.258 61.33 89 27.61
JB7-24 0.258 62.69 89 26.26
JB7-25 0.258 60.27 89 28.67
JB7-26 0.258 60.55 89 28.39
JB7-27 0.258 65.29 88.97 23.64
JB7-28 0.258 57.49 88.96 31.4
JB7-29 0.258 50.62 88.51 37.82
JB7-30 0.258 60.11 87.97 27.8
JB7-31 0.258 60.89 87.53 26.58
JB7-32 0.258 59.42 86.79 27.31
JB7-33 0.258 62.36 86.78 24.37
JB7-34 0.258 59.45 86.28 26.78
JB7-35 0.258 58.36 86.21 27.79
JB7-36 0.258 57.75 86.2 28.39
JB7-37 0.258 60.96 85.98 24.97
JB7-38 0.258 55.34 85.94 30.53
JB7-39 0.258 51.28 85.93 34.58
JB7-40 0.258 51.89 85.93 33.97
JB7-41 0.258 49.66 85.92 36.18
JB7-42 0.258 58.53 85.91 27.32
JB7-43 0.258 58.46 85.9 27.39
JB7-44 0.258 58.41 85.88 27.41
JB7-45 0.258 59.41 85.85 26.39
JB7-46 0.258 59.94 85.85 25.85
JB7-47 0.258 59.13 85.83 26.64
JB7-48 0.258 54.72 85.82 31.04
JB7-49 0.258 58.2 85.75 27.49
JB7-50 0.258 54.61 85.74 31.06
JB7-51 0.258 58.63 85.71 27.02
JB7-52 0.258 59.73 85.7 25.92
JB7-53 0.258 54.29 85.17 30.82
JB7-54 0.258 54.28 85.16 30.82
JB7-55 0.258 59.26 85.15 25.84
JB7-56 0.258 49.63 85.15 35.45
JB7-57 0.258 58.49 85.01 26.47
JB7-58 0.258 59.47 85.01 25.49
JB7-59 0.258 58.42 85.01 26.53
JB7-60 0.258 50.24 84.81 34.5

MaRS Planning Engineering Services Pvt. Ltd.


JB7-61 0.258 49.39 84.55 35.09
JB7-62 0.258 55.6 84.41 28.75
JB7-63 0.258 56.05 84.4 28.3
JB7-64 0.258 52.31 84.4 32.02
JB7-65 0.258 49.67 84.3 34.56
JB7-66 0.258 46.51 83.64 37.05
JB7-67 0.258 46.31 83.55 37.16
JB7-68 0.258 48.71 83.48 34.7
JB7-69 0.258 48.28 83.47 35.12
JB7-70 0.258 45.72 83.46 37.67
JB7-71 0.258 44.21 83.4 39.11
JB7-72 0.258 44.66 83.39 38.66
JB7-73 0.258 49.6 82.87 33.2
JB7-74 0.258 55.12 82.23 27.06
JB7-75 0.258 47.31 82.23 34.85
JB7-76 0.258 46.51 82.22 35.64
JB7-77 0.258 47.63 82.13 34.43
JB7-78 0.258 45.61 82.13 36.45
JB7-79 0.258 47.46 82.12 34.59
JB7-80 0.258 45.59 82.12 36.46
JB7-81 0.258 47.11 82.12 34.94
JB7-82 0.258 42.23 82.11 39.8
JB7-83 0.258 61.48 81.54 20.02
JB7-84 0.258 61.28 81.53 20.21
JB7-85 0.258 55.16 81.51 26.3
JB7-86 0.258 54.73 81.51 26.73
JB7-87 0.258 62.25 81.24 18.95
JB7-88 0.258 62.24 81.23 18.95
JB7-89 0.258 53.21 81.21 27.95
JB7-90 0.258 54.7 81.2 26.45
JB7-91 0.258 63.81 80.49 16.64
JB7-92 0.258 63.35 80.48 17.09
JB7-93 0.258 54.45 80.46 25.96
JB7-94 0.258 63.34 80.46 17.08
JB7-95 0.258 53.31 80.44 27.08
JB7-96 0.258 63.21 80.04 16.79
JB7-97 0.258 65.35 79.95 14.57
JB7-98 0.258 66.41 79.94 13.5
JB7-99 0.258 64.02 79.92 15.86
JB7-100 0.258 64.29 79.91 15.59
JB7-101 0.258 63.34 79.9 16.53
JB7-102 0.258 67.82 79.9 12.06
JB7-103 0.258 66.44 79.89 13.43
JB7-104 0.258 67.53 79.89 12.34
TB.-8
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB8-1 0.479 57.14 77.89 20.71

MaRS Planning Engineering Services Pvt. Ltd.


JB8-2 0.479 57.29 77.88 20.54
JB8-3 0.479 56.38 77.8 21.38
JB8-4 0.479 58.05 77.77 19.68
JB8-5 0.479 53.72 77.66 23.89
JB8-6 0.479 53.41 77.65 24.19
JB8-7 0.479 51.56 77.46 25.85
JB8-8 0.479 51.59 77.45 25.81
JB8-9 0.479 48.75 77.41 28.6
JB8-10 0.479 48.33 77.38 29
JB8-11 0.479 53.67 77.34 23.63
JB8-12 0.479 58.59 77.3 18.67
JB8-13 0.479 47.86 77.22 29.3
JB8-14 0.479 47.2 77.19 29.93
JB8-15 0.479 55.24 77.09 21.81
JB8-16 0.479 45.33 76.92 31.53
JB8-17 0.479 43.36 76.87 33.44
JB8-18 0.479 43.52 76.86 33.28
JB8-19 0.479 46.37 76.83 30.4
JB8-20 0.479 46.35 76.82 30.41
JB8-21 0.479 41.63 76.67 34.97
JB8-22 0.479 41.26 76.66 35.33
JB8-23 0.479 43.69 76.48 32.72
JB8-24 0.479 42.98 76.47 33.42
JB8-25 0.479 47.74 75.84 28.04
JB8-26 0.479 45.77 75.8 29.97
JB8-27 0.479 51.26 75.71 24.4
JB8-28 0.479 53.29 75.69 22.35
JB8-29 0.479 45.56 75.6 29.98
JB8-30 0.479 45.59 75.58 29.93
JB8-31 0.479 51.39 75.54 24.1
JB8-32 0.479 45.38 75.52 30.08
JB8-33 0.479 49.76 75.51 25.7
JB8-34 0.479 53.3 75.5 22.15
JB8-35 0.479 43.69 75.48 31.73
JB8-36 0.479 45.71 75.48 29.71
JB8-37 0.479 43.36 75.47 32.04
JB8-38 0.479 46.57 75.46 28.83
JB8-39 0.479 45.63 75.45 29.76
JB8-40 0.479 46.43 75.43 28.94
JB8-41 0.479 45.05 75.35 30.24
JB8-42 0.479 44.61 75.32 30.65
JB8-43 0.479 55.49 75.29 19.76
JB8-44 0.479 44.51 75.17 30.6
JB8-45 0.479 45.31 75.14 29.77
JB8-46 0.479 44.23 75.09 30.8
JB8-47 0.479 46.11 75.07 28.9
JB8-48 0.479 53.3 74.84 21.5
JB8-49 0.479 44.23 74.8 30.51

MaRS Planning Engineering Services Pvt. Ltd.


JB8-50 0.479 42.56 74.79 32.16
JB8-51 0.479 46.36 74.77 28.36
JB8-52 0.479 51.59 74.38 22.74
JB8-53 0.479 46.53 74.09 27.51
JB8-54 0.479 44.22 74.07 29.79
JB8-55 0.479 43.29 74.07 30.71
JB8-56 0.479 47.43 73.74 26.25
JB8-57 0.479 45.33 72.95 27.57
JB8-58 0.479 45.63 72.88 27.2
JB8-59 0.479 46.1 72.81 26.65
JB8-60 0.479 47.43 72.47 24.99
JB8-61 0.479 47.61 72.46 24.8
JB8-62 0.479 47.59 72.44 24.8
JB8-63 0.479 45.9 72.43 26.48
JB8-64 0.479 46.34 71.97 25.59
JB8-65 0.479 43.35 71.7 28.29
JB8-66 0.479 43.98 71.69 27.65
JB8-67 0.479 42.29 71.62 29.27
TB.-9
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB9-1 0.28 82.36 103.1 20.7
JB9-2 0.28 78.69 103.08 24.34
JB9-3 0.28 81.99 102.93 20.9
JB9-4 0.28 80.22 102.83 22.57
JB9-5 0.28 76.33 102.83 26.44
JB9-6 0.28 78.36 102.78 24.38
JB9-7 0.28 77.36 102.76 25.35
JB9-8 0.28 77.14 102.62 25.43
JB9-9 0.28 77.14 102.11 24.92
JB9-10 0.28 78.25 101.68 23.38
JB9-11 0.28 82.59 101.22 18.59
JB9-12 0.28 81.44 100.72 19.24
JB9-13 0.28 79.36 100.28 20.88
JB9-14 0.28 78.99 99.85 20.81
JB9-15 0.28 75.44 99.41 23.93
JB9-16 0.28 75.69 98.97 23.24
JB9-17 0.28 73.25 98.95 25.65
JB9-18 0.28 73.58 98.4 24.77
JB9-19 0.28 69.32 98 28.62
JB9-20 0.28 69.32 97.97 28.6
JB9-21 0.28 71.44 97.73 26.24
JB9-22 0.28 70.14 97.72 27.53
JB9-23 0.28 66.25 97.34 31.03
JB9-24 0.28 64.28 96.96 32.61
JB9-25 0.28 61.28 96.6 35.24
JB9-26 0.28 58.32 96.21 37.82
JB9-27 0.28 58.63 96.19 37.49

MaRS Planning Engineering Services Pvt. Ltd.


JB9-28 0.28 60.23 96.12 35.82
JB9-29 0.28 58.36 96.12 37.68
JB9-30 0.28 56.21 96.11 39.82
JB9-31 0.28 58.36 96.1 37.67
JB9-32 0.28 56.34 96.1 39.68
JB9-33 0.28 55.26 96.05 40.71
JB9-34 0.28 57.14 96.05 38.83
JB9-35 0.28 57.22 96.04 38.74
JB9-36 0.28 59.63 95.78 36.08
JB9-37 0.28 57.44 95.77 38.26
JB9-38 0.28 59.32 95.77 36.38
JB9-39 0.28 57.44 95.77 38.25
JB9-40 0.28 56.24 95.77 39.45
JB9-41 0.28 57.88 95.43 37.47
JB9-42 0.28 61.44 94.46 32.96
JB9-43 0.28 60.33 94.41 34.01
JB9-44 0.28 61.58 94.4 32.76
JB9-45 0.28 63.25 94.4 31.09
JB9-46 0.28 62.58 94.29 31.65
JB9-47 0.28 62.55 94.26 31.64
JB9-48 0.28 63.35 94.19 30.77
JB9-49 0.28 64.53 94.17 29.58
JB9-50 0.28 63.25 94.03 30.72
JB9-51 0.28 65.24 94.01 28.72
JB9-52 0.28 64.11 93.98 29.81
JB9-53 0.28 63.24 93.97 30.67
JB9-54 0.28 59.21 93.82 34.54
JB9-55 0.28 56.32 93.22 36.82
JB9-56 0.28 62.58 92.64 30
JB9-57 0.28 69.21 92.07 22.81
JB9-58 0.28 72.58 92.04 19.42
JB9-59 0.28 68.59 91.78 23.15
JB9-60 0.28 67.88 91.45 23.53
JB9-61 0.28 68.59 91.38 22.75
JB9-62 0.28 69.23 91.16 21.89
JB9-63 0.28 66.32 91 24.63
JB9-64 0.28 68.36 90.86 22.45
JB9-65 0.28 63.99 90.82 26.78
JB9-66 0.28 63.35 90.81 27.4
JB9-67 0.28 61.28 90.8 29.46
JB9-68 0.28 65.21 90.79 25.53
JB9-69 0.28 57.88 90.78 32.84
JB9-70 0.28 64.25 90.78 26.47
JB9-71 0.28 57.59 90.77 33.12
JB9-72 0.28 65.21 90.77 25.51
JB9-73 0.28 61.28 90.77 29.43
JB9-74 0.28 65.36 90.77 25.36
JB9-75 0.28 59.36 90.73 31.31

MaRS Planning Engineering Services Pvt. Ltd.


JB9-76 0.28 70.14 90.72 20.54
JB9-77 0.28 57.28 90.72 33.38
JB9-78 0.28 73.21 90.71 17.46
JB9-79 0.28 70.26 90.7 20.4
JB9-80 0.28 73.36 90.69 17.29
JB9-81 0.28 63.25 90.58 27.28
JB9-82 0.28 60.21 90.45 30.18
JB9-83 0.28 64.65 90.44 25.74
JB9-84 0.28 67.25 90.33 23.03
JB9-85 0.28 65.28 90.32 24.99
JB9-86 0.28 57.28 90.32 32.97
JB9-87 0.28 58.62 90.24 31.56
JB9-88 0.28 52.69 90.14 37.37
JB9-89 0.28 57.36 90.12 32.7
JB9-90 0.28 56.21 90.12 33.84
JB9-91 0.28 49.68 90.05 40.29
JB9-92 0.28 60.23 89.88 29.59
JB9-93 0.28 56.33 89.79 33.39
JB9-94 0.28 58.64 89.78 31.08
JB9-95 0.28 55.32 89.78 34.39
JB9-96 0.28 48.26 89.65 41.31
JB9-97 0.28 52.31 89.54 37.15
JB9-98 0.28 57.69 89.09 31.34
JB9-99 0.28 49.68 89.04 39.28
JB9-100 0.28 48.25 89.03 40.7
JB9-101 0.28 48.26 88.87 40.52
JB9-102 0.28 47.11 88.86 41.66
JB9-103 0.28 55.32 88.41 33.02
JB9-104 0.28 46.55 88.4 41.76
JB9-105 0.28 45.88 88.01 42.05
JB9-106 0.28 46.99 87.99 40.92
JB9-107 0.28 44.11 87.92 43.72
JB9-108 0.28 44.45 87.91 43.37
JB9-109 0.28 45.69 87.89 42.12
JB9-110 0.28 44.56 87.89 43.24
JB9-111 0.28 60.32 87.74 27.36
JB9-112 0.28 45.66 87.51 41.77
JB9-113 0.28 43.69 87.5 43.72
JB9-114 0.28 63.99 87.42 23.38
JB9-115 0.28 63.32 87.39 24.02
JB9-116 0.28 60.23 87.35 27.07
JB9-117 0.28 59.99 87.35 27.3
JB9-118 0.28 56.33 87.34 30.95
JB9-119 0.28 52.69 87.34 34.58
JB9-120 0.28 55.18 87.33 32.08
JB9-121 0.28 44.74 87.26 42.44
JB9-122 0.28 43.25 87.26 43.92
JB9-123 0.28 44.41 87.25 42.76

MaRS Planning Engineering Services Pvt. Ltd.


JB9-124 0.28 43.36 87.25 43.8
JB9-125 0.28 43.25 87.24 43.9
JB9-126 0.28 61.2 86.45 25.2
JB9-127 0.28 64.99 85.84 20.81
JB9-128 0.28 62.65 85.43 22.73
JB9-129 0.28 63.99 85.27 21.23
JB9-130 0.28 64.21 85.26 21
JB9-131 0.353 62.58 85.25 22.63
JB9-132 0.28 55.36 85.25 29.83
TB.-10
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB10-1 0.403 74.2 94.39 20.15
JB10-2 0.403 73.36 94.25 20.84
JB10-3 0.403 73.36 93.75 20.35
JB10-4 0.403 71.44 93.73 22.25
JB10-5 0.403 72.58 93.71 21.09
JB10-6 0.403 68.52 93.69 25.12
JB10-7 0.403 73.25 93.44 20.15
JB10-8 0.403 72.58 93.31 20.69
JB10-9 0.403 68.32 93.29 24.92
JB10-10 0.403 68.51 92.71 24.15
JB10-11 0.403 68.53 92.69 24.11
JB10-12 0.403 68.25 92.67 24.37
JB10-13 0.403 69.54 92.58 22.99
JB10-14 0.403 63.25 92.54 29.23
JB10-15 0.403 63.35 92.54 29.13
JB10-16 0.403 72.66 92.4 19.7
JB10-17 0.403 65.12 92.39 27.22
JB10-18 0.403 70.14 92.37 22.18
JB10-19 0.403 65.54 92.37 26.77
JB10-20 0.403 64.53 92.23 27.64
JB10-21 0.403 64.11 92.22 28.06
JB10-22 0.403 68.55 92.2 23.61
JB10-23 0.403 68.25 92.2 23.9
JB10-24 0.403 73.25 92.19 18.9
JB10-25 0.403 71.44 92.17 20.69
JB10-26 0.403 71.44 92.15 20.67
JB10-27 0.403 73.25 92.13 18.85
TB.-11
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB11-1 0.376 68.05 88.4 20.31
JB11-2 0.376 68.21 88.31 20.06
JB11-3 0.376 68.55 88.3 19.71
JB11-4 0.376 65.87 88.15 22.23
JB11-5 0.376 66.25 88.11 21.82
JB11-6 0.376 60.54 88.11 27.51

MaRS Planning Engineering Services Pvt. Ltd.


JB11-7 0.376 65.78 87.98 22.15
JB11-8 0.376 66.89 87.9 20.97
JB11-9 0.376 66.51 87.89 21.34
JB11-10 0.376 63.87 87.71 23.79
JB11-11 0.376 65.35 87.68 22.28
JB11-12 0.376 64.74 87.68 22.89
JB11-13 0.376 62.54 87.67 25.08
JB11-14 0.376 63.64 87.66 23.97
JB11-15 0.376 60.12 87.65 27.48
JB11-16 0.376 64.54 87.64 23.05
JB11-17 0.376 65.45 87.63 22.13
JB11-18 0.376 62.85 87.62 24.72
JB11-19 0.376 65.11 87.55 22.4
JB11-20 0.376 65.95 87.45 21.46
JB11-21 0.376 64.78 87.42 22.6
JB11-22 0.376 63.45 87.41 23.91
JB11-23 0.376 63.71 87.38 23.63
JB11-24 0.376 65.43 87.38 21.91
JB11-25 0.376 64.52 86.95 22.39
JB11-26 0.376 63.23 86.93 23.65
JB11-27 0.376 58.23 86.88 28.6
JB11-28 0.376 66.41 86.67 20.22
JB11-29 0.376 63.58 86.54 22.91
JB11-30 0.376 64.58 86.52 21.89
JB11-31 0.376 63.14 86.51 23.32
JB11-32 0.376 59.31 86.48 27.12
JB11-33 0.376 57.45 86.43 28.92
JB11-34 0.376 63.47 86.39 22.87
JB11-35 0.376 62.25 86.37 24.07
JB11-36 0.376 67.58 86.37 18.75
JB11-37 0.376 63.14 86.36 23.17
JB11-38 0.376 64.52 86.23 21.66
JB11-39 0.376 63.69 86.19 22.45
JB11-40 0.376 56.24 86.19 29.89
JB11-41 0.376 66.51 86.12 19.57
JB11-42 0.376 51.78 86.06 34.21
JB11-43 0.376 45.52 86.03 40.43
JB11-44 0.376 65.45 85.71 20.22
JB11-45 0.376 68.58 85.41 16.8
JB11-46 0.376 63.68 85.1 21.38
JB11-47 0.376 64.32 85.06 20.7
JB11-48 0.376 62.52 84.77 22.2
JB11-49 0.376 58.12 84.56 26.38
JB11-50 0.376 60.21 84.26 24
JB11-51 0.376 62.85 84.1 21.21
JB11-52 0.376 61.45 84.09 22.59
JB11-53 0.376 59.74 84.07 24.28
JB11-54 0.376 55.36 83.99 28.57

MaRS Planning Engineering Services Pvt. Ltd.


JB11-55 0.376 64.36 83.67 19.27
JB11-56 0.376 62.1 83.66 21.52
JB11-57 0.376 64.28 83.62 19.31
JB11-58 0.376 63.51 83.62 20.07
JB11-59 0.376 62.65 83.61 20.92
JB11-60 0.376 55.65 83.5 27.79
JB11-61 0.376 57.25 82.75 25.45
JB11-62 0.376 54.65 82.12 27.41
JB11-63 0.376 51.12 81.54 30.36
JB11-64 0.376 51.85 81.09 29.18
JB11-65 0.376 52.36 80.38 27.96
JB11-66 0.376 48.72 80.36 31.58
JB11-67 0.376 52.87 80.35 27.42
JB11-68 0.376 49.61 80.29 30.62
JB11-69 0.376 47.21 80.28 33
JB11-70 0.376 48.36 80.28 31.85
TB.-12
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB12-1 0.167 78.81 98.7 19.85
JB12-2 0.167 73.92 98.43 24.46
JB12-3 0.167 75.1 98.37 23.22
JB12-4 0.167 74.3 98.33 23.98
JB12-5 0.167 69.5 98.27 28.71
JB12-6 0.167 74.7 98.25 23.5
JB12-7 0.167 73.5 98.23 24.68
JB12-8 0.167 74.4 98.23 23.78
JB12-9 0.167 77.3 98.23 20.89
JB12-10 0.167 75.56 98.15 22.54
JB12-11 0.167 75.3 98.13 22.79
JB12-12 0.167 75.94 98.02 22.04
JB12-13 0.167 75.93 98 22.03
JB12-14 0.167 65.8 97.99 32.12
JB12-15 0.167 73.57 97.91 24.29
JB12-16 0.167 73.04 97.91 24.82
JB12-17 0.167 69.76 97.89 28.08
JB12-18 0.167 71.56 97.89 26.28
JB12-19 0.167 68.9 97.89 28.93
JB12-20 0.167 64.52 97.89 33.3
JB12-21 0.167 69.8 97.8 27.94
JB12-22 0.167 62.75 97.79 34.97
JB12-23 0.167 71.9 97.78 25.83
JB12-24 0.167 64.65 97.78 33.06
JB12-25 0.167 74.99 97.76 22.73
JB12-26 0.167 73.89 97.76 23.82
JB12-27 0.167 74.96 97.74 22.73
JB12-28 0.167 72.77 97.73 24.91
JB12-29 0.167 69.7 97.73 27.97

MaRS Planning Engineering Services Pvt. Ltd.


JB12-30 0.167 74.96 97.7 22.7
JB12-31 0.167 67.25 97.7 30.39
JB12-32 0.167 70.88 97.7 26.76
JB12-33 0.167 72.77 97.67 24.85
JB12-34 0.167 69.55 97.66 28.05
JB12-35 0.167 67.4 97.66 30.2
JB12-36 0.167 69.32 97.65 28.27
JB12-37 0.167 72.77 97.55 24.73
JB12-38 0.167 70.65 97.54 26.84
JB12-39 0.167 75.84 97.43 21.55
JB12-40 0.167 65.45 97.43 31.92
JB12-41 0.167 69.55 97.41 27.8
JB12-42 0.167 70.5 97.41 26.85
JB12-43 0.167 68.32 97.4 29.03
JB12-44 0.167 70.45 97.4 26.9
JB12-45 0.167 75.72 97.4 21.64
JB12-46 0.167 73.36 97.39 23.98
JB12-47 0.167 73.8 97.38 23.53
JB12-48 0.167 65.23 97.38 32.08
JB12-49 0.167 63.2 97.37 34.1
JB12-50 0.167 65.2 97.34 32.07
JB12-51 0.167 64.21 97.34 33.06
JB12-52 0.167 63.35 97.33 33.91
JB12-53 0.167 64.55 97.32 32.7
JB12-54 0.167 62.5 97.31 34.74
JB12-55 0.167 59.38 97.31 37.85
JB12-56 0.167 67.4 97.29 29.83
JB12-57 0.167 63.34 97.28 33.88
JB12-58 0.167 71.33 97.17 25.79
JB12-59 0.167 71.54 97.16 25.57
JB12-60 0.167 69.2 97.13 27.88
JB12-61 0.167 69.52 97.13 27.55
JB12-62 0.167 69.88 97.13 27.19
JB12-63 0.167 69.55 97.13 27.52
JB12-64 0.167 71.56 97.12 25.51
JB12-65 0.167 74.25 96.99 22.69
JB12-66 0.167 74.6 96.98 22.34
JB12-67 0.167 71.74 96.94 25.15
JB12-68 0.167 69.78 96.85 27.02
JB12-69 0.167 69.6 96.8 27.14
JB12-70 0.167 70.11 96.69 26.53
JB12-71 0.167 70.64 96.69 25.99
JB12-72 0.167 75.12 96.63 21.47
JB12-73 0.167 71.04 96.63 25.54
JB12-74 0.167 74.45 96.58 22.09
JB12-75 0.167 73.2 96.58 23.34
JB12-76 0.167 71.25 96.57 25.27
JB12-77 0.167 69.22 96.54 27.26

MaRS Planning Engineering Services Pvt. Ltd.


JB12-78 0.167 70.4 96.54 26.09
JB12-79 0.167 65.59 96.45 30.8
JB12-80 0.167 68.54 96.45 27.85
JB12-81 0.167 63.7 96.45 32.68
JB12-82 0.167 64.9 96.41 31.45
JB12-83 0.167 67.8 96.2 28.34
JB12-84 0.167 72.86 96.08 23.17
JB12-85 0.167 64.7 96.05 31.29
JB12-86 0.167 72.4 96.02 23.57
JB12-87 0.167 70.21 96.02 25.75
JB12-88 0.167 69.34 96.02 26.62
JB12-89 0.167 73.65 95.99 22.29
JB12-90 0.167 72.62 95.98 23.31
JB12-91 0.167 63.6 95.96 32.3
JB12-92 0.167 65.5 95.96 30.4
JB12-93 0.167 61.4 95.94 34.47
JB12-94 0.167 60.3 95.94 35.56
JB12-95 0.167 68.94 95.92 26.92
JB12-96 0.167 66.84 95.91 29.01
JB12-97 0.167 72.55 95.91 23.31
JB12-98 0.167 71.45 95.9 24.4
JB12-99 0.167 72.41 95.9 23.44
JB12-100 0.167 72.31 95.89 23.54
JB12-101 0.167 74.35 95.89 21.5
JB12-102 0.167 73.25 95.88 22.58
JB12-103 0.167 72.61 95.88 23.22
JB12-104 0.167 72.58 95.81 23.18
JB12-105 0.167 71.32 95.81 24.44
JB12-106 0.167 71.86 95.8 23.89
JB12-107 0.167 71.56 95.8 24.19
JB12-108 0.167 69.37 95.8 26.37
JB12-109 0.167 69.74 95.42 25.63
JB12-110 0.167 69.47 95.36 25.84
JB12-111 0.167 69.55 95.33 25.73
JB12-112 0.167 69.78 95.32 25.49
JB12-113 0.167 67.5 95.19 27.63
JB12-114 0.167 68.1 95.18 27.03
JB12-115 0.167 66.02 95.17 29.09
JB12-116 0.167 66.8 95.17 28.31
JB12-117 0.167 65.9 95.17 29.21
JB12-118 0.167 70.6 95.1 24.46
JB12-119 0.167 69.5 95.1 25.55
JB12-120 0.167 67.45 95.1 27.59
JB12-121 0.167 67.1 95.09 27.94
JB12-122 0.167 69.6 95.07 25.42
JB12-123 0.167 69.6 95.06 25.41
JB12-124 0.167 70.28 95.02 24.69
JB12-125 0.167 69.2 95.02 25.77

MaRS Planning Engineering Services Pvt. Ltd.


JB12-126 0.167 69.04 94.99 25.9
JB12-127 0.167 67.6 94.94 27.28
JB12-128 0.167 68.4 94.93 26.48
JB12-129 0.167 65.4 94.93 29.47
JB12-130 0.167 68.3 94.93 26.58
JB12-131 0.167 66.5 94.93 28.38
JB12-132 0.167 68.22 94.93 26.66
JB12-133 0.167 68.2 94.91 26.66
JB12-134 0.167 63.6 94.75 31.08
JB12-135 0.167 63.4 94.74 31.28
JB12-136 0.167 63.5 94.73 31.17
JB12-137 0.167 65.34 94.73 29.33
JB12-138 0.167 68.7 94.64 25.89
JB12-139 0.167 68.55 94.63 26.02
JB12-140 0.167 68.6 94.62 25.96
JB12-141 0.167 66.5 94.61 28.06
JB12-142 0.167 70.88 94.59 23.66
JB12-143 0.167 69.12 94.59 25.42
JB12-144 0.167 70.59 94.59 23.95
JB12-145 0.167 69.12 94.59 25.41
JB12-146 0.167 69.8 94.58 24.73
JB12-147 0.167 67.71 94.58 26.82
JB12-148 0.167 68.55 94.58 25.98
JB12-149 0.167 67.6 94.58 26.92
JB12-150 0.167 66.82 94.48 27.6
JB12-151 0.167 66.5 94.36 27.8
JB12-152 0.167 66.59 94.34 27.7
JB12-153 0.167 67.53 94.33 26.75
JB12-154 0.167 66.7 94.31 27.55
JB12-155 0.167 67.6 94.3 26.65
JB12-156 0.167 67.6 94.3 26.64
JB12-157 0.167 66.4 94.3 27.84
JB12-158 0.167 66.9 94.29 27.33
JB12-159 0.167 65.3 94.29 28.93
JB12-160 0.167 65.23 94.28 29
JB12-161 0.167 64.15 94.28 30.07
JB12-162 0.167 64.3 94.08 29.72
JB12-163 0.167 64.56 94.07 29.45
JB12-164 0.167 68.22 94.05 25.78
JB12-165 0.167 69.14 94.05 24.86
JB12-166 0.167 67.54 94.03 26.44
JB12-167 0.167 66.5 94.03 27.47
JB12-168 0.167 69.4 94.02 24.57
JB12-169 0.167 68.94 93.43 24.44
JB12-170 0.167 67.82 93.43 25.56
JB12-171 0.167 63.6 93.24 29.58
JB12-172 0.167 57.92 92.44 34.45
JB12-173 0.167 62.4 92.15 29.69

MaRS Planning Engineering Services Pvt. Ltd.


JB12-174 0.167 59.33 92.15 32.75
JB12-175 0.167 66.39 92.01 25.57
JB12-176 0.167 66.35 91.99 25.59
JB12-177 0.167 54.8 91.86 36.99
JB12-178 0.167 66.35 91.85 25.45
JB12-179 0.167 67.55 91.84 24.25
JB12-180 0.167 64.28 91.71 27.38
JB12-181 0.167 63.95 91.71 27.71
JB12-182 0.167 63.25 91.7 28.4
JB12-183 0.167 63.12 91.7 28.52
JB12-184 0.167 59.66 91.69 31.97
JB12-185 0.167 68.32 91.62 23.25
JB12-186 0.167 62.82 91.61 28.73
JB12-187 0.167 61.3 91.41 30.05
JB12-188 0.167 63.2 91.4 28.14
JB12-189 0.167 51.7 91.29 39.51
JB12-190 0.167 65.24 91.21 25.92
JB12-191 0.167 57.2 91.2 33.93
JB12-192 0.167 61.55 91.08 29.47
JB12-193 0.167 61.42 91.08 29.6
JB12-194 0.167 59.64 90.9 31.2
JB12-195 0.167 58.51 90.9 32.32
JB12-196 0.167 58.1 90.77 32.6
JB12-197 0.167 59.75 90.76 30.95
JB12-198 0.167 59.86 90.76 30.84
JB12-199 0.167 62.32 90.75 28.37
JB12-200 0.167 58.54 90.75 32.14
JB12-201 0.167 58.41 90.74 32.27
JB12-202 0.167 60.59 90.73 30.08
JB12-203 0.167 60.9 90.73 29.77
JB12-204 0.167 61.54 90.72 29.12
JB12-205 0.167 62.78 90.71 27.88
JB12-206 0.167 59.66 90.71 30.99
JB12-207 0.167 58.6 90.71 32.05
JB12-208 0.167 63.2 90.71 27.45
JB12-209 0.167 56.35 90.7 34.29
JB12-210 0.167 59.63 90.69 31
JB12-211 0.167 59.66 90.66 30.94
JB12-212 0.167 58.22 90.57 32.28
JB12-213 0.167 56.31 90.56 34.18
JB12-214 0.167 55.51 90.56 34.98
JB12-215 0.167 51.1 90.55 39.37
JB12-216 0.167 54.4 90.55 36.08
JB12-217 0.167 54.32 90.54 36.15
JB12-218 0.167 51.2 90.54 39.26
JB12-219 0.167 56.33 90.53 34.13
JB12-220 0.167 53.12 90.53 37.33
JB12-221 0.167 39.65 90.43 50.68

MaRS Planning Engineering Services Pvt. Ltd.


JB12-222 0.167 62.53 90.42 27.83
JB12-223 0.167 49.33 90.41 40.99
JB12-224 0.167 55.64 90.4 34.69
JB12-225 0.167 52.62 90.4 37.7
JB12-226 0.167 56.82 90.4 33.51
JB12-227 0.167 48.9 90.39 41.41
JB12-228 0.167 47.65 90.38 42.65
JB12-229 0.167 56.32 90.36 33.97
JB12-230 0.167 56.12 90.36 34.17
JB12-231 0.167 55.41 90.35 34.87
JB12-232 0.167 51.26 90.31 38.97
JB12-233 0.167 53.2 90.3 37.03
JB12-234 0.167 52.88 90.25 37.3
JB12-235 0.167 51.26 90.24 38.9
JB12-236 0.167 54.6 90.2 35.53
JB12-237 0.167 54.55 90.2 35.58
JB12-238 0.167 54.45 90.2 35.67
JB12-239 0.167 53.3 90.19 36.82
JB12-240 0.167 52.88 90.14 37.19
JB12-241 0.167 51.7 90.14 38.36
JB12-242 0.167 54.6 90.07 35.4
JB12-243 0.167 54.1 90.06 35.89
JB12-244 0.167 54.45 90.05 35.53
JB12-245 0.167 54.2 90.05 35.77
JB12-246 0.167 53.3 90.04 36.67
JB12-247 0.167 47.29 89.41 42.04
JB12-248 0.167 44.28 89.4 45.03
JB12-249 0.167 48.21 89.33 41.04
JB12-250 0.167 50.29 89.33 38.96
JB12-251 0.167 48.36 89.3 40.86
JB12-252 0.167 51.42 89.3 37.8
JB12-253 0.167 48.25 89.29 40.96
JB12-254 0.167 47.3 89.29 41.91
JB12-255 0.167 51.15 89.29 38.06
TB.-13
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JB13-1 0.177 90.6 111.15 20.5
JB13-2 0.177 86.69 110.89 24.16
JB13-3 0.177 92.36 110.85 18.45
JB13-4 0.177 84.37 110.66 26.24
JB13-5 0.177 90.65 110.48 19.79
JB13-6 0.177 79.65 110.39 30.68
JB13-7 0.177 87.56 110.23 22.63
JB13-8 0.177 90.23 110.22 19.95
JB13-9 0.177 81.23 110.19 28.9
JB13-10 0.177 88.45 110.06 21.57
JB13-11 0.177 88.68 110.04 21.31

MaRS Planning Engineering Services Pvt. Ltd.


JB13-12 0.177 86.45 110.03 23.53
JB13-13 0.177 88.65 110.01 21.31
JB13-14 0.177 85.74 109.97 24.18
JB13-15 0.177 88.87 109.96 21.05
JB13-16 0.177 79.65 109.88 30.17
JB13-17 0.177 87.56 109.82 22.22
JB13-18 0.177 87.56 109.81 22.2
JB13-19 0.177 80.56 109.8 29.18
JB13-20 0.177 80.21 109.71 29.44
JB13-21 0.177 82.58 109.63 27
JB13-22 0.177 79.65 109.55 29.84
JB13-23 0.177 81.23 109.5 28.22
JB13-24 0.177 75.63 109.38 33.68
JB13-25 0.177 88.65 109.37 20.68
JB13-26 0.177 84.56 109.28 24.67
JB13-27 0.177 72.56 109.21 36.58
JB13-28 0.177 88.56 109.15 20.55
JB13-29 0.177 88.47 109.15 20.64
JB13-30 0.177 78.65 109.04 30.32
JB13-31 0.177 70.12 109.02 38.82
JB13-32 0.177 81.25 108.92 27.62
JB13-33 0.177 85.45 108.85 23.35
JB13-34 0.177 88.41 108.85 20.4
JB13-35 0.177 68.52 108.84 40.24
JB13-36 0.177 81.45 108.75 27.24
JB13-37 0.177 81.52 108.73 27.15
JB13-38 0.177 82.26 108.73 26.41
JB13-39 0.177 81.26 108.72 27.4
JB13-40 0.177 80.15 108.72 28.51
JB13-41 0.177 81.45 108.7 27.2
JB13-42 0.177 80.36 108.7 28.28
JB13-43 0.177 78.56 108.69 30.07
JB13-44 0.177 80.52 108.68 28.11
JB13-45 0.177 80.55 108.68 28.07
JB13-46 0.177 79.63 108.68 28.99
JB13-47 0.177 78.59 108.67 30.02
JB13-48 0.177 72.52 108.66 36.06
JB13-49 0.177 81.58 108.65 27.02
JB13-50 0.177 78.96 108.65 29.63
JB13-51 0.177 72.84 108.64 35.73
JB13-52 0.177 71.48 108.63 37.08
JB13-53 0.177 82.56 108.62 26.01
JB13-54 0.177 85.69 108.6 22.87
JB13-55 0.177 85.66 108.6 22.89
JB13-56 0.177 82.56 108.59 25.98
JB13-57 0.177 82.45 108.59 26.09
JB13-58 0.177 90.23 108.56 18.29
JB13-59 0.177 75.69 108.55 32.8

MaRS Planning Engineering Services Pvt. Ltd.


JB13-60 0.177 85.54 108.55 22.97
JB13-61 0.177 75.44 108.55 33.04
JB13-62 0.177 80.12 108.54 28.36
JB13-63 0.177 80.1 108.54 28.38
JB13-64 0.177 71.45 108.53 37
JB13-65 0.177 72.26 108.5 36.17
JB13-66 0.177 80.11 108.49 28.33
JB13-67 0.177 71.46 108.49 36.96
JB13-68 0.177 80.15 108.49 28.28
JB13-69 0.177 79.11 108.47 29.3
JB13-70 0.177 79.56 108.47 28.85
JB13-71 0.177 78.45 108.46 29.95
JB13-72 0.177 78.25 108.46 30.15
JB13-73 0.177 67.85 108.4 40.47
JB13-74 0.177 67.56 108.3 40.66
JB13-75 0.177 60.55 108.15 47.51
JB13-76 0.177 59.62 108.06 48.34
JB13-77 0.177 73.23 107.94 34.64
JB13-78 0.177 63.56 107.91 44.26
JB13-79 0.177 63.56 107.85 44.2
JB13-80 0.177 64.87 107.85 42.89
JB13-81 0.177 63.87 107.79 43.83
JB13-82 0.177 64.75 107.78 42.95
JB13-83 0.177 80.25 107.58 27.27
JB13-84 0.177 72.27 107.58 35.23
JB13-85 0.177 80.21 107.57 27.31
JB13-86 0.177 62.55 107.36 44.72
JB13-87 0.177 64.52 107.35 42.74
JB13-88 0.177 74.52 107.3 32.72
JB13-89 0.177 69.63 107.3 37.59
JB13-90 0.177 62.85 107.05 44.11
JB13-91 0.177 61.47 107.05 45.48
JB13-92 0.177 62.39 107.04 44.56
JB13-93 0.177 61.26 107.03 45.68
JB13-94 0.177 60.52 107.03 46.42
JB13-95 0.177 65.68 107.03 41.27
JB13-96 0.177 64.52 106.97 42.37
JB13-97 0.177 63.57 106.97 43.31
JB13-98 0.177 63.35 106.94 43.5
JB13-99 0.177 64.15 106.94 42.7
JB13-100 0.177 73.28 106.85 33.51
JB13-101 0.177 78.65 106.8 28.09
JB13-102 0.177 71.44 106.49 34.98
JB13-103 0.177 70.52 106.49 35.9
JB13-104 0.177 71.65 106.41 34.69
JB13-105 0.177 70.52 106.36 35.77
JB13-106 0.177 69.65 106.36 36.63
JB13-107 0.177 69.85 106.31 36.39

MaRS Planning Engineering Services Pvt. Ltd.


JB13-108 0.177 69.71 106.31 36.53
JB13-109 0.177 67.66 106.31 38.57
JB13-110 0.177 73.28 105.99 32.65
JB13-111 0.177 66.65 105.89 39.16
JB13-112 0.177 64.78 105.88 41.02
JB13-113 0.177 67.89 105.82 37.85
JB13-114 0.177 66.52 105.51 38.91
JB13-115 0.177 63.87 105.21 41.26
JB13-116 0.177 76.65 105.1 28.39
JB13-117 0.177 69.85 104.97 35.05
JB13-118 0.177 63.52 104.83 41.23
JB13-119 0.177 65.24 104.83 39.51
JB13-120 0.177 69.63 104.42 34.72
JB13-121 0.177 64.31 104.29 39.9
JB13-122 0.177 66.44 104.29 37.77
JB13-123 0.177 64.23 104.27 39.96
JB13-124 0.177 76.52 104.25 27.68
JB13-125 0.177 64.52 104.24 39.64
JB13-126 0.177 63.25 104.24 40.91
JB13-127 0.177 64.41 104.24 39.75
JB13-128 0.177 65.18 104.19 38.93
JB13-129 0.177 66.35 104.19 37.76
JB13-130 0.177 65.25 104 38.67
JB13-131 0.177 61.43 103.99 42.47
JB13-132 0.177 76.63 103.87 27.18
JB13-133 0.177 75.28 103.86 28.52
JB13-134 0.177 72.13 103.84 31.65
JB13-135 0.177 74.58 103.46 28.82
JB13-136 0.177 74.52 103.4 28.82
JB13-137 0.177 81.45 103.32 21.83
JB13-138 0.177 73.63 103.09 29.4
JB13-139 0.177 71.45 103.09 31.57
JB13-140 0.177 71.56 103.07 31.45
JB13-141 0.177 73.56 102.98 29.36
JB13-142 0.177 68.56 102.97 34.34
JB13-143 0.177 67.65 102.89 35.16
JB13-144 0.177 69.65 102.85 33.14
JB13-145 0.177 73.25 102.85 29.54
JB13-146 0.177 72.25 102.85 30.54
JB13-147 0.177 78.63 102.83 24.15
JB13-148 0.177 74.85 102.83 27.92
JB13-149 0.177 73.25 102.82 29.51
JB13-150 0.177 79.85 102.74 22.84
JB13-151 0.177 81.18 102.73 21.5
JB13-152 0.177 79.63 102.72 23.05
JB13-153 0.177 79.56 102.72 23.11
JB13-154 0.177 81.66 102.72 21.01
JB13-155 0.177 74.56 102.66 28.04

MaRS Planning Engineering Services Pvt. Ltd.


JB13-156 0.177 77.85 102.43 24.53
JB13-157 0.177 77.56 102.41 24.8
JB13-158 0.177 78.56 102.4 23.8
JB13-159 0.177 77.45 102.38 24.88
JB13-160 0.177 77.41 102.37 24.91
JB13-161 0.177 76.56 102.37 25.76
JB13-162 0.177 75.85 102.37 26.47
JB13-163 0.177 75.88 102.3 26.37
JB13-164 0.177 75.47 102.29 26.77
JB13-165 0.177 73.65 102.29 28.58
JB13-166 0.177 73.21 102.22 28.95
JB13-167 0.177 70.12 102.21 32.03
JB13-168 0.177 71.46 102.21 30.69
JB13-169 0.177 75.63 102.12 26.44
JB13-170 0.177 75.63 102.02 26.34
JB13-171 0.177 78.63 102.01 23.34
JB13-172 0.177 77.23 101.89 24.61
JB13-173 0.177 77.59 101.85 24.21
JB13-174 0.177 74.56 101.85 27.23
JB13-175 0.177 78.96 101.84 22.84
JB13-176 0.177 76.36 101.84 25.42
JB13-177 0.177 78.27 101.83 23.51
JB13-178 0.177 73.25 101.81 28.51
JB13-179 0.177 76.56 101.69 25.08
JB13-180 0.177 63.25 101.61 38.28
JB13-181 0.177 61.55 101.6 39.97
JB13-182 0.177 65.34 101.56 36.15
JB13-183 0.177 66.2 101.56 35.29
JB13-184 0.177 63.15 101.56 38.33
JB13-185 0.177 71.55 101.52 29.91
JB13-186 0.177 75.41 101.48 26.02
JB13-187 0.177 75.46 101.47 25.96
JB13-188 0.177 75.38 101.41 25.97
JB13-189 0.177 72.65 101.4 28.69
JB13-190 0.177 64.28 101.39 37.03
JB13-191 0.177 62.59 101.36 38.69
JB13-192 0.177 62.41 101.35 38.87
JB13-193 0.177 61.35 101.35 39.92
JB13-194 0.177 64.51 101.35 36.76
JB13-195 0.177 65.29 101.33 35.97
JB13-196 0.177 63.12 101.33 38.13
JB13-197 0.177 75.63 101.32 25.64
JB13-198 0.177 61.42 101.32 39.82
JB13-199 0.177 63.11 101.32 38.13
JB13-200 0.177 60.68 101.32 40.56
JB13-201 0.177 73.25 101.32 28.01
JB13-202 0.177 75.32 101.24 25.86
JB13-203 0.177 78.85 101.2 22.3

MaRS Planning Engineering Services Pvt. Ltd.


JB13-204 0.177 77.56 101.19 23.59
JB13-205 0.177 75.85 101.19 25.29
JB13-206 0.177 77.85 101.17 23.27
JB13-207 0.177 77.52 101.15 23.59
JB13-208 0.177 76.69 101.15 24.41
JB13-209 0.177 74.85 101.15 26.25
JB13-210 0.177 78.52 100.86 22.3
JB13-211 0.177 76.54 100.69 24.1
JB13-212 0.177 84.74 100.51 15.74
JB13-213 0.177 87.46 100.45 12.97
JB13-214 0.177 87.56 100.45 12.86
JB13-215 0.177 84.56 100.42 15.83
JB13-216 0.177 84.75 100.42 15.64
JB13-217 0.177 81.47 100.42 18.91
JB13-218 0.177 81.23 100.41 19.14
JB13-219 0.177 78.52 100.23 21.67
JB13-220 0.177 78.52 99.73 21.17
JB13-221 0.177 76.63 99.38 22.71
JB13-222 0.177 79.65 99.38 19.69
JB13-223 0.177 74.45 99.11 24.61
JB13-224 0.177 72.54 99.07 26.47
JB13-225 0.177 68.63 99.06 30.37
JB13-226 0.177 67.45 99.06 31.55
JB13-227 0.177 71.77 99.06 27.24
JB13-228 0.177 67.28 99.06 31.72
JB13-229 0.177 70.45 99.06 28.55

MaRS Planning Engineering Services Pvt. Ltd.


Damapada Block

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2 G.P of Baranga Block
TD.-1
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD1-1 30 JD1-1 TD-1 250 DI-K7 140 -41.845 0.85 2.712
PD1-2 71 JD1-1 JD1-2 250 DI-K7 140 41.578 0.85 2.68
PD1-3 161 JD1-2 JD1-6 250 DI-K7 140 40.512 0.83 2.554
PD1-4 10 JD1-3 JD1-2 90 HDPE 145 -0.533 0.12 0.266
PD1-5 136 JD1-4 JD1-2 90 HDPE 145 -0.267 0.06 0.074
PD1-6 121 JD1-5 JD1-3 90 HDPE 145 -0.267 0.06 0.074
PD1-7 202 JD1-6 JD1-7 250 DI-K7 140 40.246 0.82 2.523
PD1-8 210 JD1-7 JD1-8 160 HDPE 145 6.93 0.48 1.87
PD1-9 9 JD1-8 JD1-9 110 HDPE 145 2.403 0.35 1.635
PD1-10 83 JD1-8 JD1-12 110 HDPE 145 2.497 0.36 1.755
PD1-11 204 JD1-8 JD1-17 90 HDPE 145 1.764 0.38 2.447
PD1-12 88 JD1-9 JD1-10 90 HDPE 145 0.267 0.06 0.074
PD1-13 171 JD1-9 JD1-14 90 HDPE 145 1.87 0.41 2.727
PD1-14 257 JD1-11 JD1-7 250 DI-K7 140 -33.05 0.67 1.752
PD1-15 80 JD1-12 JD1-13 90 HDPE 145 0.267 0.06 0.074
PD1-16 121 JD1-12 JD1-20 90 HDPE 145 1.964 0.43 2.986
PD1-17 12 JD1-14 JD1-17 90 HDPE 145 1.337 0.29 1.465
PD1-18 83 JD1-14 JD1-15 90 HDPE 145 0.267 0.06 0.074
PD1-19 10 JD1-16 JD1-18 90 HDPE 145 0.8 0.17 0.566
PD1-20 85 JD1-16 JD1-19 90 HDPE 145 0.267 0.06 0.074
PD1-21 254 JD1-16 JD1-11 250 DI-K7 140 -32.783 0.67 1.726
PD1-22 115 JD1-17 JD1-28 110 HDPE 145 2.834 0.41 2.219
PD1-23 238 JD1-18 JD1-23 90 HDPE 145 0.267 0.06 0.074
PD1-24 52 JD1-20 JD1-22 90 HDPE 145 0.267 0.06 0.074
PD1-25 117 JD1-20 JD1-26 90 HDPE 145 1.431 0.31 1.661
PD1-26 87 JD1-21 JD1-18 90 HDPE 145 -0.267 0.06 0.074
PD1-27 87 JD1-24 JD1-16 250 DI-K7 140 -31.45 0.64 1.598
PD1-28 66 JD1-25 JD1-24 90 HDPE 145 -0.267 0.06 0.074
PD1-29 107 JD1-26 JD1-27 90 HDPE 145 0.267 0.06 0.074
PD1-30 10 JD1-28 JD1-33 90 HDPE 145 1.501 0.33 1.815
PD1-31 12 JD1-28 JD1-29 90 HDPE 145 0.8 0.17 0.565
PD1-32 213 JD1-29 JD1-34 90 HDPE 145 0.267 0.06 0.074
PD1-33 93 JD1-30 JD1-28 90 HDPE 145 -0.267 0.06 0.074
PD1-34 86 JD1-31 JD1-26 90 HDPE 145 -0.898 0.19 0.701
PD1-35 121 JD1-31 JD1-32 90 HDPE 145 0.267 0.06 0.074
PD1-36 47 JD1-33 JD1-38 90 HDPE 145 0.61 0.13 0.343
PD1-37 79 JD1-33 JD1-37 90 HDPE 145 0.358 0.08 0.128
PD1-38 82 JD1-35 JD1-33 90 HDPE 145 -0.267 0.06 0.074
PD1-39 242 JD1-36 JD1-29 90 HDPE 145 -0.267 0.06 0.074
PD1-40 155 JD1-37 JD1-31 90 HDPE 145 -0.365 0.08 0.132
PD1-41 18 JD1-38 JD1-39 90 HDPE 145 0.077 0.02 0.008
PD1-42 31 JD1-38 JD1-40 90 HDPE 145 0.267 0.06 0.074

MaRS Planning Engineering Services Pvt. Ltd.


PD1-43 32 JD1-39 JD1-37 90 HDPE 145 -0.456 0.1 0.2
PD1-44 57 JD1-41 JD1-39 90 HDPE 145 -0.267 0.06 0.074
PD1-45 10 JD1-42 JD1-43 250 DI-K7 140 29.585 0.6 1.426
PD1-46 59 JD1-42 JD1-45 90 HDPE 145 1.066 0.23 0.963
PD1-47 535 JD1-42 JD1-24 250 DI-K7 140 -30.917 0.63 1.548
PD1-48 97 JD1-43 JD1-44 200 DI-K7 140 8.626 0.27 0.432
PD1-49 26 JD1-44 JD1-47 110 HDPE 145 2.399 0.35 1.629
PD1-50 183 JD1-45 JD1-49 90 HDPE 145 0.533 0.12 0.267
PD1-51 181 JD1-45 JD1-46 90 HDPE 145 0.267 0.06 0.074
PD1-52 25 JD1-47 JD1-51 90 HDPE 145 1.866 0.4 2.716
PD1-53 55 JD1-47 JD1-48 90 HDPE 145 0.267 0.06 0.074
PD1-54 186 JD1-49 JD1-50 90 HDPE 145 0.267 0.06 0.074
PD1-55 68 JD1-51 JD1-52 90 HDPE 145 0.267 0.06 0.074
PD1-56 124 JD1-51 JD1-56 90 HDPE 145 1.333 0.29 1.456
PD1-57 86 JD1-53 JD1-43 200 DI-K7 140 -20.692 0.66 2.183
PD1-58 103 JD1-53 JD1-44 160 HDPE 145 -5.961 0.41 1.415
PD1-59 10 JD1-54 JD1-53 200 DI-K7 140 -26.386 0.84 3.423
PD1-60 536 JD1-54 JD1-55 90 HDPE 145 0.267 0.06 0.074
PD1-61 61 JD1-56 JD1-57 90 HDPE 145 0.267 0.06 0.074
PD1-62 87 JD1-56 JD1-58 90 HDPE 145 0.8 0.17 0.565
PD1-63 48 JD1-58 JD1-59 90 HDPE 145 0.267 0.06 0.074
PD1-64 154 JD1-58 JD1-60 90 HDPE 145 0.267 0.06 0.074
PD1-65 160 JD1-61 JD1-62 90 HDPE 145 0.267 0.06 0.074
PD1-66 186 JD1-61 JD1-54 200 DI-K7 140 -25.853 0.82 3.297
PD1-67 168 JD1-63 JD1-61 200 DI-K7 140 -25.32 0.81 3.172
PD1-68 200 JD1-64 JD1-63 200 DI-K7 140 -25.054 0.8 3.11
PD1-69 229 JD1-64 JD1-65 200 DI-K7 140 16.525 0.53 1.439
PD1-70 57 JD1-65 JD1-66 90 HDPE 145 0.267 0.06 0.074
PD1-71 128 JD1-65 JD1-67 200 DI-K7 140 15.992 0.51 1.354
PD1-72 135 JD1-67 JD1-71 90 HDPE 145 2.132 0.46 3.478
PD1-73 174 JD1-67 JD1-69 200 DI-K7 140 13.593 0.43 1.002
PD1-74 233 JD1-68 JD1-64 160 HDPE 145 -8.262 0.57 2.59
PD1-75 199 JD1-69 JD1-70 200 DI-K7 140 13.326 0.42 0.966
PD1-76 237 JD1-70 JD1-72 200 DI-K7 140 13.06 0.42 0.931
PD1-77 141 JD1-71 JD1-75 90 HDPE 145 1.866 0.4 2.716
PD1-78 243 JD1-72 JD1-74 200 DI-K7 140 12.793 0.41 0.896
PD1-79 249 JD1-73 JD1-68 160 HDPE 145 -7.996 0.55 2.437
PD1-80 247 JD1-74 JD1-82 200 DI-K7 140 12.527 0.4 0.862
PD1-81 32 JD1-75 JD1-77 90 HDPE 145 1.333 0.29 1.456
PD1-82 80 JD1-75 JD1-76 90 HDPE 145 0.267 0.06 0.074
PD1-83 10 JD1-77 JD1-78 90 HDPE 145 0.533 0.12 0.267
PD1-84 63 JD1-77 JD1-79 90 HDPE 145 0.267 0.06 0.074
PD1-85 395 JD1-77 JD1-80 90 HDPE 145 0.267 0.06 0.074
PD1-86 417 JD1-78 JD1-81 90 HDPE 145 0.267 0.06 0.074
PD1-87 250 JD1-82 JD1-83 200 DI-K7 140 12.26 0.39 0.828
PD1-88 241 JD1-83 JD1-85 200 DI-K7 140 11.994 0.38 0.795
PD1-89 250 JD1-84 JD1-73 160 HDPE 145 -7.729 0.53 2.289
PD1-90 248 JD1-85 JD1-86 200 DI-K7 140 11.727 0.37 0.762

MaRS Planning Engineering Services Pvt. Ltd.


PD1-91 243 JD1-86 JD1-87 200 DI-K7 140 11.461 0.36 0.731
PD1-92 247 JD1-87 JD1-89 200 DI-K7 140 11.194 0.36 0.7
PD1-93 246 JD1-88 JD1-84 160 HDPE 145 -7.463 0.51 2.145
PD1-94 246 JD1-89 JD1-90 200 DI-K7 140 10.928 0.35 0.669
PD1-95 250 JD1-90 JD1-91 200 DI-K7 140 10.661 0.34 0.639
PD1-96 201 JD1-91 JD1-94 90 HDPE 145 2.132 0.46 3.478
PD1-97 277 JD1-91 JD1-95 160 HDPE 145 8.262 0.57 2.59
PD1-98 245 JD1-92 JD1-88 160 HDPE 145 -7.196 0.49 2.005
PD1-99 248 JD1-93 JD1-92 160 HDPE 145 -6.93 0.48 1.87
PD1-100 245 JD1-93 JD1-104 110 HDPE 145 2.665 0.39 1.981
PD1-101 172 JD1-94 JD1-105 90 HDPE 145 1.866 0.4 2.716
PD1-102 16 JD1-95 JD1-96 160 HDPE 145 7.196 0.49 2.005
PD1-103 66 JD1-95 JD1-97 90 HDPE 145 0.8 0.17 0.565
PD1-104 126 JD1-96 JD1-100 90 HDPE 145 0.8 0.17 0.566
PD1-105 153 JD1-96 JD1-106 140 HDPE 145 6.13 0.55 2.853
PD1-106 119 JD1-97 JD1-98 90 HDPE 145 0.267 0.06 0.074
PD1-107 158 JD1-97 JD1-99 90 HDPE 145 0.267 0.06 0.074
PD1-108 56 JD1-100 JD1-101 90 HDPE 145 0.267 0.06 0.074
PD1-109 89 JD1-100 JD1-102 90 HDPE 145 0.267 0.06 0.074
PD1-110 205 JD1-103 JD1-93 110 HDPE 145 -3.998 0.45 2.248
PD1-111 251 JD1-104 JD1-107 110 HDPE 145 2.399 0.35 1.629
PD1-112 230 JD1-105 JD1-120 90 HDPE 145 1.599 0.35 2.041
PD1-113 137 JD1-106 JD1-109 140 HDPE 145 5.864 0.53 2.627
PD1-114 249 JD1-107 JD1-139 90 HDPE 145 2.132 0.46 3.478
PD1-115 223 JD1-108 JD1-137 110 HDPE 145 3.465 0.5 3.22
PD1-116 247 JD1-108 JD1-103 110 HDPE 145 -3.731 0.42 1.978
PD1-117 56 JD1-109 JD1-126 110 HDPE 145 2.932 0.43 2.363
PD1-118 10 JD1-110 JD1-109 110 HDPE 145 -2.665 0.39 1.98
PD1-119 80 JD1-110 JD1-112 90 HDPE 145 0.254 0.06 0.067
PD1-120 66 JD1-111 JD1-110 90 HDPE 145 -0.279 0.06 0.08
PD1-121 48 JD1-112 JD1-111 90 HDPE 145 -0.013 0 0.001
PD1-122 10 JD1-113 JD1-110 90 HDPE 145 -1.866 0.4 2.716
PD1-123 17 JD1-113 JD1-116 90 HDPE 145 0.8 0.17 0.565
PD1-124 12 JD1-114 JD1-113 90 HDPE 145 -0.8 0.17 0.565
PD1-125 33 JD1-114 JD1-115 90 HDPE 145 0.267 0.06 0.074
PD1-126 119 JD1-117 JD1-114 90 HDPE 145 -0.267 0.06 0.074
PD1-127 55 JD1-118 JD1-116 90 HDPE 145 -0.533 0.12 0.267
PD1-128 63 JD1-118 JD1-119 90 HDPE 145 0.267 0.06 0.074
PD1-129 76 JD1-120 JD1-121 90 HDPE 145 0.267 0.06 0.074
PD1-130 10 JD1-122 JD1-120 90 HDPE 145 -1.066 0.23 0.963
PD1-131 76 JD1-122 JD1-124 90 HDPE 145 0.267 0.06 0.074
PD1-132 68 JD1-123 JD1-122 90 HDPE 145 -0.267 0.06 0.074
PD1-133 231 JD1-125 JD1-122 90 HDPE 145 -0.267 0.06 0.074
PD1-134 43 JD1-126 JD1-127 90 HDPE 145 0.267 0.06 0.074
PD1-135 45 JD1-126 JD1-128 110 HDPE 145 2.399 0.35 1.629
PD1-136 117 JD1-128 JD1-130 90 HDPE 145 0.267 0.06 0.074
PD1-137 11 JD1-128 JD1-129 90 HDPE 145 0.8 0.17 0.566
PD1-138 76 JD1-129 JD1-131 90 HDPE 145 0.267 0.06 0.074

MaRS Planning Engineering Services Pvt. Ltd.


PD1-139 114 JD1-129 JD1-133 90 HDPE 145 0.267 0.06 0.074
PD1-140 15 JD1-132 JD1-128 90 HDPE 145 -1.066 0.23 0.963
PD1-141 35 JD1-132 JD1-135 90 HDPE 145 0.533 0.12 0.267
PD1-142 86 JD1-132 JD1-134 90 HDPE 145 0.267 0.06 0.074
PD1-143 48 JD1-135 JD1-136 90 HDPE 145 0.267 0.06 0.074
PD1-144 81 JD1-137 JD1-138 90 HDPE 145 0.267 0.06 0.074
PD1-145 140 JD1-137 JD1-140 110 HDPE 145 2.932 0.43 2.363
PD1-146 220 JD1-139 JD1-141 90 HDPE 145 1.866 0.4 2.716
PD1-147 190 JD1-140 JD1-142 110 HDPE 145 2.665 0.39 1.981
PD1-148 123 JD1-141 JD1-144 90 HDPE 145 1.599 0.35 2.041
PD1-149 86 JD1-142 JD1-143 90 HDPE 145 0.267 0.06 0.074
PD1-150 169 JD1-142 JD1-150 90 HDPE 145 2.132 0.46 3.478
PD1-151 10 JD1-144 JD1-146 90 HDPE 145 0.8 0.17 0.566
PD1-152 42 JD1-144 JD1-145 90 HDPE 145 0.267 0.06 0.074
PD1-153 161 JD1-144 JD1-148 90 HDPE 145 0.267 0.06 0.074
PD1-154 41 JD1-146 JD1-147 90 HDPE 145 0.267 0.06 0.074
PD1-155 137 JD1-149 JD1-146 90 HDPE 145 -0.267 0.06 0.074
PD1-156 11 JD1-150 JD1-151 90 HDPE 145 1.333 0.29 1.457
PD1-157 172 JD1-150 JD1-153 90 HDPE 145 0.533 0.12 0.267
PD1-158 87 JD1-151 JD1-152 90 HDPE 145 0.267 0.06 0.074
PD1-159 167 JD1-151 JD1-155 90 HDPE 145 0.8 0.17 0.565
PD1-160 63 JD1-153 JD1-154 90 HDPE 145 0.267 0.06 0.074
PD1-161 76 JD1-155 JD1-156 90 HDPE 145 0.267 0.06 0.074
PD1-162 81 JD1-155 JD1-157 90 HDPE 145 0.267 0.06 0.074
TD.-2
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD2-1 24 TD-2 JD2-1 200 DI-K7 140 20.143 0.64 2.077
PD2-2 10 JD2-1 JD2-3 200 DI-K7 140 19.752 0.63 2.002
PD2-3 123 JD2-2 JD2-1 90 HDPE 145 -0.196 0.04 0.042
PD2-4 243 JD2-3 JD2-5 200 DI-K7 140 19.361 0.62 1.93
PD2-5 139 JD2-4 JD2-3 90 HDPE 145 -0.196 0.04 0.042
PD2-6 100 JD2-5 JD2-6 90 HDPE 145 0.196 0.04 0.042
PD2-7 311 JD2-7 JD2-5 200 DI-K7 140 -18.97 0.6 1.858
PD2-8 219 JD2-8 JD2-7 200 DI-K7 140 -18.774 0.6 1.823
PD2-9 10 JD2-9 JD2-8 200 DI-K7 140 -17.796 0.57 1.651
PD2-10 77 JD2-10 JD2-11 90 HDPE 145 0.196 0.04 0.042
PD2-11 149 JD2-10 JD2-8 90 HDPE 145 -0.782 0.17 0.543
PD2-12 40 JD2-12 JD2-13 90 HDPE 145 0.196 0.04 0.042
PD2-13 164 JD2-12 JD2-10 90 HDPE 145 -0.391 0.08 0.15
PD2-14 322 JD2-14 JD2-9 160 HDPE 145 -3.999 0.27 0.675
PD2-15 10 JD2-15 JD2-14 90 HDPE 145 -1.369 0.3 1.531
PD2-16 103 JD2-15 JD2-18 90 HDPE 145 0.48 0.1 0.22
PD2-17 25 JD2-16 JD2-15 90 HDPE 145 -0.693 0.15 0.434
PD2-18 95 JD2-17 JD2-16 90 HDPE 145 -0.196 0.04 0.042
PD2-19 70 JD2-18 JD2-20 90 HDPE 145 0.196 0.04 0.042
PD2-20 222 JD2-18 JD2-19 90 HDPE 145 0.089 0.02 0.009

MaRS Planning Engineering Services Pvt. Ltd.


PD2-21 85 JD2-19 JD2-21 90 HDPE 145 0.196 0.04 0.042
PD2-22 148 JD2-19 JD2-16 90 HDPE 145 -0.302 0.07 0.093
PD2-23 173 JD2-22 JD2-14 140 HDPE 145 -2.434 0.22 0.515
PD2-24 306 JD2-22 JD2-9 200 DI-K7 140 -13.602 0.43 1.003
PD2-25 88 JD2-23 JD2-22 200 DI-K7 140 -15.841 0.5 1.331
PD2-26 28 JD2-24 JD2-23 90 HDPE 145 -1.369 0.3 1.531
PD2-27 49 JD2-24 JD2-26 90 HDPE 145 0.978 0.21 0.821
PD2-28 152 JD2-25 JD2-24 90 HDPE 145 -0.196 0.04 0.042
PD2-29 57 JD2-26 JD2-28 90 HDPE 145 0.587 0.13 0.319
PD2-30 69 JD2-26 JD2-27 90 HDPE 145 0.196 0.04 0.042
PD2-31 173 JD2-28 JD2-30 90 HDPE 145 0.196 0.04 0.042
PD2-32 58 JD2-29 JD2-28 90 HDPE 145 -0.196 0.04 0.042
PD2-33 250 JD2-31 JD2-23 200 DI-K7 140 -14.276 0.45 1.098
PD2-34 250 JD2-32 JD2-31 200 DI-K7 140 -14.081 0.45 1.07
PD2-35 250 JD2-33 JD2-32 200 DI-K7 140 -13.885 0.44 1.043
PD2-36 250 JD2-34 JD2-33 200 DI-K7 140 -13.689 0.44 1.015
PD2-37 250 JD2-35 JD2-34 200 DI-K7 140 -13.494 0.43 0.989
PD2-38 250 JD2-36 JD2-35 200 DI-K7 140 -13.298 0.42 0.962
PD2-39 250 JD2-37 JD2-36 200 DI-K7 140 -13.103 0.42 0.936
PD2-40 250 JD2-38 JD2-37 200 DI-K7 140 -12.907 0.41 0.911
PD2-41 250 JD2-39 JD2-38 200 DI-K7 140 -12.712 0.4 0.885
PD2-42 250 JD2-40 JD2-39 200 DI-K7 140 -12.516 0.4 0.86
PD2-43 250 JD2-41 JD2-40 200 DI-K7 140 -12.32 0.39 0.835
PD2-44 304 JD2-42 JD2-41 200 DI-K7 140 -12.125 0.39 0.811
PD2-45 208 JD2-43 JD2-42 200 DI-K7 140 -11.929 0.38 0.787
PD2-46 170 JD2-44 JD2-43 200 DI-K7 140 -11.734 0.37 0.763
PD2-47 178 JD2-44 JD2-45 200 DI-K7 140 11.538 0.37 0.74
PD2-48 24 JD2-45 JD2-46 200 DI-K7 140 10.56 0.34 0.628
PD2-49 179 JD2-45 JD2-53 90 HDPE 145 0.782 0.17 0.543
PD2-50 13 JD2-46 JD2-47 200 DI-K7 140 10.169 0.32 0.586
PD2-51 346 JD2-46 JD2-49 90 HDPE 145 0.196 0.04 0.042
PD2-52 53 JD2-47 JD2-48 90 HDPE 145 0.196 0.04 0.042
PD2-53 88 JD2-47 JD2-50 200 DI-K7 140 9.778 0.31 0.545
PD2-54 10 JD2-50 JD2-57 140 HDPE 145 6.457 0.58 3.141
PD2-55 110 JD2-50 JD2-59 110 HDPE 145 2.734 0.4 2.076
PD2-56 28 JD2-51 JD2-50 90 HDPE 145 -0.391 0.08 0.15
PD2-57 48 JD2-51 JD2-52 90 HDPE 145 0.196 0.04 0.042
PD2-58 55 JD2-53 JD2-54 90 HDPE 145 0.196 0.04 0.042
PD2-59 98 JD2-53 JD2-55 90 HDPE 145 0.196 0.04 0.042
PD2-60 103 JD2-53 JD2-56 90 HDPE 145 0.196 0.04 0.042
PD2-61 154 JD2-57 JD2-65 110 HDPE 145 2.672 0.39 1.99
PD2-62 15 JD2-58 JD2-57 110 HDPE 145 -3.59 0.4 1.842
PD2-63 43 JD2-59 JD2-60 90 HDPE 145 1.165 0.25 1.135
PD2-64 57 JD2-59 JD2-64 90 HDPE 145 1.374 0.3 1.541
PD2-65 55 JD2-60 JD2-62 90 HDPE 145 0.773 0.17 0.532
PD2-66 92 JD2-61 JD2-60 90 HDPE 145 -0.196 0.04 0.042
PD2-67 67 JD2-62 JD2-64 90 HDPE 145 0.382 0.08 0.144
PD2-68 94 JD2-62 JD2-63 90 HDPE 145 0.196 0.04 0.042

MaRS Planning Engineering Services Pvt. Ltd.


PD2-69 11 JD2-64 JD2-65 90 HDPE 145 1.561 0.34 1.951
PD2-70 59 JD2-66 JD2-65 110 HDPE 145 -4.037 0.45 2.289
PD2-71 134 JD2-66 JD2-58 110 HDPE 145 -3.394 0.49 3.1
PD2-72 10 JD2-67 JD2-66 160 HDPE 145 -7.236 0.5 2.026
PD2-73 90 JD2-68 JD2-69 90 HDPE 145 0.196 0.04 0.042
PD2-74 92 JD2-68 JD2-67 110 HDPE 145 -2.712 0.39 2.045
PD2-75 10 JD2-70 JD2-71 90 HDPE 145 1.565 0.34 1.96
PD2-76 10 JD2-70 JD2-73 110 HDPE 145 4.889 0.55 3.263
PD2-77 71 JD2-70 JD2-68 110 HDPE 145 -2.321 0.34 1.532
PD2-78 113 JD2-70 JD2-67 110 HDPE 145 -4.329 0.49 2.604
PD2-79 69 JD2-71 JD2-72 90 HDPE 145 0.196 0.04 0.042
PD2-80 120 JD2-73 JD2-74 90 HDPE 145 0.196 0.04 0.042
PD2-81 211 JD2-73 JD2-81 110 HDPE 145 4.498 0.51 2.796
PD2-82 91 JD2-75 JD2-71 90 HDPE 145 -1.173 0.25 1.151
PD2-83 60 JD2-76 JD2-75 90 HDPE 145 -0.196 0.04 0.042
PD2-84 17 JD2-77 JD2-75 90 HDPE 145 -0.782 0.17 0.543
PD2-85 345 JD2-77 JD2-79 90 HDPE 145 0.391 0.08 0.15
PD2-86 58 JD2-78 JD2-77 90 HDPE 145 -0.196 0.04 0.042
PD2-87 245 JD2-79 JD2-80 90 HDPE 145 0.196 0.04 0.042
PD2-88 30 JD2-81 JD2-82 110 HDPE 145 4.302 0.48 2.575
PD2-89 92 JD2-83 JD2-84 90 HDPE 145 0.196 0.04 0.042
PD2-90 152 JD2-83 JD2-82 90 HDPE 145 -1.369 0.3 1.531
PD2-91 10 JD2-85 JD2-86 90 HDPE 145 0.587 0.13 0.319
PD2-92 78 JD2-85 JD2-87 90 HDPE 145 0.196 0.04 0.042
PD2-93 131 JD2-85 JD2-83 90 HDPE 145 -0.978 0.21 0.821
PD2-94 66 JD2-86 JD2-88 90 HDPE 145 0.196 0.04 0.042
PD2-95 225 JD2-86 JD2-89 90 HDPE 145 0.196 0.04 0.042
PD2-96 364 JD2-90 JD2-82 110 HDPE 145 -2.738 0.4 2.082
PD2-97 244 JD2-91 JD2-90 110 HDPE 145 -2.542 0.37 1.815
PD2-98 250 JD2-92 JD2-91 110 HDPE 145 -2.347 0.34 1.565
PD2-99 254 JD2-93 JD2-92 110 HDPE 145 -2.151 0.31 1.332
PD2-100 258 JD2-94 JD2-93 90 HDPE 145 -1.956 0.42 2.963
PD2-101 245 JD2-95 JD2-94 90 HDPE 145 -1.76 0.38 2.438
PD2-102 262 JD2-96 JD2-95 90 HDPE 145 -0.196 0.04 0.042
PD2-103 9 JD2-97 JD2-99 90 HDPE 145 0.978 0.21 0.821
PD2-104 80 JD2-97 JD2-95 90 HDPE 145 -1.369 0.3 1.531
PD2-105 79 JD2-98 JD2-97 90 HDPE 145 -0.196 0.04 0.042
PD2-106 91 JD2-99 JD2-101 90 HDPE 145 0.196 0.04 0.042
PD2-107 324 JD2-99 JD2-103 90 HDPE 145 0.196 0.04 0.042
PD2-108 10 JD2-100 JD2-99 90 HDPE 145 -0.391 0.08 0.15
PD2-109 82 JD2-102 JD2-100 90 HDPE 145 -0.196 0.04 0.042
TD.-3
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD3-1 36 JD3-1 TD-3 200 DI-K7 140 -20.884 0.66 2.22
PD3-2 249 JD3-1 JD3-3 110 HDPE 145 2.957 0.43 2.401
PD3-3 241 JD3-2 JD3-1 200 DI-K7 140 -17.742 0.56 1.642

MaRS Planning Engineering Services Pvt. Ltd.


PD3-4 117 JD3-3 JD3-12 90 HDPE 145 1.294 0.28 1.379
PD3-5 63 JD3-4 JD3-3 90 HDPE 145 -1.479 0.32 1.765
PD3-6 10 JD3-5 JD3-4 90 HDPE 145 -0.924 0.2 0.739
PD3-7 83 JD3-6 JD3-5 90 HDPE 145 -0.185 0.04 0.038
PD3-8 135 JD3-7 JD3-4 90 HDPE 145 -0.37 0.08 0.135
PD3-9 90 JD3-8 JD3-7 90 HDPE 145 -0.185 0.04 0.037
PD3-10 60 JD3-9 JD3-10 90 HDPE 145 0.185 0.04 0.037
PD3-11 128 JD3-9 JD3-5 90 HDPE 145 -0.554 0.12 0.287
PD3-12 87 JD3-11 JD3-9 90 HDPE 145 -0.185 0.04 0.037
PD3-13 20 JD3-12 JD3-14 90 HDPE 145 0.924 0.2 0.739
PD3-14 115 JD3-12 JD3-13 90 HDPE 145 0.185 0.04 0.038
PD3-15 42 JD3-14 JD3-16 90 HDPE 145 0.554 0.12 0.287
PD3-16 209 JD3-15 JD3-14 90 HDPE 145 -0.185 0.04 0.038
PD3-17 39 JD3-16 JD3-17 90 HDPE 145 0.185 0.04 0.038
PD3-18 103 JD3-16 JD3-18 90 HDPE 145 0.185 0.04 0.038
PD3-19 255 JD3-19 JD3-2 200 DI-K7 140 -17.557 0.56 1.61
PD3-20 248 JD3-20 JD3-19 200 DI-K7 140 -17.373 0.55 1.579
PD3-21 252 JD3-21 JD3-20 200 DI-K7 140 -17.188 0.55 1.548
PD3-22 250 JD3-22 JD3-21 200 DI-K7 140 -17.003 0.54 1.517
PD3-23 260 JD3-23 JD3-22 200 DI-K7 140 -16.818 0.54 1.487
PD3-24 242 JD3-24 JD3-23 200 DI-K7 140 -16.633 0.53 1.457
PD3-25 10 JD3-25 JD3-24 160 HDPE 145 -7.595 0.52 2.215
PD3-26 248 JD3-25 JD3-27 90 HDPE 145 0.739 0.16 0.489
PD3-27 57 JD3-26 JD3-25 160 HDPE 145 -6.67 0.46 1.743
PD3-28 249 JD3-27 JD3-31 90 HDPE 145 0.554 0.12 0.287
PD3-29 53 JD3-28 JD3-24 160 HDPE 145 -8.854 0.61 2.944
PD3-30 172 JD3-28 JD3-29 90 HDPE 145 0.185 0.04 0.038
PD3-31 11 JD3-30 JD3-28 160 HDPE 145 -8.484 0.58 2.72
PD3-32 109 JD3-31 JD3-32 90 HDPE 145 0.37 0.08 0.135
PD3-33 245 JD3-32 JD3-33 90 HDPE 145 0.185 0.04 0.038
PD3-34 225 JD3-34 JD3-30 110 HDPE 145 -2.246 0.33 1.443
PD3-35 116 JD3-34 JD3-30 140 HDPE 145 -6.053 0.54 2.787
PD3-36 79 JD3-35 JD3-37 90 HDPE 145 0.185 0.04 0.038
PD3-37 131 JD3-35 JD3-26 140 HDPE 145 -6.486 0.58 3.167
PD3-38 11 JD3-36 JD3-34 160 HDPE 145 -8.115 0.56 2.505
PD3-39 90 JD3-36 JD3-40 90 HDPE 145 0.924 0.2 0.739
PD3-40 16 JD3-38 JD3-36 160 HDPE 145 -7.006 0.48 1.908
PD3-41 64 JD3-38 JD3-39 90 HDPE 145 0.185 0.04 0.038
PD3-42 111 JD3-40 JD3-42 90 HDPE 145 0.185 0.04 0.038
PD3-43 10 JD3-41 JD3-40 90 HDPE 145 -0.554 0.12 0.287
PD3-44 56 JD3-41 JD3-43 90 HDPE 145 0.185 0.04 0.038
PD3-45 108 JD3-44 JD3-41 90 HDPE 145 -0.185 0.04 0.038
PD3-46 36 JD3-45 JD3-38 140 HDPE 145 -6.636 0.59 3.304
PD3-47 59 JD3-45 JD3-46 90 HDPE 145 0.185 0.04 0.038
PD3-48 98 JD3-47 JD3-35 140 HDPE 145 -6.116 0.55 2.841
PD3-49 119 JD3-47 JD3-49 90 HDPE 145 0.185 0.04 0.038
PD3-50 11 JD3-48 JD3-47 90 HDPE 145 -0.387 0.08 0.147
PD3-51 43 JD3-48 JD3-45 140 HDPE 145 -6.267 0.56 2.971

MaRS Planning Engineering Services Pvt. Ltd.


PD3-52 112 JD3-48 JD3-50 90 HDPE 145 0.185 0.04 0.038
PD3-53 12 JD3-51 JD3-48 140 HDPE 145 -6.284 0.56 2.987
PD3-54 117 JD3-51 JD3-52 90 HDPE 145 0.185 0.04 0.038
PD3-55 66 JD3-53 JD3-51 140 HDPE 145 -5.914 0.53 2.669
PD3-56 10 JD3-54 JD3-53 140 HDPE 145 -5.175 0.46 2.085
PD3-57 127 JD3-55 JD3-47 140 HDPE 145 -5.36 0.48 2.224
PD3-58 173 JD3-55 JD3-60 90 HDPE 145 0.37 0.08 0.135
PD3-59 181 JD3-56 JD3-54 90 HDPE 145 -0.63 0.14 0.288
PD3-60 126 JD3-57 JD3-59 90 HDPE 145 0.185 0.04 0.038
PD3-61 283 JD3-57 JD3-53 90 HDPE 145 -0.554 0.12 0.287
PD3-62 61 JD3-58 JD3-57 90 HDPE 145 -0.185 0.04 0.037
PD3-63 201 JD3-60 JD3-62 90 HDPE 145 0.185 0.04 0.038
PD3-64 29 JD3-61 JD3-54 110 HDPE 145 -4.36 0.49 2.627
PD3-65 220 JD3-61 JD3-56 90 HDPE 145 -0.446 0.1 0.112
PD3-66 13 JD3-63 JD3-61 110 HDPE 145 -4.62 0.52 2.939
PD3-67 84 JD3-63 JD3-64 110 HDPE 145 2.587 0.38 1.875
PD3-68 11 JD3-64 JD3-65 90 HDPE 145 0.554 0.12 0.287
PD3-69 106 JD3-64 JD3-80 90 HDPE 145 1.848 0.4 2.669
PD3-70 40 JD3-65 JD3-66 90 HDPE 145 0.244 0.05 0.062
PD3-71 159 JD3-65 JD3-67 90 HDPE 145 0.125 0.03 0.017
PD3-72 70 JD3-67 JD3-66 90 HDPE 145 -0.06 0.01 0.003
PD3-73 27 JD3-68 JD3-69 90 HDPE 145 0.888 0.19 0.686
PD3-74 141 JD3-68 JD3-63 90 HDPE 145 -1.848 0.4 2.669
PD3-75 34 JD3-69 JD3-70 90 HDPE 145 0.185 0.04 0.038
PD3-76 48 JD3-69 JD3-74 90 HDPE 145 0.518 0.11 0.253
PD3-77 45 JD3-71 JD3-68 90 HDPE 145 -0.776 0.17 0.534
PD3-78 107 JD3-71 JD3-73 90 HDPE 145 0.185 0.04 0.038
PD3-79 85 JD3-72 JD3-75 90 HDPE 145 0.185 0.04 0.038
PD3-80 149 JD3-72 JD3-55 110 HDPE 145 -4.805 0.54 3.16
PD3-81 20 JD3-74 JD3-76 90 HDPE 145 0.739 0.16 0.489
PD3-82 38 JD3-74 JD3-71 90 HDPE 145 -0.406 0.09 0.161
PD3-83 29 JD3-76 JD3-77 90 HDPE 145 0.37 0.08 0.135
PD3-84 175 JD3-76 JD3-79 90 HDPE 145 0.185 0.04 0.038
PD3-85 33 JD3-77 JD3-78 90 HDPE 145 0.185 0.04 0.038
PD3-86 87 JD3-80 JD3-83 90 HDPE 145 1.663 0.36 2.196
PD3-87 65 JD3-81 JD3-82 90 HDPE 145 0.185 0.04 0.038
PD3-88 58 JD3-81 JD3-72 110 HDPE 145 -4.436 0.5 2.725
PD3-89 53 JD3-83 JD3-84 90 HDPE 145 0.785 0.17 0.547
PD3-90 104 JD3-84 JD3-85 90 HDPE 145 0.185 0.04 0.038
PD3-91 91 JD3-84 JD3-87 90 HDPE 145 0.416 0.09 0.168
PD3-92 41 JD3-86 JD3-87 90 HDPE 145 0.508 0.11 0.244
PD3-93 79 JD3-86 JD3-83 90 HDPE 145 -0.693 0.15 0.434
PD3-94 72 JD3-87 JD3-88 90 HDPE 145 0.739 0.16 0.489
PD3-95 51 JD3-88 JD3-89 90 HDPE 145 0.185 0.04 0.038
PD3-96 82 JD3-88 JD3-90 90 HDPE 145 0.37 0.08 0.135
PD3-97 61 JD3-90 JD3-91 90 HDPE 145 0.185 0.04 0.038
PD3-98 139 JD3-92 JD3-93 90 HDPE 145 0.739 0.16 0.489
PD3-99 245 JD3-92 JD3-81 110 HDPE 145 -4.066 0.46 2.319

MaRS Planning Engineering Services Pvt. Ltd.


PD3-100 10 JD3-93 JD3-94 90 HDPE 145 0.37 0.08 0.136
PD3-101 174 JD3-93 JD3-95 90 HDPE 145 0.185 0.04 0.038
PD3-102 171 JD3-94 JD3-96 90 HDPE 145 0.185 0.04 0.038
PD3-103 161 JD3-97 JD3-92 110 HDPE 145 -3.142 0.46 2.686
PD3-104 278 JD3-97 JD3-104 90 HDPE 145 1.848 0.4 2.669
PD3-105 10 JD3-98 JD3-97 90 HDPE 145 -1.109 0.24 1.036
PD3-106 341 JD3-98 JD3-99 90 HDPE 145 0.185 0.04 0.038
PD3-107 224 JD3-100 JD3-98 90 HDPE 145 -0.739 0.16 0.489
PD3-108 73 JD3-101 JD3-102 90 HDPE 145 0.185 0.04 0.038
PD3-109 91 JD3-101 JD3-100 90 HDPE 145 -0.554 0.12 0.287
PD3-110 95 JD3-103 JD3-101 90 HDPE 145 -0.185 0.04 0.037
PD3-111 62 JD3-104 JD3-105 90 HDPE 145 0.185 0.04 0.037
PD3-112 27 JD3-104 JD3-106 90 HDPE 145 1.479 0.32 1.765
PD3-113 73 JD3-106 JD3-107 90 HDPE 145 0.185 0.04 0.038
PD3-114 10 JD3-106 JD3-108 90 HDPE 145 1.109 0.24 1.036
PD3-115 226 JD3-108 JD3-111 90 HDPE 145 0.185 0.04 0.038
PD3-116 199 JD3-108 JD3-110 90 HDPE 145 0.185 0.04 0.038
PD3-117 11 JD3-109 JD3-108 90 HDPE 145 -0.554 0.12 0.287
PD3-118 161 JD3-109 JD3-112 90 HDPE 145 0.185 0.04 0.038
PD3-119 255 JD3-109 JD3-113 90 HDPE 145 0.185 0.04 0.038
TD.-4
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD4-1 36 JD4-1 TD-4 250 DI-K7 140 -36.228 0.74 2.077
PD4-2 106 JD4-1 JD4-3 250 DI-K7 140 35.703 0.73 2.021
PD4-3 98 JD4-2 JD4-1 90 HDPE 145 -0.263 0.06 0.072
PD4-4 247 JD4-3 JD4-5 250 DI-K7 140 35.178 0.72 1.967
PD4-5 364 JD4-3 JD4-4 90 HDPE 145 0.263 0.06 0.072
PD4-6 185 JD4-5 JD4-6 250 DI-K7 140 34.915 0.71 1.94
PD4-7 168 JD4-6 JD4-7 250 DI-K7 140 34.653 0.71 1.913
PD4-8 10 JD4-7 JD4-8 90 HDPE 145 1.313 0.28 1.416
PD4-9 10 JD4-7 JD4-9 250 DI-K7 140 31.503 0.64 1.603
PD4-10 77 JD4-9 JD4-10 250 DI-K7 140 30.19 0.62 1.482
PD4-11 10 JD4-10 JD4-11 250 DI-K7 140 29.402 0.6 1.412
PD4-12 259 JD4-10 JD4-14 90 HDPE 145 0.525 0.11 0.26
PD4-13 248 JD4-11 JD4-23 200 DI-K7 140 13.496 0.43 0.989
PD4-14 281 JD4-11 JD4-27 200 DI-K7 140 15.644 0.5 1.3
PD4-15 168 JD4-12 JD4-8 90 HDPE 145 -1.05 0.23 0.937
PD4-16 183 JD4-13 JD4-9 90 HDPE 145 -1.05 0.23 0.937
PD4-17 241 JD4-14 JD4-15 90 HDPE 145 0.263 0.06 0.072
PD4-18 150 JD4-16 JD4-13 90 HDPE 145 -0.788 0.17 0.55
PD4-19 185 JD4-17 JD4-12 90 HDPE 145 -0.788 0.17 0.55
PD4-20 122 JD4-18 JD4-16 90 HDPE 145 -0.263 0.06 0.072
PD4-21 164 JD4-19 JD4-16 90 HDPE 145 -0.263 0.06 0.072
PD4-22 231 JD4-20 JD4-17 90 HDPE 145 -0.525 0.11 0.26
PD4-23 173 JD4-21 JD4-7 90 HDPE 145 -1.575 0.34 1.985
PD4-24 360 JD4-22 JD4-20 90 HDPE 145 -0.263 0.06 0.072

MaRS Planning Engineering Services Pvt. Ltd.


PD4-25 11 JD4-24 JD4-23 90 HDPE 145 -0.788 0.17 0.55
PD4-26 248 JD4-24 JD4-26 90 HDPE 145 0.263 0.06 0.072
PD4-27 102 JD4-25 JD4-24 90 HDPE 145 -0.263 0.06 0.072
PD4-28 53 JD4-27 JD4-29 250 DI-K7 140 27.827 0.57 1.274
PD4-29 142 JD4-27 JD4-23 200 DI-K7 140 -12.446 0.4 0.851
PD4-30 149 JD4-28 JD4-21 90 HDPE 145 -1.313 0.28 1.416
PD4-31 81 JD4-29 JD4-34 200 DI-K7 140 25.465 0.81 3.205
PD4-32 57 JD4-30 JD4-31 90 HDPE 145 0.263 0.06 0.072
PD4-33 145 JD4-30 JD4-28 90 HDPE 145 -1.05 0.23 0.937
PD4-34 64 JD4-32 JD4-30 90 HDPE 145 -0.525 0.11 0.259
PD4-35 64 JD4-33 JD4-32 90 HDPE 145 -0.263 0.06 0.072
PD4-36 71 JD4-34 JD4-36 200 DI-K7 140 24.94 0.79 3.084
PD4-37 120 JD4-34 JD4-35 90 HDPE 145 0.263 0.06 0.072
PD4-38 11 JD4-36 JD4-38 200 DI-K7 140 24.415 0.78 2.965
PD4-39 331 JD4-37 JD4-36 90 HDPE 145 -0.263 0.06 0.072
PD4-40 137 JD4-38 JD4-41 200 DI-K7 140 23.889 0.76 2.848
PD4-41 317 JD4-39 JD4-38 90 HDPE 145 -0.263 0.06 0.072
PD4-42 207 JD4-40 JD4-29 90 HDPE 145 -2.1 0.46 3.382
PD4-43 10 JD4-41 JD4-42 200 DI-K7 140 14.437 0.46 1.121
PD4-44 240 JD4-41 JD4-44 200 DI-K7 140 9.189 0.29 0.485
PD4-45 208 JD4-42 JD4-45 200 DI-K7 140 13.912 0.44 1.046
PD4-46 194 JD4-43 JD4-42 90 HDPE 145 -0.263 0.06 0.072
PD4-47 90 JD4-44 JD4-49 160 HDPE 145 8.927 0.61 2.989
PD4-48 10 JD4-45 JD4-46 140 HDPE 145 5.425 0.49 2.275
PD4-49 122 JD4-45 JD4-58 160 HDPE 145 8.225 0.56 2.568
PD4-50 80 JD4-46 JD4-48 140 HDPE 145 4.429 0.4 1.56
PD4-51 204 JD4-47 JD4-46 90 HDPE 145 -0.733 0.16 0.439
PD4-52 97 JD4-48 JD4-57 140 HDPE 145 4.637 0.42 1.701
PD4-53 216 JD4-48 JD4-47 90 HDPE 145 -0.471 0.1 0.166
PD4-54 378 JD4-49 JD4-69 160 HDPE 145 8.664 0.59 2.828
PD4-55 251 JD4-50 JD4-40 90 HDPE 145 -1.838 0.4 2.641
PD4-56 10 JD4-51 JD4-53 90 HDPE 145 0.525 0.11 0.26
PD4-57 10 JD4-51 JD4-50 90 HDPE 145 -1.313 0.28 1.417
PD4-58 200 JD4-52 JD4-50 90 HDPE 145 -0.263 0.06 0.072
PD4-59 131 JD4-54 JD4-51 90 HDPE 145 -0.263 0.06 0.072
PD4-60 131 JD4-55 JD4-53 90 HDPE 145 -0.263 0.06 0.072
PD4-61 187 JD4-56 JD4-51 90 HDPE 145 -0.263 0.06 0.072
PD4-62 184 JD4-57 JD4-66 110 HDPE 145 4.314 0.49 2.588
PD4-63 29 JD4-58 JD4-59 160 HDPE 145 8.023 0.55 2.453
PD4-64 122 JD4-58 JD4-57 90 HDPE 145 -0.061 0.01 0.004
PD4-65 159 JD4-59 JD4-67 110 HDPE 145 4.836 0.54 3.198
PD4-66 142 JD4-60 JD4-59 90 HDPE 145 -0.525 0.11 0.26
PD4-67 69 JD4-61 JD4-60 90 HDPE 145 -0.263 0.06 0.072
PD4-68 110 JD4-62 JD4-64 110 HDPE 145 1.874 0.27 1.032
PD4-69 127 JD4-62 JD4-59 110 HDPE 145 -2.399 0.35 1.63
PD4-70 72 JD4-63 JD4-62 90 HDPE 145 -0.263 0.06 0.072
PD4-71 127 JD4-64 JD4-67 90 HDPE 145 1.349 0.29 1.49
PD4-72 139 JD4-65 JD4-64 90 HDPE 145 -0.263 0.06 0.072

MaRS Planning Engineering Services Pvt. Ltd.


PD4-73 172 JD4-66 JD4-68 110 HDPE 145 4.052 0.46 2.304
PD4-74 109 JD4-67 JD4-68 140 HDPE 145 5.923 0.53 2.677
PD4-75 11 JD4-68 JD4-69 160 HDPE 145 9.712 0.67 3.494
PD4-76 268 JD4-69 JD4-70 200 DI-K7 140 18.114 0.58 1.706
PD4-77 281 JD4-70 JD4-71 200 DI-K7 140 17.851 0.57 1.66
PD4-78 270 JD4-71 JD4-72 200 DI-K7 140 17.589 0.56 1.615
PD4-79 277 JD4-72 JD4-73 200 DI-K7 140 17.326 0.55 1.571
PD4-80 267 JD4-73 JD4-74 200 DI-K7 140 17.064 0.54 1.527
PD4-81 272 JD4-74 JD4-75 200 DI-K7 140 16.801 0.53 1.484
PD4-82 213 JD4-75 JD4-76 200 DI-K7 140 16.539 0.53 1.441
PD4-83 285 JD4-76 JD4-77 200 DI-K7 140 16.276 0.52 1.399
PD4-84 274 JD4-77 JD4-78 200 DI-K7 140 16.014 0.51 1.358
PD4-85 198 JD4-78 JD4-79 200 DI-K7 140 15.751 0.5 1.317
PD4-86 167 JD4-79 JD4-80 200 DI-K7 140 15.489 0.49 1.276
PD4-87 66 JD4-80 JD4-83 160 HDPE 145 7.332 0.5 2.076
PD4-88 27 JD4-81 JD4-80 160 HDPE 145 -7.894 0.54 2.38
PD4-89 43 JD4-81 JD4-86 160 HDPE 145 7.369 0.51 2.096
PD4-90 61 JD4-81 JD4-82 90 HDPE 145 0.263 0.06 0.072
PD4-91 34 JD4-83 JD4-92 110 HDPE 145 4.013 0.45 2.264
PD4-92 74 JD4-83 JD4-93 110 HDPE 145 2.006 0.29 1.17
PD4-93 10 JD4-84 JD4-83 90 HDPE 145 -1.05 0.23 0.937
PD4-94 79 JD4-84 JD4-85 90 HDPE 145 0.263 0.06 0.072
PD4-95 10 JD4-86 JD4-91 140 HDPE 145 6.582 0.59 3.255
PD4-96 43 JD4-86 JD4-87 90 HDPE 145 0.263 0.06 0.072
PD4-97 130 JD4-86 JD4-89 90 HDPE 145 0.263 0.06 0.072
PD4-98 47 JD4-88 JD4-84 90 HDPE 145 -0.525 0.11 0.259
PD4-99 158 JD4-90 JD4-88 90 HDPE 145 -0.263 0.06 0.072
PD4-100 118 JD4-91 JD4-99 110 HDPE 145 3.306 0.48 2.952
PD4-101 22 JD4-92 JD4-94 110 HDPE 145 3.462 0.5 3.215
PD4-102 108 JD4-93 JD4-92 90 HDPE 145 -0.289 0.06 0.086
PD4-103 171 JD4-93 JD4-96 110 HDPE 145 2.032 0.3 1.199
PD4-104 108 JD4-94 JD4-95 90 HDPE 145 0.651 0.14 0.386
PD4-105 150 JD4-94 JD4-101 110 HDPE 145 2.549 0.37 1.823
PD4-106 56 JD4-95 JD4-91 110 HDPE 145 -3.013 0.44 2.485
PD4-107 63 JD4-95 JD4-98 110 HDPE 145 3.401 0.49 3.111
PD4-108 54 JD4-96 JD4-97 90 HDPE 145 0.263 0.06 0.072
PD4-109 67 JD4-96 JD4-100 90 HDPE 145 1.507 0.33 1.829
PD4-110 24 JD4-98 JD4-99 90 HDPE 145 0.763 0.17 0.519
PD4-111 84 JD4-98 JD4-107 110 HDPE 145 2.375 0.35 1.6
PD4-112 33 JD4-99 JD4-104 110 HDPE 145 3.807 0.43 2.053
PD4-113 183 JD4-100 JD4-101 90 HDPE 145 0.195 0.04 0.041
PD4-114 244 JD4-100 JD4-102 90 HDPE 145 0.263 0.06 0.072
PD4-115 11 JD4-101 JD4-103 110 HDPE 145 2.481 0.36 1.734
PD4-116 49 JD4-103 JD4-108 90 HDPE 145 1.437 0.31 1.674
PD4-117 64 JD4-104 JD4-118 110 HDPE 145 3.282 0.48 2.912
PD4-118 83 JD4-104 JD4-105 90 HDPE 145 0.263 0.06 0.072
PD4-119 55 JD4-106 JD4-110 90 HDPE 145 0.519 0.11 0.254
PD4-120 130 JD4-106 JD4-103 90 HDPE 145 -0.782 0.17 0.542

MaRS Planning Engineering Services Pvt. Ltd.


PD4-121 57 JD4-107 JD4-118 90 HDPE 145 1.708 0.37 2.305
PD4-122 35 JD4-108 JD4-109 90 HDPE 145 0.126 0.03 0.019
PD4-123 110 JD4-108 JD4-116 90 HDPE 145 1.049 0.23 0.934
PD4-124 10 JD4-109 JD4-107 90 HDPE 145 -0.405 0.09 0.161
PD4-125 52 JD4-110 JD4-111 90 HDPE 145 0.257 0.06 0.069
PD4-126 45 JD4-111 JD4-112 90 HDPE 145 -0.006 0 0
PD4-127 76 JD4-112 JD4-109 90 HDPE 145 -0.269 0.06 0.075
PD4-128 166 JD4-113 JD4-114 90 HDPE 145 0.263 0.06 0.072
PD4-129 214 JD4-113 JD4-115 90 HDPE 145 0.263 0.06 0.072
PD4-130 293 JD4-113 JD4-100 90 HDPE 145 -0.788 0.17 0.55
PD4-131 79 JD4-116 JD4-117 90 HDPE 145 0.263 0.06 0.072
PD4-132 109 JD4-116 JD4-118 90 HDPE 145 0.524 0.11 0.258
PD4-133 28 JD4-118 JD4-119 140 HDPE 145 5.25 0.47 2.141
PD4-134 12 JD4-119 JD4-120 110 HDPE 145 3.324 0.48 2.982
PD4-135 196 JD4-119 JD4-121 90 HDPE 145 1.664 0.36 2.196
PD4-136 170 JD4-120 JD4-123 90 HDPE 145 1.836 0.4 2.635
PD4-137 425 JD4-120 JD4-129 90 HDPE 145 1.226 0.27 1.249
PD4-138 42 JD4-121 JD4-122 90 HDPE 145 0.263 0.06 0.072
PD4-139 106 JD4-121 JD4-127 90 HDPE 145 1.139 0.25 1.088
PD4-140 152 JD4-123 JD4-129 90 HDPE 145 0.785 0.17 0.547
PD4-141 10 JD4-124 JD4-123 90 HDPE 145 -0.788 0.17 0.551
PD4-142 152 JD4-124 JD4-125 90 HDPE 145 0.263 0.06 0.072
PD4-143 171 JD4-126 JD4-124 90 HDPE 145 -0.263 0.06 0.072
PD4-144 162 JD4-127 JD4-131 90 HDPE 145 0.614 0.13 0.346
PD4-145 230 JD4-127 JD4-128 90 HDPE 145 0.263 0.06 0.072
PD4-146 21 JD4-129 JD4-131 90 HDPE 145 1.487 0.32 1.783
PD4-147 273 JD4-129 JD4-130 90 HDPE 145 0.263 0.06 0.072
PD4-148 254 JD4-131 JD4-133 90 HDPE 145 1.575 0.34 1.985
PD4-149 262 JD4-131 JD4-132 90 HDPE 145 0.263 0.06 0.072
PD4-150 168 JD4-133 JD4-134 90 HDPE 145 0.263 0.06 0.072
PD4-151 268 JD4-135 JD4-133 90 HDPE 145 -1.05 0.23 0.937
PD4-152 233 JD4-136 JD4-137 90 HDPE 145 0.525 0.11 0.26
PD4-153 319 JD4-136 JD4-135 90 HDPE 145 -0.788 0.17 0.55
PD4-154 196 JD4-138 JD4-137 90 HDPE 145 -0.263 0.06 0.072
TD.-5
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD5-1 285 JD5-1 JD5-3 110 HDPE 145 4.4 0.49 2.685
PD5-2 33 JD5-1 TD-5 200 DI-K7 140 -26.601 0.85 3.475
PD5-3 289 JD5-2 JD5-1 200 DI-K7 140 -22.001 0.7 2.445
PD5-4 220 JD5-3 JD5-4 90 HDPE 145 0.2 0.04 0.043
PD5-5 203 JD5-3 JD5-5 110 HDPE 145 4 0.45 2.25
PD5-6 261 JD5-5 JD5-7 110 HDPE 145 3.8 0.43 2.046
PD5-7 284 JD5-6 JD5-2 200 DI-K7 140 -21.801 0.69 2.404
PD5-8 231 JD5-7 JD5-9 110 HDPE 145 3.6 0.52 3.456
PD5-9 288 JD5-8 JD5-6 200 DI-K7 140 -21.601 0.69 2.363
PD5-10 258 JD5-9 JD5-11 110 HDPE 145 3.4 0.49 3.109

MaRS Planning Engineering Services Pvt. Ltd.


PD5-11 287 JD5-10 JD5-8 200 DI-K7 140 -21.401 0.68 2.323
PD5-12 262 JD5-11 JD5-14 110 HDPE 145 3.2 0.47 2.779
PD5-13 286 JD5-12 JD5-10 200 DI-K7 140 -21.201 0.67 2.283
PD5-14 286 JD5-13 JD5-12 200 DI-K7 140 -21.001 0.67 2.243
PD5-15 232 JD5-14 JD5-15 110 HDPE 145 3 0.44 2.466
PD5-16 257 JD5-15 JD5-17 110 HDPE 145 2.8 0.41 2.17
PD5-17 288 JD5-16 JD5-13 200 DI-K7 140 -20.801 0.66 2.204
PD5-18 250 JD5-17 JD5-19 110 HDPE 145 2.6 0.38 1.892
PD5-19 285 JD5-18 JD5-16 200 DI-K7 140 -20.601 0.66 2.165
PD5-20 296 JD5-19 JD5-21 110 HDPE 145 2.4 0.35 1.631
PD5-21 288 JD5-20 JD5-18 200 DI-K7 140 -20.401 0.65 2.126
PD5-22 213 JD5-21 JD5-22 110 HDPE 145 2.2 0.32 1.388
PD5-23 250 JD5-22 JD5-25 90 HDPE 145 2 0.43 3.089
PD5-24 286 JD5-23 JD5-20 200 DI-K7 140 -20.201 0.64 2.087
PD5-25 288 JD5-24 JD5-23 200 DI-K7 140 -20.001 0.64 2.049
PD5-26 247 JD5-25 JD5-27 90 HDPE 145 1.8 0.39 2.542
PD5-27 286 JD5-26 JD5-24 200 DI-K7 140 -19.801 0.63 2.012
PD5-28 240 JD5-27 JD5-29 90 HDPE 145 1.6 0.35 2.044
PD5-29 287 JD5-28 JD5-26 200 DI-K7 140 -19.601 0.62 1.974
PD5-30 261 JD5-29 JD5-30 90 HDPE 145 1.4 0.3 1.596
PD5-31 245 JD5-30 JD5-33 90 HDPE 145 1.2 0.26 1.2
PD5-32 286 JD5-31 JD5-28 200 DI-K7 140 -19.401 0.62 1.937
PD5-33 151 JD5-32 JD5-31 200 DI-K7 140 -19.201 0.61 1.9
PD5-34 255 JD5-33 JD5-34 90 HDPE 145 1 0.22 0.856
PD5-35 66 JD5-34 JD5-35 90 HDPE 145 0.2 0.04 0.043
PD5-36 128 JD5-34 JD5-36 90 HDPE 145 0.6 0.13 0.332
PD5-37 116 JD5-36 JD5-38 90 HDPE 145 0.2 0.04 0.043
PD5-38 67 JD5-37 JD5-36 90 HDPE 145 -0.2 0.04 0.044
PD5-39 249 JD5-39 JD5-32 200 DI-K7 140 -19.001 0.6 1.864
PD5-40 132 JD5-40 JD5-39 90 HDPE 145 -0.4 0.09 0.157
PD5-41 240 JD5-41 JD5-40 90 HDPE 145 -0.2 0.04 0.043
PD5-42 140 JD5-42 JD5-39 200 DI-K7 140 -18.401 0.59 1.756
PD5-43 161 JD5-42 JD5-44 90 HDPE 145 2 0.43 3.089
PD5-44 263 JD5-43 JD5-42 200 DI-K7 140 -16.201 0.52 1.387
PD5-45 220 JD5-44 JD5-57 90 HDPE 145 1.8 0.39 2.542
PD5-46 115 JD5-45 JD5-51 90 HDPE 145 1.8 0.39 2.542
PD5-47 259 JD5-45 JD5-43 200 DI-K7 140 -16.001 0.51 1.356
PD5-48 30 JD5-46 JD5-45 200 DI-K7 140 -14.001 0.45 1.059
PD5-49 266 JD5-47 JD5-46 90 HDPE 145 -0.4 0.09 0.157
PD5-50 257 JD5-48 JD5-47 90 HDPE 145 -0.2 0.04 0.043
PD5-51 81 JD5-49 JD5-46 200 DI-K7 140 -13.401 0.43 0.976
PD5-52 81 JD5-50 JD5-49 90 HDPE 145 -0.2 0.04 0.043
PD5-53 14 JD5-51 JD5-53 90 HDPE 145 1.4 0.3 1.597
PD5-54 154 JD5-52 JD5-51 90 HDPE 145 -0.2 0.04 0.043
PD5-55 48 JD5-53 JD5-63 90 HDPE 145 1 0.22 0.855
PD5-56 13 JD5-54 JD5-56 90 HDPE 145 1.4 0.3 1.595
PD5-57 221 JD5-54 JD5-49 200 DI-K7 140 -13 0.41 0.923
PD5-58 63 JD5-55 JD5-53 90 HDPE 145 -0.2 0.04 0.043

MaRS Planning Engineering Services Pvt. Ltd.


PD5-59 22 JD5-56 JD5-60 90 HDPE 145 0.6 0.13 0.332
PD5-60 296 JD5-56 JD5-67 90 HDPE 145 0.4 0.09 0.157
PD5-61 246 JD5-57 JD5-84 90 HDPE 145 1.6 0.35 2.044
PD5-62 98 JD5-58 JD5-56 90 HDPE 145 -0.2 0.04 0.044
PD5-63 38 JD5-59 JD5-54 200 DI-K7 140 -11.4 0.36 0.723
PD5-64 125 JD5-60 JD5-61 90 HDPE 145 0.2 0.04 0.044
PD5-65 213 JD5-62 JD5-60 90 HDPE 145 -0.2 0.04 0.043
PD5-66 45 JD5-63 JD5-64 90 HDPE 145 0.2 0.04 0.043
PD5-67 57 JD5-63 JD5-65 90 HDPE 145 0.6 0.13 0.332
PD5-68 71 JD5-65 JD5-66 90 HDPE 145 0.2 0.04 0.043
PD5-69 237 JD5-65 JD5-69 90 HDPE 145 0.2 0.04 0.043
PD5-70 282 JD5-67 JD5-70 90 HDPE 145 0.2 0.04 0.043
PD5-71 13 JD5-68 JD5-59 140 HDPE 145 -6.502 0.58 3.182
PD5-72 49 JD5-71 JD5-68 140 HDPE 145 -5.341 0.48 2.21
PD5-73 153 JD5-72 JD5-68 90 HDPE 145 -0.961 0.21 0.795
PD5-74 27 JD5-73 JD5-72 90 HDPE 145 -0.761 0.17 0.516
PD5-75 11 JD5-74 JD5-71 110 HDPE 145 -4.702 0.53 3.036
PD5-76 76 JD5-75 JD5-76 90 HDPE 145 0.022 0 0.001
PD5-77 264 JD5-75 JD5-71 90 HDPE 145 -0.439 0.1 0.186
PD5-78 73 JD5-76 JD5-73 90 HDPE 145 -0.561 0.12 0.293
PD5-79 204 JD5-77 JD5-74 90 HDPE 145 -0.4 0.09 0.157
PD5-80 134 JD5-78 JD5-76 90 HDPE 145 -0.383 0.08 0.145
PD5-81 32 JD5-79 JD5-78 90 HDPE 145 -0.183 0.04 0.037
PD5-82 79 JD5-79 JD5-80 90 HDPE 145 0.2 0.04 0.043
PD5-83 409 JD5-79 JD5-75 90 HDPE 145 -0.217 0.05 0.05
PD5-84 209 JD5-81 JD5-77 90 HDPE 145 -0.2 0.04 0.043
PD5-85 132 JD5-82 JD5-83 90 HDPE 145 0.2 0.04 0.043
PD5-86 159 JD5-82 JD5-59 110 HDPE 145 -4.699 0.53 3.032
PD5-87 79 JD5-84 JD5-89 90 HDPE 145 0.6 0.13 0.332
PD5-88 75 JD5-85 JD5-84 90 HDPE 145 -0.2 0.04 0.044
PD5-89 10 JD5-86 JD5-84 90 HDPE 145 -0.6 0.13 0.333
PD5-90 68 JD5-86 JD5-87 90 HDPE 145 0.4 0.09 0.157
PD5-91 67 JD5-88 JD5-87 90 HDPE 145 -0.2 0.04 0.044
PD5-92 208 JD5-89 JD5-91 90 HDPE 145 0.2 0.04 0.043
PD5-93 71 JD5-90 JD5-89 90 HDPE 145 -0.2 0.04 0.044
PD5-94 32 JD5-92 JD5-82 110 HDPE 145 -4.299 0.48 2.571
PD5-95 92 JD5-93 JD5-92 90 HDPE 145 -0.2 0.04 0.043
PD5-96 95 JD5-94 JD5-95 90 HDPE 145 0.2 0.04 0.043
PD5-97 204 JD5-94 JD5-92 110 HDPE 145 -3.899 0.44 2.146
PD5-98 40 JD5-96 JD5-94 110 HDPE 145 -3.499 0.39 1.756
PD5-99 37 JD5-97 JD5-96 110 HDPE 145 -3.299 0.48 2.94
PD5-100 50 JD5-97 JD5-98 90 HDPE 145 1 0.22 0.856
PD5-101 65 JD5-98 JD5-100 90 HDPE 145 0.2 0.04 0.043
PD5-102 197 JD5-98 JD5-101 90 HDPE 145 0.2 0.04 0.043
PD5-103 10 JD5-99 JD5-98 90 HDPE 145 -0.4 0.09 0.156
PD5-104 200 JD5-99 JD5-102 90 HDPE 145 0.2 0.04 0.043
PD5-105 67 JD5-103 JD5-97 110 HDPE 145 -2.098 0.3 1.272
PD5-106 126 JD5-104 JD5-103 90 HDPE 145 -0.2 0.04 0.043

MaRS Planning Engineering Services Pvt. Ltd.


PD5-107 75 JD5-105 JD5-103 90 HDPE 145 -1.698 0.37 2.283
PD5-108 532 JD5-105 JD5-74 110 HDPE 145 -4.102 0.46 2.357
PD5-109 265 JD5-106 JD5-105 140 HDPE 145 -5.6 0.5 2.413
PD5-110 275 JD5-107 JD5-106 140 HDPE 145 -5.4 0.48 2.256
PD5-111 113 JD5-108 JD5-107 140 HDPE 145 -5.2 0.47 2.103
PD5-112 147 JD5-108 JD5-109 90 HDPE 145 0.6 0.13 0.332
PD5-113 251 JD5-108 JD5-112 90 HDPE 145 1.2 0.26 1.199
PD5-114 97 JD5-109 JD5-111 90 HDPE 145 0.2 0.04 0.043
PD5-115 79 JD5-109 JD5-110 90 HDPE 145 0.2 0.04 0.043
PD5-116 271 JD5-112 JD5-114 90 HDPE 145 1 0.22 0.856
PD5-117 141 JD5-113 JD5-108 110 HDPE 145 -3.2 0.47 2.779
PD5-118 10 JD5-114 JD5-116 90 HDPE 145 0.6 0.13 0.332
PD5-119 58 JD5-114 JD5-115 90 HDPE 145 0.2 0.04 0.043
PD5-120 94 JD5-116 JD5-117 90 HDPE 145 0.2 0.04 0.043
PD5-121 266 JD5-118 JD5-116 90 HDPE 145 -0.2 0.04 0.043
PD5-122 175 JD5-119 JD5-113 110 HDPE 145 -3 0.44 2.466
PD5-123 50 JD5-120 JD5-119 90 HDPE 145 -0.2 0.04 0.043
PD5-124 93 JD5-121 JD5-119 110 HDPE 145 -2.6 0.38 1.892
PD5-125 799 JD5-121 JD5-126 90 HDPE 145 0.2 0.04 0.043
PD5-126 10 JD5-122 JD5-121 90 HDPE 145 -0.8 0.17 0.567
PD5-127 340 JD5-122 JD5-124 90 HDPE 145 0.258 0.06 0.066
PD5-128 128 JD5-123 JD5-122 90 HDPE 145 -0.342 0.07 0.114
PD5-129 120 JD5-124 JD5-125 90 HDPE 145 0.058 0.01 0.001
PD5-130 410 JD5-125 JD5-123 90 HDPE 145 -0.142 0.03 0.02
PD5-131 32 JD5-127 JD5-128 90 HDPE 145 1.2 0.26 1.2
PD5-132 130 JD5-127 JD5-121 90 HDPE 145 -1.4 0.3 1.596
PD5-133 191 JD5-129 JD5-128 90 HDPE 145 -1 0.22 0.856
PD5-134 219 JD5-130 JD5-129 90 HDPE 145 -0.8 0.17 0.566
PD5-135 164 JD5-131 JD5-130 90 HDPE 145 -0.6 0.13 0.332
PD5-136 220 JD5-131 JD5-132 90 HDPE 145 0.4 0.09 0.157
PD5-137 205 JD5-132 JD5-133 90 HDPE 145 0.2 0.04 0.043
TD.-6
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD6-1 34 JD6-1 TD-6 200 DI-K7 140 -22.439 0.71 2.536
PD6-2 128 JD6-1 JD6-2 90 HDPE 145 0.374 0.08 0.138
PD6-3 12 JD6-3 JD6-4 90 HDPE 145 1.496 0.32 1.804
PD6-4 37 JD6-3 JD6-1 200 DI-K7 140 -21.691 0.69 2.382
PD6-5 30 JD6-4 JD6-6 90 HDPE 145 0.748 0.16 0.5
PD6-6 541 JD6-4 JD6-9 90 HDPE 145 0.374 0.08 0.138
PD6-7 11 JD6-5 JD6-3 200 DI-K7 140 -19.447 0.62 1.946
PD6-8 272 JD6-5 JD6-10 90 HDPE 145 1.122 0.24 1.059
PD6-9 145 JD6-6 JD6-7 90 HDPE 145 0.374 0.08 0.138
PD6-10 439 JD6-8 JD6-3 90 HDPE 145 -0.374 0.08 0.138
PD6-11 93 JD6-10 JD6-11 90 HDPE 145 0.374 0.08 0.138
PD6-12 287 JD6-10 JD6-13 90 HDPE 145 0.374 0.08 0.138
PD6-13 189 JD6-12 JD6-5 200 DI-K7 140 -17.951 0.57 1.678

MaRS Planning Engineering Services Pvt. Ltd.


PD6-14 19 JD6-14 JD6-12 200 DI-K7 140 -16.829 0.54 1.489
PD6-15 266 JD6-14 JD6-22 140 HDPE 145 5.236 0.47 2.13
PD6-16 20 JD6-15 JD6-14 200 DI-K7 140 -11.22 0.36 0.703
PD6-17 10 JD6-16 JD6-15 200 DI-K7 140 -10.472 0.33 0.618
PD6-18 217 JD6-17 JD6-15 90 HDPE 145 -0.374 0.08 0.138
PD6-19 284 JD6-18 JD6-12 90 HDPE 145 -0.748 0.16 0.5
PD6-20 206 JD6-19 JD6-16 90 HDPE 145 -0.748 0.16 0.5
PD6-21 286 JD6-20 JD6-18 90 HDPE 145 -0.374 0.08 0.138
PD6-22 243 JD6-21 JD6-19 90 HDPE 145 -0.374 0.08 0.138
PD6-23 269 JD6-22 JD6-24 110 HDPE 145 4.862 0.55 3.229
PD6-24 253 JD6-23 JD6-16 160 HDPE 145 -9.35 0.64 3.256
PD6-25 259 JD6-24 JD6-26 110 HDPE 145 4.488 0.5 2.784
PD6-26 245 JD6-25 JD6-23 160 HDPE 145 -8.976 0.62 3.019
PD6-27 285 JD6-26 JD6-28 110 HDPE 145 4.114 0.46 2.37
PD6-28 250 JD6-27 JD6-25 160 HDPE 145 -8.602 0.59 2.79
PD6-29 246 JD6-28 JD6-30 110 HDPE 145 3.74 0.42 1.987
PD6-30 173 JD6-29 JD6-31 160 HDPE 145 7.854 0.54 2.358
PD6-31 258 JD6-29 JD6-27 160 HDPE 145 -8.228 0.56 2.57
PD6-32 260 JD6-30 JD6-39 110 HDPE 145 3.366 0.49 3.051
PD6-33 172 JD6-31 JD6-33 160 HDPE 145 7.106 0.49 1.959
PD6-34 130 JD6-32 JD6-31 90 HDPE 145 -0.374 0.08 0.138
PD6-35 10 JD6-33 JD6-34 90 HDPE 145 0.748 0.16 0.5
PD6-36 10 JD6-33 JD6-35 110 HDPE 145 2.831 0.41 2.214
PD6-37 175 JD6-33 JD6-40 110 HDPE 145 3.153 0.46 2.704
PD6-38 217 JD6-34 JD6-36 90 HDPE 145 0.374 0.08 0.138
PD6-39 162 JD6-35 JD6-37 90 HDPE 145 0.374 0.08 0.138
PD6-40 200 JD6-35 JD6-38 110 HDPE 145 2.083 0.3 1.255
PD6-41 223 JD6-38 JD6-43 90 HDPE 145 1.709 0.37 2.308
PD6-42 266 JD6-39 JD6-48 110 HDPE 145 2.992 0.43 2.453
PD6-43 132 JD6-40 JD6-41 110 HDPE 145 2.779 0.4 2.14
PD6-44 10 JD6-41 JD6-43 90 HDPE 145 2.031 0.44 3.178
PD6-45 117 JD6-41 JD6-42 90 HDPE 145 0.374 0.08 0.138
PD6-46 10 JD6-43 JD6-44 90 HDPE 145 1.496 0.32 1.804
PD6-47 111 JD6-43 JD6-51 90 HDPE 145 1.87 0.41 2.727
PD6-48 95 JD6-44 JD6-46 90 HDPE 145 0.748 0.16 0.5
PD6-49 105 JD6-44 JD6-45 90 HDPE 145 0.374 0.08 0.138
PD6-50 142 JD6-46 JD6-47 90 HDPE 145 0.374 0.08 0.138
PD6-51 10 JD6-48 JD6-50 90 HDPE 145 1.122 0.24 1.059
PD6-52 169 JD6-48 JD6-58 90 HDPE 145 1.122 0.24 1.059
PD6-53 59 JD6-49 JD6-48 90 HDPE 145 -0.374 0.08 0.138
PD6-54 180 JD6-50 JD6-56 90 HDPE 145 0.748 0.16 0.5
PD6-55 10 JD6-51 JD6-52 90 HDPE 145 1.122 0.24 1.059
PD6-56 132 JD6-52 JD6-53 90 HDPE 145 0.374 0.08 0.138
PD6-57 333 JD6-54 JD6-51 90 HDPE 145 -0.374 0.08 0.138
PD6-58 318 JD6-55 JD6-52 90 HDPE 145 -0.374 0.08 0.138
PD6-59 49 JD6-56 JD6-57 90 HDPE 145 0.374 0.08 0.138
PD6-60 54 JD6-58 JD6-60 90 HDPE 145 0.374 0.08 0.138
PD6-61 46 JD6-59 JD6-58 90 HDPE 145 -0.374 0.08 0.138

MaRS Planning Engineering Services Pvt. Ltd.


TD.-7
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD7-1 35 JD7-1 TD-7 200 DI-K7 140 -21.321 0.68 2.307
PD7-2 127 JD7-1 JD7-2 90 HDPE 145 0.328 0.07 0.109
PD7-3 81 JD7-3 JD7-1 200 DI-K7 140 -20.665 0.66 2.177
PD7-4 137 JD7-3 JD7-4 90 HDPE 145 0.328 0.07 0.109
PD7-5 118 JD7-5 JD7-6 90 HDPE 145 1.312 0.28 1.415
PD7-6 244 JD7-5 JD7-3 200 DI-K7 140 -20.009 0.64 2.051
PD7-7 10 JD7-6 JD7-7 90 HDPE 145 0.656 0.14 0.392
PD7-8 246 JD7-6 JD7-8 90 HDPE 145 0.328 0.07 0.109
PD7-9 248 JD7-7 JD7-9 90 HDPE 145 0.328 0.07 0.109
PD7-10 201 JD7-10 JD7-5 200 DI-K7 140 -18.369 0.58 1.751
PD7-11 260 JD7-11 JD7-10 200 DI-K7 140 -18.041 0.57 1.693
PD7-12 94 JD7-12 JD7-11 200 DI-K7 140 -17.713 0.56 1.636
PD7-13 138 JD7-12 JD7-13 90 HDPE 145 0.328 0.07 0.109
PD7-14 33 JD7-14 JD7-12 200 DI-K7 140 -17.057 0.54 1.526
PD7-15 72 JD7-15 JD7-14 90 HDPE 145 -0.328 0.07 0.109
PD7-16 10 JD7-16 JD7-17 90 HDPE 145 0.984 0.21 0.831
PD7-17 46 JD7-16 JD7-14 200 DI-K7 140 -16.401 0.52 1.419
PD7-18 210 JD7-17 JD7-19 90 HDPE 145 0.328 0.07 0.109
PD7-19 429 JD7-17 JD7-20 90 HDPE 145 0.328 0.07 0.109
PD7-20 102 JD7-18 JD7-16 90 HDPE 145 -0.328 0.07 0.109
PD7-21 10 JD7-21 JD7-22 200 DI-K7 140 13.449 0.43 0.983
PD7-22 126 JD7-21 JD7-16 200 DI-K7 140 -14.761 0.47 1.168
PD7-23 108 JD7-22 JD7-28 200 DI-K7 140 12.465 0.4 0.854
PD7-24 104 JD7-23 JD7-22 90 HDPE 145 -0.656 0.14 0.392
PD7-25 66 JD7-24 JD7-23 90 HDPE 145 -0.328 0.07 0.108
PD7-26 41 JD7-25 JD7-26 90 HDPE 145 0.328 0.07 0.108
PD7-27 101 JD7-25 JD7-21 90 HDPE 145 -0.984 0.21 0.831
PD7-28 69 JD7-27 JD7-25 90 HDPE 145 -0.328 0.07 0.109
PD7-29 10 JD7-28 JD7-29 200 DI-K7 140 11.809 0.38 0.772
PD7-30 189 JD7-29 JD7-32 200 DI-K7 140 11.153 0.35 0.695
PD7-31 135 JD7-30 JD7-28 90 HDPE 145 -0.328 0.07 0.109
PD7-32 137 JD7-31 JD7-29 90 HDPE 145 -0.328 0.07 0.109
PD7-33 197 JD7-32 JD7-33 200 DI-K7 140 10.825 0.34 0.657
PD7-34 204 JD7-33 JD7-34 200 DI-K7 140 10.496 0.33 0.621
PD7-35 199 JD7-34 JD7-35 200 DI-K7 140 10.168 0.32 0.585
PD7-36 198 JD7-35 JD7-36 200 DI-K7 140 9.84 0.31 0.551
PD7-37 188 JD7-36 JD7-37 160 HDPE 145 9.512 0.65 3.362
PD7-38 186 JD7-37 JD7-38 160 HDPE 145 9.184 0.63 3.151
PD7-39 183 JD7-38 JD7-42 160 HDPE 145 7.872 0.54 2.368
PD7-40 127 JD7-39 JD7-38 90 HDPE 145 -0.984 0.21 0.831
PD7-41 247 JD7-39 JD7-41 90 HDPE 145 0.328 0.07 0.109
PD7-42 63 JD7-40 JD7-39 90 HDPE 145 -0.328 0.07 0.109
PD7-43 11 JD7-42 JD7-44 160 HDPE 145 7.216 0.5 2.015
PD7-44 141 JD7-42 JD7-43 90 HDPE 145 0.328 0.07 0.109

MaRS Planning Engineering Services Pvt. Ltd.


PD7-45 3 JD7-44 JD7-45 140 HDPE 145 6.56 0.59 3.235
PD7-46 145 JD7-44 JD7-46 90 HDPE 145 0.328 0.07 0.109
PD7-47 12 JD7-45 JD7-48 140 HDPE 145 5.904 0.53 2.661
PD7-48 136 JD7-45 JD7-47 90 HDPE 145 0.328 0.07 0.109
PD7-49 130 JD7-48 JD7-49 110 HDPE 145 2.624 0.38 1.924
PD7-50 201 JD7-48 JD7-51 110 HDPE 145 2.952 0.43 2.393
PD7-51 131 JD7-49 JD7-50 110 HDPE 145 2.296 0.33 1.503
PD7-52 106 JD7-50 JD7-55 90 HDPE 145 1.312 0.28 1.415
PD7-53 127 JD7-50 JD7-52 90 HDPE 145 0.656 0.14 0.392
PD7-54 206 JD7-51 JD7-59 110 HDPE 145 2.296 0.33 1.503
PD7-55 215 JD7-51 JD7-53 90 HDPE 145 0.328 0.07 0.109
PD7-56 193 JD7-52 JD7-54 90 HDPE 145 0.328 0.07 0.109
PD7-57 110 JD7-55 JD7-56 90 HDPE 145 0.328 0.07 0.109
PD7-58 152 JD7-55 JD7-57 90 HDPE 145 0.656 0.14 0.392
PD7-59 143 JD7-57 JD7-58 90 HDPE 145 0.328 0.07 0.109
PD7-60 197 JD7-59 JD7-60 90 HDPE 145 1.968 0.43 2.998
PD7-61 203 JD7-60 JD7-61 90 HDPE 145 1.64 0.36 2.139
PD7-62 10 JD7-61 JD7-62 90 HDPE 145 0.984 0.21 0.831
PD7-63 194 JD7-61 JD7-63 90 HDPE 145 0.328 0.07 0.109
PD7-64 198 JD7-62 JD7-64 90 HDPE 145 0.328 0.07 0.109
PD7-65 201 JD7-65 JD7-62 90 HDPE 145 -0.328 0.07 0.109
TD.-8
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD8-1 194 JD8-1 JD8-2 200 DI-K7 140 12.915 0.41 0.912
PD8-2 210 JD8-1 TD-8 200 DI-K7 140 -20.822 0.66 2.208
PD8-3 103 JD8-2 JD8-11 160 HDPE 145 7.684 0.53 2.264
PD8-4 128 JD8-3 JD8-1 160 HDPE 145 -7.644 0.52 2.242
PD8-5 144 JD8-3 JD8-4 90 HDPE 145 0.264 0.06 0.072
PD8-6 83 JD8-5 JD8-2 140 HDPE 145 -4.967 0.45 1.932
PD8-7 10 JD8-6 JD8-5 90 HDPE 145 -0.791 0.17 0.554
PD8-8 70 JD8-7 JD8-6 90 HDPE 145 -0.264 0.06 0.072
PD8-9 31 JD8-8 JD8-3 160 HDPE 145 -7.116 0.49 1.964
PD8-10 59 JD8-9 JD8-8 90 HDPE 145 -0.264 0.06 0.072
PD8-11 872 JD8-10 JD8-6 90 HDPE 145 -0.264 0.06 0.072
PD8-12 47 JD8-11 JD8-12 90 HDPE 145 0.264 0.06 0.072
PD8-13 188 JD8-11 JD8-16 160 HDPE 145 7.157 0.49 1.985
PD8-14 60 JD8-13 JD8-14 90 HDPE 145 0.264 0.06 0.072
PD8-15 119 JD8-13 JD8-8 140 HDPE 145 -6.589 0.59 3.261
PD8-16 205 JD8-15 JD8-5 110 HDPE 145 -3.913 0.44 2.16
PD8-17 278 JD8-16 JD8-45 140 HDPE 145 6.103 0.55 2.829
PD8-18 10 JD8-17 JD8-16 90 HDPE 145 -0.791 0.17 0.554
PD8-19 279 JD8-17 JD8-19 90 HDPE 145 0.264 0.06 0.072
PD8-20 42 JD8-18 JD8-17 90 HDPE 145 -0.264 0.06 0.072
PD8-21 75 JD8-20 JD8-13 140 HDPE 145 -6.062 0.54 2.794
PD8-22 182 JD8-20 JD8-34 110 HDPE 145 2.636 0.38 1.94
PD8-23 10 JD8-21 JD8-20 110 HDPE 145 -3.163 0.46 2.719

MaRS Planning Engineering Services Pvt. Ltd.


PD8-24 132 JD8-21 JD8-22 90 HDPE 145 1.043 0.23 0.924
PD8-25 185 JD8-23 JD8-15 110 HDPE 145 -3.65 0.41 1.899
PD8-26 63 JD8-24 JD8-21 90 HDPE 145 -1.857 0.4 2.692
PD8-27 91 JD8-24 JD8-22 90 HDPE 145 -0.779 0.17 0.539
PD8-28 10 JD8-25 JD8-24 110 HDPE 145 -2.372 0.34 1.596
PD8-29 66 JD8-25 JD8-26 90 HDPE 145 0.896 0.19 0.699
PD8-30 104 JD8-26 JD8-27 90 HDPE 145 0.633 0.14 0.367
PD8-31 71 JD8-28 JD8-25 90 HDPE 145 -1.212 0.26 1.222
PD8-32 10 JD8-29 JD8-28 90 HDPE 145 -0.685 0.15 0.425
PD8-33 14 JD8-30 JD8-29 90 HDPE 145 -0.158 0.03 0.028
PD8-34 52 JD8-30 JD8-27 90 HDPE 145 -0.369 0.08 0.135
PD8-35 159 JD8-31 JD8-28 90 HDPE 145 -0.264 0.06 0.072
PD8-36 141 JD8-32 JD8-29 90 HDPE 145 -0.264 0.06 0.072
PD8-37 158 JD8-33 JD8-30 90 HDPE 145 -0.264 0.06 0.072
PD8-38 49 JD8-34 JD8-35 90 HDPE 145 0.264 0.06 0.072
PD8-39 10 JD8-36 JD8-34 90 HDPE 145 -1.318 0.29 1.426
PD8-40 173 JD8-36 JD8-39 90 HDPE 145 0.791 0.17 0.554
PD8-41 238 JD8-37 JD8-36 90 HDPE 145 -0.264 0.06 0.072
PD8-42 181 JD8-38 JD8-34 90 HDPE 145 -0.791 0.17 0.554
PD8-43 271 JD8-38 JD8-41 90 HDPE 145 0.264 0.06 0.072
PD8-44 25 JD8-39 JD8-40 90 HDPE 145 0.264 0.06 0.072
PD8-45 300 JD8-42 JD8-38 90 HDPE 145 -0.264 0.06 0.072
PD8-46 197 JD8-43 JD8-39 90 HDPE 145 -0.264 0.06 0.072
PD8-47 130 JD8-44 JD8-48 90 HDPE 145 0.791 0.17 0.554
PD8-48 245 JD8-44 JD8-23 110 HDPE 145 -3.386 0.38 1.653
PD8-49 10 JD8-45 JD8-47 140 HDPE 145 5.53 0.5 2.357
PD8-50 250 JD8-45 JD8-46 90 HDPE 145 0.309 0.07 0.097
PD8-51 37 JD8-46 JD8-44 110 HDPE 145 -2.332 0.34 1.546
PD8-52 73 JD8-47 JD8-52 110 HDPE 145 5.012 0.56 3.416
PD8-53 233 JD8-47 JD8-49 90 HDPE 145 0.254 0.06 0.068
PD8-54 104 JD8-48 JD8-51 90 HDPE 145 0.264 0.06 0.072
PD8-55 10 JD8-49 JD8-46 110 HDPE 145 -2.377 0.35 1.603
PD8-56 83 JD8-50 JD8-48 90 HDPE 145 -0.264 0.06 0.072
PD8-57 64 JD8-52 JD8-53 160 HDPE 145 7.116 0.49 1.964
PD8-58 146 JD8-52 JD8-49 110 HDPE 145 -2.368 0.34 1.591
PD8-59 25 JD8-53 JD8-55 140 HDPE 145 6.589 0.59 3.261
PD8-60 49 JD8-53 JD8-54 90 HDPE 145 0.264 0.06 0.072
PD8-61 10 JD8-55 JD8-56 140 HDPE 145 5.199 0.47 2.103
PD8-62 494 JD8-55 JD8-60 90 HDPE 145 1.127 0.24 1.067
PD8-63 21 JD8-56 JD8-57 110 HDPE 145 3.819 0.43 2.065
PD8-64 458 JD8-56 JD8-59 90 HDPE 145 1.117 0.24 1.05
PD8-65 108 JD8-57 JD8-58 90 HDPE 145 0.264 0.06 0.072
PD8-66 150 JD8-57 JD8-59 110 HDPE 145 3.292 0.48 2.928
PD8-67 10 JD8-59 JD8-60 110 HDPE 145 4.145 0.47 2.403
PD8-68 78 JD8-60 JD8-61 110 HDPE 145 5.008 0.56 3.411
PD8-69 10 JD8-61 JD8-63 110 HDPE 145 4.481 0.5 2.776
PD8-70 228 JD8-61 JD8-62 90 HDPE 145 0.264 0.06 0.072
PD8-71 123 JD8-63 JD8-67 90 HDPE 145 1.739 0.38 2.384

MaRS Planning Engineering Services Pvt. Ltd.


PD8-72 171 JD8-63 JD8-69 90 HDPE 145 1.687 0.37 2.255
PD8-73 52 JD8-64 JD8-65 90 HDPE 145 0.264 0.06 0.072
PD8-74 193 JD8-64 JD8-63 90 HDPE 145 -0.791 0.17 0.554
PD8-75 106 JD8-66 JD8-64 90 HDPE 145 -0.264 0.06 0.072
PD8-76 85 JD8-67 JD8-68 90 HDPE 145 0.264 0.06 0.072
PD8-77 124 JD8-67 JD8-74 90 HDPE 145 1.212 0.26 1.221
PD8-78 12 JD8-69 JD8-70 90 HDPE 145 0.952 0.21 0.781
PD8-79 280 JD8-69 JD8-72 90 HDPE 145 0.472 0.1 0.213
PD8-80 71 JD8-70 JD8-71 90 HDPE 145 0.264 0.06 0.072
PD8-81 286 JD8-70 JD8-73 90 HDPE 145 0.425 0.09 0.175
PD8-82 15 JD8-72 JD8-73 90 HDPE 145 0.102 0.02 0.012
PD8-83 168 JD8-73 JD8-76 90 HDPE 145 0.264 0.06 0.072
PD8-84 18 JD8-74 JD8-72 90 HDPE 145 -0.106 0.02 0.013
PD8-85 73 JD8-74 JD8-75 90 HDPE 145 0.264 0.06 0.072
PD8-86 100 JD8-74 JD8-77 90 HDPE 145 0.791 0.17 0.554
PD8-87 102 JD8-77 JD8-78 90 HDPE 145 0.264 0.06 0.072
PD8-88 146 JD8-77 JD8-79 90 HDPE 145 0.264 0.06 0.072
TD.-9
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD9-1 12 JD9-1 JD9-2 160 HDPE 145 7.253 0.5 2.035
PD9-2 31 JD9-1 TD-9 200 DI-K7 140 -18.443 0.59 1.764
PD9-3 10 JD9-2 JD9-6 140 HDPE 145 6.838 0.61 3.493
PD9-4 163 JD9-2 JD9-3 90 HDPE 145 0.207 0.04 0.046
PD9-5 48 JD9-4 JD9-5 90 HDPE 145 0.207 0.04 0.046
PD9-6 51 JD9-4 JD9-1 200 DI-K7 140 -10.983 0.35 0.675
PD9-7 72 JD9-6 JD9-17 110 HDPE 145 3.013 0.44 2.486
PD9-8 162 JD9-6 JD9-8 90 HDPE 145 0.829 0.18 0.604
PD9-9 165 JD9-6 JD9-22 110 HDPE 145 2.789 0.41 2.154
PD9-10 50 JD9-7 JD9-10 90 HDPE 145 1.036 0.22 0.914
PD9-11 129 JD9-7 JD9-4 200 DI-K7 140 -10.568 0.34 0.629
PD9-12 10 JD9-8 JD9-9 90 HDPE 145 0.414 0.09 0.167
PD9-13 135 JD9-8 JD9-12 90 HDPE 145 0.207 0.04 0.046
PD9-14 148 JD9-9 JD9-13 90 HDPE 145 0.207 0.04 0.046
PD9-15 38 JD9-10 JD9-11 90 HDPE 145 0.207 0.04 0.046
PD9-16 200 JD9-10 JD9-14 90 HDPE 145 0.622 0.13 0.355
PD9-17 38 JD9-14 JD9-15 90 HDPE 145 0.207 0.04 0.046
PD9-18 95 JD9-14 JD9-16 90 HDPE 145 0.207 0.04 0.046
PD9-19 10 JD9-17 JD9-18 110 HDPE 145 2.392 0.35 1.62
PD9-20 241 JD9-17 JD9-19 90 HDPE 145 0.414 0.09 0.167
PD9-21 80 JD9-18 JD9-21 90 HDPE 145 1.096 0.24 1.013
PD9-22 180 JD9-18 JD9-23 90 HDPE 145 1.089 0.24 1.002
PD9-23 152 JD9-19 JD9-20 90 HDPE 145 0.207 0.04 0.046
PD9-24 145 JD9-21 JD9-23 90 HDPE 145 0.888 0.19 0.687
PD9-25 182 JD9-22 JD9-28 110 HDPE 145 2.582 0.38 1.867
PD9-26 146 JD9-23 JD9-29 90 HDPE 145 1.77 0.38 2.464
PD9-27 39 JD9-24 JD9-25 90 HDPE 145 0.207 0.04 0.046

MaRS Planning Engineering Services Pvt. Ltd.


PD9-28 120 JD9-24 JD9-7 160 HDPE 145 -9.325 0.64 3.241
PD9-29 49 JD9-26 JD9-27 90 HDPE 145 0.207 0.04 0.046
PD9-30 79 JD9-26 JD9-24 160 HDPE 145 -8.911 0.61 2.979
PD9-31 148 JD9-28 JD9-31 110 HDPE 145 2.374 0.35 1.599
PD9-32 176 JD9-29 JD9-30 90 HDPE 145 0.207 0.04 0.046
PD9-33 288 JD9-29 JD9-37 90 HDPE 145 1.356 0.29 1.503
PD9-34 12 JD9-31 JD9-35 90 HDPE 145 1.96 0.43 2.975
PD9-35 78 JD9-31 JD9-32 90 HDPE 145 0.207 0.04 0.046
PD9-36 106 JD9-33 JD9-34 90 HDPE 145 0.207 0.04 0.046
PD9-37 95 JD9-33 JD9-26 160 HDPE 145 -8.496 0.58 2.727
PD9-38 110 JD9-35 JD9-39 90 HDPE 145 1.546 0.34 1.916
PD9-39 153 JD9-36 JD9-35 90 HDPE 145 -0.207 0.04 0.046
PD9-40 10 JD9-37 JD9-39 90 HDPE 145 0.941 0.2 0.765
PD9-41 116 JD9-38 JD9-37 90 HDPE 145 -0.207 0.04 0.046
PD9-42 278 JD9-39 JD9-40 110 HDPE 145 2.279 0.33 1.483
PD9-43 202 JD9-40 JD9-54 90 HDPE 145 2.072 0.45 3.299
PD9-44 11 JD9-41 JD9-42 90 HDPE 145 0.622 0.13 0.355
PD9-45 79 JD9-41 JD9-45 90 HDPE 145 1.451 0.31 1.704
PD9-46 280 JD9-41 JD9-33 160 HDPE 145 -8.082 0.55 2.486
PD9-47 76 JD9-42 JD9-43 90 HDPE 145 0.207 0.04 0.046
PD9-48 160 JD9-44 JD9-42 90 HDPE 145 -0.207 0.04 0.046
PD9-49 19 JD9-45 JD9-47 90 HDPE 145 1.036 0.22 0.914
PD9-50 73 JD9-45 JD9-46 90 HDPE 145 0.207 0.04 0.046
PD9-51 10 JD9-47 JD9-48 90 HDPE 145 0.622 0.13 0.355
PD9-52 119 JD9-47 JD9-49 90 HDPE 145 0.207 0.04 0.046
PD9-53 79 JD9-48 JD9-50 90 HDPE 145 0.207 0.04 0.046
PD9-54 103 JD9-48 JD9-51 90 HDPE 145 0.207 0.04 0.046
PD9-55 118 JD9-52 JD9-53 90 HDPE 145 0.207 0.04 0.046
PD9-56 157 JD9-52 JD9-41 140 HDPE 145 -5.802 0.52 2.577
PD9-57 61 JD9-54 JD9-55 90 HDPE 145 0.622 0.13 0.355
PD9-58 174 JD9-54 JD9-58 90 HDPE 145 1.243 0.27 1.281
PD9-59 80 JD9-55 JD9-56 90 HDPE 145 0.207 0.04 0.046
PD9-60 112 JD9-55 JD9-57 90 HDPE 145 0.207 0.04 0.046
PD9-61 15 JD9-58 JD9-59 90 HDPE 145 0.622 0.13 0.355
PD9-62 152 JD9-58 JD9-61 90 HDPE 145 0.207 0.04 0.046
PD9-63 137 JD9-59 JD9-63 90 HDPE 145 0.207 0.04 0.046
PD9-64 126 JD9-60 JD9-58 90 HDPE 145 -0.207 0.04 0.046
PD9-65 134 JD9-62 JD9-59 90 HDPE 145 -0.207 0.04 0.046
PD9-66 10 JD9-64 JD9-65 90 HDPE 145 0.414 0.09 0.167
PD9-67 276 JD9-64 JD9-52 140 HDPE 145 -5.388 0.48 2.246
PD9-68 195 JD9-66 JD9-65 90 HDPE 145 -0.207 0.04 0.046
PD9-69 111 JD9-67 JD9-64 110 HDPE 145 -1.882 0.27 1.04
PD9-70 199 JD9-68 JD9-64 110 HDPE 145 -2.884 0.42 2.292
PD9-71 12 JD9-69 JD9-70 90 HDPE 145 0.622 0.13 0.355
PD9-72 269 JD9-69 JD9-67 90 HDPE 145 -1.675 0.36 2.225
PD9-73 77 JD9-70 JD9-71 90 HDPE 145 0.207 0.04 0.046
PD9-74 267 JD9-70 JD9-72 90 HDPE 145 0.207 0.04 0.046
PD9-75 213 JD9-73 JD9-69 90 HDPE 145 -0.846 0.18 0.628

MaRS Planning Engineering Services Pvt. Ltd.


PD9-76 177 JD9-74 JD9-73 90 HDPE 145 -0.639 0.14 0.373
PD9-77 229 JD9-74 JD9-68 110 HDPE 145 -2.677 0.39 1.996
PD9-78 186 JD9-75 JD9-74 110 HDPE 145 -3.108 0.45 2.633
PD9-79 218 JD9-76 JD9-75 110 HDPE 145 -2.901 0.42 2.317
PD9-80 10 JD9-77 JD9-78 90 HDPE 145 1.386 0.3 1.567
PD9-81 288 JD9-77 JD9-76 110 HDPE 145 -2.694 0.39 2.02
PD9-82 113 JD9-78 JD9-79 90 HDPE 145 0.207 0.04 0.046
PD9-83 174 JD9-80 JD9-77 90 HDPE 145 -1.1 0.24 1.022
PD9-84 84 JD9-81 JD9-87 90 HDPE 145 0.622 0.13 0.355
PD9-85 347 JD9-81 JD9-78 90 HDPE 145 -0.972 0.21 0.812
PD9-86 10 JD9-82 JD9-81 90 HDPE 145 -0.143 0.03 0.023
PD9-87 172 JD9-82 JD9-80 90 HDPE 145 -0.893 0.19 0.694
PD9-88 346 JD9-82 JD9-85 90 HDPE 145 0.207 0.04 0.046
PD9-89 11 JD9-83 JD9-82 90 HDPE 145 -0.622 0.13 0.355
PD9-90 363 JD9-83 JD9-86 90 HDPE 145 0.207 0.04 0.046
PD9-91 107 JD9-84 JD9-83 90 HDPE 145 -0.207 0.04 0.046
PD9-92 56 JD9-87 JD9-88 90 HDPE 145 0.207 0.04 0.046
PD9-93 75 JD9-87 JD9-89 90 HDPE 145 0.207 0.04 0.046
TD.-10
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD10-1 34 JD10-1 TD-10 200 DI-K7 140 -19.674 0.63 1.988
PD10-2 45 JD10-2 JD10-3 90 HDPE 145 0.229 0.05 0.056
PD10-3 193 JD10-2 JD10-1 200 DI-K7 140 -19.445 0.62 1.945
PD10-4 179 JD10-4 JD10-2 200 DI-K7 140 -18.988 0.6 1.861
PD10-5 231 JD10-5 JD10-4 200 DI-K7 140 -18.759 0.6 1.82
PD10-6 226 JD10-6 JD10-5 200 DI-K7 140 -18.53 0.59 1.779
PD10-7 229 JD10-7 JD10-6 200 DI-K7 140 -18.301 0.58 1.739
PD10-8 233 JD10-8 JD10-7 200 DI-K7 140 -18.073 0.58 1.699
PD10-9 232 JD10-9 JD10-8 200 DI-K7 140 -17.844 0.57 1.659
PD10-10 135 JD10-10 JD10-13 140 HDPE 145 6.405 0.57 3.095
PD10-11 228 JD10-10 JD10-9 200 DI-K7 140 -17.615 0.56 1.62
PD10-12 181 JD10-11 JD10-10 200 DI-K7 140 -10.981 0.35 0.675
PD10-13 200 JD10-11 JD10-12 90 HDPE 145 1.144 0.25 1.098
PD10-14 200 JD10-12 JD10-14 90 HDPE 145 0.915 0.2 0.726
PD10-15 196 JD10-13 JD10-24 140 HDPE 145 6.177 0.55 2.893
PD10-16 10 JD10-14 JD10-15 90 HDPE 145 0.458 0.1 0.201
PD10-17 269 JD10-14 JD10-16 90 HDPE 145 0.229 0.05 0.056
PD10-18 262 JD10-15 JD10-17 90 HDPE 145 0.229 0.05 0.056
PD10-19 186 JD10-18 JD10-11 160 HDPE 145 -9.608 0.66 3.425
PD10-20 203 JD10-18 JD10-25 110 HDPE 145 2.179 0.32 1.364
PD10-21 10 JD10-19 JD10-18 160 HDPE 145 -7.2 0.49 2.008
PD10-22 198 JD10-19 JD10-26 110 HDPE 145 2.134 0.31 1.312
PD10-23 54 JD10-20 JD10-19 110 HDPE 145 -4.838 0.54 3.2
PD10-24 81 JD10-21 JD10-20 90 HDPE 145 -0.229 0.05 0.056
PD10-25 11 JD10-22 JD10-20 110 HDPE 145 -4.381 0.49 2.663
PD10-26 74 JD10-23 JD10-22 90 HDPE 145 -0.229 0.05 0.056

MaRS Planning Engineering Services Pvt. Ltd.


PD10-27 159 JD10-24 JD10-49 140 HDPE 145 5.948 0.53 2.698
PD10-28 10 JD10-25 JD10-26 90 HDPE 145 0.566 0.12 0.298
PD10-29 42 JD10-25 JD10-29 90 HDPE 145 1.385 0.3 1.564
PD10-30 58 JD10-26 JD10-33 110 HDPE 145 2.47 0.36 1.721
PD10-31 44 JD10-27 JD10-22 110 HDPE 145 -3.923 0.44 2.17
PD10-32 10 JD10-28 JD10-27 110 HDPE 145 -2.663 0.39 1.977
PD10-33 201 JD10-29 JD10-41 90 HDPE 145 0.927 0.2 0.744
PD10-34 124 JD10-30 JD10-29 90 HDPE 145 -0.229 0.05 0.056
PD10-35 106 JD10-31 JD10-28 90 HDPE 145 -0.458 0.1 0.201
PD10-36 103 JD10-32 JD10-31 90 HDPE 145 -0.229 0.05 0.056
PD10-37 10 JD10-33 JD10-34 90 HDPE 145 1.485 0.32 1.781
PD10-38 61 JD10-34 JD10-36 90 HDPE 145 0.491 0.11 0.229
PD10-39 254 JD10-34 JD10-43 90 HDPE 145 0.765 0.17 0.522
PD10-40 103 JD10-35 JD10-27 90 HDPE 145 -1.031 0.22 0.906
PD10-41 11 JD10-36 JD10-35 90 HDPE 145 -0.574 0.12 0.306
PD10-42 77 JD10-37 JD10-35 90 HDPE 145 -0.229 0.05 0.056
PD10-43 28 JD10-38 JD10-28 90 HDPE 145 -1.977 0.43 3.023
PD10-44 97 JD10-38 JD10-39 90 HDPE 145 0.229 0.05 0.056
PD10-45 115 JD10-40 JD10-36 90 HDPE 145 -0.836 0.18 0.614
PD10-46 40 JD10-41 JD10-44 90 HDPE 145 1.226 0.27 1.248
PD10-47 218 JD10-41 JD10-33 90 HDPE 145 -0.756 0.16 0.51
PD10-48 82 JD10-42 JD10-41 90 HDPE 145 -0.229 0.05 0.056
PD10-49 143 JD10-43 JD10-40 90 HDPE 145 -0.607 0.13 0.339
PD10-50 10 JD10-44 JD10-43 90 HDPE 145 -1.144 0.25 1.098
PD10-51 57 JD10-44 JD10-45 110 HDPE 145 2.141 0.31 1.32
PD10-52 10 JD10-45 JD10-46 90 HDPE 145 0.769 0.17 0.525
PD10-53 52 JD10-45 JD10-52 90 HDPE 145 1.144 0.25 1.098
PD10-54 214 JD10-46 JD10-48 90 HDPE 145 0.311 0.07 0.098
PD10-55 186 JD10-47 JD10-46 90 HDPE 145 -0.229 0.05 0.056
PD10-56 10 JD10-48 JD10-50 90 HDPE 145 1.601 0.35 2.046
PD10-57 121 JD10-48 JD10-38 90 HDPE 145 -1.519 0.33 1.856
PD10-58 175 JD10-49 JD10-62 140 HDPE 145 5.719 0.51 2.509
PD10-59 150 JD10-50 JD10-51 90 HDPE 145 0.229 0.05 0.056
PD10-60 13 JD10-52 JD10-54 90 HDPE 145 0.686 0.15 0.426
PD10-61 64 JD10-52 JD10-53 90 HDPE 145 0.229 0.05 0.056
PD10-62 51 JD10-54 JD10-55 90 HDPE 145 0.229 0.05 0.056
PD10-63 75 JD10-54 JD10-56 90 HDPE 145 0.229 0.05 0.056
PD10-64 38 JD10-57 JD10-58 90 HDPE 145 0.229 0.05 0.056
PD10-65 232 JD10-57 JD10-50 90 HDPE 145 -1.144 0.25 1.098
PD10-66 10 JD10-59 JD10-57 90 HDPE 145 -0.686 0.15 0.426
PD10-67 35 JD10-59 JD10-60 90 HDPE 145 0.229 0.05 0.056
PD10-68 87 JD10-61 JD10-59 90 HDPE 145 -0.229 0.05 0.056
PD10-69 221 JD10-62 JD10-67 110 HDPE 145 4.575 0.51 2.886
PD10-70 271 JD10-62 JD10-63 90 HDPE 145 0.915 0.2 0.726
PD10-71 10 JD10-63 JD10-64 90 HDPE 145 0.458 0.1 0.201
PD10-72 249 JD10-63 JD10-65 90 HDPE 145 0.229 0.05 0.056
PD10-73 251 JD10-64 JD10-66 90 HDPE 145 0.229 0.05 0.056
PD10-74 195 JD10-67 JD10-68 110 HDPE 145 4.347 0.49 2.624

MaRS Planning Engineering Services Pvt. Ltd.


PD10-75 207 JD10-68 JD10-69 110 HDPE 145 4.118 0.46 2.374
PD10-76 185 JD10-69 JD10-70 110 HDPE 145 3.889 0.44 2.136
PD10-77 10 JD10-70 JD10-72 110 HDPE 145 3.432 0.5 3.162
PD10-78 267 JD10-71 JD10-70 90 HDPE 145 -0.229 0.05 0.056
PD10-79 174 JD10-72 JD10-74 110 HDPE 145 2.974 0.43 2.426
PD10-80 256 JD10-73 JD10-72 90 HDPE 145 -0.229 0.05 0.056
PD10-81 86 JD10-74 JD10-76 90 HDPE 145 1.496 0.32 1.805
PD10-82 95 JD10-75 JD10-74 90 HDPE 145 -0.229 0.05 0.056
PD10-83 141 JD10-76 JD10-81 90 HDPE 145 1.039 0.23 0.918
PD10-84 53 JD10-77 JD10-76 90 HDPE 145 -0.229 0.05 0.056
PD10-85 194 JD10-78 JD10-74 90 HDPE 145 -1.02 0.22 0.888
PD10-86 194 JD10-79 JD10-78 90 HDPE 145 -0.791 0.17 0.555
PD10-87 10 JD10-80 JD10-79 90 HDPE 145 -0.428 0.09 0.178
PD10-88 10 JD10-81 JD10-82 90 HDPE 145 0.581 0.13 0.313
PD10-89 10 JD10-82 JD10-84 90 HDPE 145 0.488 0.11 0.227
PD10-90 375 JD10-82 JD10-79 90 HDPE 145 -0.135 0.03 0.021
PD10-91 91 JD10-83 JD10-81 90 HDPE 145 -0.229 0.05 0.056
PD10-92 36 JD10-84 JD10-86 90 HDPE 145 0.229 0.05 0.056
PD10-93 194 JD10-84 JD10-85 90 HDPE 145 0.03 0.01 0.001
PD10-94 201 JD10-85 JD10-80 90 HDPE 145 -0.199 0.04 0.043
TD.-11
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD11-1 33 JD11-1 TD-11 300 DI-K7 140 -49.515 0.7 1.524
PD11-2 148 JD11-1 JD11-9 110 HDPE 145 3.573 0.52 3.409
PD11-3 51 JD11-2 JD11-1 250 DI-K7 140 -45.431 0.93 3.158
PD11-4 68 JD11-2 JD11-5 250 DI-K7 140 41.858 0.85 2.714
PD11-5 12 JD11-3 JD11-2 110 HDPE 145 -3.063 0.45 2.562
PD11-6 67 JD11-3 JD11-4 90 HDPE 145 1.021 0.22 0.889
PD11-7 449 JD11-4 JD11-6 90 HDPE 145 0.51 0.11 0.246
PD11-8 10 JD11-5 JD11-7 250 DI-K7 140 40.837 0.83 2.592
PD11-9 532 JD11-5 JD11-8 90 HDPE 145 0.51 0.11 0.246
PD11-10 304 JD11-7 JD11-19 200 DI-K7 140 19.937 0.63 2.037
PD11-11 297 JD11-7 JD11-20 200 DI-K7 140 20.39 0.65 2.124
PD11-12 159 JD11-9 JD11-11 110 HDPE 145 3.063 0.45 2.562
PD11-13 65 JD11-10 JD11-12 90 HDPE 145 0.51 0.11 0.246
PD11-14 375 JD11-10 JD11-3 90 HDPE 145 -1.531 0.33 1.884
PD11-15 10 JD11-11 JD11-13 90 HDPE 145 1.021 0.22 0.889
PD11-16 14 JD11-11 JD11-14 90 HDPE 145 1.021 0.22 0.889
PD11-17 129 JD11-11 JD11-17 90 HDPE 145 0.51 0.11 0.246
PD11-18 49 JD11-14 JD11-15 90 HDPE 145 0.51 0.11 0.246
PD11-19 156 JD11-16 JD11-10 90 HDPE 145 -0.51 0.11 0.246
PD11-20 158 JD11-18 JD11-13 90 HDPE 145 -0.51 0.11 0.246
PD11-21 4 JD11-19 JD11-20 110 HDPE 145 3.532 0.51 3.336
PD11-22 11 JD11-20 JD11-22 200 DI-K7 140 23.412 0.75 2.743
PD11-23 10 JD11-21 JD11-19 200 DI-K7 140 -15.894 0.51 1.339
PD11-24 298 JD11-21 JD11-26 140 HDPE 145 1.903 0.17 0.327

MaRS Planning Engineering Services Pvt. Ltd.


PD11-25 62 JD11-22 JD11-31 90 HDPE 145 2.042 0.44 3.21
PD11-26 158 JD11-22 JD11-41 200 DI-K7 140 20.859 0.66 2.215
PD11-27 11 JD11-23 JD11-24 200 DI-K7 140 12.598 0.4 0.871
PD11-28 73 JD11-23 JD11-21 200 DI-K7 140 -13.481 0.43 0.987
PD11-29 10 JD11-24 JD11-25 200 DI-K7 140 11.528 0.37 0.739
PD11-30 127 JD11-25 JD11-42 90 HDPE 145 1.76 0.38 2.437
PD11-31 131 JD11-25 JD11-28 200 DI-K7 140 9.258 0.29 0.492
PD11-32 10 JD11-26 JD11-27 110 HDPE 145 1.764 0.2 0.494
PD11-33 185 JD11-26 JD11-23 90 HDPE 145 -0.372 0.08 0.135
PD11-34 189 JD11-27 JD11-24 110 HDPE 145 -0.56 0.08 0.11
PD11-35 196 JD11-27 JD11-35 110 HDPE 145 1.814 0.26 0.971
PD11-36 33 JD11-28 JD11-29 140 HDPE 145 4.647 0.42 1.708
PD11-37 28 JD11-29 JD11-32 140 HDPE 145 3.626 0.32 1.079
PD11-38 51 JD11-29 JD11-30 90 HDPE 145 0.51 0.11 0.246
PD11-39 31 JD11-31 JD11-34 90 HDPE 145 1.531 0.33 1.884
PD11-40 64 JD11-32 JD11-33 90 HDPE 145 0.51 0.11 0.246
PD11-41 68 JD11-32 JD11-38 110 HDPE 145 2.605 0.29 1.017
PD11-42 52 JD11-34 JD11-36 90 HDPE 145 0.51 0.11 0.246
PD11-43 281 JD11-34 JD11-39 90 HDPE 145 0.51 0.11 0.246
PD11-44 54 JD11-35 JD11-37 90 HDPE 145 0.51 0.11 0.246
PD11-45 190 JD11-35 JD11-42 90 HDPE 145 0.793 0.17 0.557
PD11-46 38 JD11-38 JD11-40 160 HDPE 145 6.195 0.43 1.52
PD11-47 115 JD11-38 JD11-28 140 HDPE 145 -4.101 0.37 1.355
PD11-48 10 JD11-40 JD11-41 160 HDPE 145 5.174 0.36 1.089
PD11-49 22 JD11-41 JD11-46 200 DI-K7 140 25.523 0.81 3.219
PD11-50 11 JD11-42 JD11-44 90 HDPE 145 1.531 0.33 1.884
PD11-51 160 JD11-42 JD11-45 90 HDPE 145 0.51 0.11 0.246
PD11-52 153 JD11-43 JD11-40 90 HDPE 145 -0.51 0.11 0.246
PD11-53 181 JD11-44 JD11-48 90 HDPE 145 0.51 0.11 0.246
PD11-54 10 JD11-46 JD11-47 90 HDPE 145 1.021 0.22 0.889
PD11-55 10 JD11-46 JD11-49 200 DI-K7 140 23.481 0.75 2.758
PD11-56 382 JD11-46 JD11-53 90 HDPE 145 0.51 0.11 0.246
PD11-57 222 JD11-47 JD11-51 90 HDPE 145 0.51 0.11 0.246
PD11-58 213 JD11-49 JD11-54 200 DI-K7 140 22.46 0.71 2.54
PD11-59 267 JD11-49 JD11-52 90 HDPE 145 0.51 0.11 0.246
PD11-60 241 JD11-50 JD11-44 90 HDPE 145 -0.51 0.11 0.246
PD11-61 54 JD11-54 JD11-55 200 DI-K7 140 9.604 0.31 0.527
PD11-62 140 JD11-54 JD11-58 200 DI-K7 140 12.346 0.39 0.839
PD11-63 292 JD11-55 JD11-74 160 HDPE 145 7.562 0.52 2.198
PD11-64 10 JD11-56 JD11-55 90 HDPE 145 -1.531 0.33 1.884
PD11-65 297 JD11-56 JD11-59 90 HDPE 145 0.51 0.11 0.246
PD11-66 55 JD11-57 JD11-56 90 HDPE 145 -0.51 0.11 0.246
PD11-67 10 JD11-58 JD11-60 200 DI-K7 140 11.325 0.36 0.715
PD11-68 237 JD11-58 JD11-61 90 HDPE 145 0.51 0.11 0.246
PD11-69 91 JD11-60 JD11-62 200 DI-K7 140 10.304 0.33 0.6
PD11-70 247 JD11-60 JD11-63 90 HDPE 145 0.51 0.11 0.246
PD11-71 10 JD11-62 JD11-65 160 HDPE 145 9.283 0.64 3.214
PD11-72 94 JD11-62 JD11-64 90 HDPE 145 0.51 0.11 0.246

MaRS Planning Engineering Services Pvt. Ltd.


PD11-73 49 JD11-65 JD11-67 160 HDPE 145 8.262 0.57 2.59
PD11-74 91 JD11-65 JD11-66 90 HDPE 145 0.51 0.11 0.246
PD11-75 10 JD11-67 JD11-68 140 HDPE 145 6.222 0.56 2.933
PD11-76 321 JD11-67 JD11-84 90 HDPE 145 1.53 0.33 1.88
PD11-77 201 JD11-68 JD11-69 90 HDPE 145 0.907 0.2 0.714
PD11-78 212 JD11-69 JD11-70 90 HDPE 145 0.396 0.09 0.154
PD11-79 56 JD11-70 JD11-68 110 HDPE 145 -4.805 0.54 3.16
PD11-80 10 JD11-71 JD11-70 110 HDPE 145 -4.691 0.53 3.022
PD11-81 25 JD11-71 JD11-73 110 HDPE 145 3.485 0.51 3.255
PD11-82 173 JD11-72 JD11-71 90 HDPE 145 -0.695 0.15 0.436
PD11-83 191 JD11-72 JD11-73 90 HDPE 145 0.185 0.04 0.038
PD11-84 10 JD11-73 JD11-76 110 HDPE 145 3.159 0.46 2.713
PD11-85 29 JD11-74 JD11-78 160 HDPE 145 6.541 0.45 1.68
PD11-86 41 JD11-74 JD11-75 90 HDPE 145 0.51 0.11 0.246
PD11-87 10 JD11-76 JD11-77 90 HDPE 145 1.531 0.33 1.884
PD11-88 273 JD11-76 JD11-87 90 HDPE 145 1.117 0.24 1.051
PD11-89 252 JD11-77 JD11-79 90 HDPE 145 0.58 0.13 0.312
PD11-90 70 JD11-78 JD11-81 110 HDPE 145 4.074 0.46 2.328
PD11-91 69 JD11-79 JD11-80 90 HDPE 145 0.51 0.11 0.246
PD11-92 419 JD11-79 JD11-77 90 HDPE 145 -0.441 0.1 0.188
PD11-93 11 JD11-81 JD11-82 110 HDPE 145 2.985 0.43 2.443
PD11-94 31 JD11-82 JD11-85 90 HDPE 145 1.531 0.33 1.884
PD11-95 188 JD11-83 JD11-81 90 HDPE 145 -0.579 0.13 0.311
PD11-96 134 JD11-84 JD11-83 90 HDPE 145 -0.069 0.01 0.006
PD11-97 199 JD11-84 JD11-78 110 HDPE 145 -1.957 0.28 1.117
PD11-98 107 JD11-85 JD11-88 90 HDPE 145 0.51 0.11 0.246
PD11-99 150 JD11-85 JD11-89 90 HDPE 145 0.51 0.11 0.246
PD11-100 11 JD11-86 JD11-84 110 HDPE 145 -3.044 0.44 2.534
PD11-101 85 JD11-86 JD11-91 90 HDPE 145 1.099 0.24 1.019
PD11-102 289 JD11-87 JD11-94 90 HDPE 145 0.607 0.13 0.339
PD11-103 46 JD11-90 JD11-95 90 HDPE 145 0.924 0.2 0.74
PD11-104 109 JD11-90 JD11-86 110 HDPE 145 -1.435 0.21 0.629
PD11-105 67 JD11-91 JD11-92 90 HDPE 145 0.078 0.02 0.008
PD11-106 251 JD11-91 JD11-97 90 HDPE 145 0.51 0.11 0.246
PD11-107 44 JD11-92 JD11-93 90 HDPE 145 0.51 0.11 0.246
PD11-108 191 JD11-92 JD11-82 90 HDPE 145 -0.943 0.2 0.767
PD11-109 37 JD11-95 JD11-94 90 HDPE 145 -0.097 0.02 0.011
PD11-110 71 JD11-95 JD11-96 90 HDPE 145 0.51 0.11 0.246
TD.-12
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD12-1 34 JD12-1 TD-12 300 DI-K7 140 -60.704 0.86 2.223
PD12-2 97 JD12-1 JD12-2 110 HDPE 145 4.922 0.55 3.304
PD12-3 258 JD12-2 JD12-6 110 HDPE 145 4.717 0.53 3.053
PD12-4 189 JD12-3 JD12-1 300 DI-K7 140 -55.577 0.79 1.888
PD12-5 245 JD12-4 JD12-3 300 DI-K7 140 -55.372 0.78 1.875
PD12-6 127 JD12-5 JD12-4 300 DI-K7 140 -55.167 0.78 1.862

MaRS Planning Engineering Services Pvt. Ltd.


PD12-7 283 JD12-6 JD12-9 110 HDPE 145 4.512 0.51 2.812
PD12-8 166 JD12-7 JD12-5 300 DI-K7 140 -54.962 0.78 1.849
PD12-9 222 JD12-8 JD12-7 300 DI-K7 140 -54.757 0.77 1.836
PD12-10 268 JD12-9 JD12-12 110 HDPE 145 4.307 0.48 2.58
PD12-11 111 JD12-10 JD12-8 300 DI-K7 140 -54.552 0.77 1.824
PD12-12 282 JD12-11 JD12-10 300 DI-K7 140 -54.346 0.77 1.811
PD12-13 268 JD12-12 JD12-14 110 HDPE 145 4.102 0.46 2.357
PD12-14 242 JD12-13 JD12-11 300 DI-K7 140 -54.141 0.77 1.798
PD12-15 271 JD12-14 JD12-19 110 HDPE 145 3.897 0.44 2.143
PD12-16 44 JD12-15 JD12-16 90 HDPE 145 0.205 0.04 0.046
PD12-17 200 JD12-15 JD12-13 300 DI-K7 140 -53.936 0.76 1.786
PD12-18 111 JD12-17 JD12-15 300 DI-K7 140 -53.526 0.76 1.761
PD12-19 136 JD12-17 JD12-18 90 HDPE 145 0.205 0.04 0.046
PD12-20 276 JD12-19 JD12-21 110 HDPE 145 3.691 0.42 1.939
PD12-21 261 JD12-20 JD12-17 300 DI-K7 140 -53.116 0.75 1.736
PD12-22 262 JD12-21 JD12-24 110 HDPE 145 3.486 0.51 3.257
PD12-23 301 JD12-22 JD12-20 300 DI-K7 140 -52.911 0.75 1.723
PD12-24 231 JD12-23 JD12-22 300 DI-K7 140 -52.706 0.75 1.711
PD12-25 274 JD12-24 JD12-27 110 HDPE 145 3.281 0.48 2.911
PD12-26 270 JD12-25 JD12-23 300 DI-K7 140 -52.501 0.74 1.699
PD12-27 327 JD12-26 JD12-25 300 DI-K7 140 -52.296 0.74 1.686
PD12-28 270 JD12-27 JD12-29 110 HDPE 145 3.076 0.45 2.583
PD12-29 228 JD12-28 JD12-26 300 DI-K7 140 -52.091 0.74 1.674
PD12-30 270 JD12-29 JD12-32 110 HDPE 145 2.871 0.42 2.273
PD12-31 344 JD12-30 JD12-28 300 DI-K7 140 -51.886 0.73 1.662
PD12-32 236 JD12-31 JD12-30 300 DI-K7 140 -51.68 0.73 1.65
PD12-33 246 JD12-32 JD12-33 110 HDPE 145 2.666 0.39 1.982
PD12-34 204 JD12-33 JD12-50 90 HDPE 145 1.641 0.36 2.141
PD12-35 387 JD12-34 JD12-31 300 DI-K7 140 -51.475 0.73 1.638
PD12-36 24 JD12-35 JD12-34 300 DI-K7 140 -50.245 0.71 1.566
PD12-37 122 JD12-35 JD12-36 90 HDPE 145 0.205 0.04 0.046
PD12-38 10 JD12-37 JD12-38 90 HDPE 145 0.41 0.09 0.165
PD12-39 229 JD12-37 JD12-33 90 HDPE 145 -0.82 0.18 0.593
PD12-40 314 JD12-39 JD12-37 90 HDPE 145 -0.205 0.04 0.046
PD12-41 317 JD12-40 JD12-38 90 HDPE 145 -0.205 0.04 0.046
PD12-42 68 JD12-41 JD12-35 300 DI-K7 140 -49.835 0.71 1.542
PD12-43 198 JD12-41 JD12-42 90 HDPE 145 0.205 0.04 0.046
PD12-44 231 JD12-43 JD12-34 90 HDPE 145 -1.025 0.22 0.896
PD12-45 37 JD12-44 JD12-43 90 HDPE 145 -0.205 0.04 0.046
PD12-46 72 JD12-45 JD12-46 90 HDPE 145 0.205 0.04 0.046
PD12-47 82 JD12-45 JD12-43 90 HDPE 145 -0.615 0.13 0.348
PD12-48 96 JD12-47 JD12-45 90 HDPE 145 -0.205 0.04 0.046
PD12-49 92 JD12-48 JD12-49 90 HDPE 145 0.205 0.04 0.045
PD12-50 129 JD12-48 JD12-41 300 DI-K7 140 -49.425 0.7 1.519
PD12-51 191 JD12-50 JD12-57 90 HDPE 145 1.436 0.31 1.672
PD12-52 76 JD12-51 JD12-48 300 DI-K7 140 -49.014 0.69 1.496
PD12-53 264 JD12-51 JD12-53 200 DI-K7 140 11.853 0.38 0.778
PD12-54 10 JD12-52 JD12-51 250 DI-K7 140 -36.957 0.75 2.155

MaRS Planning Engineering Services Pvt. Ltd.


PD12-55 252 JD12-52 JD12-55 200 DI-K7 140 11.767 0.37 0.767
PD12-56 49 JD12-53 JD12-54 90 HDPE 145 0.205 0.04 0.045
PD12-57 14 JD12-55 JD12-53 200 DI-K7 140 -11.442 0.36 0.728
PD12-58 12 JD12-56 JD12-55 200 DI-K7 140 -23.004 0.73 2.655
PD12-59 205 JD12-57 JD12-70 90 HDPE 145 1.23 0.27 1.256
PD12-60 84 JD12-58 JD12-56 160 HDPE 145 -3.517 0.24 0.532
PD12-61 116 JD12-58 JD12-61 90 HDPE 145 0.205 0.04 0.045
PD12-62 88 JD12-59 JD12-52 200 DI-K7 140 -24.985 0.8 3.094
PD12-63 11 JD12-60 JD12-58 90 HDPE 145 -0.615 0.13 0.348
PD12-64 119 JD12-60 JD12-63 90 HDPE 145 0.205 0.04 0.046
PD12-65 73 JD12-62 JD12-60 90 HDPE 145 -0.205 0.04 0.046
PD12-66 141 JD12-64 JD12-59 90 HDPE 145 -0.205 0.04 0.046
PD12-67 61 JD12-65 JD12-58 140 HDPE 145 -2.491 0.22 0.537
PD12-68 10 JD12-66 JD12-65 140 HDPE 145 -2.081 0.19 0.385
PD12-69 102 JD12-66 JD12-69 140 HDPE 145 1.671 0.15 0.256
PD12-70 320 JD12-67 JD12-65 90 HDPE 145 -0.205 0.04 0.045
PD12-71 316 JD12-68 JD12-66 90 HDPE 145 -0.205 0.04 0.046
PD12-72 56 JD12-69 JD12-56 200 DI-K7 140 -19.282 0.61 1.915
PD12-73 210 JD12-70 JD12-72 90 HDPE 145 1.025 0.22 0.896
PD12-74 106 JD12-71 JD12-59 200 DI-K7 140 -24.575 0.78 3.001
PD12-75 118 JD12-71 JD12-69 200 DI-K7 140 -20.748 0.66 2.193
PD12-76 205 JD12-72 JD12-73 90 HDPE 145 0.82 0.18 0.593
PD12-77 273 JD12-73 JD12-74 90 HDPE 145 0.615 0.13 0.348
PD12-78 197 JD12-74 JD12-75 90 HDPE 145 0.41 0.09 0.164
PD12-79 161 JD12-75 JD12-76 90 HDPE 145 0.205 0.04 0.046
PD12-80 227 JD12-77 JD12-80 90 HDPE 145 0.82 0.18 0.593
PD12-81 245 JD12-77 JD12-71 250 DI-K7 140 -45.118 0.92 3.118
PD12-82 239 JD12-78 JD12-77 90 HDPE 145 -0.205 0.04 0.045
PD12-83 244 JD12-79 JD12-77 90 HDPE 145 -0.205 0.04 0.046
PD12-84 188 JD12-80 JD12-82 90 HDPE 145 0.385 0.08 0.145
PD12-85 480 JD12-80 JD12-81 90 HDPE 145 0.231 0.05 0.056
PD12-86 626 JD12-81 JD12-82 90 HDPE 145 0.026 0.01 0.001
PD12-87 56 JD12-83 JD12-82 90 HDPE 145 -0.205 0.04 0.046
PD12-88 168 JD12-84 JD12-77 250 DI-K7 140 -43.682 0.89 2.937
PD12-89 19 JD12-85 JD12-86 200 DI-K7 140 25.282 0.8 3.163
PD12-90 43 JD12-85 JD12-87 200 DI-K7 140 17.99 0.57 1.684
PD12-91 186 JD12-85 JD12-84 250 DI-K7 140 -43.477 0.89 2.911
PD12-92 174 JD12-86 JD12-108 200 DI-K7 140 15.739 0.5 1.315
PD12-93 10 JD12-87 JD12-88 140 HDPE 145 6.152 0.55 2.872
PD12-94 59 JD12-88 JD12-105 140 HDPE 145 5.537 0.5 2.363
PD12-95 84 JD12-89 JD12-88 90 HDPE 145 -0.41 0.09 0.164
PD12-96 54 JD12-90 JD12-92 90 HDPE 145 0.205 0.04 0.045
PD12-97 125 JD12-90 JD12-86 200 DI-K7 140 -9.339 0.3 0.5
PD12-98 214 JD12-91 JD12-89 90 HDPE 145 -0.205 0.04 0.046
PD12-99 88 JD12-93 JD12-87 200 DI-K7 140 -11.632 0.37 0.751
PD12-100 10 JD12-94 JD12-93 200 DI-K7 140 -8.489 0.27 0.419
PD12-101 214 JD12-95 JD12-94 90 HDPE 145 -0.205 0.04 0.045
PD12-102 66 JD12-96 JD12-90 200 DI-K7 140 -8.928 0.28 0.46

MaRS Planning Engineering Services Pvt. Ltd.


PD12-103 185 JD12-96 JD12-100 90 HDPE 145 0.615 0.13 0.348
PD12-104 14 JD12-97 JD12-96 160 HDPE 145 -8.108 0.56 2.501
PD12-105 194 JD12-97 JD12-99 90 HDPE 145 0.205 0.04 0.046
PD12-106 69 JD12-98 JD12-97 90 HDPE 145 -0.205 0.04 0.045
PD12-107 52 JD12-100 JD12-102 90 HDPE 145 0.205 0.04 0.045
PD12-108 137 JD12-100 JD12-104 90 HDPE 145 0.205 0.04 0.045
PD12-109 54 JD12-101 JD12-103 90 HDPE 145 0.205 0.04 0.045
PD12-110 202 JD12-101 JD12-94 200 DI-K7 140 -8.079 0.26 0.382
PD12-111 33 JD12-105 JD12-110 110 HDPE 145 4.922 0.55 3.304
PD12-112 64 JD12-105 JD12-107 90 HDPE 145 0.205 0.04 0.046
PD12-113 58 JD12-106 JD12-105 90 HDPE 145 -0.205 0.04 0.046
PD12-114 47 JD12-108 JD12-97 160 HDPE 145 -7.493 0.51 2.161
PD12-115 75 JD12-108 JD12-109 200 DI-K7 140 7.727 0.25 0.352
PD12-116 91 JD12-109 JD12-117 160 HDPE 145 6.076 0.42 1.466
PD12-117 21 JD12-110 JD12-113 110 HDPE 145 4.512 0.51 2.812
PD12-118 59 JD12-111 JD12-110 90 HDPE 145 -0.205 0.04 0.045
PD12-119 57 JD12-112 JD12-108 200 DI-K7 140 -15.3 0.49 1.248
PD12-120 176 JD12-112 JD12-93 110 HDPE 145 -2.938 0.33 1.271
PD12-121 10 JD12-113 JD12-116 110 HDPE 145 4.102 0.46 2.357
PD12-122 152 JD12-113 JD12-115 90 HDPE 145 0.205 0.04 0.045
PD12-123 31 JD12-114 JD12-112 200 DI-K7 140 -18.033 0.57 1.692
PD12-124 57 JD12-114 JD12-109 90 HDPE 145 -1.446 0.31 1.693
PD12-125 95 JD12-116 JD12-121 90 HDPE 145 1.436 0.31 1.672
PD12-126 276 JD12-116 JD12-135 110 HDPE 145 2.461 0.36 1.709
PD12-127 180 JD12-117 JD12-124 160 HDPE 145 5.871 0.4 1.376
PD12-128 122 JD12-118 JD12-119 90 HDPE 145 0.205 0.04 0.045
PD12-129 142 JD12-118 JD12-101 160 HDPE 145 -7.669 0.53 2.256
PD12-130 36 JD12-120 JD12-122 140 HDPE 145 3.627 0.33 1.079
PD12-131 93 JD12-120 JD12-114 200 DI-K7 140 -19.273 0.61 1.914
PD12-132 258 JD12-121 JD12-138 90 HDPE 145 1.23 0.27 1.256
PD12-133 27 JD12-122 JD12-123 90 HDPE 145 0.205 0.04 0.046
PD12-134 92 JD12-124 JD12-130 160 HDPE 145 5.666 0.39 1.288
PD12-135 177 JD12-125 JD12-122 140 HDPE 145 -3.217 0.29 0.864
PD12-136 9 JD12-126 JD12-125 140 HDPE 145 -2.451 0.22 0.522
PD12-137 161 JD12-126 JD12-134 110 HDPE 145 2.041 0.23 0.647
PD12-138 182 JD12-127 JD12-126 90 HDPE 145 -0.205 0.04 0.046
PD12-139 127 JD12-128 JD12-118 160 HDPE 145 -7.258 0.5 2.037
PD12-140 104 JD12-129 JD12-125 90 HDPE 145 -0.561 0.12 0.288
PD12-141 175 JD12-129 JD12-120 200 DI-K7 140 -15.441 0.49 1.269
PD12-142 34 JD12-130 JD12-132 160 HDPE 145 5.256 0.36 1.121
PD12-143 222 JD12-130 JD12-131 90 HDPE 145 0.205 0.04 0.045
PD12-144 54 JD12-132 JD12-136 160 HDPE 145 4.846 0.33 0.964
PD12-145 107 JD12-132 JD12-133 90 HDPE 145 0.205 0.04 0.045
PD12-146 59 JD12-134 JD12-129 200 DI-K7 140 -15.797 0.5 1.324
PD12-147 91 JD12-135 JD12-137 90 HDPE 145 0.205 0.04 0.045
PD12-148 261 JD12-135 JD12-147 90 HDPE 145 2.051 0.45 3.236
PD12-149 10 JD12-136 JD12-139 200 DI-K7 140 22.273 0.71 2.501
PD12-150 10 JD12-136 JD12-134 200 DI-K7 140 -17.633 0.56 1.624

MaRS Planning Engineering Services Pvt. Ltd.


PD12-151 278 JD12-138 JD12-140 90 HDPE 145 1.025 0.22 0.896
PD12-152 69 JD12-139 JD12-128 160 HDPE 145 -7.053 0.48 1.932
PD12-153 273 JD12-139 JD12-141 250 DI-K7 140 29.122 0.59 1.386
PD12-154 269 JD12-140 JD12-142 90 HDPE 145 0.82 0.18 0.593
PD12-155 276 JD12-141 JD12-146 250 DI-K7 140 28.916 0.59 1.368
PD12-156 10 JD12-142 JD12-143 90 HDPE 145 0.41 0.09 0.165
PD12-157 220 JD12-142 JD12-144 90 HDPE 145 0.205 0.04 0.045
PD12-158 231 JD12-143 JD12-145 90 HDPE 145 0.205 0.04 0.046
PD12-159 142 JD12-146 JD12-148 250 DI-K7 140 28.711 0.58 1.35
PD12-160 186 JD12-147 JD12-153 90 HDPE 145 1.846 0.4 2.662
PD12-161 168 JD12-148 JD12-149 250 DI-K7 140 28.506 0.58 1.332
PD12-162 10 JD12-149 JD12-150 250 DI-K7 140 28.096 0.57 1.297
PD12-163 289 JD12-149 JD12-151 90 HDPE 145 0.205 0.04 0.046
PD12-164 246 JD12-150 JD12-154 250 DI-K7 140 27.686 0.56 1.262
PD12-165 291 JD12-150 JD12-152 90 HDPE 145 0.205 0.04 0.045
PD12-166 144 JD12-153 JD12-155 90 HDPE 145 1.641 0.36 2.141
PD12-167 297 JD12-154 JD12-157 250 DI-K7 140 27.481 0.56 1.245
PD12-168 120 JD12-155 JD12-156 90 HDPE 145 1.436 0.31 1.672
PD12-169 176 JD12-156 JD12-158 90 HDPE 145 1.23 0.27 1.256
PD12-170 222 JD12-157 JD12-159 250 DI-K7 140 27.276 0.56 1.228
PD12-171 206 JD12-158 JD12-160 90 HDPE 145 1.025 0.22 0.896
PD12-172 322 JD12-159 JD12-165 250 DI-K7 140 27.071 0.55 1.211
PD12-173 147 JD12-160 JD12-161 90 HDPE 145 0.82 0.18 0.593
PD12-174 246 JD12-161 JD12-163 90 HDPE 145 0.41 0.09 0.164
PD12-175 101 JD12-162 JD12-161 90 HDPE 145 -0.205 0.04 0.046
PD12-176 213 JD12-163 JD12-164 90 HDPE 145 0.205 0.04 0.046
PD12-177 260 JD12-165 JD12-166 250 DI-K7 140 26.866 0.55 1.194
PD12-178 213 JD12-166 JD12-167 200 DI-K7 140 26.661 0.85 3.49
PD12-179 318 JD12-167 JD12-168 200 DI-K7 140 26.455 0.84 3.44
PD12-180 158 JD12-168 JD12-169 200 DI-K7 140 26.25 0.84 3.391
PD12-181 20 JD12-169 JD12-171 200 DI-K7 140 25.84 0.82 3.294
PD12-182 119 JD12-170 JD12-169 90 HDPE 145 -0.205 0.04 0.045
PD12-183 10 JD12-171 JD12-176 200 DI-K7 140 24.815 0.79 3.056
PD12-184 10 JD12-171 JD12-172 90 HDPE 145 0.82 0.18 0.593
PD12-185 194 JD12-172 JD12-174 90 HDPE 145 0.205 0.04 0.046
PD12-186 18 JD12-173 JD12-172 90 HDPE 145 -0.41 0.09 0.165
PD12-187 154 JD12-175 JD12-173 90 HDPE 145 -0.205 0.04 0.045
PD12-188 40 JD12-176 JD12-178 200 DI-K7 140 23.174 0.74 2.692
PD12-189 202 JD12-176 JD12-185 90 HDPE 145 1.23 0.27 1.256
PD12-190 135 JD12-177 JD12-176 90 HDPE 145 -0.205 0.04 0.045
PD12-191 60 JD12-178 JD12-184 200 DI-K7 140 21.944 0.7 2.433
PD12-192 10 JD12-179 JD12-178 90 HDPE 145 -1.025 0.22 0.896
PD12-193 155 JD12-180 JD12-179 90 HDPE 145 -0.205 0.04 0.046
PD12-194 117 JD12-181 JD12-179 90 HDPE 145 -0.615 0.13 0.348
PD12-195 56 JD12-182 JD12-181 90 HDPE 145 -0.205 0.04 0.045
PD12-196 77 JD12-183 JD12-181 90 HDPE 145 -0.205 0.04 0.045
PD12-197 10 JD12-184 JD12-188 200 DI-K7 140 20.918 0.67 2.226
PD12-198 176 JD12-185 JD12-196 90 HDPE 145 1.025 0.22 0.896

MaRS Planning Engineering Services Pvt. Ltd.


PD12-199 10 JD12-186 JD12-184 90 HDPE 145 -0.82 0.18 0.593
PD12-200 35 JD12-187 JD12-186 90 HDPE 145 -0.205 0.04 0.045
PD12-201 12 JD12-188 JD12-192 200 DI-K7 140 20.508 0.65 2.147
PD12-202 46 JD12-189 JD12-188 90 HDPE 145 -0.205 0.04 0.046
PD12-203 150 JD12-190 JD12-186 90 HDPE 145 -0.41 0.09 0.164
PD12-204 80 JD12-191 JD12-190 90 HDPE 145 -0.205 0.04 0.045
PD12-205 80 JD12-192 JD12-193 90 HDPE 145 0.615 0.13 0.348
PD12-206 189 JD12-192 JD12-201 200 DI-K7 140 19.688 0.63 1.99
PD12-207 78 JD12-193 JD12-194 90 HDPE 145 0.205 0.04 0.046
PD12-208 83 JD12-193 JD12-195 90 HDPE 145 0.205 0.04 0.046
PD12-209 155 JD12-196 JD12-197 90 HDPE 145 0.82 0.18 0.593
PD12-210 146 JD12-197 JD12-198 90 HDPE 145 0.615 0.13 0.348
PD12-211 237 JD12-198 JD12-199 90 HDPE 145 0.41 0.09 0.164
PD12-212 178 JD12-199 JD12-200 90 HDPE 145 0.205 0.04 0.046
PD12-213 10 JD12-201 JD12-203 200 DI-K7 140 19.278 0.61 1.914
PD12-214 59 JD12-201 JD12-202 90 HDPE 145 0.205 0.04 0.046
PD12-215 24 JD12-203 JD12-205 200 DI-K7 140 18.867 0.6 1.84
PD12-216 59 JD12-203 JD12-204 90 HDPE 145 0.205 0.04 0.046
PD12-217 10 JD12-205 JD12-206 200 DI-K7 140 14.67 0.47 1.154
PD12-218 151 JD12-205 JD12-216 140 HDPE 145 3.993 0.36 1.289
PD12-219 48 JD12-206 JD12-207 200 DI-K7 140 12.573 0.4 0.867
PD12-220 247 JD12-206 JD12-223 110 HDPE 145 1.892 0.27 1.05
PD12-221 11 JD12-207 JD12-208 200 DI-K7 140 10.63 0.34 0.636
PD12-222 11 JD12-208 JD12-209 90 HDPE 145 1.436 0.31 1.672
PD12-223 101 JD12-208 JD12-228 160 HDPE 145 8.989 0.62 3.028
PD12-224 62 JD12-209 JD12-210 90 HDPE 145 0.688 0.15 0.428
PD12-225 114 JD12-209 JD12-212 90 HDPE 145 0.543 0.12 0.276
PD12-226 39 JD12-210 JD12-211 90 HDPE 145 0.205 0.04 0.046
PD12-227 65 JD12-210 JD12-212 90 HDPE 145 0.278 0.06 0.08
PD12-228 56 JD12-212 JD12-213 90 HDPE 145 0.615 0.13 0.348
PD12-229 36 JD12-213 JD12-214 90 HDPE 145 0.205 0.04 0.046
PD12-230 41 JD12-213 JD12-215 90 HDPE 145 0.205 0.04 0.046
PD12-231 20 JD12-216 JD12-218 110 HDPE 145 2.301 0.33 1.508
PD12-232 109 JD12-216 JD12-222 110 HDPE 145 1.487 0.22 0.672
PD12-233 65 JD12-217 JD12-207 90 HDPE 145 -1.738 0.38 2.378
PD12-234 10 JD12-218 JD12-220 110 HDPE 145 1.89 0.27 1.048
PD12-235 106 JD12-218 JD12-219 90 HDPE 145 0.205 0.04 0.046
PD12-236 85 JD12-220 JD12-230 90 HDPE 145 1.48 0.32 1.769
PD12-237 118 JD12-220 JD12-221 90 HDPE 145 0.205 0.04 0.046
PD12-238 20 JD12-222 JD12-223 90 HDPE 145 0.301 0.07 0.093
PD12-239 81 JD12-223 JD12-225 110 HDPE 145 1.783 0.2 0.504
PD12-240 68 JD12-224 JD12-223 90 HDPE 145 -0.205 0.04 0.045
PD12-241 55 JD12-225 JD12-217 90 HDPE 145 -1.533 0.33 1.883
PD12-242 142 JD12-225 JD12-231 140 HDPE 145 3.111 0.28 0.812
PD12-243 57 JD12-226 JD12-227 90 HDPE 145 0.205 0.04 0.046
PD12-244 115 JD12-226 JD12-222 90 HDPE 145 -0.981 0.21 0.825
PD12-245 21 JD12-228 JD12-231 160 HDPE 145 8.579 0.59 2.777
PD12-246 131 JD12-228 JD12-229 90 HDPE 145 0.205 0.04 0.046

MaRS Planning Engineering Services Pvt. Ltd.


PD12-247 73 JD12-230 JD12-226 90 HDPE 145 -0.571 0.12 0.303
PD12-248 10 JD12-231 JD12-232 90 HDPE 145 0.41 0.09 0.164
PD12-249 237 JD12-231 JD12-234 200 DI-K7 140 11.074 0.35 0.686
PD12-250 238 JD12-232 JD12-233 90 HDPE 145 0.205 0.04 0.046
PD12-251 77 JD12-234 JD12-235 200 DI-K7 140 10.869 0.35 0.662
PD12-252 94 JD12-235 JD12-236 90 HDPE 145 0.205 0.04 0.046
PD12-253 332 JD12-235 JD12-237 200 DI-K7 140 10.459 0.33 0.617
PD12-254 188 JD12-237 JD12-239 140 HDPE 145 6.152 0.55 2.872
PD12-255 248 JD12-237 JD12-240 110 HDPE 145 4.102 0.46 2.357
PD12-256 201 JD12-238 JD12-230 90 HDPE 145 -1.846 0.4 2.662
PD12-257 170 JD12-239 JD12-242 140 HDPE 145 5.947 0.53 2.697
PD12-258 262 JD12-240 JD12-255 110 HDPE 145 3.897 0.44 2.143
PD12-259 277 JD12-241 JD12-238 90 HDPE 145 -1.641 0.36 2.141
PD12-260 12 JD12-242 JD12-251 90 HDPE 145 2.116 0.46 3.43
PD12-261 106 JD12-242 JD12-263 90 HDPE 145 1.641 0.36 2.141
PD12-262 238 JD12-242 JD12-243 90 HDPE 145 0.205 0.04 0.046
PD12-263 208 JD12-244 JD12-241 90 HDPE 145 -1.436 0.31 1.672
PD12-264 10 JD12-245 JD12-244 90 HDPE 145 -0.615 0.13 0.348
PD12-265 36 JD12-246 JD12-245 90 HDPE 145 -0.205 0.04 0.046
PD12-266 54 JD12-247 JD12-245 90 HDPE 145 -0.205 0.04 0.045
PD12-267 54 JD12-248 JD12-244 90 HDPE 145 -0.615 0.13 0.348
PD12-268 42 JD12-249 JD12-248 90 HDPE 145 -0.205 0.04 0.046
PD12-269 48 JD12-250 JD12-248 90 HDPE 145 -0.205 0.04 0.045
PD12-270 60 JD12-251 JD12-257 90 HDPE 145 1.706 0.37 2.302
PD12-271 247 JD12-251 JD12-252 90 HDPE 145 0.205 0.04 0.046
PD12-272 49 JD12-253 JD12-242 90 HDPE 145 -1.78 0.39 2.49
PD12-273 57 JD12-254 JD12-253 90 HDPE 145 -0.205 0.04 0.046
PD12-274 19 JD12-255 JD12-261 110 HDPE 145 3.076 0.45 2.583
PD12-275 36 JD12-256 JD12-253 90 HDPE 145 -1.37 0.3 1.533
PD12-276 39 JD12-256 JD12-257 90 HDPE 145 0.224 0.05 0.054
PD12-277 10 JD12-257 JD12-262 90 HDPE 145 1.726 0.37 2.35
PD12-278 113 JD12-258 JD12-255 90 HDPE 145 -0.615 0.13 0.348
PD12-279 86 JD12-259 JD12-258 90 HDPE 145 -0.205 0.04 0.046
PD12-280 109 JD12-260 JD12-258 90 HDPE 145 -0.205 0.04 0.045
PD12-281 192 JD12-261 JD12-286 90 HDPE 145 0.959 0.21 0.792
PD12-282 198 JD12-261 JD12-287 90 HDPE 145 1.025 0.22 0.896
PD12-283 90 JD12-262 JD12-273 90 HDPE 145 0.912 0.2 0.721
PD12-284 10 JD12-263 JD12-265 90 HDPE 145 1.23 0.27 1.257
PD12-285 136 JD12-263 JD12-264 90 HDPE 145 0.205 0.04 0.046
PD12-286 66 JD12-265 JD12-270 90 HDPE 145 0.615 0.13 0.348
PD12-287 139 JD12-265 JD12-267 90 HDPE 145 0.205 0.04 0.046
PD12-288 92 JD12-266 JD12-265 90 HDPE 145 -0.205 0.04 0.046
PD12-289 83 JD12-268 JD12-269 90 HDPE 145 0.205 0.04 0.046
PD12-290 94 JD12-268 JD12-256 90 HDPE 145 -0.941 0.2 0.764
PD12-291 59 JD12-270 JD12-271 90 HDPE 145 0.205 0.04 0.046
PD12-292 110 JD12-272 JD12-270 90 HDPE 145 -0.205 0.04 0.045
PD12-293 11 JD12-273 JD12-275 90 HDPE 145 0.516 0.11 0.252
PD12-294 64 JD12-274 JD12-273 90 HDPE 145 -0.191 0.04 0.04

MaRS Planning Engineering Services Pvt. Ltd.


PD12-295 197 JD12-274 JD12-262 90 HDPE 145 -0.609 0.13 0.341
PD12-296 172 JD12-275 JD12-283 90 HDPE 145 0.205 0.04 0.045
PD12-297 10 JD12-276 JD12-278 90 HDPE 145 0.41 0.09 0.164
PD12-298 11 JD12-276 JD12-274 90 HDPE 145 -0.29 0.06 0.086
PD12-299 86 JD12-276 JD12-268 90 HDPE 145 -0.53 0.12 0.264
PD12-300 10 JD12-277 JD12-274 90 HDPE 145 -0.304 0.07 0.095
PD12-301 64 JD12-277 JD12-275 90 HDPE 145 -0.106 0.02 0.013
PD12-302 36 JD12-279 JD12-277 90 HDPE 145 -0.205 0.04 0.045
PD12-303 104 JD12-280 JD12-276 90 HDPE 145 -0.205 0.04 0.045
PD12-304 109 JD12-281 JD12-278 90 HDPE 145 -0.205 0.04 0.046
PD12-305 204 JD12-283 JD12-282 90 HDPE 145 0 0 0
PD12-306 196 JD12-284 JD12-261 90 HDPE 145 -0.887 0.19 0.685
PD12-307 68 JD12-285 JD12-284 90 HDPE 145 -0.205 0.04 0.045
PD12-308 83 JD12-286 JD12-284 90 HDPE 145 -0.477 0.1 0.217
PD12-309 252 JD12-286 JD12-292 90 HDPE 145 1.23 0.27 1.256
PD12-310 195 JD12-287 JD12-288 90 HDPE 145 0.82 0.18 0.593
PD12-311 10 JD12-288 JD12-289 90 HDPE 145 0.615 0.13 0.348
PD12-312 44 JD12-289 JD12-290 90 HDPE 145 0.205 0.04 0.046
PD12-313 198 JD12-291 JD12-289 90 HDPE 145 -0.205 0.04 0.045
PD12-314 286 JD12-292 JD12-293 90 HDPE 145 1.025 0.22 0.896
PD12-315 113 JD12-293 JD12-295 90 HDPE 145 0.205 0.04 0.046
PD12-316 10 JD12-294 JD12-293 90 HDPE 145 -0.615 0.13 0.348
PD12-317 120 JD12-294 JD12-296 90 HDPE 145 0.205 0.04 0.046
PD12-318 171 JD12-297 JD12-294 90 HDPE 145 -0.205 0.04 0.046
TD.-13
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD13-1 35 JD13-1 TD-13 200 DI-K7 140 -21.513 0.68 2.346
PD13-2 41 JD13-1 JD13-5 200 DI-K7 140 20.451 0.65 2.136
PD13-3 96 JD13-2 JD13-1 90 HDPE 145 -0.797 0.17 0.562
PD13-4 167 JD13-3 JD13-2 90 HDPE 145 -0.266 0.06 0.073
PD13-5 295 JD13-4 JD13-2 90 HDPE 145 -0.266 0.06 0.073
PD13-6 169 JD13-5 JD13-6 90 HDPE 145 0.266 0.06 0.073
PD13-7 264 JD13-5 JD13-7 200 DI-K7 140 19.919 0.63 2.034
PD13-8 19 JD13-7 JD13-9 200 DI-K7 140 19.388 0.62 1.935
PD13-9 186 JD13-7 JD13-8 90 HDPE 145 0.266 0.06 0.073
PD13-10 205 JD13-9 JD13-13 200 DI-K7 140 18.326 0.58 1.743
PD13-11 56 JD13-10 JD13-9 90 HDPE 145 -0.797 0.17 0.562
PD13-12 43 JD13-11 JD13-10 90 HDPE 145 -0.266 0.06 0.073
PD13-13 193 JD13-12 JD13-10 90 HDPE 145 -0.266 0.06 0.073
PD13-14 10 JD13-13 JD13-15 200 DI-K7 140 17.795 0.57 1.65
PD13-15 149 JD13-13 JD13-14 90 HDPE 145 0.266 0.06 0.073
PD13-16 42 JD13-15 JD13-18 200 DI-K7 140 14.873 0.47 1.184
PD13-17 151 JD13-15 JD13-16 90 HDPE 145 0.266 0.06 0.073
PD13-18 10 JD13-17 JD13-15 110 HDPE 145 -2.39 0.35 1.619
PD13-19 79 JD13-18 JD13-25 110 HDPE 145 3.532 0.4 1.787
PD13-20 11 JD13-19 JD13-18 200 DI-K7 140 -11.076 0.35 0.686

MaRS Planning Engineering Services Pvt. Ltd.


PD13-21 82 JD13-19 JD13-27 110 HDPE 145 2.439 0.35 1.681
PD13-22 203 JD13-20 JD13-17 90 HDPE 145 -0.531 0.12 0.265
PD13-23 241 JD13-21 JD13-20 90 HDPE 145 -0.266 0.06 0.073
PD13-24 8 JD13-22 JD13-26 110 HDPE 145 4.121 0.46 2.378
PD13-25 44 JD13-22 JD13-19 160 HDPE 145 -8.371 0.57 2.653
PD13-26 72 JD13-23 JD13-24 90 HDPE 145 0.266 0.06 0.073
PD13-27 80 JD13-23 JD13-17 90 HDPE 145 -1.594 0.35 2.028
PD13-28 79 JD13-25 JD13-41 110 HDPE 145 3.266 0.37 1.546
PD13-29 10 JD13-26 JD13-33 110 HDPE 145 3.59 0.52 3.439
PD13-30 79 JD13-27 JD13-40 90 HDPE 145 1.234 0.27 1.263
PD13-31 117 JD13-28 JD13-23 90 HDPE 145 -0.531 0.12 0.265
PD13-32 125 JD13-29 JD13-23 90 HDPE 145 -0.531 0.12 0.265
PD13-33 291 JD13-30 JD13-26 90 HDPE 145 -0.266 0.06 0.073
PD13-34 95 JD13-31 JD13-28 90 HDPE 145 -0.266 0.06 0.073
PD13-35 110 JD13-32 JD13-29 90 HDPE 145 -0.266 0.06 0.073
PD13-36 78 JD13-33 JD13-34 90 HDPE 145 0.137 0.03 0.022
PD13-37 45 JD13-34 JD13-27 90 HDPE 145 -0.94 0.2 0.763
PD13-38 83 JD13-34 JD13-38 90 HDPE 145 0.812 0.18 0.581
PD13-39 11 JD13-35 JD13-33 110 HDPE 145 -3.187 0.46 2.758
PD13-40 71 JD13-35 JD13-47 110 HDPE 145 2.656 0.39 1.968
PD13-41 71 JD13-36 JD13-22 90 HDPE 145 -1.328 0.29 1.447
PD13-42 274 JD13-37 JD13-35 90 HDPE 145 -0.266 0.06 0.073
PD13-43 61 JD13-38 JD13-40 90 HDPE 145 0.546 0.12 0.279
PD13-44 45 JD13-39 JD13-36 90 HDPE 145 -0.266 0.06 0.074
PD13-45 10 JD13-40 JD13-41 90 HDPE 145 1.514 0.33 1.846
PD13-46 147 JD13-41 JD13-57 110 HDPE 145 4.515 0.51 2.816
PD13-47 78 JD13-42 JD13-36 90 HDPE 145 -0.797 0.17 0.562
PD13-48 54 JD13-43 JD13-42 90 HDPE 145 -0.266 0.06 0.073
PD13-49 77 JD13-44 JD13-42 90 HDPE 145 -0.266 0.06 0.073
PD13-50 91 JD13-45 JD13-22 110 HDPE 145 -2.656 0.39 1.968
PD13-51 88 JD13-46 JD13-45 90 HDPE 145 -0.266 0.06 0.073
PD13-52 10 JD13-48 JD13-49 90 HDPE 145 1.328 0.29 1.447
PD13-53 123 JD13-48 JD13-47 110 HDPE 145 -2.39 0.35 1.619
PD13-54 185 JD13-49 JD13-50 90 HDPE 145 0.266 0.06 0.073
PD13-55 77 JD13-51 JD13-53 90 HDPE 145 0.266 0.06 0.073
PD13-56 79 JD13-51 JD13-48 90 HDPE 145 -0.797 0.17 0.562
PD13-57 52 JD13-52 JD13-51 90 HDPE 145 -0.266 0.06 0.073
PD13-58 94 JD13-54 JD13-49 90 HDPE 145 -0.797 0.17 0.562
PD13-59 45 JD13-55 JD13-54 90 HDPE 145 -0.266 0.06 0.073
PD13-60 123 JD13-56 JD13-54 90 HDPE 145 -0.266 0.06 0.073
PD13-61 182 JD13-57 JD13-59 110 HDPE 145 4.249 0.48 2.517
PD13-62 187 JD13-58 JD13-45 90 HDPE 145 -2.125 0.46 3.455
PD13-63 10 JD13-59 JD13-60 110 HDPE 145 2.211 0.32 1.402
PD13-64 113 JD13-59 JD13-63 90 HDPE 145 1.773 0.38 2.47
PD13-65 172 JD13-60 JD13-61 90 HDPE 145 0.266 0.06 0.073
PD13-66 118 JD13-60 JD13-62 90 HDPE 145 1.68 0.36 2.237
PD13-67 206 JD13-62 JD13-67 90 HDPE 145 1.083 0.24 0.992
PD13-68 11 JD13-63 JD13-62 90 HDPE 145 -0.331 0.07 0.111

MaRS Planning Engineering Services Pvt. Ltd.


PD13-69 20 JD13-63 JD13-65 90 HDPE 145 1.838 0.4 2.642
PD13-70 175 JD13-64 JD13-58 90 HDPE 145 -1.859 0.4 2.698
PD13-71 131 JD13-65 JD13-69 90 HDPE 145 1.307 0.28 1.405
PD13-72 56 JD13-66 JD13-65 90 HDPE 145 -0.266 0.06 0.073
PD13-73 67 JD13-67 JD13-68 90 HDPE 145 0.266 0.06 0.073
PD13-74 47 JD13-69 JD13-71 90 HDPE 145 0.776 0.17 0.535
PD13-75 69 JD13-69 JD13-70 90 HDPE 145 0.266 0.06 0.073
PD13-76 10 JD13-71 JD13-72 90 HDPE 145 1.062 0.23 0.957
PD13-77 208 JD13-71 JD13-67 90 HDPE 145 -0.552 0.12 0.285
PD13-78 212 JD13-72 JD13-73 90 HDPE 145 0.266 0.06 0.073
PD13-79 314 JD13-72 JD13-74 90 HDPE 145 0.531 0.12 0.265
PD13-80 116 JD13-74 JD13-75 90 HDPE 145 0.266 0.06 0.073
PD13-81 205 JD13-76 JD13-64 90 HDPE 145 -1.594 0.35 2.028
PD13-82 197 JD13-77 JD13-76 90 HDPE 145 -1.328 0.29 1.447
PD13-83 196 JD13-78 JD13-77 90 HDPE 145 -1.062 0.23 0.957
PD13-84 161 JD13-79 JD13-78 90 HDPE 145 -0.797 0.17 0.562
PD13-85 93 JD13-80 JD13-79 90 HDPE 145 -0.266 0.06 0.073
PD13-86 104 JD13-81 JD13-79 90 HDPE 145 -0.266 0.06 0.073
TD.-14
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD14-1 76 JD14-1 TD-14 200 DI-K7 140 -25.786 0.82 3.281
PD14-2 100 JD14-2 JD14-3 90 HDPE 145 0.25 0.05 0.066
PD14-3 145 JD14-2 JD14-5 90 HDPE 145 0.501 0.11 0.238
PD14-4 144 JD14-2 JD14-1 200 DI-K7 140 -25.536 0.81 3.222
PD14-5 10 JD14-4 JD14-2 200 DI-K7 140 -24.534 0.78 2.992
PD14-6 96 JD14-4 JD14-6 90 HDPE 145 0.25 0.05 0.066
PD14-7 202 JD14-4 JD14-7 90 HDPE 145 0.25 0.05 0.066
PD14-8 141 JD14-5 JD14-8 90 HDPE 145 0.25 0.05 0.066
PD14-9 316 JD14-9 JD14-4 200 DI-K7 140 -23.783 0.76 2.825
PD14-10 153 JD14-10 JD14-9 200 DI-K7 140 -23.533 0.75 2.77
PD14-11 195 JD14-11 JD14-10 200 DI-K7 140 -23.283 0.74 2.715
PD14-12 199 JD14-12 JD14-11 200 DI-K7 140 -23.032 0.73 2.662
PD14-13 10 JD14-13 JD14-14 90 HDPE 145 1.252 0.27 1.297
PD14-14 203 JD14-13 JD14-12 200 DI-K7 140 -22.782 0.73 2.608
PD14-15 66 JD14-14 JD14-15 90 HDPE 145 0.562 0.12 0.294
PD14-16 32 JD14-15 JD14-17 90 HDPE 145 0.25 0.05 0.066
PD14-17 65 JD14-16 JD14-15 90 HDPE 145 -0.061 0.01 0.005
PD14-18 106 JD14-16 JD14-14 90 HDPE 145 -0.44 0.1 0.187
PD14-19 198 JD14-18 JD14-16 90 HDPE 145 -0.25 0.05 0.066
PD14-20 59 JD14-19 JD14-20 90 HDPE 145 0.25 0.05 0.066
PD14-21 133 JD14-19 JD14-13 200 DI-K7 140 -21.28 0.68 2.299
PD14-22 184 JD14-21 JD14-19 200 DI-K7 140 -20.779 0.66 2.2
PD14-23 201 JD14-22 JD14-21 200 DI-K7 140 -20.529 0.65 2.151
PD14-24 198 JD14-23 JD14-22 200 DI-K7 140 -20.278 0.65 2.102
PD14-25 202 JD14-24 JD14-23 200 DI-K7 140 -20.028 0.64 2.055
PD14-26 200 JD14-25 JD14-24 200 DI-K7 140 -19.778 0.63 2.007

MaRS Planning Engineering Services Pvt. Ltd.


PD14-27 50 JD14-26 JD14-27 200 DI-K7 140 10.264 0.33 0.596
PD14-28 176 JD14-26 JD14-25 200 DI-K7 140 -19.527 0.62 1.96
PD14-29 132 JD14-27 JD14-28 90 HDPE 145 0.25 0.05 0.066
PD14-30 150 JD14-27 JD14-29 200 DI-K7 140 9.764 0.31 0.543
PD14-31 11 JD14-29 JD14-30 90 HDPE 145 0.751 0.16 0.504
PD14-32 180 JD14-29 JD14-35 160 HDPE 145 8.762 0.6 2.888
PD14-33 123 JD14-30 JD14-31 90 HDPE 145 0.25 0.05 0.066
PD14-34 180 JD14-30 JD14-32 90 HDPE 145 0.25 0.05 0.066
PD14-35 97 JD14-33 JD14-34 90 HDPE 145 0.25 0.05 0.066
PD14-36 144 JD14-33 JD14-26 160 HDPE 145 -9.013 0.62 3.042
PD14-37 185 JD14-35 JD14-42 160 HDPE 145 8.262 0.57 2.59
PD14-38 265 JD14-35 JD14-36 90 HDPE 145 0.25 0.05 0.066
PD14-39 11 JD14-37 JD14-38 110 HDPE 145 1.925 0.28 1.083
PD14-40 210 JD14-37 JD14-33 160 HDPE 145 -8.512 0.58 2.737
PD14-41 89 JD14-38 JD14-40 110 HDPE 145 1.424 0.21 0.619
PD14-42 211 JD14-38 JD14-39 90 HDPE 145 0.25 0.05 0.066
PD14-43 97 JD14-40 JD14-41 90 HDPE 145 0.25 0.05 0.066
PD14-44 194 JD14-42 JD14-49 160 HDPE 145 8.011 0.55 2.446
PD14-45 69 JD14-43 JD14-40 90 HDPE 145 -0.923 0.2 0.734
PD14-46 52 JD14-44 JD14-37 140 HDPE 145 -6.337 0.57 3.033
PD14-47 102 JD14-44 JD14-43 90 HDPE 145 -0.673 0.15 0.407
PD14-48 10 JD14-45 JD14-44 140 HDPE 145 -6.759 0.61 3.418
PD14-49 103 JD14-45 JD14-47 110 HDPE 145 4.787 0.54 3.138
PD14-50 193 JD14-46 JD14-45 110 HDPE 145 -1.722 0.25 0.882
PD14-51 16 JD14-47 JD14-48 110 HDPE 145 4.537 0.51 2.841
PD14-52 10 JD14-48 JD14-50 110 HDPE 145 3.48 0.51 3.247
PD14-53 203 JD14-49 JD14-67 160 HDPE 145 7.761 0.53 2.306
PD14-54 20 JD14-50 JD14-51 110 HDPE 145 2.503 0.36 1.764
PD14-55 46 JD14-51 JD14-52 90 HDPE 145 0.25 0.05 0.066
PD14-56 70 JD14-51 JD14-65 90 HDPE 145 2.003 0.43 3.097
PD14-57 182 JD14-53 JD14-48 90 HDPE 145 -0.806 0.17 0.574
PD14-58 77 JD14-54 JD14-56 90 HDPE 145 0.25 0.05 0.066
PD14-59 179 JD14-54 JD14-46 90 HDPE 145 -1.472 0.32 1.751
PD14-60 183 JD14-55 JD14-50 90 HDPE 145 -0.726 0.16 0.473
PD14-61 10 JD14-57 JD14-58 90 HDPE 145 0.025 0.01 0.001
PD14-62 218 JD14-57 JD14-53 90 HDPE 145 -0.556 0.12 0.288
PD14-63 64 JD14-58 JD14-59 90 HDPE 145 0.25 0.05 0.066
PD14-64 220 JD14-58 JD14-55 90 HDPE 145 -0.476 0.1 0.217
PD14-65 76 JD14-60 JD14-54 90 HDPE 145 -0.971 0.21 0.811
PD14-66 124 JD14-60 JD14-57 90 HDPE 145 -0.281 0.06 0.081
PD14-67 12 JD14-61 JD14-60 90 HDPE 145 -1.001 0.22 0.858
PD14-68 200 JD14-61 JD14-62 90 HDPE 145 0.25 0.05 0.066
PD14-69 218 JD14-63 JD14-61 90 HDPE 145 -0.501 0.11 0.238
PD14-70 193 JD14-64 JD14-63 90 HDPE 145 -0.25 0.05 0.066
PD14-71 42 JD14-65 JD14-66 90 HDPE 145 1.752 0.38 2.419
PD14-72 62 JD14-66 JD14-68 90 HDPE 145 1.502 0.33 1.818
PD14-73 268 JD14-67 JD14-74 160 HDPE 145 7.51 0.52 2.171
PD14-74 102 JD14-68 JD14-69 90 HDPE 145 1.252 0.27 1.297

MaRS Planning Engineering Services Pvt. Ltd.


PD14-75 106 JD14-69 JD14-70 90 HDPE 145 0.25 0.05 0.066
PD14-76 172 JD14-69 JD14-71 90 HDPE 145 0.751 0.16 0.504
PD14-77 169 JD14-71 JD14-72 90 HDPE 145 0.501 0.11 0.238
PD14-78 133 JD14-72 JD14-73 90 HDPE 145 0.25 0.05 0.066
PD14-79 10 JD14-74 JD14-79 140 HDPE 145 6.259 0.56 2.965
PD14-80 10 JD14-74 JD14-75 90 HDPE 145 0.751 0.16 0.504
PD14-81 85 JD14-74 JD14-76 90 HDPE 145 0.25 0.05 0.066
PD14-82 187 JD14-75 JD14-77 90 HDPE 145 0.25 0.05 0.066
PD14-83 260 JD14-78 JD14-75 90 HDPE 145 -0.25 0.05 0.066
PD14-84 219 JD14-79 JD14-80 90 HDPE 145 0.25 0.05 0.066
PD14-85 164 JD14-79 JD14-81 140 HDPE 145 5.758 0.52 2.54
PD14-86 63 JD14-81 JD14-83 140 HDPE 145 5.257 0.47 2.146
PD14-87 260 JD14-81 JD14-82 90 HDPE 145 0.25 0.05 0.066
PD14-88 14 JD14-83 JD14-84 110 HDPE 145 3.255 0.47 2.867
PD14-89 270 JD14-83 JD14-87 90 HDPE 145 1.752 0.38 2.419
PD14-90 236 JD14-84 JD14-86 110 HDPE 145 2.754 0.4 2.104
PD14-91 65 JD14-85 JD14-84 90 HDPE 145 -0.25 0.05 0.066
PD14-92 265 JD14-86 JD14-91 110 HDPE 145 2.503 0.36 1.764
PD14-93 219 JD14-87 JD14-88 90 HDPE 145 0.25 0.05 0.066
PD14-94 257 JD14-87 JD14-89 90 HDPE 145 1.252 0.27 1.297
PD14-95 78 JD14-89 JD14-90 90 HDPE 145 0.25 0.05 0.066
PD14-96 126 JD14-89 JD14-93 90 HDPE 145 0.751 0.16 0.504
PD14-97 28 JD14-91 JD14-96 90 HDPE 145 2.003 0.43 3.097
PD14-98 61 JD14-91 JD14-92 90 HDPE 145 0.25 0.05 0.066
PD14-99 34 JD14-93 JD14-94 90 HDPE 145 0.25 0.05 0.066
PD14-100 67 JD14-93 JD14-95 90 HDPE 145 0.25 0.05 0.066
PD14-101 52 JD14-96 JD14-98 90 HDPE 145 1.502 0.33 1.818
PD14-102 88 JD14-96 JD14-97 90 HDPE 145 0.25 0.05 0.066
PD14-103 89 JD14-98 JD14-99 90 HDPE 145 0.25 0.05 0.066
PD14-104 251 JD14-98 JD14-100 90 HDPE 145 1.001 0.22 0.858
PD14-105 203 JD14-100 JD14-101 90 HDPE 145 0.751 0.16 0.504
PD14-106 55 JD14-101 JD14-102 90 HDPE 145 0.25 0.05 0.066
PD14-107 63 JD14-101 JD14-103 90 HDPE 145 0.25 0.05 0.066
TD.-15
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD15-1 35 JD15-1 TD-15 250 DI-K7 140 -28.463 0.58 1.329
PD15-2 248 JD15-1 JD15-2 110 HDPE 145 3.491 0.51 3.264
PD15-3 260 JD15-2 JD15-3 90 HDPE 145 0.269 0.06 0.075
PD15-4 251 JD15-2 JD15-5 110 HDPE 145 2.954 0.43 2.396
PD15-5 251 JD15-4 JD15-6 200 DI-K7 140 24.435 0.78 2.97
PD15-6 310 JD15-4 JD15-1 200 DI-K7 140 -24.704 0.79 3.03
PD15-7 234 JD15-5 JD15-7 110 HDPE 145 2.685 0.39 2.008
PD15-8 243 JD15-6 JD15-9 200 DI-K7 140 24.167 0.77 2.909
PD15-9 216 JD15-7 JD15-8 110 HDPE 145 2.417 0.35 1.652
PD15-10 221 JD15-8 JD15-11 110 HDPE 145 2.148 0.31 1.328
PD15-11 245 JD15-9 JD15-19 200 DI-K7 140 23.63 0.75 2.791

MaRS Planning Engineering Services Pvt. Ltd.


PD15-12 437 JD15-9 JD15-10 90 HDPE 145 0.269 0.06 0.075
PD15-13 173 JD15-11 JD15-12 90 HDPE 145 0.806 0.17 0.573
PD15-14 232 JD15-11 JD15-15 90 HDPE 145 1.074 0.23 0.977
PD15-15 145 JD15-12 JD15-13 90 HDPE 145 0.269 0.06 0.075
PD15-16 150 JD15-12 JD15-14 90 HDPE 145 0.269 0.06 0.075
PD15-17 213 JD15-15 JD15-16 90 HDPE 145 0.806 0.17 0.573
PD15-18 119 JD15-16 JD15-17 90 HDPE 145 0.269 0.06 0.075
PD15-19 211 JD15-16 JD15-18 90 HDPE 145 0.269 0.06 0.075
PD15-20 191 JD15-19 JD15-20 90 HDPE 145 0.269 0.06 0.075
PD15-21 182 JD15-19 JD15-21 200 DI-K7 140 23.093 0.74 2.675
PD15-22 12 JD15-21 JD15-23 200 DI-K7 140 22.556 0.72 2.561
PD15-23 147 JD15-22 JD15-21 90 HDPE 145 -0.269 0.06 0.075
PD15-24 264 JD15-23 JD15-25 200 DI-K7 140 22.019 0.7 2.449
PD15-25 168 JD15-24 JD15-23 90 HDPE 145 -0.269 0.06 0.075
PD15-26 202 JD15-25 JD15-26 200 DI-K7 140 21.75 0.69 2.394
PD15-27 116 JD15-26 JD15-27 200 DI-K7 140 21.482 0.68 2.339
PD15-28 136 JD15-27 JD15-28 90 HDPE 145 0.269 0.06 0.075
PD15-29 227 JD15-27 JD15-29 200 DI-K7 140 20.944 0.67 2.232
PD15-30 134 JD15-29 JD15-30 90 HDPE 145 0.269 0.06 0.075
PD15-31 139 JD15-29 JD15-31 200 DI-K7 140 20.407 0.65 2.127
PD15-32 16 JD15-31 JD15-32 160 HDPE 145 7.032 0.48 1.921
PD15-33 10 JD15-32 JD15-33 160 HDPE 145 6.056 0.42 1.456
PD15-34 224 JD15-32 JD15-37 110 HDPE 145 0.707 0.1 0.17
PD15-35 135 JD15-33 JD15-41 110 HDPE 145 3.645 0.41 1.894
PD15-36 223 JD15-33 JD15-43 110 HDPE 145 2.143 0.31 1.323
PD15-37 39 JD15-34 JD15-36 90 HDPE 145 0.635 0.14 0.369
PD15-38 54 JD15-34 JD15-31 200 DI-K7 140 -13.107 0.42 0.937
PD15-39 10 JD15-35 JD15-34 200 DI-K7 140 -12.203 0.39 0.821
PD15-40 332 JD15-35 JD15-58 110 HDPE 145 2.336 0.34 1.551
PD15-41 219 JD15-36 JD15-39 90 HDPE 145 0.214 0.05 0.049
PD15-42 281 JD15-36 JD15-38 90 HDPE 145 0.153 0.03 0.026
PD15-43 64 JD15-37 JD15-39 90 HDPE 145 0.323 0.07 0.106
PD15-44 220 JD15-38 JD15-37 90 HDPE 145 -0.116 0.03 0.016
PD15-45 63 JD15-39 JD15-40 90 HDPE 145 0.269 0.06 0.075
PD15-46 10 JD15-41 JD15-42 110 HDPE 145 2.954 0.43 2.396
PD15-47 233 JD15-41 JD15-44 90 HDPE 145 0.422 0.09 0.173
PD15-48 49 JD15-42 JD15-49 90 HDPE 145 1.685 0.37 2.249
PD15-49 152 JD15-42 JD15-51 90 HDPE 145 1 0.22 0.856
PD15-50 78 JD15-43 JD15-44 90 HDPE 145 0.115 0.02 0.016
PD15-51 178 JD15-44 JD15-45 90 HDPE 145 0.269 0.06 0.075
PD15-52 93 JD15-46 JD15-35 160 HDPE 145 -9.599 0.66 3.419
PD15-53 116 JD15-46 JD15-55 90 HDPE 145 1.366 0.3 1.526
PD15-54 10 JD15-47 JD15-46 160 HDPE 145 -7.964 0.55 2.419
PD15-55 144 JD15-47 JD15-67 90 HDPE 145 1.52 0.33 1.857
PD15-56 10 JD15-48 JD15-47 140 HDPE 145 -6.176 0.55 2.892
PD15-57 159 JD15-49 JD15-50 90 HDPE 145 0.342 0.07 0.118
PD15-58 179 JD15-49 JD15-60 90 HDPE 145 1.074 0.23 0.977
PD15-59 19 JD15-51 JD15-52 90 HDPE 145 0.806 0.17 0.573

MaRS Planning Engineering Services Pvt. Ltd.


PD15-60 102 JD15-51 JD15-50 90 HDPE 145 -0.074 0.02 0.007
PD15-61 66 JD15-52 JD15-53 90 HDPE 145 0.537 0.12 0.271
PD15-62 160 JD15-53 JD15-54 90 HDPE 145 0.269 0.06 0.075
PD15-63 70 JD15-55 JD15-56 90 HDPE 145 0.269 0.06 0.075
PD15-64 214 JD15-55 JD15-69 90 HDPE 145 0.829 0.18 0.605
PD15-65 13 JD15-57 JD15-58 110 HDPE 145 1.491 0.22 0.675
PD15-66 244 JD15-57 JD15-43 110 HDPE 145 -1.76 0.26 0.918
PD15-67 71 JD15-58 JD15-69 110 HDPE 145 3.29 0.37 1.567
PD15-68 71 JD15-59 JD15-58 90 HDPE 145 -0.269 0.06 0.075
PD15-69 180 JD15-60 JD15-65 90 HDPE 145 0.537 0.12 0.271
PD15-70 136 JD15-61 JD15-48 110 HDPE 145 -2.148 0.31 1.328
PD15-71 80 JD15-62 JD15-60 90 HDPE 145 -0.269 0.06 0.075
PD15-72 160 JD15-63 JD15-61 90 HDPE 145 -0.269 0.06 0.075
PD15-73 46 JD15-64 JD15-66 90 HDPE 145 0.269 0.06 0.075
PD15-74 112 JD15-64 JD15-48 110 HDPE 145 -3.759 0.42 2.006
PD15-75 213 JD15-65 JD15-68 90 HDPE 145 0.269 0.06 0.075
PD15-76 89 JD15-67 JD15-71 90 HDPE 145 0.806 0.17 0.573
PD15-77 187 JD15-67 JD15-70 90 HDPE 145 0.445 0.1 0.191
PD15-78 10 JD15-69 JD15-70 110 HDPE 145 3.851 0.43 2.097
PD15-79 31 JD15-70 JD15-74 110 HDPE 145 4.028 0.45 2.279
PD15-80 75 JD15-71 JD15-72 90 HDPE 145 0.269 0.06 0.075
PD15-81 160 JD15-71 JD15-73 90 HDPE 145 0.269 0.06 0.075
PD15-82 59 JD15-74 JD15-84 110 HDPE 145 3.491 0.51 3.264
PD15-83 89 JD15-74 JD15-75 90 HDPE 145 0.269 0.06 0.075
PD15-84 73 JD15-76 JD15-64 110 HDPE 145 -3.222 0.47 2.815
PD15-85 10 JD15-77 JD15-76 90 HDPE 145 -1.343 0.29 1.477
PD15-86 72 JD15-77 JD15-79 90 HDPE 145 0.537 0.12 0.271
PD15-87 67 JD15-78 JD15-77 90 HDPE 145 -0.269 0.06 0.075
PD15-88 109 JD15-79 JD15-81 90 HDPE 145 0.269 0.06 0.075
PD15-89 266 JD15-80 JD15-77 90 HDPE 145 -0.269 0.06 0.075
PD15-90 26 JD15-82 JD15-76 90 HDPE 145 -1.611 0.35 2.07
PD15-91 77 JD15-82 JD15-83 90 HDPE 145 0.269 0.06 0.075
PD15-92 12 JD15-84 JD15-86 110 HDPE 145 2.417 0.35 1.652
PD15-93 103 JD15-84 JD15-87 90 HDPE 145 0.537 0.12 0.271
PD15-94 217 JD15-84 JD15-85 90 HDPE 145 0.269 0.06 0.075
PD15-95 94 JD15-86 JD15-92 90 HDPE 145 1.88 0.41 2.754
PD15-96 184 JD15-86 JD15-88 90 HDPE 145 0.269 0.06 0.075
PD15-97 154 JD15-89 JD15-87 90 HDPE 145 -0.269 0.06 0.075
PD15-98 236 JD15-90 JD15-61 90 HDPE 145 -1.611 0.35 2.07
PD15-99 238 JD15-91 JD15-82 90 HDPE 145 -1.074 0.23 0.977
PD15-100 27 JD15-92 JD15-94 90 HDPE 145 1.343 0.29 1.477
PD15-101 96 JD15-93 JD15-92 90 HDPE 145 -0.269 0.06 0.075
PD15-102 10 JD15-95 JD15-94 90 HDPE 145 -0.806 0.17 0.573
PD15-103 257 JD15-96 JD15-91 90 HDPE 145 -0.806 0.17 0.573
PD15-104 118 JD15-97 JD15-94 90 HDPE 145 -0.269 0.06 0.075
PD15-105 102 JD15-98 JD15-95 90 HDPE 145 -0.269 0.06 0.075
PD15-106 114 JD15-99 JD15-95 90 HDPE 145 -0.269 0.06 0.075
PD15-107 238 JD15-100 JD15-96 90 HDPE 145 -0.537 0.12 0.271

MaRS Planning Engineering Services Pvt. Ltd.


PD15-108 283 JD15-101 JD15-100 90 HDPE 145 -0.269 0.06 0.075
PD15-109 241 JD15-102 JD15-90 90 HDPE 145 -1.343 0.29 1.477
PD15-110 240 JD15-103 JD15-102 90 HDPE 145 -1.074 0.23 0.977
PD15-111 266 JD15-104 JD15-106 90 HDPE 145 0.269 0.06 0.075
PD15-112 200 JD15-104 JD15-105 90 HDPE 145 0.269 0.06 0.075
PD15-113 180 JD15-104 JD15-103 90 HDPE 145 -0.806 0.17 0.573
TD.-16
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD16-1 34 JD16-1 TD-16 200 DI-K7 140 -18.207 0.58 1.722
PD16-2 272 JD16-1 JD16-2 90 HDPE 145 0.167 0.04 0.031
PD16-3 266 JD16-3 JD16-1 200 DI-K7 140 -17.873 0.57 1.664
PD16-4 247 JD16-4 JD16-3 200 DI-K7 140 -14.532 0.46 1.134
PD16-5 243 JD16-5 JD16-4 200 DI-K7 140 -14.365 0.46 1.11
PD16-6 157 JD16-6 JD16-7 90 HDPE 145 0.501 0.11 0.238
PD16-7 242 JD16-6 JD16-3 110 HDPE 145 -3.174 0.46 2.737
PD16-8 108 JD16-7 JD16-9 90 HDPE 145 0.167 0.04 0.031
PD16-9 74 JD16-7 JD16-8 90 HDPE 145 0.167 0.04 0.031
PD16-10 83 JD16-10 JD16-6 110 HDPE 145 -2.506 0.36 1.766
PD16-11 177 JD16-10 JD16-11 90 HDPE 145 0.167 0.04 0.031
PD16-12 274 JD16-12 JD16-5 200 DI-K7 140 -14.198 0.45 1.086
PD16-13 247 JD16-13 JD16-12 200 DI-K7 140 -14.031 0.45 1.063
PD16-14 10 JD16-14 JD16-15 90 HDPE 145 1.002 0.22 0.859
PD16-15 203 JD16-14 JD16-21 90 HDPE 145 1.002 0.22 0.859
PD16-16 234 JD16-14 JD16-10 110 HDPE 145 -2.171 0.32 1.355
PD16-17 66 JD16-15 JD16-16 90 HDPE 145 0.167 0.04 0.031
PD16-18 239 JD16-15 JD16-18 90 HDPE 145 0.501 0.11 0.238
PD16-19 233 JD16-15 JD16-17 90 HDPE 145 0.167 0.04 0.031
PD16-20 154 JD16-18 JD16-20 90 HDPE 145 0.167 0.04 0.031
PD16-21 108 JD16-18 JD16-19 90 HDPE 145 0.167 0.04 0.031
PD16-22 82 JD16-21 JD16-22 90 HDPE 145 0.835 0.18 0.613
PD16-23 40 JD16-22 JD16-23 90 HDPE 145 0.668 0.14 0.406
PD16-24 111 JD16-23 JD16-24 90 HDPE 145 0.167 0.04 0.031
PD16-25 253 JD16-25 JD16-13 200 DI-K7 140 -13.864 0.44 1.04
PD16-26 113 JD16-26 JD16-23 90 HDPE 145 -0.334 0.07 0.112
PD16-27 203 JD16-27 JD16-26 90 HDPE 145 -0.167 0.04 0.031
PD16-28 243 JD16-28 JD16-25 200 DI-K7 140 -13.697 0.44 1.017
PD16-29 261 JD16-29 JD16-28 200 DI-K7 140 -13.53 0.43 0.994
PD16-30 247 JD16-30 JD16-29 200 DI-K7 140 -13.363 0.43 0.971
PD16-31 13 JD16-31 JD16-32 90 HDPE 145 0.835 0.18 0.613
PD16-32 252 JD16-31 JD16-30 200 DI-K7 140 -13.196 0.42 0.949
PD16-33 161 JD16-32 JD16-33 90 HDPE 145 0.167 0.04 0.031
PD16-34 146 JD16-32 JD16-35 90 HDPE 145 0.334 0.07 0.112
PD16-35 205 JD16-32 JD16-34 90 HDPE 145 0.167 0.04 0.031
PD16-36 120 JD16-35 JD16-36 90 HDPE 145 0.167 0.04 0.031
PD16-37 39 JD16-37 JD16-31 200 DI-K7 140 -12.194 0.39 0.82
PD16-38 80 JD16-37 JD16-38 90 HDPE 145 0.167 0.04 0.031

MaRS Planning Engineering Services Pvt. Ltd.


PD16-39 181 JD16-39 JD16-37 200 DI-K7 140 -11.86 0.38 0.779
PD16-40 208 JD16-39 JD16-42 90 HDPE 145 0.334 0.07 0.112
PD16-41 10 JD16-40 JD16-39 200 DI-K7 140 -11.358 0.36 0.718
PD16-42 205 JD16-40 JD16-41 90 HDPE 145 0.167 0.04 0.031
PD16-43 171 JD16-42 JD16-43 90 HDPE 145 0.167 0.04 0.031
PD16-44 36 JD16-44 JD16-40 200 DI-K7 140 -11.024 0.35 0.68
PD16-45 190 JD16-44 JD16-45 90 HDPE 145 0.167 0.04 0.031
PD16-46 10 JD16-46 JD16-44 200 DI-K7 140 -10.69 0.34 0.642
PD16-47 247 JD16-46 JD16-47 90 HDPE 145 0.167 0.04 0.031
PD16-48 28 JD16-48 JD16-51 140 HDPE 145 6.633 0.59 3.301
PD16-49 193 JD16-48 JD16-46 200 DI-K7 140 -10.356 0.33 0.606
PD16-50 11 JD16-49 JD16-48 110 HDPE 145 -3.556 0.4 1.81
PD16-51 394 JD16-49 JD16-50 90 HDPE 145 0.167 0.04 0.031
PD16-52 10 JD16-51 JD16-52 90 HDPE 145 1.622 0.35 2.095
PD16-53 126 JD16-51 JD16-81 110 HDPE 145 4.844 0.54 3.208
PD16-54 34 JD16-52 JD16-54 90 HDPE 145 1.288 0.28 1.367
PD16-55 302 JD16-52 JD16-53 90 HDPE 145 0.167 0.04 0.031
PD16-56 12 JD16-54 JD16-56 90 HDPE 145 0.501 0.11 0.237
PD16-57 56 JD16-54 JD16-55 90 HDPE 145 0.167 0.04 0.031
PD16-58 198 JD16-54 JD16-61 90 HDPE 145 0.453 0.1 0.197
PD16-59 216 JD16-56 JD16-58 90 HDPE 145 0.167 0.04 0.031
PD16-60 338 JD16-56 JD16-59 90 HDPE 145 0.167 0.04 0.031
PD16-61 53 JD16-57 JD16-49 110 HDPE 145 -3.222 0.47 2.815
PD16-62 231 JD16-57 JD16-60 90 HDPE 145 0.383 0.08 0.144
PD16-63 58 JD16-60 JD16-61 90 HDPE 145 0.049 0.01 0.003
PD16-64 233 JD16-60 JD16-62 90 HDPE 145 0.167 0.04 0.031
PD16-65 128 JD16-61 JD16-63 90 HDPE 145 0.334 0.07 0.112
PD16-66 147 JD16-63 JD16-64 90 HDPE 145 0.167 0.04 0.031
PD16-67 43 JD16-65 JD16-57 110 HDPE 145 -2.673 0.39 1.991
PD16-68 249 JD16-65 JD16-66 90 HDPE 145 0.167 0.04 0.031
PD16-69 10 JD16-67 JD16-65 110 HDPE 145 -2.339 0.34 1.554
PD16-70 242 JD16-67 JD16-72 90 HDPE 145 0.718 0.16 0.464
PD16-71 32 JD16-68 JD16-67 90 HDPE 145 -1.453 0.32 1.71
PD16-72 287 JD16-68 JD16-70 90 HDPE 145 0.167 0.04 0.031
PD16-73 7 JD16-69 JD16-68 90 HDPE 145 -1.119 0.24 1.054
PD16-74 151 JD16-69 JD16-73 90 HDPE 145 0.785 0.17 0.546
PD16-75 218 JD16-71 JD16-69 90 HDPE 145 -0.167 0.04 0.031
PD16-76 31 JD16-73 JD16-74 90 HDPE 145 1.169 0.25 1.143
PD16-77 111 JD16-73 JD16-72 90 HDPE 145 -0.551 0.12 0.284
PD16-78 11 JD16-74 JD16-76 90 HDPE 145 0.835 0.18 0.613
PD16-79 134 JD16-74 JD16-75 90 HDPE 145 0.167 0.04 0.031
PD16-80 19 JD16-76 JD16-78 90 HDPE 145 0.501 0.11 0.238
PD16-81 133 JD16-76 JD16-77 90 HDPE 145 0.167 0.04 0.031
PD16-82 81 JD16-78 JD16-79 90 HDPE 145 0.167 0.04 0.031
PD16-83 182 JD16-78 JD16-80 90 HDPE 145 0.167 0.04 0.031
PD16-84 67 JD16-81 JD16-83 110 HDPE 145 4.51 0.51 2.81
PD16-85 246 JD16-81 JD16-82 90 HDPE 145 0.167 0.04 0.031
PD16-86 10 JD16-83 JD16-85 110 HDPE 145 4.176 0.47 2.437

MaRS Planning Engineering Services Pvt. Ltd.


PD16-87 240 JD16-83 JD16-84 90 HDPE 145 0.167 0.04 0.031
PD16-88 8 JD16-85 JD16-87 110 HDPE 145 3.842 0.43 2.088
PD16-89 222 JD16-85 JD16-86 90 HDPE 145 0.167 0.04 0.031
PD16-90 24 JD16-87 JD16-91 110 HDPE 145 3.174 0.46 2.737
PD16-91 104 JD16-87 JD16-88 90 HDPE 145 0.501 0.11 0.238
PD16-92 43 JD16-88 JD16-89 90 HDPE 145 0.167 0.04 0.031
PD16-93 65 JD16-88 JD16-90 90 HDPE 145 0.167 0.04 0.031
PD16-94 10 JD16-91 JD16-93 110 HDPE 145 2.84 0.41 2.227
PD16-95 314 JD16-91 JD16-92 90 HDPE 145 0.167 0.04 0.031
PD16-96 118 JD16-93 JD16-94 90 HDPE 145 0.501 0.11 0.238
PD16-97 180 JD16-93 JD16-97 110 HDPE 145 2.171 0.32 1.355
PD16-98 174 JD16-94 JD16-95 90 HDPE 145 0.167 0.04 0.031
PD16-99 179 JD16-94 JD16-96 90 HDPE 145 0.167 0.04 0.031
PD16-100 60 JD16-97 JD16-99 90 HDPE 145 1.837 0.4 2.64
PD16-101 210 JD16-97 JD16-98 90 HDPE 145 0.167 0.04 0.031
PD16-102 10 JD16-99 JD16-101 90 HDPE 145 1.503 0.33 1.821
PD16-103 82 JD16-100 JD16-99 90 HDPE 145 -0.167 0.04 0.031
PD16-104 137 JD16-101 JD16-103 90 HDPE 145 1.169 0.25 1.143
PD16-105 83 JD16-102 JD16-101 90 HDPE 145 -0.167 0.04 0.031
PD16-106 10 JD16-103 JD16-106 90 HDPE 145 0.668 0.14 0.406
PD16-107 73 JD16-103 JD16-104 90 HDPE 145 0.167 0.04 0.031
PD16-108 89 JD16-103 JD16-105 90 HDPE 145 0.167 0.04 0.031
PD16-109 69 JD16-106 JD16-107 90 HDPE 145 0.167 0.04 0.031
PD16-110 98 JD16-106 JD16-108 90 HDPE 145 0.167 0.04 0.031
PD16-111 201 JD16-106 JD16-109 90 HDPE 145 0.167 0.04 0.031
TD.-17
Length Headloss
Start Stop Diameter Hazen- Flow Velocity
Label (Scaled) Material Gradient
Node Node (mm) Williams C (L/s) (m/s)
(m) (m/km)
PD17-1 35 JD17-1 TD-17 200 DI-K7 140 -23.809 0.76 2.83
PD17-2 117 JD17-1 JD17-3 200 DI-K7 140 23.347 0.74 2.729
PD17-3 58 JD17-2 JD17-1 90 HDPE 145 -0.231 0.05 0.057
PD17-4 276 JD17-3 JD17-20 200 DI-K7 140 19.417 0.62 1.94
PD17-5 10 JD17-4 JD17-5 110 HDPE 145 3.005 0.44 2.473
PD17-6 49 JD17-4 JD17-3 110 HDPE 145 -3.698 0.42 1.946
PD17-7 96 JD17-5 JD17-10 110 HDPE 145 2.312 0.34 1.522
PD17-8 213 JD17-6 JD17-4 90 HDPE 145 -0.462 0.1 0.205
PD17-9 211 JD17-7 JD17-6 90 HDPE 145 -0.231 0.05 0.057
PD17-10 214 JD17-8 JD17-5 90 HDPE 145 -0.462 0.1 0.205
PD17-11 212 JD17-9 JD17-8 90 HDPE 145 -0.231 0.05 0.057
PD17-12 10 JD17-10 JD17-11 90 HDPE 145 0.693 0.15 0.435
PD17-13 105 JD17-10 JD17-15 90 HDPE 145 1.156 0.25 1.119
PD17-14 202 JD17-10 JD17-12 90 HDPE 145 0.231 0.05 0.057
PD17-15 164 JD17-11 JD17-13 90 HDPE 145 0.231 0.05 0.057
PD17-16 295 JD17-11 JD17-14 90 HDPE 145 0.231 0.05 0.057
PD17-17 10 JD17-15 JD17-17 90 HDPE 145 0.693 0.15 0.435
PD17-18 67 JD17-15 JD17-16 90 HDPE 145 0.231 0.05 0.057
PD17-19 70 JD17-17 JD17-18 90 HDPE 145 0.231 0.05 0.057

MaRS Planning Engineering Services Pvt. Ltd.


PD17-20 185 JD17-17 JD17-19 90 HDPE 145 0.231 0.05 0.057
PD17-21 249 JD17-20 JD17-21 200 DI-K7 140 19.186 0.61 1.897
PD17-22 253 JD17-21 JD17-22 200 DI-K7 140 18.955 0.6 1.855
PD17-23 269 JD17-22 JD17-23 200 DI-K7 140 18.724 0.6 1.814
PD17-24 214 JD17-23 JD17-24 200 DI-K7 140 18.492 0.59 1.772
PD17-25 265 JD17-24 JD17-25 200 DI-K7 140 18.261 0.58 1.732
PD17-26 240 JD17-25 JD17-26 200 DI-K7 140 18.03 0.57 1.691
PD17-27 242 JD17-26 JD17-27 200 DI-K7 140 17.799 0.57 1.651
PD17-28 277 JD17-27 JD17-29 200 DI-K7 140 17.337 0.55 1.573
PD17-29 251 JD17-28 JD17-27 90 HDPE 145 -0.231 0.05 0.057
PD17-30 21 JD17-29 JD17-30 200 DI-K7 140 12.482 0.4 0.856
PD17-31 32 JD17-30 JD17-31 90 HDPE 145 1.618 0.35 2.087
PD17-32 250 JD17-30 JD17-38 200 DI-K7 140 10.633 0.34 0.636
PD17-33 194 JD17-31 JD17-32 90 HDPE 145 0.462 0.1 0.205
PD17-34 188 JD17-31 JD17-33 90 HDPE 145 0.473 0.1 0.214
PD17-35 181 JD17-32 JD17-35 90 HDPE 145 0.231 0.05 0.057
PD17-36 174 JD17-33 JD17-36 90 HDPE 145 0.242 0.05 0.062
PD17-37 211 JD17-34 JD17-31 90 HDPE 145 -0.452 0.1 0.197
PD17-38 73 JD17-36 JD17-37 90 HDPE 145 0.231 0.05 0.057
PD17-39 181 JD17-36 JD17-34 90 HDPE 145 -0.221 0.05 0.052
PD17-40 272 JD17-38 JD17-39 200 DI-K7 140 10.402 0.33 0.611
PD17-41 238 JD17-39 JD17-40 200 DI-K7 140 10.171 0.32 0.586
PD17-42 235 JD17-40 JD17-41 200 DI-K7 140 9.94 0.32 0.561
PD17-43 221 JD17-41 JD17-43 160 HDPE 145 9.709 0.67 3.492
PD17-44 259 JD17-42 JD17-29 110 HDPE 145 -4.623 0.52 2.942
PD17-45 13 JD17-43 JD17-45 160 HDPE 145 9.246 0.63 3.19
PD17-46 227 JD17-43 JD17-44 90 HDPE 145 0.231 0.05 0.057
PD17-47 224 JD17-45 JD17-48 160 HDPE 145 8.784 0.6 2.901
PD17-48 222 JD17-45 JD17-46 90 HDPE 145 0.231 0.05 0.057
PD17-49 291 JD17-47 JD17-42 110 HDPE 145 -4.392 0.49 2.675
PD17-50 229 JD17-48 JD17-50 160 HDPE 145 8.553 0.59 2.761
PD17-51 241 JD17-49 JD17-47 110 HDPE 145 -4.161 0.47 2.42
PD17-52 83 JD17-50 JD17-52 140 HDPE 145 5.72 0.51 2.509
PD17-53 274 JD17-51 JD17-49 110 HDPE 145 -3.93 0.44 2.177
PD17-54 10 JD17-52 JD17-53 110 HDPE 145 3.456 0.5 3.205
PD17-55 89 JD17-53 JD17-74 90 HDPE 145 2.08 0.45 3.323
PD17-56 39 JD17-54 JD17-52 90 HDPE 145 -2.033 0.44 3.183
PD17-57 161 JD17-55 JD17-54 90 HDPE 145 -0.231 0.05 0.057
PD17-58 10 JD17-56 JD17-54 90 HDPE 145 -1.57 0.34 1.973
PD17-59 133 JD17-57 JD17-56 90 HDPE 145 -0.231 0.05 0.057
PD17-60 204 JD17-58 JD17-51 110 HDPE 145 -3.698 0.42 1.946
PD17-61 223 JD17-59 JD17-50 110 HDPE 145 -2.602 0.38 1.894
PD17-62 69 JD17-60 JD17-59 90 HDPE 145 -0.231 0.05 0.057
PD17-63 30 JD17-61 JD17-59 110 HDPE 145 -2.139 0.31 1.318
PD17-64 202 JD17-62 JD17-53 90 HDPE 145 -1.145 0.25 1.099
PD17-65 10 JD17-63 JD17-61 90 HDPE 145 -0.693 0.15 0.435
PD17-66 124 JD17-64 JD17-61 90 HDPE 145 -0.231 0.05 0.057
PD17-67 87 JD17-65 JD17-63 90 HDPE 145 -0.231 0.05 0.057

MaRS Planning Engineering Services Pvt. Ltd.


PD17-68 275 JD17-66 JD17-63 90 HDPE 145 -0.231 0.05 0.057
PD17-69 49 JD17-67 JD17-61 90 HDPE 145 -0.984 0.21 0.83
PD17-70 149 JD17-68 JD17-56 90 HDPE 145 -1.108 0.24 1.035
PD17-71 216 JD17-69 JD17-67 90 HDPE 145 -0.231 0.05 0.057
PD17-72 96 JD17-70 JD17-67 90 HDPE 145 -0.521 0.11 0.256
PD17-73 153 JD17-70 JD17-75 90 HDPE 145 0.231 0.05 0.057
PD17-74 10 JD17-71 JD17-70 90 HDPE 145 -0.059 0.01 0.005
PD17-75 135 JD17-71 JD17-68 90 HDPE 145 -0.38 0.08 0.143
PD17-76 56 JD17-72 JD17-71 90 HDPE 145 -0.208 0.05 0.047
PD17-77 93 JD17-72 JD17-68 90 HDPE 145 -0.497 0.11 0.234
PD17-78 12 JD17-73 JD17-72 90 HDPE 145 -0.473 0.1 0.215
PD17-79 95 JD17-73 JD17-62 90 HDPE 145 -0.914 0.2 0.724
PD17-80 10 JD17-74 JD17-77 90 HDPE 145 1.618 0.35 2.086
PD17-81 144 JD17-76 JD17-74 90 HDPE 145 -0.231 0.05 0.057
PD17-82 31 JD17-77 JD17-79 90 HDPE 145 1.156 0.25 1.119
PD17-83 138 JD17-78 JD17-77 90 HDPE 145 -0.231 0.05 0.057
PD17-84 11 JD17-79 JD17-80 90 HDPE 145 0.693 0.15 0.434
PD17-85 194 JD17-80 JD17-81 90 HDPE 145 0.231 0.05 0.057
PD17-86 362 JD17-82 JD17-79 90 HDPE 145 -0.231 0.05 0.057
PD17-87 349 JD17-83 JD17-80 90 HDPE 145 -0.231 0.05 0.057
PD17-88 132 JD17-84 JD17-73 90 HDPE 145 -1.156 0.25 1.119
PD17-89 53 JD17-85 JD17-84 90 HDPE 145 -0.231 0.05 0.057
PD17-90 10 JD17-86 JD17-84 90 HDPE 145 -0.693 0.15 0.434
PD17-91 194 JD17-86 JD17-88 90 HDPE 145 0.231 0.05 0.057
PD17-92 61 JD17-87 JD17-86 90 HDPE 145 -0.231 0.05 0.057
PD17-93 274 JD17-89 JD17-58 110 HDPE 145 -3.467 0.5 3.224
PD17-94 10 JD17-90 JD17-89 110 HDPE 145 -2.774 0.4 2.132
PD17-95 236 JD17-91 JD17-89 90 HDPE 145 -0.462 0.1 0.205
PD17-96 188 JD17-92 JD17-91 90 HDPE 145 -0.231 0.05 0.057
PD17-97 225 JD17-93 JD17-90 90 HDPE 145 -1.142 0.25 1.095
PD17-98 128 JD17-94 JD17-97 90 HDPE 145 0.68 0.15 0.419
PD17-99 187 JD17-94 JD17-93 90 HDPE 145 -0.911 0.2 0.72
PD17-100 194 JD17-95 JD17-96 90 HDPE 145 0.231 0.05 0.057
PD17-101 248 JD17-95 JD17-90 90 HDPE 145 -1.401 0.3 1.597
PD17-102 10 JD17-97 JD17-98 90 HDPE 145 0.218 0.05 0.051
PD17-103 51 JD17-98 JD17-95 90 HDPE 145 -0.938 0.2 0.76
PD17-104 10 JD17-99 JD17-98 90 HDPE 145 -0.925 0.2 0.74
PD17-105 238 JD17-99 JD17-101 90 HDPE 145 0.231 0.05 0.057
PD17-106 316 JD17-100 JD17-97 90 HDPE 145 -0.231 0.05 0.057
PD17-107 138 JD17-102 JD17-99 90 HDPE 145 -0.462 0.1 0.205
PD17-108 171 JD17-103 JD17-102 90 HDPE 145 -0.231 0.05 0.057

MaRS Planning Engineering Services Pvt. Ltd.


Mega Piped Water Supply Scheme For 13 G.Ps. Of Banki, 17 G.Ps. Of Damapada Block & 2
G.P of Baranga Block
TD.-1
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD1-1 0.267 74.22 94.48 20.22
JD1-2 0.267 62.42 94.29 31.8
JD1-3 0.267 62.57 94.29 31.65
JD1-4 0.267 57.51 94.28 36.69
JD1-5 0.267 57.5 94.28 36.7
JD1-6 0.267 57.36 93.88 36.44
JD1-7 0.267 45.3 93.37 47.97
JD1-8 0.267 47.11 92.97 45.77
JD1-9 0.267 46.2 92.96 46.66
JD1-10 0.267 43.4 92.95 49.45
JD1-11 0.267 44.21 92.92 48.61
JD1-12 0.267 47.63 92.83 45.11
JD1-13 0.267 47.46 92.82 45.27
JD1-14 0.267 44.26 92.49 48.13
JD1-15 0.267 42.41 92.49 49.97
JD1-16 0.267 47.14 92.48 45.25
JD1-17 0.267 44.31 92.47 48.07
JD1-18 0.267 47.08 92.47 45.3
JD1-19 0.267 51.41 92.47 40.98
JD1-20 0.267 48.28 92.47 44.1
JD1-21 0.267 43.27 92.46 49.1
JD1-22 0.267 46.29 92.46 46.08
JD1-23 0.267 44.15 92.45 48.21
JD1-24 0.267 43.4 92.34 48.84
JD1-25 0.267 48.26 92.33 43.98
JD1-26 0.267 48.33 92.27 43.85
JD1-27 0.267 52.29 92.26 39.89
JD1-28 0.267 43.37 92.22 48.75
JD1-29 0.267 43.48 92.21 48.63
JD1-30 0.267 46.41 92.21 45.71
JD1-31 0.267 45.25 92.21 46.87
JD1-32 0.267 47.32 92.2 44.79
JD1-33 0.267 43.45 92.2 48.65
JD1-34 0.267 42.35 92.2 49.75
JD1-35 0.267 46.49 92.19 45.61
JD1-36 0.267 45.23 92.19 46.87
JD1-37 0.267 44.3 92.19 47.79
JD1-38 0.267 45.1 92.18 46.99
JD1-39 0.267 44.42 92.18 47.67
JD1-40 0.267 45.05 92.18 47.04
JD1-41 0.267 45.21 92.18 46.88
JD1-42 0.267 48.15 91.51 43.27
JD1-43 0.267 48.2 91.49 43.21

MaRS Planning Engineering Services Pvt. Ltd.


JD1-44 0.267 48.32 91.45 43.05
JD1-45 0.267 50.3 91.45 41.07
JD1-46 0.267 55.41 91.44 35.96
JD1-47 0.267 48.68 91.41 42.65
JD1-48 0.267 48.42 91.41 42.9
JD1-49 0.267 45.21 91.4 46.1
JD1-50 0.267 44.29 91.39 47
JD1-51 0.267 49.2 91.34 42.06
JD1-52 0.267 48.96 91.34 42.29
JD1-53 0.267 45.26 91.31 45.95
JD1-54 0.267 45.2 91.27 45.98
JD1-55 0.267 44.28 91.23 46.86
JD1-56 0.267 52.23 91.16 38.85
JD1-57 0.267 43.5 91.16 47.56
JD1-58 0.267 49.19 91.11 41.84
JD1-59 0.267 44.25 91.11 46.76
JD1-60 0.267 42.15 91.1 48.85
JD1-61 0.267 40.9 90.66 49.66
JD1-62 0.267 40.32 90.65 50.22
JD1-63 0.267 41.14 90.12 48.88
JD1-64 0.267 40.56 89.5 48.84
JD1-65 0.267 41.36 89.17 47.72
JD1-66 0.267 42.41 89.17 46.66
JD1-67 0.267 41.97 89 46.94
JD1-68 0.267 40.24 88.9 48.56
JD1-69 0.267 43.22 88.82 45.51
JD1-70 0.267 43.89 88.63 44.65
JD1-71 0.267 42.5 88.53 45.94
JD1-72 0.267 45.28 88.41 43.05
JD1-73 0.267 40.33 88.29 47.87
JD1-74 0.267 46.39 88.19 41.72
JD1-75 0.267 43.45 88.15 44.61
JD1-76 0.267 42.58 88.14 45.47
JD1-77 0.267 43.63 88.1 44.38
JD1-78 0.267 43.57 88.1 44.44
JD1-79 0.267 43.14 88.1 44.87
JD1-80 0.267 43.18 88.07 44.8
JD1-81 0.267 43.05 88.07 44.93
JD1-82 0.267 46.51 87.98 41.38
JD1-83 0.267 45.71 87.77 41.98
JD1-84 0.267 41.46 87.72 46.16
JD1-85 0.267 45.08 87.58 42.42
JD1-86 0.267 44.69 87.39 42.62
JD1-87 0.267 44.47 87.21 42.65
JD1-88 0.267 42.08 87.19 45.02
JD1-89 0.267 43.41 87.04 43.54
JD1-90 0.267 42.95 86.88 43.84
JD1-91 0.267 41.92 86.72 44.71

MaRS Planning Engineering Services Pvt. Ltd.


JD1-92 0.267 42.84 86.7 43.78
JD1-93 0.267 43.52 86.24 42.64
JD1-94 0.267 44.5 86.02 41.44
JD1-95 0.267 40.99 86 44.92
JD1-96 0.267 40.82 85.97 45.06
JD1-97 0.267 43.16 85.96 42.72
JD1-98 0.267 49.3 85.95 36.58
JD1-99 0.267 52.35 85.95 33.53
JD1-100 0.267 41.45 85.9 44.36
JD1-101 0.267 41.26 85.89 44.54
JD1-102 0.267 45.15 85.89 40.66
JD1-103 0.267 44.07 85.78 41.63
JD1-104 0.267 39.7 85.75 45.96
JD1-105 0.267 48.25 85.55 37.23
JD1-106 0.267 38.12 85.53 47.31
JD1-107 0.267 41.03 85.34 44.23
JD1-108 0.267 44.52 85.29 40.69
JD1-109 0.267 41.21 85.17 43.87
JD1-110 0.267 41.25 85.15 43.81
JD1-111 0.267 40.26 85.15 44.8
JD1-112 0.267 41.13 85.15 43.93
JD1-113 0.267 41.28 85.12 43.75
JD1-114 0.267 41.31 85.12 43.72
JD1-115 0.267 40.48 85.11 44.54
JD1-116 0.267 41.28 85.11 43.75
JD1-117 0.267 38.18 85.11 46.83
JD1-118 0.267 40.26 85.1 44.75
JD1-119 0.267 32.41 85.09 52.58
JD1-120 0.267 51.17 85.08 33.85
JD1-121 0.267 57.35 85.08 27.67
JD1-122 0.267 51.19 85.07 33.82
JD1-123 0.267 45.26 85.07 39.73
JD1-124 0.267 57.3 85.07 27.71
JD1-125 0.267 48.2 85.06 36.78
JD1-126 0.267 41.4 85.04 43.55
JD1-127 0.267 41.48 85.04 43.47
JD1-128 0.267 41.26 84.97 43.62
JD1-129 0.267 41.26 84.96 43.61
JD1-130 0.267 36.12 84.96 48.74
JD1-131 0.267 28.16 84.95 56.68
JD1-132 0.267 41.2 84.95 43.66
JD1-133 0.267 36.02 84.95 48.83
JD1-134 0.267 28.21 84.94 56.62
JD1-135 0.267 76.32 84.94 8.6
JD1-136 0.267 32.46 84.94 52.37
JD1-137 0.267 45.31 84.57 39.18
JD1-138 0.267 47.26 84.56 37.23
JD1-139 0.267 44.26 84.48 40.14

MaRS Planning Engineering Services Pvt. Ltd.


JD1-140 0.267 45.22 84.24 38.94
JD1-141 0.267 44.37 83.88 39.43
JD1-142 0.267 43.33 83.86 40.45
JD1-143 0.267 41.26 83.86 42.51
JD1-144 0.267 44.45 83.63 39.1
JD1-145 0.267 45.33 83.63 38.22
JD1-146 0.267 44.37 83.62 39.18
JD1-147 0.267 45.28 83.62 38.26
JD1-148 0.267 46.33 83.62 37.21
JD1-149 0.267 44.31 83.61 39.22
JD1-150 0.267 47.11 83.27 36.09
JD1-151 0.267 47.18 83.26 36.01
JD1-152 0.267 47.26 83.25 35.92
JD1-153 0.267 42.29 83.23 40.86
JD1-154 0.267 40.29 83.22 42.85
JD1-155 0.267 42.29 83.16 40.79
JD1-156 0.267 40.39 83.16 42.68
JD1-157 0.267 43.49 83.16 39.59
TD.-2
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD2-1 0.196 50.31 70.57 20.22
JD2-2 0.196 54.29 70.56 16.24
JD2-3 0.196 50.35 70.55 20.16
JD2-4 0.196 54.25 70.54 16.26
JD2-5 0.196 45.65 70.08 24.38
JD2-6 0.196 43.25 70.08 26.77
JD2-7 0.196 42.95 69.5 26.5
JD2-8 0.196 43.31 69.1 25.74
JD2-9 0.196 43.28 69.09 25.75
JD2-10 0.196 45.48 69.02 23.49
JD2-11 0.196 45.85 69.02 23.12
JD2-12 0.196 48.65 69 20.31
JD2-13 0.196 48.23 69 20.72
JD2-14 0.196 45.86 68.87 22.96
JD2-15 0.196 45.81 68.85 23
JD2-16 0.196 46.66 68.84 22.14
JD2-17 0.196 50.2 68.84 18.6
JD2-18 0.196 46.96 68.83 21.83
JD2-19 0.196 49.26 68.83 19.53
JD2-20 0.196 47.43 68.83 21.35
JD2-21 0.196 43.36 68.83 25.41
JD2-22 0.196 42.7 68.78 26.03
JD2-23 0.196 42.61 68.66 26
JD2-24 0.196 43.35 68.62 25.22
JD2-25 0.196 48.89 68.61 19.68
JD2-26 0.196 45.66 68.58 22.87
JD2-27 0.196 49.22 68.58 19.32

MaRS Planning Engineering Services Pvt. Ltd.


JD2-28 0.196 45.69 68.56 22.83
JD2-29 0.196 47.69 68.56 20.83
JD2-30 0.196 50.87 68.55 17.65
JD2-31 0.196 42.24 68.39 26.09
JD2-32 0.196 41.88 68.12 26.19
JD2-33 0.196 41.26 67.86 26.55
JD2-34 0.196 40.75 67.61 26.8
JD2-35 0.196 39.68 67.36 27.62
JD2-36 0.196 39.06 67.12 28.01
JD2-37 0.196 38.38 66.88 28.45
JD2-38 0.196 38.01 66.66 28.59
JD2-39 0.196 37.56 66.44 28.82
JD2-40 0.196 37.75 66.22 28.41
JD2-41 0.196 37.9 66.01 28.05
JD2-42 0.196 38.05 65.76 27.66
JD2-43 0.196 38.41 65.6 27.14
JD2-44 0.196 41.25 65.47 24.17
JD2-45 0.196 43.36 65.34 21.94
JD2-46 0.196 44.22 65.32 21.06
JD2-47 0.196 43.63 65.32 21.64
JD2-48 0.196 41.5 65.32 23.77
JD2-49 0.196 34.7 65.31 30.55
JD2-50 0.196 40.78 65.27 24.44
JD2-51 0.196 40.46 65.27 24.76
JD2-52 0.196 41.23 65.26 23.99
JD2-53 0.196 41.19 65.24 24
JD2-54 0.196 40.48 65.24 24.71
JD2-55 0.196 39.68 65.24 25.51
JD2-56 0.196 40.14 65.24 25.05
JD2-57 0.196 40.75 65.24 24.44
JD2-58 0.196 40.46 65.21 24.7
JD2-59 0.196 38.58 65.04 26.41
JD2-60 0.196 36.12 64.99 28.81
JD2-61 0.196 35.88 64.99 29.05
JD2-62 0.196 36.57 64.96 28.34
JD2-63 0.196 36.15 64.96 28.75
JD2-64 0.196 37.51 64.95 27.39
JD2-65 0.196 37.55 64.93 27.33
JD2-66 0.196 38.25 64.79 26.49
JD2-67 0.196 38.3 64.77 26.42
JD2-68 0.196 40.2 64.59 24.34
JD2-69 0.196 40.17 64.58 24.36
JD2-70 0.196 39.74 64.48 24.69
JD2-71 0.196 39.68 64.46 24.73
JD2-72 0.196 40.28 64.46 24.13
JD2-73 0.196 39.67 64.44 24.72
JD2-74 0.196 38.42 64.44 25.97
JD2-75 0.196 38.36 64.35 25.94

MaRS Planning Engineering Services Pvt. Ltd.


JD2-76 0.196 38.57 64.35 25.73
JD2-77 0.196 38.44 64.34 25.85
JD2-78 0.196 38.65 64.34 25.64
JD2-79 0.196 42.54 64.29 21.71
JD2-80 0.196 40.31 64.28 23.92
JD2-81 0.196 37.91 63.85 25.89
JD2-82 0.196 37.85 63.78 25.87
JD2-83 0.196 41.66 63.54 21.84
JD2-84 0.196 38.69 63.54 24.8
JD2-85 0.196 44.31 63.44 19.09
JD2-86 0.196 44.24 63.43 19.15
JD2-87 0.196 43.74 63.43 19.65
JD2-88 0.196 43.28 63.43 20.11
JD2-89 0.196 24.53 63.42 38.82
JD2-90 0.196 38.18 63.02 24.79
JD2-91 0.196 40.47 62.58 22.06
JD2-92 0.196 35.67 62.19 26.47
JD2-93 0.196 38.76 61.85 23.04
JD2-94 0.196 40.81 61.08 20.24
JD2-95 0.196 42.74 60.49 17.71
JD2-96 0.196 42.87 60.48 17.57
JD2-97 0.196 40.15 60.36 20.17
JD2-98 0.196 39.94 60.36 20.38
JD2-99 0.196 40.24 60.36 20.08
JD2-100 0.196 40.24 60.35 20.07
JD2-101 0.196 38.65 60.35 21.66
JD2-102 0.196 39.92 60.35 20.39
JD2-103 0.196 40.71 60.34 19.59
TD.-3
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD3-1 0.185 50.51 71.28 20.73
JD3-2 0.185 45.59 70.88 25.24
JD3-3 0.185 49.41 70.68 21.23
JD3-4 0.185 49.53 70.57 21
JD3-5 0.185 49.48 70.57 21.04
JD3-6 0.185 47.4 70.56 23.12
JD3-7 0.185 45.26 70.55 25.24
JD3-8 0.185 42.14 70.55 28.35
JD3-9 0.185 45.35 70.53 25.13
JD3-10 0.185 46.31 70.53 24.17
JD3-11 0.185 42.21 70.53 28.26
JD3-12 0.185 47.29 70.52 23.19
JD3-13 0.185 50.36 70.52 20.12
JD3-14 0.185 47.21 70.51 23.25
JD3-15 0.185 42.16 70.5 28.28
JD3-16 0.185 46.48 70.5 23.97
JD3-17 0.185 45.26 70.49 25.18

MaRS Planning Engineering Services Pvt. Ltd.


JD3-18 0.185 46.12 70.49 24.32
JD3-19 0.185 40.5 70.48 29.91
JD3-20 0.185 38.42 70.08 31.6
JD3-21 0.185 38.35 69.69 31.28
JD3-22 0.185 37.26 69.31 31.99
JD3-23 0.185 41.19 68.93 27.68
JD3-24 0.185 42.39 68.57 26.13
JD3-25 0.185 42.53 68.55 25.97
JD3-26 0.185 42.39 68.45 26.01
JD3-27 0.185 45.26 68.43 23.12
JD3-28 0.185 42.45 68.42 25.92
JD3-29 0.185 39.3 68.41 29.05
JD3-30 0.185 42.56 68.39 25.78
JD3-31 0.185 47.19 68.36 21.13
JD3-32 0.185 48.36 68.34 19.94
JD3-33 0.185 50.23 68.34 18.07
JD3-34 0.185 42.31 68.06 25.7
JD3-35 0.185 42.26 68.04 25.73
JD3-36 0.185 42.39 68.04 25.6
JD3-37 0.185 43.15 68.04 24.84
JD3-38 0.185 42.35 68.01 25.61
JD3-39 0.185 42.26 68 25.69
JD3-40 0.185 34.41 67.97 33.49
JD3-41 0.185 34.25 67.97 33.65
JD3-42 0.185 38.02 67.97 29.89
JD3-43 0.185 39.13 67.97 28.78
JD3-44 0.185 38.05 67.96 29.85
JD3-45 0.185 43.31 67.89 24.53
JD3-46 0.185 42.03 67.89 25.8
JD3-47 0.185 42.24 67.76 25.47
JD3-48 0.185 42.3 67.76 25.41
JD3-49 0.185 46.16 67.76 21.55
JD3-50 0.185 42.38 67.76 25.32
JD3-51 0.185 42.09 67.72 25.58
JD3-52 0.185 40.26 67.72 27.41
JD3-53 0.185 41.86 67.55 25.64
JD3-54 0.185 41.9 67.53 25.58
JD3-55 0.185 41.89 67.48 25.54
JD3-56 0.185 36.22 67.48 31.19
JD3-57 0.185 39.16 67.47 28.25
JD3-58 0.185 36.49 67.47 30.91
JD3-59 0.185 35.27 67.46 32.13
JD3-60 0.185 41.26 67.46 26.14
JD3-61 0.185 41.82 67.45 25.58
JD3-62 0.185 39.47 67.45 27.92
JD3-63 0.185 41.75 67.41 25.61
JD3-64 0.185 39.2 67.25 28
JD3-65 0.185 39.24 67.25 27.96

MaRS Planning Engineering Services Pvt. Ltd.


JD3-66 0.185 38.42 67.25 28.77
JD3-67 0.185 41.32 67.25 25.88
JD3-68 0.185 41.68 67.04 25.3
JD3-69 0.185 41.26 67.02 25.71
JD3-70 0.185 42.09 67.02 24.88
JD3-71 0.185 41.72 67.01 25.24
JD3-72 0.185 41.75 67.01 25.2
JD3-73 0.185 40.23 67.01 26.72
JD3-74 0.185 41.17 67.01 25.78
JD3-75 0.185 42.14 67 24.81
JD3-76 0.185 41.11 67 25.83
JD3-77 0.185 40.3 66.99 26.64
JD3-78 0.185 39.38 66.99 27.55
JD3-79 0.185 37.44 66.99 29.49
JD3-80 0.185 41.28 66.97 25.64
JD3-81 0.185 41.82 66.85 24.98
JD3-82 0.185 40.33 66.85 26.46
JD3-83 0.185 41.36 66.78 25.37
JD3-84 0.185 38.26 66.75 28.43
JD3-85 0.185 39.33 66.75 27.36
JD3-86 0.185 38.49 66.75 28.2
JD3-87 0.185 36.51 66.74 30.17
JD3-88 0.185 36.27 66.7 30.37
JD3-89 0.185 34.39 66.7 32.24
JD3-90 0.185 39.12 66.69 27.51
JD3-91 0.185 36.4 66.69 30.23
JD3-92 0.185 41.67 66.28 24.56
JD3-93 0.185 43.29 66.21 22.88
JD3-94 0.185 43.24 66.21 22.93
JD3-95 0.185 48.12 66.21 18.05
JD3-96 0.185 48.19 66.21 17.98
JD3-97 0.185 41.86 65.85 23.94
JD3-98 0.185 41.97 65.84 23.82
JD3-99 0.185 44.09 65.83 21.69
JD3-100 0.185 42.27 65.73 23.42
JD3-101 0.185 42.21 65.7 23.45
JD3-102 0.185 44.13 65.7 21.53
JD3-103 0.185 42.1 65.7 23.55
JD3-104 0.185 44.28 65.11 20.79
JD3-105 0.185 42.14 65.11 22.92
JD3-106 0.185 45.38 65.06 19.64
JD3-107 0.185 48.36 65.06 16.66
JD3-108 0.185 45.21 65.05 19.8
JD3-109 0.185 45.13 65.05 19.88
JD3-110 0.185 41.1 65.04 23.89
JD3-111 0.185 40.16 65.04 24.83
JD3-112 0.185 44.12 65.04 20.88
JD3-113 0.185 47.19 65.04 17.81

MaRS Planning Engineering Services Pvt. Ltd.


TD.-4
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD4-1 0.263 67.56 88 20.4
JD4-2 0.263 68.75 88 19.21
JD4-3 0.263 66.52 87.79 21.23
JD4-4 0.263 64.25 87.76 23.47
JD4-5 0.263 66.77 87.3 20.49
JD4-6 0.263 62.86 86.94 24.03
JD4-7 0.263 57.62 86.62 28.94
JD4-8 0.263 57.68 86.61 28.87
JD4-9 0.263 57.59 86.61 28.96
JD4-10 0.263 55.18 86.49 31.25
JD4-11 0.263 55.12 86.48 31.3
JD4-12 0.263 62.71 86.45 23.69
JD4-13 0.263 57.31 86.43 29.07
JD4-14 0.263 55.28 86.42 31.08
JD4-15 0.263 52.67 86.41 33.67
JD4-16 0.263 57.39 86.35 28.9
JD4-17 0.263 66.57 86.35 19.74
JD4-18 0.263 56.32 86.34 29.96
JD4-19 0.263 51.56 86.34 34.71
JD4-20 0.263 66.32 86.29 19.93
JD4-21 0.263 57.31 86.28 28.91
JD4-22 0.263 64.31 86.26 21.91
JD4-23 0.263 58.11 86.23 28.07
JD4-24 0.263 58.16 86.23 28.01
JD4-25 0.263 56.35 86.22 29.81
JD4-26 0.263 52.75 86.21 33.39
JD4-27 0.263 53.42 86.11 32.62
JD4-28 0.263 57.2 86.07 28.81
JD4-29 0.263 52.95 86.04 33.03
JD4-30 0.263 56.26 85.93 29.61
JD4-31 0.263 54.67 85.93 31.2
JD4-32 0.263 56.26 85.92 29.6
JD4-33 0.263 52.19 85.91 33.65
JD4-34 0.263 52.7 85.78 33.02
JD4-35 0.263 51.66 85.77 34.05
JD4-36 0.263 53.91 85.57 31.59
JD4-37 0.263 40.24 85.54 45.21
JD4-38 0.263 53.81 85.53 31.66
JD4-39 0.263 42.56 85.51 42.87
JD4-40 0.263 52.02 85.34 33.26
JD4-41 0.263 56.15 85.14 28.94
JD4-42 0.263 55.07 85.13 30
JD4-43 0.263 57.56 85.12 27.5
JD4-44 0.263 55.9 85.03 29.07
JD4-45 0.263 58.69 84.91 26.17

MaRS Planning Engineering Services Pvt. Ltd.


JD4-46 0.263 58.62 84.89 26.22
JD4-47 0.263 55.2 84.8 29.54
JD4-48 0.263 55.9 84.77 28.81
JD4-49 0.263 55.36 84.76 29.34
JD4-50 0.263 55.23 84.68 29.39
JD4-51 0.263 55.25 84.67 29.36
JD4-52 0.263 54.71 84.67 29.9
JD4-53 0.263 55.34 84.67 29.27
JD4-54 0.263 56.58 84.66 28.02
JD4-55 0.263 56.62 84.66 27.98
JD4-56 0.263 54.88 84.65 29.71
JD4-57 0.263 55.21 84.6 29.33
JD4-58 0.263 59.55 84.6 25
JD4-59 0.263 60.08 84.53 24.4
JD4-60 0.263 58.23 84.49 26.21
JD4-61 0.263 56.89 84.49 27.54
JD4-62 0.263 61.54 84.32 22.74
JD4-63 0.263 60.88 84.32 23.39
JD4-64 0.263 59.02 84.21 25.14
JD4-65 0.263 57.61 84.2 26.54
JD4-66 0.263 57.26 84.13 26.81
JD4-67 0.263 59.84 84.02 24.13
JD4-68 0.263 59.39 83.73 24.29
JD4-69 0.263 59.24 83.69 24.4
JD4-70 0.263 57.82 83.23 25.36
JD4-71 0.263 55.85 82.77 26.86
JD4-72 0.263 54.5 82.33 27.78
JD4-73 0.263 52.74 81.89 29.09
JD4-74 0.263 49.83 81.49 31.59
JD4-75 0.263 47.94 81.08 33.08
JD4-76 0.263 47.34 80.78 33.37
JD4-77 0.263 46.78 80.38 33.53
JD4-78 0.263 45.26 80 34.67
JD4-79 0.263 44.61 79.74 35.06
JD4-80 0.263 39.35 79.53 40.1
JD4-81 0.263 39.53 79.47 39.86
JD4-82 0.263 39.37 79.46 40.01
JD4-83 0.263 42.52 79.39 36.8
JD4-84 0.263 42.58 79.38 36.73
JD4-85 0.263 41.05 79.38 38.25
JD4-86 0.263 40.71 79.38 38.59
JD4-87 0.263 38.55 79.37 40.74
JD4-88 0.263 38.56 79.37 40.73
JD4-89 0.263 40.38 79.37 38.91
JD4-90 0.263 44.57 79.36 34.72
JD4-91 0.263 40.78 79.34 38.49
JD4-92 0.263 40.63 79.32 38.61
JD4-93 0.263 41.12 79.31 38.11

MaRS Planning Engineering Services Pvt. Ltd.


JD4-94 0.263 40.28 79.25 38.89
JD4-95 0.263 42.61 79.2 36.52
JD4-96 0.263 41.85 79.1 37.18
JD4-97 0.263 42.36 79.1 36.66
JD4-98 0.263 41.24 79.01 37.69
JD4-99 0.263 40.32 79 38.6
JD4-100 0.263 43.28 78.98 35.63
JD4-101 0.263 43.12 78.97 35.78
JD4-102 0.263 51.41 78.96 27.5
JD4-103 0.263 43.02 78.95 35.87
JD4-104 0.263 41.08 78.93 37.77
JD4-105 0.263 38.76 78.92 40.08
JD4-106 0.263 68.43 78.88 10.43
JD4-107 0.263 42.89 78.87 35.91
JD4-108 0.263 43.78 78.87 35.02
JD4-109 0.263 42.84 78.87 35.96
JD4-110 0.263 68.49 78.87 10.36
JD4-111 0.263 69.41 78.87 9.44
JD4-112 0.263 69.53 78.87 9.32
JD4-113 0.263 43.62 78.82 35.13
JD4-114 0.263 47.54 78.81 31.2
JD4-115 0.263 51.24 78.8 27.51
JD4-116 0.263 47.6 78.77 31.11
JD4-117 0.263 50.34 78.76 28.37
JD4-118 0.263 42.79 78.74 35.88
JD4-119 0.263 42.48 78.68 36.13
JD4-120 0.263 42.56 78.65 36.01
JD4-121 0.263 43.01 78.25 35.17
JD4-122 0.263 50.03 78.25 28.16
JD4-123 0.263 42.24 78.2 35.89
JD4-124 0.263 42.16 78.19 35.96
JD4-125 0.263 41.8 78.18 36.31
JD4-126 0.263 42.6 78.18 35.51
JD4-127 0.263 43.3 78.13 34.76
JD4-128 0.263 53.72 78.12 24.35
JD4-129 0.263 41.86 78.12 36.19
JD4-130 0.263 45.46 78.1 32.57
JD4-131 0.263 41.23 78.08 36.77
JD4-132 0.263 45.46 78.06 32.53
JD4-133 0.263 41.91 77.57 35.6
JD4-134 0.263 43.02 77.56 34.47
JD4-135 0.263 42.36 77.32 34.89
JD4-136 0.263 40.67 77.15 36.4
JD4-137 0.263 38.23 77.09 38.78
JD4-138 0.263 35.61 77.07 41.38
TD.-5
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)

MaRS Planning Engineering Services Pvt. Ltd.


JD5-1 0.2 147.84 168.57 20.69
JD5-2 0.2 150.54 167.87 17.29
JD5-3 0.2 144.57 167.81 23.19
JD5-4 0.2 146.52 167.8 21.24
JD5-5 0.2 139.54 167.35 27.76
JD5-6 0.2 149.78 167.19 17.37
JD5-7 0.2 139.65 166.82 27.11
JD5-8 0.2 144.78 166.5 21.68
JD5-9 0.2 134.87 166.02 31.09
JD5-10 0.2 149.75 165.84 16.06
JD5-11 0.2 131.35 165.22 33.8
JD5-12 0.2 148.58 165.19 16.57
JD5-13 0.2 134.87 164.54 29.61
JD5-14 0.2 126.12 164.49 38.29
JD5-15 0.2 128.36 163.92 35.48
JD5-16 0.2 133.69 163.91 30.16
JD5-17 0.2 122.12 163.36 41.16
JD5-18 0.2 124.36 163.29 38.85
JD5-19 0.2 120.65 162.88 42.15
JD5-20 0.2 118.34 162.68 44.25
JD5-21 0.2 115.36 162.4 46.95
JD5-22 0.2 113.78 162.11 48.23
JD5-23 0.2 116.41 162.08 45.58
JD5-24 0.2 99.58 161.49 61.79
JD5-25 0.2 117.62 161.33 43.63
JD5-26 0.2 85.36 160.92 75.41
JD5-27 0.2 115.25 160.71 45.37
JD5-28 0.2 72.63 160.35 87.54
JD5-29 0.2 109.54 160.22 50.57
JD5-30 0.2 115.74 159.8 43.97
JD5-31 0.2 66.32 159.8 93.29
JD5-32 0.2 62.58 159.51 96.73
JD5-33 0.2 117.1 159.51 42.32
JD5-34 0.2 122.41 159.29 36.8
JD5-35 0.2 123.85 159.29 35.36
JD5-36 0.2 125.52 159.25 33.66
JD5-37 0.2 123.89 159.24 35.28
JD5-38 0.2 128.63 159.24 30.55
JD5-39 0.2 55.46 159.04 103.38
JD5-40 0.2 59.65 159.02 99.17
JD5-41 0.2 58.14 159.01 100.67
JD5-42 0.2 50.56 158.8 108.02
JD5-43 0.2 58.36 158.43 99.87
JD5-44 0.2 43.36 158.3 114.71
JD5-45 0.2 72.91 158.08 85.01
JD5-46 0.2 73.5 158.05 84.38
JD5-47 0.2 79.66 158.01 78.19
JD5-48 0.2 69.47 158 88.35

MaRS Planning Engineering Services Pvt. Ltd.


JD5-49 0.2 73.35 157.97 84.45
JD5-50 0.2 77.15 157.97 80.66
JD5-51 0.2 70.14 157.79 87.47
JD5-52 0.2 75.04 157.78 82.58
JD5-53 0.2 69.55 157.77 88.04
JD5-54 0.2 72.34 157.77 85.25
JD5-55 0.2 70.57 157.77 87.02
JD5-56 0.2 72.4 157.75 85.17
JD5-57 0.2 50.12 157.74 107.41
JD5-58 0.2 71.28 157.74 86.29
JD5-59 0.2 71.73 157.74 85.84
JD5-60 0.2 73.35 157.74 84.22
JD5-61 0.2 73.14 157.73 84.42
JD5-62 0.2 75.36 157.73 82.2
JD5-63 0.2 67.27 157.73 90.27
JD5-64 0.2 67.87 157.72 89.67
JD5-65 0.2 65.36 157.71 92.16
JD5-66 0.2 66.74 157.7 90.78
JD5-67 0.2 73.46 157.7 84.07
JD5-68 0.2 71.8 157.7 85.73
JD5-69 0.2 54.85 157.7 102.64
JD5-70 0.2 58.32 157.69 99.17
JD5-71 0.2 71.23 157.59 86.18
JD5-72 0.2 68.67 157.58 88.73
JD5-73 0.2 68.67 157.56 88.71
JD5-74 0.2 71.28 157.56 86.1
JD5-75 0.2 61.69 157.54 95.66
JD5-76 0.2 65.6 157.54 91.76
JD5-77 0.2 68.43 157.52 88.91
JD5-78 0.2 68.67 157.52 88.67
JD5-79 0.2 62.36 157.52 94.97
JD5-80 0.2 60.85 157.52 96.47
JD5-81 0.2 65.72 157.52 91.62
JD5-82 0.2 68.67 157.26 88.41
JD5-83 0.2 75.37 157.25 81.72
JD5-84 0.2 57.68 157.24 99.36
JD5-85 0.2 58.97 157.24 98.07
JD5-86 0.2 57.61 157.24 99.43
JD5-87 0.2 60.14 157.23 96.89
JD5-88 0.2 60.14 157.22 96.89
JD5-89 0.2 60.14 157.21 96.88
JD5-90 0.2 60.17 157.21 96.85
JD5-91 0.2 61.38 157.21 95.63
JD5-92 0.2 68.67 157.18 88.33
JD5-93 0.2 71.69 157.17 85.31
JD5-94 0.2 68.67 156.74 87.89
JD5-95 0.2 65.58 156.73 90.97
JD5-96 0.2 62.36 156.67 94.12

MaRS Planning Engineering Services Pvt. Ltd.


JD5-97 0.2 71.66 156.56 84.73
JD5-98 0.2 63.17 156.52 93.16
JD5-99 0.2 63.12 156.51 93.21
JD5-100 0.2 66.46 156.51 89.87
JD5-101 0.2 68.67 156.51 87.66
JD5-102 0.2 68.75 156.51 87.58
JD5-103 0.2 57.36 156.47 98.91
JD5-104 0.2 58.68 156.47 97.59
JD5-105 0.2 53.41 156.3 102.68
JD5-106 0.2 50.69 155.66 104.76
JD5-107 0.2 49.63 155.04 105.2
JD5-108 0.2 55.36 154.8 99.24
JD5-109 0.2 57.69 154.76 96.87
JD5-110 0.2 53.65 154.75 100.9
JD5-111 0.2 59.49 154.75 95.07
JD5-112 0.2 56.24 154.5 98.07
JD5-113 0.2 63.65 154.41 90.58
JD5-114 0.2 59.68 154.27 94.4
JD5-115 0.2 53.11 154.27 100.96
JD5-116 0.2 59.63 154.27 94.45
JD5-117 0.2 53.02 154.26 101.04
JD5-118 0.2 56.21 154.26 97.85
JD5-119 0.2 66.65 153.98 87.15
JD5-120 0.2 66.45 153.98 87.35
JD5-121 0.2 63.47 153.8 90.15
JD5-122 0.2 63.51 153.8 90.1
JD5-123 0.2 64.96 153.78 88.64
JD5-124 0.2 56.41 153.77 97.17
JD5-125 0.2 54.25 153.77 99.32
JD5-126 0.2 51.57 153.77 101.99
JD5-127 0.2 64.96 153.59 88.46
JD5-128 0.2 64.96 153.56 88.42
JD5-129 0.2 54.01 153.39 99.18
JD5-130 0.2 54.25 153.27 98.82
JD5-131 0.2 56.03 153.21 96.99
JD5-132 0.2 61.98 153.18 91.02
JD5-133 0.2 51.63 153.17 101.34
TD.-6
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD6-1 0.374 44.82 65.21 20.35
JD6-2 0.374 45.48 65.2 19.68
JD6-3 0.374 44.81 65.13 20.27
JD6-4 0.374 44.61 65.1 20.45
JD6-5 0.374 44.93 65.1 20.14
JD6-6 0.374 56.41 65.09 8.66
JD6-7 0.374 45.42 65.07 19.61
JD6-8 0.374 47.62 65.07 17.41

MaRS Planning Engineering Services Pvt. Ltd.


JD6-9 0.374 46.27 65.03 18.72
JD6-10 0.374 45.34 64.82 19.44
JD6-11 0.374 45.88 64.8 18.89
JD6-12 0.374 44.48 64.79 20.27
JD6-13 0.374 46.2 64.78 18.54
JD6-14 0.374 44.56 64.76 20.16
JD6-15 0.374 44.62 64.74 20.08
JD6-16 0.374 44.56 64.74 20.14
JD6-17 0.374 45.55 64.71 19.13
JD6-18 0.374 47.56 64.65 17.05
JD6-19 0.374 45.59 64.64 19.01
JD6-20 0.374 41.41 64.61 23.15
JD6-21 0.374 42.76 64.6 21.8
JD6-22 0.374 44.15 64.19 20
JD6-23 0.374 44.08 63.91 19.79
JD6-24 0.374 41.24 63.32 22.04
JD6-25 0.374 43.18 63.17 19.95
JD6-26 0.374 41.21 62.6 21.35
JD6-27 0.374 41.93 62.48 20.5
JD6-28 0.374 41.02 61.93 20.87
JD6-29 0.374 41.09 61.81 20.68
JD6-30 0.374 41.38 61.44 20.02
JD6-31 0.374 40.72 61.4 20.64
JD6-32 0.374 41.67 61.39 19.68
JD6-33 0.374 42.38 61.07 18.65
JD6-34 0.374 42.3 61.06 18.72
JD6-35 0.374 42.55 61.04 18.46
JD6-36 0.374 42.76 61.03 18.23
JD6-37 0.374 43.68 61.02 17.31
JD6-38 0.374 42.81 60.79 17.95
JD6-39 0.374 41.53 60.65 19.08
JD6-40 0.374 43.59 60.59 16.97
JD6-41 0.374 43.37 60.31 16.91
JD6-42 0.374 44.59 60.29 15.67
JD6-43 0.374 43.32 60.28 16.92
JD6-44 0.374 43.27 60.26 16.96
JD6-45 0.374 44.65 60.25 15.56
JD6-46 0.374 44.43 60.21 15.75
JD6-47 0.374 43.57 60.19 16.59
JD6-48 0.374 42.51 59.99 17.45
JD6-49 0.374 42.28 59.98 17.67
JD6-50 0.374 42.45 59.98 17.5
JD6-51 0.374 44.43 59.98 15.52
JD6-52 0.374 44.38 59.97 15.55
JD6-53 0.374 43.66 59.95 16.25
JD6-54 0.374 41.56 59.93 18.33
JD6-55 0.374 41.52 59.92 18.36
JD6-56 0.374 43.42 59.89 16.44

MaRS Planning Engineering Services Pvt. Ltd.


JD6-57 0.374 43.61 59.88 16.24
JD6-58 0.374 43.42 59.81 16.36
JD6-59 0.374 43.18 59.81 16.59
JD6-60 0.374 43.67 59.81 16.1
TD.-7
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD7-1 0.328 68.06 88.3 20.2
JD7-2 0.328 68.35 88.29 19.9
JD7-3 0.328 66.25 88.12 21.83
JD7-4 0.328 66.54 88.11 21.52
JD7-5 0.328 58.67 87.62 28.9
JD7-6 0.328 63.4 87.46 24.01
JD7-7 0.328 65.34 87.45 22.07
JD7-8 0.328 63.37 87.43 24.01
JD7-9 0.328 65.34 87.43 22.04
JD7-10 0.328 56.24 87.27 30.97
JD7-11 0.328 47.26 86.83 39.49
JD7-12 0.328 48.69 86.68 37.91
JD7-13 0.328 57.63 86.66 28.98
JD7-14 0.328 49.26 86.63 37.29
JD7-15 0.328 46.26 86.62 40.28
JD7-16 0.328 49.26 86.56 37.23
JD7-17 0.328 49.36 86.55 37.12
JD7-18 0.328 46.25 86.55 40.22
JD7-19 0.328 57.69 86.53 28.78
JD7-20 0.328 49.17 86.51 37.26
JD7-21 0.328 49.25 86.42 37.09
JD7-22 0.328 49.37 86.41 36.96
JD7-23 0.328 45.58 86.36 40.7
JD7-24 0.328 43.52 86.36 42.75
JD7-25 0.328 45.58 86.33 40.67
JD7-26 0.328 46.58 86.33 39.67
JD7-27 0.328 43.46 86.32 42.78
JD7-28 0.328 54.52 86.31 31.73
JD7-29 0.328 54.61 86.31 31.63
JD7-30 0.328 46.26 86.3 39.96
JD7-31 0.328 46.32 86.29 39.89
JD7-32 0.328 49.22 86.17 36.88
JD7-33 0.328 51.26 86.04 34.71
JD7-34 0.328 52.22 85.92 33.63
JD7-35 0.328 55.21 85.8 30.53
JD7-36 0.328 55.58 85.69 30.05
JD7-37 0.328 60.28 85.06 24.73
JD7-38 0.328 61.35 84.47 23.08
JD7-39 0.328 62.21 84.37 22.11
JD7-40 0.328 62.34 84.36 21.98
JD7-41 0.328 67.52 84.34 16.79

MaRS Planning Engineering Services Pvt. Ltd.


JD7-42 0.328 61.59 84.04 22.4
JD7-43 0.328 63.28 84.02 20.7
JD7-44 0.328 61.01 84.02 22.96
JD7-45 0.328 61.24 84.01 22.72
JD7-46 0.328 63.24 84 20.72
JD7-47 0.328 59.16 83.99 24.78
JD7-48 0.328 60.9 83.98 23.03
JD7-49 0.328 59.21 83.73 24.47
JD7-50 0.328 63.23 83.53 20.26
JD7-51 0.328 60.21 83.5 23.24
JD7-52 0.328 61.26 83.48 22.18
JD7-53 0.328 60.68 83.47 22.75
JD7-54 0.328 60.26 83.46 23.15
JD7-55 0.328 61.26 83.38 22.08
JD7-56 0.328 63.23 83.37 20.1
JD7-57 0.328 59.21 83.32 24.06
JD7-58 0.328 60.26 83.31 23
JD7-59 0.328 54.21 83.19 28.92
JD7-60 0.328 54.21 82.6 28.33
JD7-61 0.328 53.21 82.16 28.89
JD7-62 0.328 53.3 82.15 28.8
JD7-63 0.328 46.52 82.14 35.55
JD7-64 0.328 43.48 82.13 38.57
JD7-65 0.328 54.28 82.13 27.8
TD.-8
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD8-1 0.264 42.49 60.4 17.87
JD8-2 0.264 41.96 60.22 18.23
JD8-3 0.264 43.1 60.11 16.97
JD8-4 0.264 42.17 60.1 17.89
JD8-5 0.264 40.17 60.06 19.85
JD8-6 0.264 40.12 60.06 19.9
JD8-7 0.264 40.77 60.05 19.24
JD8-8 0.264 43.27 60.05 16.75
JD8-9 0.264 41.14 60.04 18.87
JD8-10 0.264 40.61 59.99 19.34
JD8-11 0.264 41.49 59.99 18.46
JD8-12 0.264 42.26 59.98 17.69
JD8-13 0.264 43.42 59.66 16.21
JD8-14 0.264 44.48 59.66 15.15
JD8-15 0.264 42.98 59.62 16.6
JD8-16 0.264 40.82 59.62 18.76
JD8-17 0.264 40.72 59.61 18.85
JD8-18 0.264 37.55 59.61 22.01
JD8-19 0.264 40.51 59.59 19.04
JD8-20 0.264 43.61 59.45 15.81
JD8-21 0.264 43.66 59.42 15.73

MaRS Planning Engineering Services Pvt. Ltd.


JD8-22 0.264 41.55 59.3 17.72
JD8-23 0.264 42.27 59.27 16.96
JD8-24 0.264 43.88 59.25 15.34
JD8-25 0.264 43.81 59.24 15.4
JD8-26 0.264 42.46 59.19 16.7
JD8-27 0.264 42.46 59.15 16.66
JD8-28 0.264 44.1 59.15 15.02
JD8-29 0.264 44.03 59.15 15.09
JD8-30 0.264 44.14 59.15 14.98
JD8-31 0.264 42.11 59.14 16.99
JD8-32 0.264 42.15 59.14 16.95
JD8-33 0.264 44.37 59.13 14.74
JD8-34 0.264 41.25 59.1 17.81
JD8-35 0.264 40.07 59.1 18.99
JD8-36 0.264 41.35 59.08 17.7
JD8-37 0.264 40.11 59.07 18.92
JD8-38 0.264 39.55 59 19.41
JD8-39 0.264 42.46 58.99 16.5
JD8-40 0.264 42.15 58.99 16.8
JD8-41 0.264 38.55 58.98 20.39
JD8-42 0.264 37.33 58.98 21.6
JD8-43 0.264 44.3 58.97 14.64
JD8-44 0.264 41.15 58.86 17.68
JD8-45 0.264 40.57 58.83 18.22
JD8-46 0.264 42.71 58.8 16.06
JD8-47 0.264 40.32 58.8 18.45
JD8-48 0.264 41.65 58.79 17.1
JD8-49 0.264 42.65 58.79 16.11
JD8-50 0.264 42.17 58.78 16.58
JD8-51 0.264 40.69 58.78 18.05
JD8-52 0.264 40.39 58.56 18.13
JD8-53 0.264 40.38 58.43 18.02
JD8-54 0.264 42.28 58.43 16.11
JD8-55 0.264 40.31 58.35 18
JD8-56 0.264 40.46 58.33 17.83
JD8-57 0.264 40.58 58.28 17.67
JD8-58 0.264 40.26 58.28 17.98
JD8-59 0.264 40.57 57.85 17.24
JD8-60 0.264 40.27 57.82 17.52
JD8-61 0.264 40.62 57.55 16.9
JD8-62 0.264 39.49 57.54 18.01
JD8-63 0.264 40.73 57.53 16.77
JD8-64 0.264 37.78 57.42 19.6
JD8-65 0.264 39.25 57.42 18.13
JD8-66 0.264 38.35 57.41 19.02
JD8-67 0.264 40.85 57.23 16.35
JD8-68 0.264 41.28 57.23 15.91
JD8-69 0.264 39.78 57.14 17.33

MaRS Planning Engineering Services Pvt. Ltd.


JD8-70 0.264 39.67 57.13 17.43
JD8-71 0.264 38.47 57.13 18.62
JD8-72 0.264 40.96 57.08 16.09
JD8-73 0.264 41.02 57.08 16.03
JD8-74 0.264 40.69 57.08 16.36
JD8-75 0.264 41.01 57.08 16.04
JD8-76 0.264 40.31 57.07 16.73
JD8-77 0.264 39.25 57.03 17.74
JD8-78 0.264 39.52 57.02 17.46
JD8-79 0.264 38.66 57.02 18.32
TD.-9
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD9-1 0.207 49.37 69.86 20.44
JD9-2 0.207 49.42 69.83 20.37
JD9-3 0.207 41.35 69.82 28.42
JD9-4 0.207 49.1 69.82 20.68
JD9-5 0.207 50.65 69.82 19.13
JD9-6 0.207 49.48 69.8 20.28
JD9-7 0.207 48.43 69.74 21.27
JD9-8 0.207 49.74 69.7 19.92
JD9-9 0.207 49.67 69.7 19.99
JD9-10 0.207 48.16 69.69 21.49
JD9-11 0.207 49.64 69.69 20.01
JD9-12 0.207 50.79 69.69 18.86
JD9-13 0.207 50.86 69.69 18.79
JD9-14 0.207 50.17 69.62 19.41
JD9-15 0.207 50.68 69.62 18.9
JD9-16 0.207 49.46 69.62 20.12
JD9-17 0.207 49.82 69.62 19.76
JD9-18 0.207 49.92 69.6 19.64
JD9-19 0.207 42.16 69.58 27.36
JD9-20 0.207 40.25 69.57 29.26
JD9-21 0.207 52.08 69.52 17.4
JD9-22 0.207 41.25 69.44 28.13
JD9-23 0.207 42.16 69.42 27.2
JD9-24 0.207 47.8 69.35 21.5
JD9-25 0.207 47.58 69.35 21.72
JD9-26 0.207 47.42 69.11 21.65
JD9-27 0.207 47.45 69.11 21.62
JD9-28 0.207 40.74 69.1 28.3
JD9-29 0.207 40.14 69.06 28.86
JD9-30 0.207 37.56 69.05 31.43
JD9-31 0.207 42.25 68.86 26.56
JD9-32 0.207 42.39 68.86 26.42
JD9-33 0.207 47.17 68.85 21.64
JD9-34 0.207 48.26 68.85 20.55
JD9-35 0.207 42.31 68.83 26.47

MaRS Planning Engineering Services Pvt. Ltd.


JD9-36 0.207 40.82 68.82 27.95
JD9-37 0.207 39.81 68.63 28.76
JD9-38 0.207 42.38 68.62 26.19
JD9-39 0.207 39.72 68.62 28.85
JD9-40 0.207 37.77 68.21 30.38
JD9-41 0.207 46.46 68.16 21.65
JD9-42 0.207 46.37 68.15 21.74
JD9-43 0.207 44.74 68.15 23.36
JD9-44 0.207 45.81 68.15 22.29
JD9-45 0.207 46.14 68.02 21.84
JD9-46 0.207 45.26 68.02 22.71
JD9-47 0.207 46.61 68 21.35
JD9-48 0.207 46.68 68 21.28
JD9-49 0.207 44.91 68 23.04
JD9-50 0.207 45.69 68 22.26
JD9-51 0.207 44.96 68 22.99
JD9-52 0.207 45.89 67.75 21.82
JD9-53 0.207 43.14 67.75 24.56
JD9-54 0.207 38.69 67.54 28.79
JD9-55 0.207 37.45 67.52 30.01
JD9-56 0.207 36.48 67.51 30.97
JD9-57 0.207 39.15 67.51 28.3
JD9-58 0.207 38.71 67.32 28.55
JD9-59 0.207 38.65 67.31 28.6
JD9-60 0.207 36.8 67.31 30.45
JD9-61 0.207 38 67.31 29.25
JD9-62 0.207 36.93 67.31 30.32
JD9-63 0.207 38.46 67.31 28.79
JD9-64 0.207 45.29 67.13 21.79
JD9-65 0.207 45.15 67.13 21.94
JD9-66 0.207 45.28 67.12 21.8
JD9-67 0.207 46.58 67.02 20.4
JD9-68 0.207 45.17 66.68 21.46
JD9-69 0.207 47.45 66.42 18.93
JD9-70 0.207 47.59 66.42 18.79
JD9-71 0.207 46.14 66.41 20.23
JD9-72 0.207 46.62 66.4 19.74
JD9-73 0.207 46.78 66.29 19.47
JD9-74 0.207 45.4 66.22 20.78
JD9-75 0.207 45.58 65.73 20.11
JD9-76 0.207 44.69 65.22 20.49
JD9-77 0.207 43.75 64.64 20.85
JD9-78 0.207 43.61 64.63 20.97
JD9-79 0.207 44.78 64.62 19.8
JD9-80 0.207 43.61 64.46 20.81
JD9-81 0.207 43.22 64.34 21.08
JD9-82 0.207 43.31 64.34 20.99
JD9-83 0.207 43.21 64.34 21.09

MaRS Planning Engineering Services Pvt. Ltd.


JD9-84 0.207 43.3 64.34 20.99
JD9-85 0.207 43.39 64.33 20.9
JD9-86 0.207 43.37 64.32 20.91
JD9-87 0.207 42.58 64.31 21.69
JD9-88 0.207 42.59 64.31 21.68
JD9-89 0.207 41.87 64.31 22.4
TD.-10
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD10-1 0.229 72.69 93.08 20.35
JD10-2 0.229 67.69 92.71 24.97
JD10-3 0.229 68.67 92.71 23.99
JD10-4 0.229 63.69 92.37 28.63
JD10-5 0.229 55.26 91.95 36.62
JD10-6 0.229 52.69 91.55 38.78
JD10-7 0.229 55.26 91.15 35.82
JD10-8 0.229 60.68 90.76 30.02
JD10-9 0.229 60.26 90.38 30.05
JD10-10 0.229 52.63 90.01 37.3
JD10-11 0.229 53.19 89.88 36.62
JD10-12 0.229 59.39 89.66 30.21
JD10-13 0.229 52 89.59 37.51
JD10-14 0.229 62.29 89.52 27.17
JD10-15 0.229 62.21 89.52 27.25
JD10-16 0.229 61.29 89.5 28.16
JD10-17 0.229 61.18 89.5 28.27
JD10-18 0.229 51.23 89.25 37.94
JD10-19 0.229 51.17 89.23 37.98
JD10-20 0.229 53.24 89.06 35.74
JD10-21 0.229 52.15 89.05 36.83
JD10-22 0.229 53.36 89.03 35.6
JD10-23 0.229 52.08 89.02 36.87
JD10-24 0.229 51.68 89.02 37.26
JD10-25 0.229 45.69 88.97 43.19
JD10-26 0.229 45.61 88.97 43.27
JD10-27 0.229 53.47 88.93 35.39
JD10-28 0.229 53.61 88.91 35.23
JD10-29 0.229 46.25 88.91 42.57
JD10-30 0.229 44.29 88.9 44.52
JD10-31 0.229 51.67 88.89 37.15
JD10-32 0.229 50.37 88.88 38.44
JD10-33 0.229 48.26 88.87 40.53
JD10-34 0.229 48.16 88.85 40.61
JD10-35 0.229 51.62 88.84 37.14
JD10-36 0.229 51.67 88.84 37.09
JD10-37 0.229 48.21 88.83 40.54
JD10-38 0.229 53.25 88.83 35.51
JD10-39 0.229 55.43 88.82 33.33

MaRS Planning Engineering Services Pvt. Ltd.


JD10-40 0.229 50.44 88.76 38.25
JD10-41 0.229 47.27 88.76 41.4
JD10-42 0.229 42.58 88.75 46.08
JD10-43 0.229 46.51 88.72 42.12
JD10-44 0.229 46.69 88.71 41.93
JD10-45 0.229 45.64 88.63 42.9
JD10-46 0.229 45.58 88.63 42.96
JD10-47 0.229 50.31 88.61 38.23
JD10-48 0.229 53.91 88.6 34.63
JD10-49 0.229 51.56 88.59 36.95
JD10-50 0.229 53.76 88.58 34.75
JD10-51 0.229 60.23 88.58 28.29
JD10-52 0.229 46.47 88.57 42.02
JD10-53 0.229 43.82 88.57 44.66
JD10-54 0.229 44.56 88.57 43.92
JD10-55 0.229 43.96 88.57 44.52
JD10-56 0.229 46.59 88.56 41.89
JD10-57 0.229 46.65 88.33 41.59
JD10-58 0.229 47.36 88.33 40.88
JD10-59 0.229 46.51 88.32 41.73
JD10-60 0.229 47.32 88.32 40.92
JD10-61 0.229 46.51 88.32 41.73
JD10-62 0.229 51.1 88.15 36.98
JD10-63 0.229 57.69 87.95 30.2
JD10-64 0.229 57.69 87.95 30.2
JD10-65 0.229 60.79 87.94 27.1
JD10-66 0.229 60.71 87.94 27.17
JD10-67 0.229 50.37 87.51 37.07
JD10-68 0.229 50.04 87 36.89
JD10-69 0.229 49.87 86.51 36.57
JD10-70 0.229 49.63 86.11 36.41
JD10-71 0.229 41.32 86.1 44.69
JD10-72 0.229 49.59 86.08 36.42
JD10-73 0.229 41.23 86.07 44.75
JD10-74 0.229 49.05 85.66 36.54
JD10-75 0.229 46.23 85.65 39.34
JD10-76 0.229 48.81 85.5 36.62
JD10-77 0.229 47.21 85.5 38.21
JD10-78 0.229 51.34 85.49 34.08
JD10-79 0.229 48.52 85.38 36.78
JD10-80 0.229 48.65 85.38 36.65
JD10-81 0.229 48.5 85.37 36.8
JD10-82 0.229 47.59 85.37 37.7
JD10-83 0.229 47.14 85.37 38.15
JD10-84 0.229 47.63 85.37 37.66
JD10-85 0.229 51.21 85.37 34.09
JD10-86 0.229 43.31 85.37 41.97
TD.-11

MaRS Planning Engineering Services Pvt. Ltd.


Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD11-1 0.51 45.6 65.99 20.35
JD11-2 0.51 45.35 65.83 20.44
JD11-3 0.51 45.12 65.8 20.63
JD11-4 0.51 45.18 65.74 20.51
JD11-5 0.51 45.28 65.64 20.32
JD11-6 0.51 42.13 65.63 23.45
JD11-7 0.51 45.18 65.62 20.4
JD11-8 0.51 36.6 65.51 28.85
JD11-9 0.51 46.93 65.48 18.52
JD11-10 0.51 42.88 65.09 22.16
JD11-11 0.51 47.16 65.08 17.88
JD11-12 0.51 42.21 65.07 22.82
JD11-13 0.51 47.12 65.07 17.91
JD11-14 0.51 47.76 65.07 17.27
JD11-15 0.51 46.25 65.05 18.76
JD11-16 0.51 42.2 65.05 22.8
JD11-17 0.51 48.67 65.05 16.34
JD11-18 0.51 49.82 65.03 15.18
JD11-19 0.51 45.44 65 19.52
JD11-20 0.51 45.51 64.99 19.44
JD11-21 0.51 45.31 64.98 19.63
JD11-22 0.51 43.2 64.96 21.71
JD11-23 0.51 43.05 64.91 21.81
JD11-24 0.51 43.08 64.9 21.78
JD11-25 0.51 43.04 64.89 21.81
JD11-26 0.51 46.22 64.89 18.63
JD11-27 0.51 46.32 64.88 18.52
JD11-28 0.51 42.21 64.83 22.57
JD11-29 0.51 41.21 64.77 23.52
JD11-30 0.51 41.34 64.76 23.37
JD11-31 0.51 42.55 64.76 22.16
JD11-32 0.51 41.65 64.74 23.05
JD11-33 0.51 39.29 64.73 25.39
JD11-34 0.51 41.59 64.7 23.06
JD11-35 0.51 42.22 64.69 22.43
JD11-36 0.51 41.21 64.68 23.43
JD11-37 0.51 41.71 64.68 22.92
JD11-38 0.51 45.59 64.67 19.05
JD11-39 0.51 36.68 64.63 27.89
JD11-40 0.51 45.72 64.62 18.86
JD11-41 0.51 45.64 64.61 18.93
JD11-42 0.51 42.85 64.59 21.69
JD11-43 0.51 43.28 64.58 21.26
JD11-44 0.51 42.61 64.56 21.91
JD11-45 0.51 40.58 64.55 23.92
JD11-46 0.51 43.54 64.53 20.95

MaRS Planning Engineering Services Pvt. Ltd.


JD11-47 0.51 43.47 64.53 21.01
JD11-48 0.51 42.26 64.52 22.21
JD11-49 0.51 43.28 64.51 21.18
JD11-50 0.51 42.35 64.51 22.11
JD11-51 0.51 43.71 64.47 20.72
JD11-52 0.51 36.58 64.44 27.8
JD11-53 0.51 37.42 64.44 26.97
JD11-54 0.51 43.86 63.97 20.06
JD11-55 0.51 43.75 63.94 20.15
JD11-56 0.51 43.62 63.92 20.26
JD11-57 0.51 43.23 63.9 20.63
JD11-58 0.51 48.76 63.85 15.06
JD11-59 0.51 43.52 63.85 20.28
JD11-60 0.51 48.8 63.84 15.01
JD11-61 0.51 43.17 63.79 20.58
JD11-62 0.51 45.52 63.79 18.23
JD11-63 0.51 43.21 63.78 20.53
JD11-64 0.51 44.75 63.76 18.98
JD11-65 0.51 45.65 63.75 18.07
JD11-66 0.51 44.82 63.73 18.87
JD11-67 0.51 41.52 63.63 22.06
JD11-68 0.51 41.63 63.6 21.92
JD11-69 0.51 42.39 63.45 21.02
JD11-70 0.51 42.35 63.42 21.03
JD11-71 0.51 45.21 63.39 18.14
JD11-72 0.51 42.38 63.31 20.89
JD11-73 0.51 45.58 63.31 17.69
JD11-74 0.51 42.68 63.3 20.58
JD11-75 0.51 42.26 63.29 20.98
JD11-76 0.51 45.69 63.28 17.55
JD11-77 0.51 45.72 63.26 17.51
JD11-78 0.51 42.13 63.25 21.07
JD11-79 0.51 42.75 63.18 20.39
JD11-80 0.51 44.21 63.17 18.92
JD11-81 0.51 41.12 63.08 21.92
JD11-82 0.51 41.23 63.06 21.78
JD11-83 0.51 44.91 63.03 18.08
JD11-84 0.51 42.67 63.02 20.31
JD11-85 0.51 40.21 63 22.74
JD11-86 0.51 42.99 63 19.97
JD11-87 0.51 42.67 62.99 20.28
JD11-88 0.51 39.14 62.97 23.78
JD11-89 0.51 34.52 62.96 28.38
JD11-90 0.51 42.29 62.93 20.6
JD11-91 0.51 42.71 62.91 20.16
JD11-92 0.51 44.91 62.91 17.96
JD11-93 0.51 43.32 62.9 19.54
JD11-94 0.51 42.42 62.89 20.43

MaRS Planning Engineering Services Pvt. Ltd.


JD11-95 0.51 42.31 62.89 20.54
JD11-96 0.51 40.69 62.88 22.14
JD11-97 0.51 38.51 62.85 24.29
TD.-12
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD12-1 0.205 132.82 152.4 19.54
JD12-2 0.205 131.75 152.08 20.29
JD12-3 0.205 135.14 152.04 16.86
JD12-4 0.205 118.88 151.58 32.63
JD12-5 0.205 116.44 151.34 34.83
JD12-6 0.205 128.47 151.29 22.77
JD12-7 0.205 108.25 151.04 42.7
JD12-8 0.205 97.1 150.63 53.42
JD12-9 0.205 126.78 150.49 23.67
JD12-10 0.205 95.69 150.43 54.63
JD12-11 0.205 96.47 149.91 53.34
JD12-12 0.205 124.15 149.8 25.6
JD12-13 0.205 88.12 149.48 61.24
JD12-14 0.205 123.85 149.17 25.27
JD12-15 0.205 84.66 149.12 64.33
JD12-16 0.205 86.69 149.12 62.3
JD12-17 0.205 80.33 148.93 68.46
JD12-18 0.205 83.67 148.92 65.12
JD12-19 0.205 120.69 148.59 27.84
JD12-20 0.205 78.41 148.47 69.92
JD12-21 0.205 118.54 148.05 29.45
JD12-22 0.205 77.63 147.96 70.18
JD12-23 0.205 69.24 147.56 78.16
JD12-24 0.205 117.69 147.2 29.45
JD12-25 0.205 65.63 147.1 81.31
JD12-26 0.205 59.28 146.55 87.09
JD12-27 0.205 113.45 146.4 32.89
JD12-28 0.205 60.34 146.17 85.65
JD12-29 0.205 114.68 145.7 30.96
JD12-30 0.205 53.67 145.59 91.74
JD12-31 0.205 52.25 145.21 92.77
JD12-32 0.205 108.25 145.09 36.77
JD12-33 0.205 105.47 144.6 39.05
JD12-34 0.205 55.61 144.57 88.78
JD12-35 0.205 55.84 144.54 88.52
JD12-36 0.205 50.67 144.53 93.67
JD12-37 0.205 106.77 144.47 37.62
JD12-38 0.205 106.62 144.47 37.77
JD12-39 0.205 110.36 144.45 34.02
JD12-40 0.205 110.28 144.45 34.1
JD12-41 0.205 55.11 144.43 89.14
JD12-42 0.205 54.65 144.42 89.59

MaRS Planning Engineering Services Pvt. Ltd.


JD12-43 0.205 52.38 144.37 91.8
JD12-44 0.205 53.67 144.36 90.51
JD12-45 0.205 50.39 144.34 93.76
JD12-46 0.205 51.45 144.33 92.7
JD12-47 0.205 49.62 144.33 94.52
JD12-48 0.205 55.66 144.23 88.4
JD12-49 0.205 55.67 144.23 88.38
JD12-50 0.205 106.83 144.17 37.26
JD12-51 0.205 53.64 144.12 90.3
JD12-52 0.205 53.52 144.1 90.4
JD12-53 0.205 49.24 143.92 94.49
JD12-54 0.205 48.31 143.91 95.41
JD12-55 0.205 48.75 143.91 94.96
JD12-56 0.205 48.47 143.87 95.21
JD12-57 0.205 105.74 143.85 38.03
JD12-58 0.205 43.47 143.83 100.16
JD12-59 0.205 50.33 143.83 93.31
JD12-60 0.205 43.56 143.83 100.06
JD12-61 0.205 47.04 143.82 96.59
JD12-62 0.205 41.51 143.82 102.11
JD12-63 0.205 47.12 143.82 96.51
JD12-64 0.205 51.12 143.82 92.51
JD12-65 0.205 45.5 143.8 98.1
JD12-66 0.205 45.58 143.79 98.01
JD12-67 0.205 36.42 143.78 107.15
JD12-68 0.205 38.68 143.78 104.89
JD12-69 0.205 48.14 143.77 95.44
JD12-70 0.205 103.78 143.59 39.73
JD12-71 0.205 47.99 143.51 95.32
JD12-72 0.205 99.36 143.4 43.95
JD12-73 0.205 102.98 143.28 40.22
JD12-74 0.205 98.47 143.19 44.63
JD12-75 0.205 93.36 143.15 49.69
JD12-76 0.205 94.52 143.15 48.53
JD12-77 0.205 47.6 142.74 94.96
JD12-78 0.205 43.12 142.73 99.41
JD12-79 0.205 43.17 142.73 99.36
JD12-80 0.205 49.57 142.61 92.85
JD12-81 0.205 53.36 142.58 89.04
JD12-82 0.205 52.47 142.58 89.93
JD12-83 0.205 52.25 142.58 90.15
JD12-84 0.205 49.12 142.25 92.95
JD12-85 0.205 46.47 141.71 95.05
JD12-86 0.205 47.53 141.65 93.93
JD12-87 0.205 46.69 141.64 94.76
JD12-88 0.205 46.76 141.61 94.66
JD12-89 0.205 47.28 141.6 94.13
JD12-90 0.205 47.58 141.59 93.82

MaRS Planning Engineering Services Pvt. Ltd.


JD12-91 0.205 44.25 141.59 97.14
JD12-92 0.205 46.41 141.58 94.98
JD12-93 0.205 47.25 141.57 94.13
JD12-94 0.205 47.36 141.57 94.02
JD12-95 0.205 44.14 141.56 97.22
JD12-96 0.205 46.17 141.56 95.19
JD12-97 0.205 46.32 141.52 95.01
JD12-98 0.205 47.51 141.52 93.82
JD12-99 0.205 43.59 141.51 97.73
JD12-100 0.205 43.47 141.49 97.83
JD12-101 0.205 47.32 141.49 93.98
JD12-102 0.205 42.19 141.49 99.1
JD12-103 0.205 47.97 141.49 93.33
JD12-104 0.205 41.66 141.49 99.63
JD12-105 0.205 48.67 141.47 92.61
JD12-106 0.205 48.17 141.47 93.11
JD12-107 0.205 48.81 141.47 92.47
JD12-108 0.205 46.6 141.42 94.63
JD12-109 0.205 46.37 141.39 94.83
JD12-110 0.205 49.47 141.36 91.7
JD12-111 0.205 48.66 141.36 92.51
JD12-112 0.205 46.28 141.35 94.88
JD12-113 0.205 49.71 141.3 91.41
JD12-114 0.205 47.25 141.3 93.86
JD12-115 0.205 52.32 141.29 88.8
JD12-116 0.205 49.74 141.28 91.35
JD12-117 0.205 46.18 141.26 94.89
JD12-118 0.205 49.41 141.17 91.58
JD12-119 0.205 43.33 141.17 97.64
JD12-120 0.205 49.69 141.12 91.25
JD12-121 0.205 50.68 141.12 90.26
JD12-122 0.205 49.47 141.08 91.43
JD12-123 0.205 49.39 141.08 91.51
JD12-124 0.205 46 141.01 94.83
JD12-125 0.205 46.25 140.93 94.49
JD12-126 0.205 45.86 140.92 94.87
JD12-127 0.205 46.28 140.92 94.45
JD12-128 0.205 48.28 140.91 92.44
JD12-129 0.205 48.28 140.9 92.43
JD12-130 0.205 44.68 140.89 96.02
JD12-131 0.205 44.94 140.88 95.75
JD12-132 0.205 45.68 140.86 94.98
JD12-133 0.205 42.36 140.85 98.29
JD12-134 0.205 45.42 140.82 95.21
JD12-135 0.205 52.66 140.81 87.97
JD12-136 0.205 45.39 140.8 95.22
JD12-137 0.205 51.78 140.8 88.84
JD12-138 0.205 47.39 140.8 93.22

MaRS Planning Engineering Services Pvt. Ltd.


JD12-139 0.205 49.5 140.78 91.1
JD12-140 0.205 45.66 140.55 94.69
JD12-141 0.205 44.94 140.4 95.27
JD12-142 0.205 50.69 140.39 89.52
JD12-143 0.205 50.61 140.38 89.59
JD12-144 0.205 53.47 140.38 86.73
JD12-145 0.205 53.41 140.37 86.79
JD12-146 0.205 44.69 140.02 95.14
JD12-147 0.205 50.47 139.96 89.31
JD12-148 0.205 44.38 139.83 95.26
JD12-149 0.205 44.38 139.61 95.03
JD12-150 0.205 44.29 139.59 95.11
JD12-151 0.205 46.15 139.59 93.25
JD12-152 0.205 46.06 139.58 93.33
JD12-153 0.205 53.58 139.47 85.71
JD12-154 0.205 44.31 139.28 94.79
JD12-155 0.205 55.39 139.16 83.6
JD12-156 0.205 58.67 138.96 80.13
JD12-157 0.205 44.69 138.91 94.03
JD12-158 0.205 61.96 138.74 76.62
JD12-159 0.205 43.25 138.64 95.2
JD12-160 0.205 63.17 138.55 75.23
JD12-161 0.205 66.58 138.47 71.74
JD12-162 0.205 62.36 138.46 75.95
JD12-163 0.205 67.66 138.43 70.62
JD12-164 0.205 73.14 138.42 65.15
JD12-165 0.205 44.79 138.25 93.27
JD12-166 0.205 45.1 137.94 92.65
JD12-167 0.205 45.2 137.2 91.81
JD12-168 0.205 45.21 136.1 90.71
JD12-169 0.205 49.69 135.57 85.7
JD12-170 0.205 49.36 135.56 86.03
JD12-171 0.205 50.46 135.5 84.87
JD12-172 0.205 50.34 135.5 84.98
JD12-173 0.205 49.69 135.49 85.63
JD12-174 0.205 46.38 135.49 88.93
JD12-175 0.205 42.15 135.49 93.15
JD12-176 0.205 50.54 135.47 84.76
JD12-177 0.205 51.57 135.46 83.73
JD12-178 0.205 51.66 135.36 83.53
JD12-179 0.205 51.6 135.35 83.59
JD12-180 0.205 51.48 135.35 83.7
JD12-181 0.205 52.68 135.31 82.47
JD12-182 0.205 52.67 135.31 82.47
JD12-183 0.205 53.72 135.31 81.43
JD12-184 0.205 52.67 135.22 82.38
JD12-185 0.205 46.28 135.22 88.76
JD12-186 0.205 52.61 135.21 82.44

MaRS Planning Engineering Services Pvt. Ltd.


JD12-187 0.205 52.98 135.21 82.06
JD12-188 0.205 52.75 135.2 82.28
JD12-189 0.205 52.86 135.19 82.17
JD12-190 0.205 52.68 135.19 82.34
JD12-191 0.205 53.61 135.18 81.41
JD12-192 0.205 52.87 135.17 82.13
JD12-193 0.205 51.68 135.14 83.29
JD12-194 0.205 50.28 135.14 84.69
JD12-195 0.205 49.33 135.14 85.64
JD12-196 0.205 46.69 135.06 88.19
JD12-197 0.205 48.36 134.97 86.43
JD12-198 0.205 50.41 134.92 84.34
JD12-199 0.205 55.67 134.88 79.05
JD12-200 0.205 56.69 134.87 78.02
JD12-201 0.205 54.88 134.79 79.75
JD12-202 0.205 53.55 134.79 81.08
JD12-203 0.205 54.81 134.78 79.8
JD12-204 0.205 53.47 134.77 81.14
JD12-205 0.205 54.69 134.73 79.88
JD12-206 0.205 54.76 134.72 79.8
JD12-207 0.205 54.14 134.68 80.38
JD12-208 0.205 54.97 134.67 79.54
JD12-209 0.205 54.82 134.65 79.67
JD12-210 0.205 54.69 134.63 79.78
JD12-211 0.205 53.11 134.62 81.35
JD12-212 0.205 54.69 134.62 79.77
JD12-213 0.205 54.68 134.6 79.76
JD12-214 0.205 52.39 134.6 82.04
JD12-215 0.205 53.13 134.6 81.31
JD12-216 0.205 53.24 134.54 81.13
JD12-217 0.205 54.57 134.52 79.79
JD12-218 0.205 53.58 134.51 80.76
JD12-219 0.205 53.61 134.5 80.73
JD12-220 0.205 53.69 134.49 80.64
JD12-221 0.205 53.68 134.49 80.65
JD12-222 0.205 53.42 134.46 80.88
JD12-223 0.205 53.68 134.46 80.62
JD12-224 0.205 51.55 134.46 82.74
JD12-225 0.205 53.66 134.42 80.6
JD12-226 0.205 52.89 134.37 81.31
JD12-227 0.205 52.32 134.36 81.88
JD12-228 0.205 55.67 134.36 78.53
JD12-229 0.205 53.13 134.36 81.06
JD12-230 0.205 53.66 134.35 80.52
JD12-231 0.205 55.68 134.3 78.47
JD12-232 0.205 55.76 134.3 78.38
JD12-233 0.205 55.2 134.29 78.93
JD12-234 0.205 55.14 134.14 78.84

MaRS Planning Engineering Services Pvt. Ltd.


JD12-235 0.205 55.36 134.09 78.57
JD12-236 0.205 52.66 134.09 81.26
JD12-237 0.205 56.68 133.89 77.05
JD12-238 0.205 51.97 133.81 81.68
JD12-239 0.205 57.28 133.35 75.91
JD12-240 0.205 59.67 133.3 73.48
JD12-241 0.205 49.39 133.22 83.66
JD12-242 0.205 54.69 132.89 78.04
JD12-243 0.205 56.36 132.88 76.36
JD12-244 0.205 48.57 132.87 84.13
JD12-245 0.205 48.51 132.87 84.19
JD12-246 0.205 47.17 132.87 85.52
JD12-247 0.205 48.21 132.86 84.48
JD12-248 0.205 48.27 132.85 84.41
JD12-249 0.205 47.17 132.85 85.51
JD12-250 0.205 48.29 132.85 84.39
JD12-251 0.205 54.6 132.85 78.09
JD12-252 0.205 56.48 132.84 76.2
JD12-253 0.205 54.75 132.77 77.86
JD12-254 0.205 53.41 132.76 79.19
JD12-255 0.205 60.85 132.74 71.75
JD12-256 0.205 54.69 132.71 77.86
JD12-257 0.205 54.39 132.71 78.16
JD12-258 0.205 59.37 132.7 73.18
JD12-259 0.205 57.28 132.7 75.27
JD12-260 0.205 59.38 132.7 73.17
JD12-261 0.205 60.35 132.69 72.2
JD12-262 0.205 54.48 132.68 78.05
JD12-263 0.205 55.57 132.66 76.94
JD12-264 0.205 57.68 132.66 74.82
JD12-265 0.205 55.63 132.65 76.86
JD12-266 0.205 53.58 132.65 78.91
JD12-267 0.205 57.57 132.64 74.92
JD12-268 0.205 53.18 132.64 79.3
JD12-269 0.205 52.28 132.64 80.19
JD12-270 0.205 56.39 132.63 76.08
JD12-271 0.205 57.17 132.62 75.3
JD12-272 0.205 54.57 132.62 77.89
JD12-273 0.205 53.22 132.62 79.24
JD12-274 0.205 53.29 132.62 79.17
JD12-275 0.205 53.15 132.62 79.31
JD12-276 0.205 53.98 132.62 78.48
JD12-277 0.205 53.21 132.62 79.25
JD12-278 0.205 53.84 132.61 78.62
JD12-279 0.205 52.67 132.61 79.78
JD12-280 0.205 52.38 132.61 80.07
JD12-281 0.205 52.46 132.61 79.99
JD12-282 0 52.77 132.61 79.68

MaRS Planning Engineering Services Pvt. Ltd.


JD12-283 0.205 52.36 132.61 80.09
JD12-284 0.205 57.17 132.56 75.24
JD12-285 0.205 59.37 132.55 73.04
JD12-286 0.205 56.17 132.54 76.22
JD12-287 0.205 57.27 132.51 75.09
JD12-288 0.205 57.68 132.4 74.57
JD12-289 0.205 57.42 132.4 74.82
JD12-290 0.205 56.98 132.39 75.26
JD12-291 0.205 57.2 132.39 75.03
JD12-292 0.205 56.25 132.22 75.82
JD12-293 0.205 63.69 131.97 68.14
JD12-294 0.205 63.58 131.96 68.25
JD12-295 0.205 64.17 131.96 67.65
JD12-296 0.205 64.24 131.96 67.58
JD12-297 0.205 59.22 131.96 72.59
TD.-13
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD13-1 0.266 44.72 64.67 19.91
JD13-2 0.266 43.55 64.61 21.02
JD13-3 0.266 40.47 64.6 24.08
JD13-4 0.266 33.12 64.59 31.41
JD13-5 0.266 45.02 64.58 19.52
JD13-6 0.266 47.65 64.57 16.88
JD13-7 0.266 44.98 64.04 19.03
JD13-8 0.266 42.89 64.03 21.1
JD13-9 0.266 44.04 64.01 19.92
JD13-10 0.266 45.22 63.97 18.72
JD13-11 0.266 45.14 63.97 18.79
JD13-12 0.266 43.77 63.96 20.15
JD13-13 0.266 43.36 63.65 20.25
JD13-14 0.266 41.25 63.64 22.34
JD13-15 0.266 43.11 63.63 20.48
JD13-16 0.266 41.11 63.62 22.47
JD13-17 0.266 43.34 63.62 20.23
JD13-18 0.266 43.76 63.58 19.78
JD13-19 0.266 43.36 63.57 20.17
JD13-20 0.266 44.58 63.56 18.94
JD13-21 0.266 43.52 63.54 19.98
JD13-22 0.266 44.58 63.46 18.84
JD13-23 0.266 43.77 63.45 19.64
JD13-24 0.266 44.24 63.45 19.17
JD13-25 0.266 43.52 63.44 19.88
JD13-26 0.266 44.22 63.44 19.18
JD13-27 0.266 43.36 63.44 20.04
JD13-28 0.266 42.59 63.42 20.79
JD13-29 0.266 42.69 63.42 20.69
JD13-30 0.266 40.15 63.42 23.22

MaRS Planning Engineering Services Pvt. Ltd.


JD13-31 0.266 43.36 63.41 20.01
JD13-32 0.266 43.69 63.41 19.68
JD13-33 0.266 43.36 63.4 20
JD13-34 0.266 44.25 63.4 19.11
JD13-35 0.266 43.32 63.37 20.01
JD13-36 0.266 43.36 63.36 19.96
JD13-37 0.266 40.66 63.35 22.65
JD13-38 0.266 45.66 63.35 17.66
JD13-39 0.266 41.99 63.35 21.32
JD13-40 0.266 43.32 63.34 19.98
JD13-41 0.266 43.09 63.32 20.19
JD13-42 0.266 43.45 63.31 19.82
JD13-43 0.266 44.52 63.31 18.75
JD13-44 0.266 43.69 63.31 19.58
JD13-45 0.266 43.22 63.28 20.02
JD13-46 0.266 44.02 63.27 19.21
JD13-47 0.266 44.25 63.24 18.95
JD13-48 0.266 44.23 63.04 18.77
JD13-49 0.266 44.15 63.02 18.83
JD13-50 0.266 45.23 63.01 17.74
JD13-51 0.266 44.58 62.99 18.37
JD13-52 0.266 46.36 62.99 16.59
JD13-53 0.266 43.66 62.99 19.29
JD13-54 0.266 44.11 62.97 18.82
JD13-55 0.266 44.97 62.96 17.96
JD13-56 0.266 43.22 62.96 19.7
JD13-57 0.266 42.9 62.91 19.97
JD13-58 0.266 40.78 62.63 21.81
JD13-59 0.266 42.82 62.45 19.59
JD13-60 0.266 42.26 62.44 20.13
JD13-61 0.266 43.58 62.42 18.8
JD13-62 0.266 42.25 62.17 19.88
JD13-63 0.266 42.56 62.17 19.57
JD13-64 0.266 35.69 62.16 26.41
JD13-65 0.266 42.42 62.12 19.65
JD13-66 0.266 42.44 62.11 19.63
JD13-67 0.266 39.87 61.97 22.05
JD13-68 0.266 38.06 61.96 23.85
JD13-69 0.266 42.25 61.93 19.64
JD13-70 0.266 41.58 61.93 20.31
JD13-71 0.266 42.37 61.91 19.5
JD13-72 0.266 42.23 61.9 19.63
JD13-73 0.266 39.52 61.88 22.32
JD13-74 0.266 42.07 61.81 19.7
JD13-75 0.266 43.74 61.81 18.03
JD13-76 0.266 36.65 61.74 25.04
JD13-77 0.266 35.25 61.46 26.15
JD13-78 0.266 38.31 61.27 22.91

MaRS Planning Engineering Services Pvt. Ltd.


JD13-79 0.266 39.85 61.18 21.28
JD13-80 0.266 38.65 61.17 22.48
JD13-81 0.266 38.25 61.17 22.87
TD.-14
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD14-1 0.25 71.42 89.47 18.02
JD14-2 0.25 66.64 89.01 22.32
JD14-3 0.25 59.69 89 29.25
JD14-4 0.25 66.35 88.98 22.58
JD14-5 0.25 62.26 88.97 26.66
JD14-6 0.25 59.33 88.97 29.58
JD14-7 0.25 69.35 88.97 19.58
JD14-8 0.25 60.26 88.97 28.65
JD14-9 0.25 56.97 88.09 31.05
JD14-10 0.25 51.69 87.66 35.9
JD14-11 0.25 49.95 87.13 37.11
JD14-12 0.25 50.86 86.6 35.68
JD14-13 0.25 55.96 86.08 30.05
JD14-14 0.25 55.47 86.06 30.53
JD14-15 0.25 55.23 86.04 30.75
JD14-16 0.25 55.28 86.04 30.7
JD14-17 0.25 55.12 86.04 30.86
JD14-18 0.25 63.35 86.03 22.63
JD14-19 0.25 55.48 85.77 30.23
JD14-20 0.25 55.27 85.77 30.43
JD14-21 0.25 63.62 85.36 21.7
JD14-22 0.25 65.12 84.93 19.77
JD14-23 0.25 63.91 84.51 20.56
JD14-24 0.25 61.95 84.1 22.1
JD14-25 0.25 60.11 83.7 23.54
JD14-26 0.25 60.5 83.35 22.81
JD14-27 0.25 54.78 83.32 28.49
JD14-28 0.25 59.69 83.32 23.58
JD14-29 0.25 50.67 83.24 32.51
JD14-30 0.25 50.25 83.24 32.92
JD14-31 0.25 54.58 83.23 28.59
JD14-32 0.25 50.29 83.23 32.87
JD14-33 0.25 63.62 82.92 19.26
JD14-34 0.25 63.08 82.91 19.79
JD14-35 0.25 49.63 82.72 33.02
JD14-36 0.25 45.65 82.7 36.98
JD14-37 0.25 62.92 82.34 19.38
JD14-38 0.25 62.26 82.33 20.03
JD14-39 0.25 63.31 82.32 18.97
JD14-40 0.25 66.52 82.28 15.73
JD14-41 0.25 70.21 82.27 12.04
JD14-42 0.25 48.66 82.24 33.52

MaRS Planning Engineering Services Pvt. Ltd.


JD14-43 0.25 63.33 82.23 18.86
JD14-44 0.25 60.21 82.19 21.93
JD14-45 0.25 60.34 82.15 21.76
JD14-46 0.25 57.66 81.98 24.28
JD14-47 0.25 63.85 81.83 17.94
JD14-48 0.25 63.31 81.78 18.43
JD14-49 0.25 47.64 81.77 34.06
JD14-50 0.25 63.34 81.75 18.37
JD14-51 0.25 65.26 81.71 16.42
JD14-52 0.25 66.63 81.71 15.05
JD14-53 0.25 60.36 81.68 21.27
JD14-54 0.25 50.25 81.67 31.35
JD14-55 0.25 60.24 81.66 21.38
JD14-56 0.25 50.2 81.66 31.4
JD14-57 0.25 54.23 81.61 27.33
JD14-58 0.25 54.59 81.61 26.97
JD14-59 0.25 50.63 81.61 30.92
JD14-60 0.25 50.69 81.6 30.85
JD14-61 0.25 50.36 81.59 31.17
JD14-62 0.25 50.21 81.58 31.31
JD14-63 0.25 47.99 81.54 33.49
JD14-64 0.25 47.62 81.53 33.84
JD14-65 0.25 69.23 81.49 12.24
JD14-66 0.25 67.24 81.39 14.12
JD14-67 0.25 48.61 81.3 32.62
JD14-68 0.25 70.54 81.28 10.72
JD14-69 0.25 68.26 81.15 12.86
JD14-70 0.25 73.21 81.14 7.91
JD14-71 0.25 66.26 81.06 14.77
JD14-72 0.25 66.64 81.02 14.35
JD14-73 0.25 70.84 81.01 10.15
JD14-74 0.25 47.92 80.72 32.73
JD14-75 0.25 47.31 80.71 33.33
JD14-76 0.25 45.23 80.71 35.41
JD14-77 0.25 49.23 80.7 31.41
JD14-78 0.25 48.59 80.7 32.04
JD14-79 0.25 47.53 80.69 33.09
JD14-80 0.25 49.35 80.67 31.26
JD14-81 0.25 48.96 80.27 31.25
JD14-82 0.25 66.23 80.26 14
JD14-83 0.25 48.68 80.14 31.4
JD14-84 0.25 48.56 80.1 31.47
JD14-85 0.25 48.74 80.09 31.29
JD14-86 0.25 47.38 79.6 32.15
JD14-87 0.25 53.23 79.48 26.2
JD14-88 0.25 61.26 79.47 18.17
JD14-89 0.25 54.36 79.15 24.74
JD14-90 0.25 49.26 79.15 29.82

MaRS Planning Engineering Services Pvt. Ltd.


JD14-91 0.25 46.75 79.14 32.32
JD14-92 0.25 47.65 79.13 31.42
JD14-93 0.25 49.69 79.09 29.34
JD14-94 0.25 47.26 79.08 31.76
JD14-95 0.25 50.29 79.08 28.73
JD14-96 0.25 48.21 79.05 30.78
JD14-97 0.25 44.28 79.04 34.69
JD14-98 0.25 46.84 78.95 32.05
JD14-99 0.25 41.22 78.95 37.65
JD14-100 0.25 46.98 78.74 31.69
JD14-101 0.25 48.21 78.64 30.36
JD14-102 0.25 48.63 78.63 29.94
JD14-103 0.25 48.74 78.63 29.83
TD.-15
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD15-1 0.269 68.48 88.97 20.45
JD15-2 0.269 63.98 88.16 24.14
JD15-3 0.269 59.63 88.14 28.46
JD15-4 0.269 66.62 88.03 21.37
JD15-5 0.269 59.47 87.56 28.04
JD15-6 0.269 57.69 87.29 29.54
JD15-7 0.269 52.48 87.09 34.54
JD15-8 0.269 48.69 86.74 37.97
JD15-9 0.269 52.18 86.58 34.34
JD15-10 0.269 47.54 86.55 38.93
JD15-11 0.269 44.25 86.44 42.11
JD15-12 0.269 40.69 86.34 45.56
JD15-13 0.269 37.88 86.33 48.35
JD15-14 0.269 37.58 86.33 48.65
JD15-15 0.269 48.49 86.21 37.65
JD15-16 0.269 47.25 86.09 38.76
JD15-17 0.269 50.25 86.08 35.76
JD15-18 0.269 43.69 86.08 42.3
JD15-19 0.269 49.41 85.9 36.41
JD15-20 0.269 46.75 85.89 39.06
JD15-21 0.269 47.62 85.42 37.72
JD15-22 0.269 50.98 85.4 34.35
JD15-23 0.269 47.26 85.39 38.05
JD15-24 0.269 50.47 85.37 34.83
JD15-25 0.269 45.32 84.74 39.34
JD15-26 0.269 44.71 84.26 39.47
JD15-27 0.269 43.98 83.99 39.93
JD15-28 0.269 41.67 83.97 42.22
JD15-29 0.269 42.53 83.48 40.86
JD15-30 0.269 42.65 83.47 40.74
JD15-31 0.269 42.25 83.18 40.86
JD15-32 0.269 42.63 83.15 40.44

MaRS Planning Engineering Services Pvt. Ltd.


JD15-33 0.269 42.31 83.14 40.74
JD15-34 0.269 42.64 83.13 40.41
JD15-35 0.269 42.21 83.12 40.83
JD15-36 0.269 43.69 83.12 39.35
JD15-37 0.269 44.36 83.11 38.68
JD15-38 0.269 43.14 83.11 39.89
JD15-39 0.269 45.28 83.11 37.75
JD15-40 0.269 44.29 83.1 38.73
JD15-41 0.269 41.52 82.88 41.28
JD15-42 0.269 41.56 82.86 41.22
JD15-43 0.269 44.65 82.84 38.12
JD15-44 0.269 42.23 82.84 40.53
JD15-45 0.269 40.29 82.83 42.45
JD15-46 0.269 43.04 82.8 39.69
JD15-47 0.269 43.32 82.78 39.38
JD15-48 0.269 43.46 82.75 39.21
JD15-49 0.269 41.34 82.75 41.32
JD15-50 0.269 39.36 82.73 43.28
JD15-51 0.269 40.69 82.73 41.95
JD15-52 0.269 40.02 82.72 42.61
JD15-53 0.269 42.15 82.7 40.47
JD15-54 0.269 40.21 82.69 42.39
JD15-55 0.269 46.58 82.63 35.97
JD15-56 0.269 46.87 82.62 35.68
JD15-57 0.269 43.29 82.62 39.25
JD15-58 0.269 43.32 82.61 39.21
JD15-59 0.269 44.26 82.6 38.27
JD15-60 0.269 41.13 82.57 41.36
JD15-61 0.269 41.25 82.57 41.24
JD15-62 0.269 42.23 82.57 40.25
JD15-63 0.269 40.17 82.56 42.3
JD15-64 0.269 43.59 82.53 38.86
JD15-65 0.269 40.62 82.52 41.82
JD15-66 0.269 43.97 82.52 38.48
JD15-67 0.269 46.32 82.51 36.12
JD15-68 0.269 40.41 82.51 42.02
JD15-69 0.269 43.25 82.5 39.17
JD15-70 0.269 43.51 82.48 38.89
JD15-71 0.269 44.25 82.46 38.13
JD15-72 0.269 43.25 82.46 39.13
JD15-73 0.269 40.78 82.45 41.59
JD15-74 0.269 42.54 82.41 39.78
JD15-75 0.269 40.25 82.4 42.06
JD15-76 0.269 43.77 82.32 38.48
JD15-77 0.269 43.36 82.31 38.87
JD15-78 0.269 43.69 82.3 38.53
JD15-79 0.269 43.59 82.29 38.62
JD15-80 0.269 43.36 82.29 38.85

MaRS Planning Engineering Services Pvt. Ltd.


JD15-81 0.269 43.46 82.28 38.74
JD15-82 0.269 44.78 82.27 37.41
JD15-83 0.269 41.54 82.26 40.64
JD15-84 0.269 41.26 82.21 40.87
JD15-85 0.269 40.16 82.2 41.95
JD15-86 0.269 41.31 82.19 40.8
JD15-87 0.269 40.19 82.19 41.91
JD15-88 0.269 40.13 82.18 41.97
JD15-89 0.269 38.52 82.17 43.57
JD15-90 0.269 41.77 82.08 40.23
JD15-91 0.269 43.94 82.03 38.02
JD15-92 0.269 40.63 81.94 41.22
JD15-93 0.269 40.35 81.93 41.49
JD15-94 0.269 39.24 81.9 42.57
JD15-95 0.269 39.52 81.89 42.28
JD15-96 0.269 43.82 81.89 37.99
JD15-97 0.269 39.87 81.89 41.93
JD15-98 0.269 38.78 81.88 43.01
JD15-99 0.269 39.41 81.88 42.39
JD15-100 0.269 43.96 81.82 37.78
JD15-101 0.269 44.5 81.8 37.23
JD15-102 0.269 43.74 81.73 37.91
JD15-103 0.269 46.35 81.49 35.07
JD15-104 0.269 49.63 81.39 31.69
JD15-105 0.269 48.25 81.37 33.06
JD15-106 0.269 48.52 81.37 32.78
TD.-16
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD16-1 0.167 61.72 82.12 20.36
JD16-2 0.167 56.68 82.11 25.38
JD16-3 0.167 57.67 81.68 23.96
JD16-4 0.167 56.65 81.4 24.7
JD16-5 0.167 55.45 81.13 25.63
JD16-6 0.167 56.98 81.02 23.99
JD16-7 0.167 54.44 80.98 26.49
JD16-8 0.167 54.53 80.98 26.39
JD16-9 0.167 53.39 80.98 27.53
JD16-10 0.167 57.62 80.87 23.2
JD16-11 0.167 57.48 80.87 23.34
JD16-12 0.167 51.61 80.83 29.16
JD16-13 0.167 52.52 80.57 27.99
JD16-14 0.167 56.05 80.55 24.46
JD16-15 0.167 56.32 80.54 24.18
JD16-16 0.167 55.42 80.54 25.07
JD16-17 0.167 57.59 80.54 22.9
JD16-18 0.167 57.42 80.49 23.02
JD16-19 0.167 57.66 80.48 22.78

MaRS Planning Engineering Services Pvt. Ltd.


JD16-20 0.167 56.43 80.48 24
JD16-21 0.167 57.49 80.38 22.84
JD16-22 0.167 57.47 80.33 22.81
JD16-23 0.167 58.28 80.31 21.99
JD16-24 0.167 58.37 80.31 21.89
JD16-25 0.167 51.59 80.31 28.66
JD16-26 0.167 56.67 80.3 23.58
JD16-27 0.167 57.59 80.29 22.66
JD16-28 0.167 49.68 80.06 30.32
JD16-29 0.167 49.63 79.8 30.11
JD16-30 0.167 52.47 79.56 27.03
JD16-31 0.167 51.38 79.32 27.88
JD16-32 0.167 51.29 79.31 27.97
JD16-33 0.167 52.56 79.31 26.69
JD16-34 0.167 52.47 79.31 26.78
JD16-35 0.167 52.29 79.3 26.95
JD16-36 0.167 49.48 79.29 29.75
JD16-37 0.167 52.53 79.29 26.7
JD16-38 0.167 52.64 79.29 26.59
JD16-39 0.167 49.52 79.15 29.57
JD16-40 0.167 49.78 79.14 29.3
JD16-41 0.167 48.71 79.13 30.36
JD16-42 0.167 48.93 79.12 30.13
JD16-43 0.167 51.59 79.12 27.47
JD16-44 0.167 47.86 79.11 31.19
JD16-45 0.167 48.77 79.11 30.28
JD16-46 0.167 47.52 79.11 31.52
JD16-47 0.167 52.69 79.1 26.36
JD16-48 0.167 47.42 78.99 31.51
JD16-49 0.167 47.55 78.97 31.36
JD16-50 0.167 48.04 78.96 30.86
JD16-51 0.167 46.62 78.9 32.21
JD16-52 0.167 46.36 78.88 32.45
JD16-53 0.167 43.47 78.87 35.33
JD16-54 0.167 46.27 78.83 32.49
JD16-55 0.167 45.38 78.83 33.38
JD16-56 0.167 46.32 78.83 32.44
JD16-57 0.167 46.37 78.82 32.39
JD16-58 0.167 44.56 78.82 34.19
JD16-59 0.167 45.23 78.82 33.52
JD16-60 0.167 46.42 78.79 32.31
JD16-61 0.167 46.56 78.79 32.17
JD16-62 0.167 42.28 78.78 36.43
JD16-63 0.167 45.37 78.78 33.34
JD16-64 0.167 43.51 78.77 35.19
JD16-65 0.167 46.32 78.74 32.35
JD16-66 0.167 46.33 78.73 32.34
JD16-67 0.167 46.37 78.72 32.29

MaRS Planning Engineering Services Pvt. Ltd.


JD16-68 0.167 46.56 78.67 32.04
JD16-69 0.167 46.85 78.66 31.75
JD16-70 0.167 48.51 78.66 30.09
JD16-71 0.167 45.36 78.65 33.22
JD16-72 0.167 46.18 78.61 32.37
JD16-73 0.167 47.27 78.58 31.25
JD16-74 0.167 46.38 78.54 32.1
JD16-75 0.167 47.33 78.54 31.15
JD16-76 0.167 46.39 78.54 32.08
JD16-77 0.167 47.52 78.53 30.95
JD16-78 0.167 46.22 78.53 32.25
JD16-79 0.167 43.29 78.53 35.17
JD16-80 0.167 45.26 78.53 33.2
JD16-81 0.167 46.4 78.49 32.03
JD16-82 0.167 46.38 78.49 32.04
JD16-83 0.167 46.39 78.3 31.85
JD16-84 0.167 48.56 78.3 29.68
JD16-85 0.167 46.07 78.28 32.15
JD16-86 0.167 48.27 78.27 29.94
JD16-87 0.167 47.39 78.26 30.81
JD16-88 0.167 44.58 78.24 33.59
JD16-89 0.167 42.48 78.24 35.69
JD16-90 0.167 44.61 78.24 33.56
JD16-91 0.167 45.56 78.2 32.57
JD16-92 0.167 49.66 78.19 28.47
JD16-93 0.167 45.75 78.17 32.36
JD16-94 0.167 48.33 78.15 29.76
JD16-95 0.167 46.63 78.14 31.45
JD16-96 0.167 49.51 78.14 28.57
JD16-97 0.167 45.61 77.93 32.26
JD16-98 0.167 45.32 77.92 32.54
JD16-99 0.167 45.28 77.77 32.43
JD16-100 0.167 45.27 77.77 32.43
JD16-101 0.167 45.32 77.75 32.37
JD16-102 0.167 45.22 77.75 32.47
JD16-103 0.167 46.41 77.6 31.12
JD16-104 0.167 47.22 77.59 30.31
JD16-105 0.167 44.62 77.59 32.91
JD16-106 0.167 46.34 77.59 31.19
JD16-107 0.167 47.46 77.59 30.07
JD16-108 0.167 44.63 77.59 32.89
JD16-109 0.167 44.26 77.59 33.26
TD.-17
Demand Elevation Hydraulic Pressure
Label
(L/s) (m) Grade (m) (m H2O)
JD17-1 0.231 62.09 82.48 20.35
JD17-2 0.231 62.35 82.48 20.09
JD17-3 0.231 60.42 82.16 21.7

MaRS Planning Engineering Services Pvt. Ltd.


JD17-4 0.231 59.34 82.07 22.68
JD17-5 0.231 59.58 82.04 22.42
JD17-6 0.231 63.18 82.02 18.81
JD17-7 0.231 65.25 82.01 16.73
JD17-8 0.231 63.35 82 18.61
JD17-9 0.231 65.29 81.99 16.66
JD17-10 0.231 58.12 81.9 23.73
JD17-11 0.231 58.45 81.89 23.4
JD17-12 0.231 56.69 81.89 25.14
JD17-13 0.231 56.28 81.88 25.55
JD17-14 0.231 55.58 81.88 26.24
JD17-15 0.231 57.86 81.78 23.87
JD17-16 0.231 59.86 81.78 21.87
JD17-17 0.231 57.12 81.77 24.61
JD17-18 0.231 59.49 81.77 22.24
JD17-19 0.231 55.36 81.76 26.35
JD17-20 0.231 55.21 81.63 26.36
JD17-21 0.231 51.99 81.16 29.11
JD17-22 0.231 51.68 80.69 28.95
JD17-23 0.231 51.02 80.2 29.12
JD17-24 0.231 55.67 79.82 24.1
JD17-25 0.231 57.15 79.36 22.17
JD17-26 0.231 57.89 78.96 21.02
JD17-27 0.231 53.62 78.56 24.89
JD17-28 0.231 57.56 78.54 20.94
JD17-29 0.231 51.13 78.12 26.94
JD17-30 0.231 50.9 78.1 27.15
JD17-31 0.231 52.19 78.04 25.79
JD17-32 0.231 56.32 78 21.63
JD17-33 0.231 56.23 78 21.72
JD17-34 0.231 57.1 77.99 20.85
JD17-35 0.231 56.39 77.99 21.55
JD17-36 0.231 56.89 77.99 21.05
JD17-37 0.231 56.4 77.98 21.54
JD17-38 0.231 46.55 77.94 31.33
JD17-39 0.231 45.67 77.78 32.04
JD17-40 0.231 44.25 77.64 33.32
JD17-41 0.231 46.51 77.51 30.94
JD17-42 0.231 48.38 77.36 28.92
JD17-43 0.231 49.63 76.74 27.05
JD17-44 0.231 44.36 76.72 32.3
JD17-45 0.231 49.69 76.69 26.95
JD17-46 0.231 44.6 76.68 32.02
JD17-47 0.231 45.98 76.58 30.54
JD17-48 0.231 48.35 76.04 27.64
JD17-49 0.231 45.39 76 30.55
JD17-50 0.231 53.96 75.41 21.41
JD17-51 0.231 47.28 75.4 28.06

MaRS Planning Engineering Services Pvt. Ltd.


JD17-52 0.231 53.79 75.21 21.37
JD17-53 0.231 53.36 75.17 21.77
JD17-54 0.231 54.15 75.08 20.88
JD17-55 0.231 55.48 75.07 19.55
JD17-56 0.231 54.25 75.06 20.77
JD17-57 0.231 55.48 75.05 19.53
JD17-58 0.231 51.63 75 23.33
JD17-59 0.231 54.61 74.99 20.34
JD17-60 0.231 55.64 74.99 19.31
JD17-61 0.231 54.41 74.95 20.5
JD17-62 0.231 55.46 74.95 19.45
JD17-63 0.231 54.59 74.95 20.32
JD17-64 0.231 52.29 74.94 22.61
JD17-65 0.231 52.39 74.94 22.51
JD17-66 0.231 55.29 74.93 19.6
JD17-67 0.231 54.63 74.91 20.24
JD17-68 0.231 55.33 74.91 19.54
JD17-69 0.231 55.46 74.9 19.4
JD17-70 0.231 54.86 74.89 19.99
JD17-71 0.231 54.41 74.89 20.44
JD17-72 0.231 55.78 74.88 19.07
JD17-73 0.231 55.63 74.88 19.21
JD17-74 0.231 54.14 74.88 20.7
JD17-75 0.231 55.56 74.88 19.28
JD17-76 0.231 56.69 74.87 18.14
JD17-77 0.231 54 74.86 20.82
JD17-78 0.231 56.28 74.85 18.53
JD17-79 0.231 54.42 74.82 20.36
JD17-80 0.231 54.29 74.82 20.49
JD17-81 0.231 55.95 74.81 18.82
JD17-82 0.231 57.43 74.8 17.34
JD17-83 0.231 57.86 74.8 16.9
JD17-84 0.231 56.2 74.73 18.5
JD17-85 0.231 57.02 74.73 17.68
JD17-86 0.231 56.62 74.73 18.07
JD17-87 0.231 54.14 74.73 20.54
JD17-88 0.231 54.69 74.72 19.99
JD17-89 0.231 55.36 74.12 18.73
JD17-90 0.231 55.78 74.1 18.28
JD17-91 0.231 60.23 74.07 13.81
JD17-92 0.231 60.21 74.06 13.82
JD17-93 0.231 60.26 73.85 13.57
JD17-94 0.231 61.45 73.72 12.24
JD17-95 0.231 63.11 73.7 10.57
JD17-96 0.231 61.34 73.69 12.33
JD17-97 0.231 63.35 73.67 10.29
JD17-98 0.231 63.28 73.67 10.36
JD17-99 0.231 63.32 73.66 10.32

MaRS Planning Engineering Services Pvt. Ltd.


JD17-100 0.231 63.35 73.65 10.28
JD17-101 0.231 61.32 73.64 12.3
JD17-102 0.231 63.58 73.63 10.03
JD17-103 0.231 63.96 73.62 9.64

MaRS Planning Engineering Services Pvt. Ltd.


0
0
0

Operation
&
Maintenance
(With Electricity Cost)

MaRS Planning Engineering Services Pvt. Ltd.


2.8 ABSTRACT OF ECONOMICS
Item No. Description At Initial Stage At Mid Stage At Ultimate Stage

1 Population 2,07,663 2,44,769 2,86,585

2 Annual Water Demand in (KL) 64,42,750 75,93,969 88,91,303

Capital Cost of Project (including House


3 1,88,18,34,349 1,88,18,34,349 1,88,18,34,349
Connection)

4 Annual income ( In Rs.) 6,97,75,440 14,39,24,760 30,60,78,120

5 Total Annual Expenditure (In Rs.) 6,80,07,938.00 14,13,83,618.73 29,39,26,389.09

6 Annual Profit(+)/Loss (-) (In Rs.) 17,67,502.00 25,41,141.27 1,21,51,730.91

7 Per Capita Cost 9,062 7,688 6,566

Per Capita maintainence cost (in Rs.)


8 327.49 577.62 1,025.62

Cost of Production of water / KL. (in


9 10.56 18.62 33.06
Rs.)

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Breakup Cost of Works
Mechanical & Civil Construction
Item.No. Description Pipeline Misc. Work Total
Electrical Work
1 Intake Well - 2,32,14,286 2,32,14,286

2 Pump and Motor for IW 47,94,194 -

3 Raw Water Rising Main 57,25,032

4 Staff Quarter 12,34,564 -

5 Compound wall 1,95,41,442 1,95,41,442

6 Water Treatment Plant 11,85,26,782 11,85,26,782

7 Pump and Motor for WTP 1,71,51,647 1,71,51,647

8 Pump and Motor for SUMP 66,24,221 66,24,221

9 Clear Water Rising Main 74,92,64,806 74,92,64,806

10 Distribution Clear Water 55,61,09,863 55,61,09,863

11 Approach Road 6,66,017 6,66,017

12 NH /Rail way Crossing 43,56,419 43,56,419

13 SCADA System 1,74,42,464 1,74,42,464

14 Sump and Elevated Service Reservoir 25,23,58,400 25,23,58,400

15 Improvement of Existing Sump and ESR 16,00,000 16,00,000

16 Improvement of Existing Pump and Motor 6,20,000 6,20,000

17 Intake Well 4,79,420 4,79,420

18 Water Treatment Plant 16,14,998 16,14,998

19 Sump 5,62,255 5,62,255

Total 1,31,10,99,701 4,92,89,199 41,71,41,491 43,56,419 1,77,01,33,020

MaRS Planning Engineering Services Pvt. Ltd.


5 YEARS EXPENDUTURE IN OPERATION & MAINTENANCE
Item No. Description Maintenance Cost (in Rs. )
Operation And Maintenance for 1st Year including labour
1 6,80,07,938.00
cess
Operation And Maintenance for 2nd Year (As per item No.
2 7,20,88,414.28
1+6% of item No. 1 )
Operation And Maintenance for 3rd Year (As per item No.
2 7,64,13,719.14
2+6% of item No. 2 )
Operation And Maintenance for 4th Year (As per item No.
2 8,09,98,542.29
3+6% of item No. 3 )
Operation And Maintenance for 5th Year (As per item No.
2 8,58,58,454.82
4+6% of item No. 4 )
Total 38,33,67,068.52

Say Total 38,33,67,069

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Operation And Maintenance
2.3 Annual Expenduture In Operation And Maintenance
Item No. Description Base Year

1 Chemicals (as per table no. 2.4) 20,10,515.00

2 Electricity Charges(as per table no. 2.5) 4,53,99,263.00

3 Staff salary and Administration(as per table no. 2.6) 1,09,71,170.00

4 Annual Repair Charges(as per table no. 2.7) 96,26,990.00

6,80,07,938.00

Total (in Rs.) 6,80,07,938

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


ANNUAL RECURRING EXPENDITURE ON CHEMICALS
Item No. Description Base year
1 Population 2,07,663
2 Annual Water Demand in (KL) 17,651
3 Average Annual Production of water in (KL) 64,42,750
4 Proposed average dose of chlorine in mg per litre 2
5 Quantity of Chlorine required annually (kg) 12,885.50
6 Proportionate Quantity of Bleaching Powder Required 19,328.25

6 Rate of Liquid Chlorin (Gas Cylinder (Tonner) (Rs/Kg) 13.00

7 Cost of Chlorine to be consumed annualy (in Rs) 2,51,267.24


Cost of chemicals required for testing water sample for
8 24,000
quality control (1000 x 24 Samples)
9 Sub-Total (in Rs.) ( A) 2,75,267.24
10 Proposed average doze of Alum in mg/liter for 4 months 40
11 Quantity of Alum required for 4 months 85,903.33
12 Proposed average doze of Alum in mg/litre for 8 month 20
13 Quantity of Alum required for 8 months 85,903.33
14 Total Quality of Alum in Kg. 1,71,806.66
15 Rate of Alum(As Per MJP SOR) 8.20
16 Cost of Alum consumed annually (B) 14,08,814.58
17 Cost of Lime taken as 40% of Alum Quantity 68,722.66
18 Rate of Lime 4.75
19 Cost of Lime consumed annually (C) 3,26,432.65
20 Total (in Rs.) ( A+B+C) 20,10,514.47
Total (in Rs.) 20,10,515

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


ANNUAL EXPENDITURE ON ELECTRICITY

Item No. Description Base Year

1 B.H.P. Required at Intake Well 230

2 B.H.P. Required at WTP. 1,285

3 B.H.P. Required at Sump-A & B 305

Total BHP 1,820

4 Pumping Hours 17
Total Annual Units consumed ( B.H.P.x pumping hours x 0.746
5 84,24,652.60
x 365)
6 Rate of electricity(Rs. Per Unit) 5.00

7 Cost of electricity (in Rs.) 4,21,23,263.00

8 Fixed Charges @ Rs.150/H.P./month 32,76,000

Total (in Rs. ) 4,53,99,263.00

Say total 4,53,99,263

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


ANNUAL EXPENDITURE ON MAINTENANCE STAFF
Item No. Description Base Year

A For Pumping Station (At Intake Well)

1 Operator -03 @ Rs 448.0/day base year 4,90,560

2 Helper/Fitter -03 @ Rs. 338.0 /day base year 3,70,110

3 Watchman -02 @ Rs 338.0 /day base year 2,46,740

B For Water Treatment Plant

1 Operator-03 @ Rs 448.0/day base year 4,90,560

2 Assistant Operater -03 @ 338.0 /day base year 11,10,330

3 Electrician/ Machnic -03 @ Rs 448.0/day base year 4,90,560

4 Helper/Fitter -03 Rs. 338.0 /day base 3,70,110

5 Watchman-02 @ Rs. 338.0 /day base year 2,46,740

C For ESRs.

1 Keyman cum chaukidar 29 nos ESR x 2 nos each x @ 338.0 /day 71,55,460

1,09,71,170
Total
Say Total 1,09,71,170

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


ANNUAL REPAIR CHARGES
Item No. Description Base Year

1 Cost of Repair on Pipe line Work on lacs 0.5% 65,55,498.51

2 Cost of repair on mechanical works on lacs @2% 9,85,783.98

3 Building works on Rs lacs @ 0.5% 20,85,707.45

Total (in Rs.) 96,26,990

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


ANNUAL INCOME AND PROFIT/LOSS
At Ultimate
Item No. Description At Initial Stage At Mid Stage
Stage

1 Population 2,07,663 2,44,769 2,86,585

2 No. of families (Taking 5 person/family) 41,533 48,954 57,318

3 Annual income in Rs.@ Rs.62.50 per month / 3,11,49,750 3,67,15,500 4,29,88,500

Total 3,11,49,750 3,67,15,500 4,29,88,500

4 Total Annual Expenditure in Rs. 6,80,07,938 14,13,83,619 29,39,26,389

5 Annual profit (+)/Loss (-) (in Rs.) -3,68,58,188 -10,46,68,119 -25,09,37,890

6 Annual Income from Proposed Tariff

Annual income in Rs.@ Rs. 140.00 per month/


family per connection in Base Year,Rs 245.00 per
6.1 month/family per connection in. Middle Year & 6,97,75,440 14,39,24,760 30,60,78,120
Rs. 445.00 per month/family per connection in
Design Year

Total 6,97,75,440 14,39,24,760 30,60,78,120

7 Annual Profit(+)/Loss(-) from proposed tax(In Rs.) 17,67,502 25,41,141 1,21,51,731

Total ( in Rs.) 17,67,502 25,41,141 1,21,51,731

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


0
0
0

Operation
&
Maintenance
(Without Electricity Cost)

MaRS Planning Engineering Services Pvt. Ltd.


5 YEARS EXPENDUTURE IN OPERATION & MAINTENANCE
Item No. Description Maintenance Cost (in Rs. )
Operation And Maintenance for 1st Year including labour
1 2,26,08,675.00
cess
Operation And Maintenance for 2nd Year (As per item No.
2 2,39,65,195.50
1+6% of item No. 1 )
Operation And Maintenance for 3rd Year (As per item No.
2 2,54,03,107.23
2+6% of item No. 2 )
Operation And Maintenance for 4th Year (As per item No.
2 2,69,27,293.66
3+6% of item No. 3 )
Operation And Maintenance for 5th Year (As per item No.
2 2,85,42,931.28
4+6% of item No. 4 )
Total 12,74,47,202.68

Say Total 12,74,47,203

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Operation And Maintenance
2.3 Annual Expenduture In Operation And Maintenance
Item No. Description Base Year

1 Chemicals (as per table no. 2.4) 20,10,515.00

2 Staff salary and Administration(as per table no. 2.6) 1,09,71,170.00

3 Annual Repair Charges(as per table no. 2.7) 96,26,990.00

2,26,08,675.00

Total (in Rs.) 2,26,08,675

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Intake Well

MaRS Planning Engineering Services Pvt. Ltd.


Estimate of Intake Well
. SOR No. Description Unit Quantity Rate Amount
Attached Annexure - A
Intake well (upto 20 M depth) including
,Page -1 ( Non Schedule
dewatering ,cofferdam,pump house on the well
Item Rates Approved by
1 ,2.5 m wide RCC /MS walk way to intake pump
Deptt vide Letter No.
house but excluding external electrification raw
8611 Dated 06.06.2016
water pump,approach to site,outoff wall ect.
)
1 Nos. 10 m Dia. No. 1 2,32,14,286 2,32,14,286

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


E&M
at Intake Well

MaRS Planning Engineering Services Pvt. Ltd.


Mechanical & Electrical Part at Intake Well
Item
SOR No. Item Description Unit Quantity Rate Amount
No.

As Per SOR (Memo No-


13827,Dated-
16.9.2017)-Government Horizontal Split Casing Centrifugal Pump set with
1
of Odisha-Works control panel.
Departement-Revision
of SOR 2014 on GST.

Therefore(2W + 1S) Pumps Have been taken


S.No-357-ii HP 330 7,143 23,57,190
(Discharge-8670 LPM,Head- 32 M 110 HP.)
Supplying all material,Labour, T & P for earthing with
40 mm dia G.I. pipe 3 Mtr. Long etc. all
2 S No. (10) Each 4 3,125 12,500
complete.(including 2 Nos. for Transformer & 12 Nos.
Pump Motor)
3 S No. (7) Transformer (S/S)
Including installation with all requred material.350
Each 1 8,03,571 8,03,571
KVA.
Our Door control pannel empty Box made of MS
4 363 i Each 4 6,250 25,000
plate.
5 363 ii Star Delta Control Pannel with APFC arrangment. HP 4 1,786 7,144
6 363 iii A T S control pannel HP 4 2,679 10,716
Soft starter with six wire bypass arrangement up to
7 363 iv HP 3 1,339 4,017
300 HP.
Cost for provision of LT/HT Line from the nearest
available power source including electrical
8 S.No.362 Km 5.50 2,86,192 15,74,056
connection, metering etc .In other states or market
rate is about 6 Lakh per km.
Say Total 47,94,194
9 External Electrification 4,79,420

MaRS Planning Engineering Services Pvt. Ltd.


RAW WATER
RISING MAIN

MaRS Planning Engineering Services Pvt. Ltd.


Estimate for Raw Water Rising Main
Item SOR No. Item description Unit Quantity Rate Amount
No.
Supplying all materials, labour T&P for laying in trenches
As Per SOR (Memo No-
centrically cast (spun) D.I pressure, socket & spigot pipes
13827,Dated-16.9.2017)-
Class-K9 & K7 without cement mortar lining , confirming to
Government of Odisha-
1 IS.8329-2000 of the following nominal diameter as per
Works Departement-
specification complete (Earth work in excavation in
Revision of SOR 2014 on
trenches jointing of pipes & fittings to be measured & paid
GST.
separately)
DI - K9 Dia 600 mm x 490 m M 490 8,456.41 41,43,640.90
Attached Annexure - A , (
Non Schedule Item Rates
Approved by Deptt vide
2 DI - K9 Dia 600 mm Length 490 M (Laying) M 490 259.68 1,27,243.20
Letter No. 8611 Dated
06.06.2016 ),Page -2 , S
No. 15 (iii)
Annexure A,Page -2 , S No. DI - K9 Dia 600 mm, Length 490 M (tytan jointing ) (5 M
3 Nos. 98 424.10 41,561.80
17 (iii) av.each joint)
As Per SOR (Memo No-
13827,Dated-16.9.2017)-
Providing and supplying ISI standard D.I. specials for D.I.
Government of Odisha-
pipes including ED,CST, all taxes etc complete as per IS KG 866 239.36 2,07,285.76
Works Departement-
9523 but excluding freight @ 5%.(incluiding C.P & OHC.)
Revision of SOR 2014 on
GST.Item-24,Page-9
Annexure A,Page -4 , S No. Double Flanged Sluice valve (P.N.1.6) (with Wheel)
4
29 (x) (including 15% OH. & C.P.)
DI - K9 Dia 600 mm x 490 m Each 2 1,23,167.80 2,46,335.60

Cost of Non return valve (P.N.1.6) (including 15% OH. &


Annexure A,Page -5 , S No. C.P.)
5
31 (x)

DI - K9 Dia 600 mm x 490 m NRV Each 1 2,60,801.70 2,60,801.70


Annexure A, Page -5 , S Cost of CI Double flange Air valve. 150 mm Dia (P.N. -1.6)
6 Each 2 10,580.00 21,160.00
No. 33 (ii) (including 15% OH. & C.P.)
Rate Analysis as per Earth Work in excavation for laying of Different types and
attached Annexure - B size of pipes so as to give one meter average cover over
7 (External Water Supply the socket of pipe with disposal of excavated earth
Analysis PHE Odisha) within initial lead and lift as per direction of Engineer in-
Page -12 , S No. 1 charge.
DI - K9 Dia 600 mm x 490 m Length 490 *.70*1.20 411.60
5% extra for junction 20.58
Total Cum 432.18
50% for Ordinary soil Cum 216.09 147.19 31,806.29
50% for Hard soil Cum 216.09 195.27 42,195.89
Fitting & Fixing Double Air Valve for water works purpose
Annexure A, Page -3 , S of the following diameter including cost of rubber insertion,
8
No. 21 (i) Nut & Bolt but excluding the cost of Double Air valve as per
specification complete.
ii Air valve. 150 mm Dia Each 2 742.89 1,485.77

Fitting & Fixing cast iron sluice valve (PN -1.6) with double
flanged end for water works purpose of the following rating
Annexure A, Page -3 , S
9 & nominal diameter excluding the cost of C.I. sluice valve
No. 20
but including cost of nut & bolts & rubber insertion. etc
.Supplying Labour and tools for fixing C.I. sluice valve.

vii DI - K9 Dia 600 mm x 490 m Each 2 8,599.42 17,198.84

MaRS Planning Engineering Services Pvt. Ltd.


Fitting & Fixing cast iron NRV with double flanged end for
Annexure A, Page -3 , S water works purpose of the following rating & nominal
10
No. 20 diameter excluding the cost of NRV but including cost of
nut & bolts & rubber insertion. Etc.
vii DI - K9 Dia 600 mm x 490 m NRV Each 1 8,599.42 8,599.42
Rate Analysis as per
Earthwork in back filling the trenches after laying different
attached Annexure - B
types and sizes of pipes with earth removed during
11 (External Water Supply
excavation within initial lead and lift as per direction of
Analysis PHE Odisha)
Engineer-in-Charge.
Page -13 , S No. 10
Taken as 80% of total earth work i.e Each 345.74 184.64 63,838.17
Rate Analysis as per Construction of Sluice Valve Chamber of size 0.90 mt. x
attached Annexure - B 0.90 mt.x 1.50 mt. including cost of all labour , materials
12 (External Water Supply ,cariage ,royality, etc.complete. Each 3 21,702.00 65,106.00
Analysis PHE Odisha) , S
No .1,Page 10
Rate Analysis as per
attached Annexure - B Construction of Air Valve Chamber of size 0.60 mt. x 0.60
13 (External Water Supply mt.x 1.10 mt. including cost of all labour , materials ,cariage Each 2 11,348.00 22,696.00
Analysis PHE Odisha) , S , royality, curing ,T & P etc.complete.
No .2,Page 10
Total 53,00,955.35
Add for Dismantling & Road Restoration @ 8% 4,24,076
Say Total 57,25,032

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


E & M WTP.

MaRS Planning Engineering Services Pvt. Ltd.


Mechanical & Electrical Part at WTP

Item No. SOR No. Item Description Unit Quantity Rate Amount

As Per SOR (Memo No-


13827,Dated-
16.9.2017)-Government Horizontal Split Casing Centrifugal Pump set with
1
of Odisha-Works control panel.
Departement-Revision
of SOR 2014 on GST.

Therefore(6W +3S) Pumps Have been taken (Discharge-


S.No-357-ii HP 1,800 7,143 1,28,57,400
2890 LPM,Head- 175 M 200 HP.)
Supplying all material,Labour, T & P for earthing with
40 mm dia G.I. pipe 3 Mtr. Long etc. all
2 S No. (10) Each 10 3,125 31,250
complete.(including 2 Nos. for Transformer & 12 Nos.
Pump Motor)
3 S No. (7) Transformer (S/S)
Including installation with all requred material. 1800
Each 1 32,14,284 32,14,284
KVA.
4 363 i Our Door control pannel empty Box made of MS plate. Each 3 6,250 18,750

5 363 ii Star Delta Control Pannel with APFC arrangment. HP 3 1,786 5,358
6 363 iii A T S control pannel HP 3 2,679 8,037
Soft starter with six wire bypass arrangement up to 300
7 363 iv HP 3 1,339 4,017
HP.
Substation Building of size (5 M x 3 M) for 250 KVA and
8 S No.361-vi Each 1 10,879 10,879
Above Transformers
Cost for provision of LT/HT Line from the nearest
available power source including electrical connection,
9 S.No.362 Km 3.50 2,86,192 10,01,672
metering etc .In other states or market rate is about 6
Lakh per km.
Say Total 1,71,51,647
10 External Electrification 16,14,998

MaRS Planning Engineering Services Pvt. Ltd.


E&M
Clear Water Sump.

MaRS Planning Engineering Services Pvt. Ltd.


Mechanical & Electrical Part at Clear Water Sump

Item No. SOR No. Item Description Unit Quantity Rate Amount

As Per SOR (Memo No-


13827,Dated-
16.9.2017)-Government Horizontal Split Casing Centrifugal Pump set with
1
of Odisha-Works control panel.
Departement-Revision
of SOR 2014 on GST.

Therefore(2W + 1S) Pumps Have been taken (Discharge-


Sump-A S.No-357-ii HP 420 7,143 30,00,060
2680 LPM,Head- 110 M 140 HP.)
Therefore(1W + 1S) Pumps Have been taken (Discharge-
Sump-B S.No-357-ii HP 20 7,143 1,42,860
250 LPM,Head- 75 M 10 HP.)
Supplying all material,Labour, T & P for earthing with
40 mm dia G.I. pipe 3 Mtr. Long etc. all
2 S No. (10) Each 7 3,125 21,875
complete.(including 2 Nos. for Transformer & 12 Nos.
Pump Motor)
3 S No. (7) Transformer (S/S)
Including installation with all requred material. 700
Sump-A Each 1 16,07,142 16,07,142
KVA.
Sump-B Including installation with all requred material. 63 KVA. Each 1 8,03,571 8,03,571

4 363 i Our Door control pannel empty Box made of MS plate. Each 3 6,250 18,750

5 363 ii Star Delta Control Pannel with APFC arrangment. HP 3 1,786 5,358
6 363 iii A T S control pannel HP 3 2,679 8,037
Soft starter with six wire bypass arrangement up to 300
7 363 iv HP 3 1,339 4,017
HP.
Substation Building of size (5 M x 3 M) for 250 KVA and
8 S No.361-vi Each 1 10,879 10,879
Above Transformers
Cost for provision of LT/HT Line from the nearest
available power source including electrical connection,
9 S.No.362 Km 3.50 2,86,192 10,01,672
metering etc .In other states or market rate is about 6
Lakh per km.
Say Total 66,24,221
10 External Electrification 5,62,255

MaRS Planning Engineering Services Pvt. Ltd.


WATER TREATMENT PLANT

MaRS Planning Engineering Services Pvt. Ltd.


Estimate for Raw Water Treatment Plant
Item SOR No. Description Unit Quantity Rate Amount
No.
1 As Per SOR (Memo No- WTP with cascade aerator,raw water chanel,chemical house,chemical
13827,Dated-16.9.2017)- store,flash mixer rapid Mix/HBCF/Clariflocculator,bye pass channel,filter
Government of Odisha- house with back wash arrangement,CWR,Clear water pump house,sludge
Works Departement- disposal arrangement lab,administrative block but excluding clear water
Revision of SOR 2014 on pump & External Electrification.
GST.
29.5 MLD. (Above 10.00 MLD @ Rs 4017857.00 /MLD) MLD 29.50 40,17,857 11,85,26,782

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


CLEAR WATER
RISING MAIN

MaRS Planning Engineering Services Pvt. Ltd.


Estimate for Clear Water Rising Main
Item
SOR No. Description Unit Quantity Rate Amount
No.
Supplying all materials, labour T&P for laying in trenches
centrically cast (spun) D.I pressure, socket & spigot pipes
Class-K9 & K7 without cement mortar lining , confirming to
1 Attached pipe Rate IS.8329-2000 of the following nominal diameter as per
specification complete (Earth work in excavation in
trenches jointing of pipes & fittings to be measured & paid
separately)
DI K-9 ,Dia 100 mm M 3,971 1,026.26 40,75,278.46
DI K-9 ,Dia 150 mm M 34,820 1,487.18 5,17,83,607.60
DI K-9 ,Dia 200 mm M 41,135 1,913.14 7,86,97,013.90
DI K-9 ,Dia 250 mm M 12,859 2,548.52 3,27,71,354.39
DI K-9 ,Dia 300 mm M 6,850 3,224.83 2,20,90,085.50
DI K-9 ,Dia 350 mm M 8,208 3,943.12 3,23,65,128.96
DI K-9 ,Dia 400 mm M 7,546 4,706.26 3,55,13,437.96
DI K-9 ,Dia 450 mm M 52,995 5,575.55 29,54,76,007.28
DI K-9 ,Dia 500 mm M 4,738 6,576.39 3,11,58,935.82
DI K-9 ,Dia 600 mm M 1,080 8,456.41 91,32,922.80
Attached Annexure - A , ( Non Schedule Item Rates Approved by Deptt vide Letter No.
2
8611 Dated 06.06.2016 ), Page -2 , S No. 15

DI K-9 ,Dia 100 mm (Laying) M 3,971 23.74 94,271.54


DI K-9 ,Dia 150 mm (Laying) M 34,820 33.99 11,83,531.80
DI K-9 ,Dia 200 mm (Laying) M 41,135 45.35 18,65,266.58
DI K-9 ,Dia 250 mm (Laying) M 12,859 59.88 7,69,996.92
DI K-9 ,Dia 300 mm (Laying) M 6,850 75.18 5,14,983.00
DI K-9 ,Dia 350 mm (Laying) M 8,208 92.66 7,60,553.28
DI K-9 ,Dia 400 mm (Laying) M 7,546 111.06 8,38,058.76
DI K-9 ,Dia 450 mm (Laying) M 52,995 132.54 70,23,957.30
DI K-9 ,Dia 500 mm (Laying) M 4,738 154.17 7,30,457.46
DI K-9 ,Dia 600 mm (Laying) M 1,080 259.68 2,80,454.40
Attached Annexure - A , ( Non Schedule Item Rates Approved by Deptt vide Letter No.
3
8611 Dated 06.06.2016 ), Page -2 , S No. 17
DI K-9 ,Dia 100 mm (tytan jointing ) (Length/5 M av.) nos. 795 110.02 87,465.90
DI K-9 ,Dia 150 mm (tytan jointing ) (Length/5 M av.) nos. 6,964 150.71 10,49,544.44
DI K-9 ,Dia 200 mm (tytan jointing ) (Length/5 M av.) nos. 8,227 179.44 14,76,252.88
DI K-9 ,Dia 250 mm (tytan jointing ) (Length/5 M av.) nos. 2,572 179.44 4,61,519.68
DI K-9 ,Dia 300 mm (tytan jointing ) (Length/5 M av.) nos. 1,370 189.58 2,59,724.60
DI K-9 ,Dia 350 mm (tytan jointing ) (Length/5 M av.) nos. 1,642 264.07 4,33,602.94
DI K-9 ,Dia 400 mm (tytan jointing ) (Length/5 M av.) nos. 1,510 264.07 3,98,745.70
DI K-9 ,Dia 450 mm (tytan jointing ) (Length/5 M av.) nos. 10,599 297.22 31,50,234.78
DI K-9 ,Dia 500 mm (tytan jointing ) (Length/5 M av.) nos. 948 310.22 2,94,088.56
DI K-9 ,Dia 600 mm (tytan jointing ) (Length/5 M av.) nos. 216 424.10 91,605.60
Providing and supplying ISI standard D.I. specials for D.I.
pipes including ED,CST, all taxes etc complete as per IS
Attached pipe Rate KG 1,23,885 239.36 2,96,53,113.60
9523 but excluding freight @ 5%.(incluiding C.P & OHC.)

Annexure A,Page -4 , S No. Double Flanged Sluice valve (P.N.1.6) (with Wheel)
4
29 (including 15% OH. & C.P.)
DI K-9 ,Dia 100 mm Each 4 5,516.10 22,064.40
DI K-9 ,Dia 150 mm Each 32 8,633.10 2,76,259.20
DI K-9 ,Dia 200 mm Each 37 12,978.80 4,80,215.60
DI K-9 ,Dia 250 mm Each 12 19,881.40 2,38,576.80

MaRS Planning Engineering Services Pvt. Ltd.


DI K-9 ,Dia 300 mm Each 6 26,143.20 1,56,859.20
DI K-9 ,Dia 350 mm Each 7 49,411.90 3,45,883.30
DI K-9 ,Dia 400 mm Each 7 58,094.10 4,06,658.70
DI K-9 ,Dia 450 mm Each 48 75,196.60 36,09,436.80
DI K-9 ,Dia 500 mm Each 4 91,021.20 3,64,084.80
DI K-9 ,Dia 600 mm Each 1 1,23,167.80 1,23,167.80
Annexure A,Page -5 , S Cost of Non return valve (P.N.1.6) (including 15% OH. &
5
No. 31 C.P.)
DI K-9 ,Dia 100 mm Each 2 4816.10 9,632.20
DI K-9 ,Dia 150 mm Each 17 6914.40 1,17,544.80
DI K-9 ,Dia 200 mm Each 20 13583.10 2,71,662.00
DI K-9 ,Dia 250 mm Each 6 23,028.80 1,38,172.80
DI K-9 ,Dia 300 mm Each 3 30,254.20 90,762.60
DI K-9 ,Dia 350 mm Each 4 45,566.10 1,82,264.40
DI K-9 ,Dia 400 mm Each 4 75,832.20 3,03,328.80
DI K-9 ,Dia 450 mm Each 26 1,04,961.90 27,29,009.40
DI K-9 ,Dia 500 mm Each 2 1,60,654.20 3,21,308.40
DI K-9 ,Dia 600 mm Each 1 2,60,801.70 2,60,801.70

Annexure A, Page -5 , S No. Cost of CI Double flange Air valve. 50 mm Dia (P.N. -1.6)
6 Each 190 6,274.01 11,92,061.79
33 (i) (including 15% OH. & C.P.) (upto 250 mm dia pipe.)

Cost of CI Double flange Air valve. 80 mm Dia (P.N. -1.6)


Annexure A, Page -5 , S No.
7a (including 15% OH. & C.P.) (Above 250 mm dia upto 350 Each 30 8,858.25 2,65,747.64
33 (ii)
mm dia pipe.)
Cost of CI Double flange Air valve. 100 mm Dia (P.N. -1.6)
Annexure A, Page -5 , S No.
7b (including 15% OH. & C.P.) (Above 450 mm dia upto 600 Each 150 10,580.00 15,87,000.00
33 (ii)
mm dia pipe.)
Cost of CI Double flange Air valve. 150 mm Dia (P.N. -1.6)
Annexure A, Page -5 , S No.
7c (including 15% OH. & C.P.) (Above 600 mm dia upto 1000 Each - 21,991.04 -
33 (ii)
mm dia pipe.)
Rate Analysis as per Earth Work in excavation for laying of Different types and
attached Annexure - B size of pipes so as to give one meter average cover over
8 (External Water Supply the socket of pipe with disposal of excavated earth
Analysis PHE Odisha) Page within initial lead and lift as per direction of Engineer in-
-12 , S No. 1 charge.
DI K-9 ,Dia 100 mm Length 3971 *0.5*1.05 2,084.78

DI K-9 ,Dia 150 mm Length 34820 *0.6*1.175 24,548.10

DI K-9 ,Dia 200 mm Length 41135 *0.7*1.25 35,993.13

DI K-9 ,Dia 250 mm Length 12859 *0.7*1.30 11,701.69

DI K-9 ,Dia 300 mm Length 6850 *0.8*1.35 7,398.00

DI K-9 ,Dia 350 mm Length 8208 *0.9*1.40 10,342.08

DI K-9 ,Dia 400 mm Length 7546 *0.9*1.45 9,847.53

DI K-9 ,Dia 450 mm Length 52995 *0.90*1.50 71,543.25


DI K-9 ,Dia 500 mm Length 4738 *1.0*1.55 7,107.00
DI K-9 ,Dia 600 mm Length 1080 *1.1*1.65 1,960.20
sub Total 1,82,525.75
5% extra for junction 9,126.29
Total Cum 1,91,652.04
50% for Ordinary soil Cum 95,826.02 147.19 1,41,04,631.70
50% for Hard soil Cum 95,826.02 195.27 1,87,11,946.68
Puuca Road ( Except black top only taken out material to be
Annexure A, Page -3 , S No. used ) for cutting road as per requirement Assuming 40 of
3
22 total road cutting.as well restoring the home as per
specification & direction E/I.

MaRS Planning Engineering Services Pvt. Ltd.


DI K-9 ,Dia 100 mm Length 3971 *0.5 0.50 3,971 1,985.50

DI K-9 ,Dia 150 mm Length 34820 *0.7 0.70 34,820 24,374.00


DI K-9 ,Dia 200 mm Length 41135 *0.7 0.70 41,135 28,794.50
DI K-9 ,Dia 250 mm Length 12859 *0.8 0.80 12,859 10,287.20

DI K-9 ,Dia 300 mm Length 6850 *0.9 0.90 6,850 6,165.00

DI K-9 ,Dia 350 mm Length 8208 *0.9 0.90 8,208 7,387.20


DI K-9 ,Dia 400 mm Length 7546 *0.9 0.90 7,546 6,791.40
DI K-9 ,Dia 450 mm Length 52995 *1.0 1.00 52,995 52,995.00
DI K-9 ,Dia 500 mm Length 4738 *1.10 1.10 4,738 5,211.80

DI K-9 ,Dia 600 mm Length 1080 *1.20 1.2 1,080 1,296.00

Sum of Road Cutting Sqm 1,45,287.60


Assuming 40 % of road cutting 0.4 58115.04
40 % Taken as Pucca Road 0.4 23246.02 584.80 1,35,94,270.16

Water bound Macadam road ( taken out material will be


4
used ) for cutting road as per reuirement .)
40 % of restoration work Sqm 9298.41 284.9 7,94,734.80
Rate Analysis as per
attached Annexure - B Dismantling and removing cement concrete including
5 (External Water Supply stacking the useful materials for reuse and removing the
Analysis PHE Odisha) Page debreis within 50 M lead.
-14 , S No. 13
30% of restoration work Cum 6973.80 527.7 11,04,023.04
Rate Analysis as per
attached Annexure - B
6 (External Water Supply P.C.C.(1:2:4) In foundation using 12mm size h.g.c.b.chips
Analysis PHE Odisha) Page
-15 & 16 , S No. 3
30 % of restoration work & 15 mm Cum 6973.80 6524.03 20,47,379.03
Fitting & Fixing Double Air Valve for water works purpose
Annexure A, Page -3 , S No. of the following diameter including cost of rubber
9
21 insertion,Nut & Bolt but excluding the cost of Double Air
valve as per specification complete.
Air valve. 50 mm Dia Each 190 292.79 55,629.30
Air valve. 80 mm Dia Each 30 742.89 22,286.58
Air valve. 100 mm Dia Each 150 742.89 1,11,432.91
Air valve. 150 mm Dia Each - 742.89 -

Fitting & Fixing cast iron sluice valve (PN -1.6) with double
flanged end for water works purpose of the following rating
Annexure A, Page -3 , S No.
10 & nominal diameter excluding the cost of C.I. sluice valve
20
but including cost of nut & bolts & rubber insertion. etc
.Supplying Labour and tools for fixing C.I. sluice valve.

DI K-9 ,Dia 100 mm Each 4 724.41 2,897.64


DI K-9 ,Dia 150 mm Each 32 1,118.32 35,786.24
DI K-9 ,Dia 200 mm Each 37 1,315.55 48,675.35
DI K-9 ,Dia 250 mm Each 12 1,940.90 23,290.80
DI K-9 ,Dia 300 mm Each 6 2,155.95 12,935.70
DI K-9 ,Dia 350 mm Each 7 2,858.52 20,009.64
DI K-9 ,Dia 400 mm Each 7 4,002.08 28,014.56
DI K-9 ,Dia 450 mm Each 48 4,786.71 2,29,762.08
DI K-9 ,Dia 500 mm Each 4 5,279.07 21,116.28
DI K-9 ,Dia 600 mm Each 1 8,599.42 8,599.42
Fitting & Fixing cast iron NRV with double flanged end for
Annexure A, Page -3 , S No. water works purpose of the following rating & nominal
11
20 diameter excluding the cost of NRV but including cost of
nut & bolts & rubber insertion. Etc.

MaRS Planning Engineering Services Pvt. Ltd.


DI K-9 ,Dia 100 mm Each 2 724.41 1,448.82
DI K-9 ,Dia 150 mm Each 17 1,118.32 19,011.44
DI K-9 ,Dia 200 mm Each 20 1,315.55 26,311.00
DI K-9 ,Dia 250 mm Each 6 1,940.90 11,645.40
DI K-9 ,Dia 300 mm Each 3 2,155.95 6,467.85
DI K-9 ,Dia 350 mm Each 4 2,858.52 11,434.08
DI K-9 ,Dia 400 mm Each 4 4,002.08 16,008.32
DI K-9 ,Dia 450 mm Each 26 4,786.71 1,24,454.46
DI K-9 ,Dia 500 mm Each 2 5,279.07 10,558.14
DI K-9 ,Dia 600 mm Each 1 8,599.42 8,599.42
Rate Analysis as per
Earthwork in back filling the trenches after laying different
attached Annexure - B
types and sizes of pipes with earth removed during
12 (External Water Supply
excavation within initial lead and lift as per direction of
Analysis PHE Odisha) Page
Engineer-in-Charge.
-13 , S No. 10
Taken as 80% of total earth work i.e Each 1,53,321.63 184.64 2,83,09,305.76
Rate Analysis as per
attached Annexure - B Construction of Sluice Valve Chamber of size 0.90 mt. x
13 (External Water Supply 0.90 mt.x 1.50 mt. including cost of all labour , materials Each 238 21,702 51,65,076.00
Analysis PHE Odisha) , S ,cariage ,royality, etc.complete.
No .1,Page 10
Rate Analysis as per
attached Annexure - B Construction of Air Valve Chamber of size 0.60 mt. x 0.60
14 (External Water Supply mt.x 1.10 mt. including cost of all labour , materials ,cariage 370 11,348 41,98,760.00
Analysis PHE Odisha) , S , royality, curing ,T & P etc.complete.
No .2,Page 10
Supply all materials & construction of Thrust Block where
15
required.
Up to 250mm Each 266 4,266 11,34,756
Above 350mm upto 450 mm Each 197 5,667 11,16,399
Above 450mm upto 900 mm Each 17 9,026 1,53,442
Total 74,92,64,805.10
Say Total 74,92,64,806

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Clear Water Rising Main Details
S.No. Dia (in mm) 100 150 200 250 300 350 400 450 500 600 700 750 800 900 1000

1 Part-A - 21,610 26,770 7,523 1,899 - 5,565 12,385 4,738 1,080 - - - - -

Length (in Mtr.)


Part-B 86 5,683 14,365 5,336 4,951 8,208 1,981 40,610 - - - - - - -

Part-C - 3,125 - - - - - - - - - - - - -

Baranga 3,885 4,402 - - - - - - - - - - - - -

Total 3,971 34,820 41,135 12,859 6,850 8,208 7,546 52,995 4,738 1,080 - - - - -

MaRS Planning Engineering Services Pvt. Ltd.


ELEVATED SERVICE RESERVOIR

MaRS Planning Engineering Services Pvt. Ltd.


Estimate of Elevated Service Reservoir & Sumps
Item No. SOR No. Description Unit Rate/Ltr. Qty.in Lit Amount
Attached Annexure - A ,( Non Schedule Item Rates Approved by Deptt vide Letter
No. 13828 Dated 16.09.2017 ),Page -26, S No. 5 & 6
Sumps
Above 10.0 lakh ltr.
Sump-A ltr. 4.02 37,70,000 1,51,55,400
Above 2.25 Upto 10.0 lakh ltr.
Sump-B ltr. 4.46 1,80,000 8,02,800
ESR Details
Staiging of ESR's Unit Rate Capacity
Banki Block
Elevated Storage Reservoirs
Above 1.0 lakh ltr.(Upto 20 mtr.Ht.)
ESR-2 20 1,30,000
ESR-3 20 4,50,000
ESR-4 20 2,30,000
ESR-5 20 1,80,000
ESR-6 20 3,50,000
ESR-7 20 4,20,000
ESR-8 20 3,90,000
ESR-9 20 4,70,000
ESR-10 20 3,70,000
ESR-11 20 5,90,000
Sub Total ltr. 21.43 35,80,000 7,67,19,400
Damapada Block
Elevated Storage Reservoirs
Above 1.0 lakh ltr.(Upto 20 mtr.Ht.)
ESR-2 20 2,90,000

MaRS Planning Engineering Services Pvt. Ltd.


ESR-3 20 3,00,000
ESR-5 20 3,00,000
ESR-6 20 3,10,000
ESR-7 20 3,00,000
ESR-8 20 2,70,000
ESR-9 20 2,90,000
ESR-10 20 7,20,000
ESR-13 20 2,50,000
ESR-14 20 4,10,000
ESR-15 20 2,70,000
ESR-16 20 3,50,000
ESR-17 20 3,90,000
ESR-12 20 3,10,000
Sub Total ltr. 21.43 47,60,000 10,20,06,800
Above 5.0 lakh ltr.(Upto 20 mtr.Ht.)
ESR-1 20 6,10,000
ESR-4 20 5,30,000
ESR-11 20 8,80,000
Sub Total ltr. 19.64 20,20,000 3,96,72,800
Baranga Block
Elevated Storage Reservoirs
Above 1.0 lakh ltr.(Upto 20 mtr.Ht.)
ESR-1 20 4,20,000
ESR-2 20 4,20,000
Sub Total ltr. 21.43 8,40,000 1,80,01,200
Total 25,23,58,400

MaRS Planning Engineering Services Pvt. Ltd.


Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


DISTRIBUTION SYSTEM

MaRS Planning Engineering Services Pvt. Ltd.


Estimate Of Distribution System
Item SOR No. Description Unit Dimensions Quantity Rate Amount
No. Nos Length width Height
1 2 3 4 5 6 7 8 9 10 11
Earth Work in excavation for laying of Different types
Rate Analysis as per attached
and size of pipes so as to give one meter average cover
Annexure - B (External Water
1 over the socket of pipe with disposal of excavated
Supply Analysis PHE Odisha)
earth within initial lead and lift as per direction of
Page -12 , S No. 1
Engineer in-charge.
100 mm dia cum - 0.50 1.05 -
150 mm dia cum - 0.60 1.175 -
200 mm dia cum 74,982 0.70 1.25 65,609.25
250 mm dia cum 14,932 0.70 1.30 13,588.12
300 mm dia cum 4,844 0.80 1.35 5,231.52
350 mm dia cum - 0.90 1.4 -
63 mm dia (HDPE) cum - 0.50 1.05 -
75 mm dia (HDPE) cum - 0.50 1.05 -
90 mm dia (HDPE) cum 3,58,002 0.50 1.05 1,87,951.05
110 mm dia (HDPE) cum 72,442 0.50 1.05 38,032.05
125 mm dia (HDPE) cum - 0.50 1.05 -
140 mm dia (HDPE) cum 19,186 0.60 1.175 13,526.13
160 mm dia (HDPE) cum 32,036 0.60 1.175 22,585.38
3,46,523.50
Add Extra for 5 % For Socket 0.05 17,326.18
3,63,849.68
70% for Ordinary soil Cum 70% 2,54,694.77 147.19 3,74,88,523.56
30% for Hard soil Cum 30% 1,09,154.90 195.27 2,13,14,677.81

Puuca Road ( Except black top only taken out material to


be used ) for cutting road as per requirement Assuming
3 Annexure A, Page -3 , S No. 22
40 of total road cutting.as well restoring the home as
per specification & direction E/I.

100 mm dia - 0.50 -


150 mm dia - 0.60 -
200 mm dia 74,982 0.70 52,487.40
250 mm dia 14,932 0.70 10,452.40
300 mm dia 4,844 0.80 3,875.20
350 mm dia - 0.90 -
63 mm dia (HDPE) - 0.50 -

MaRS Planning Engineering Services Pvt. Ltd.


75 mm dia (HDPE) - 0.50 -
90 mm dia (HDPE) 3,58,002 0.50 1,79,001.00
110 mm dia (HDPE) 72,442 0.50 36,221.00
125 mm dia (HDPE) - 0.50 -
140 mm dia (HDPE) 19,186 0.60 11,511.60
160 mm dia (HDPE) 32,036 0.60 19,221.60
3,12,770.20
Assuming 70 % of road cutting 0.7 312770.20 2,18,939.14
40 % Taken as Pucca Road Sqm 0.4 218939.14 87,575.66 584.80 5,12,14,243.63
Water bound Macadam road ( taken out material will be
4
used ) for cutting road as per reuirement .)
30 % of restoration work Sqm 0.3 218939.14 65,681.74 284.90 1,87,12,728.30
Rate Analysis as per attached
Dismantling and removing cement concrete including
Annexure - B (External Water
5 stacking the useful materials for reuse and removing the
Supply Analysis PHE Odisha)
debreis within 50 M lead.
Page -14 , S No. 13
30% of restoration work Cum 0.3 218939.14 0.15 9,852.26 527.70 51,99,038.29

Rate Analysis as per attached


Annexure - B (External Water
6 P.C.C.(1:2:4) In foundation using 12mm size h.g.c.b.chips
Supply Analysis PHE Odisha)
Page -15 & 16 , S No. 3

30 % of restoration work Cum 0.3 218939.14 0.15 9,852.26 6,524.03 6,42,76,448.29


Rate Analysis as per attached Earthwork in back filling the trenches after laying
Annexure - B (External Water different types and sizes of pipes with earth removed
7 Supply Analysis PHE Odisha) during excavation within initial lead and lift as per
Page -13 , S No. 10 direction of Engineer-in-Charge.
Taken as 80 % of total earth work Cum 0.8 363849.68 2,91,079.74 184.64 5,37,44,963.19

Supplying all materials, labour T&P for laying in trenches


centrically cast (spun) D.I pressure, socket & spigot
pipes Class-K9 & K7 without cement mortar lining ,
8 Attached pipe Rate confirming to IS.8329-2000 of the following nominal
diameter as per specification complete (Earth work in
excavation in trenches jointing of pipes & fittings to be
measured & paid separately).(HDPE Pipe rate for PN-6)

100 mm dia RMtr - 904.36 -


150 mm dia RMtr - 1,291.34 -
200 mm dia RMtr 74,982 1,625.64 12,18,93,738.48

MaRS Planning Engineering Services Pvt. Ltd.


250 mm dia RMtr 14,932 2,129.46 3,17,97,022.06
300 mm dia RMtr 4,844 2,686.86 1,30,15,149.84
350 mm dia RMtr - 3,253.12 -
63 mm dia (HDPE) RMtr - 65.61 -
75 mm dia (HDPE) RMtr - 93.81 -
90 mm dia (HDPE) RMtr 3,58,002 133.27 4,77,10,926.54
110 mm dia (HDPE) RMtr 72,442 201.83 1,46,20,968.86
125 mm dia (HDPE) RMtr - 257.88 -
140 mm dia (HDPE) RMtr 19,186 323.03 61,97,653.58
160 mm dia (HDPE) RMtr 32,036 423.65 1,35,72,051.40
Providing and supplying ISI standard D.I. specials for
D.I. pipes including ED,CST, all taxes etc complete as per
8a Attached pipe Rate KG 51,973 239.36 1,24,40,257.28
IS 9523 but excluding freight @ 5%.(incluiding C.P &
OHC.)
Attached Annexure - A , ( Non Schedule Item Rates Approved by Deptt vide Letter No.
8b
8611 Dated 06.06.2016 ),Page -2 , S No. 15
15 i DI - K7 Dia 100 (laying ) M - 23.74 -
15 ii DI - K7 Dia 150 (laying ) M - 33.99 -
15 iii DI - K7 Dia 200 (laying ) M 74,982 45.35 34,00,058.79
15 iv DI - K7 Dia 250 (laying ) M 14,932 59.88 8,94,128.16
15v DI - K7 Dia 300 (laying ) M 4,844 75.18 3,64,171.92
15v DI - K7 Dia 350 (laying ) M - 92.66 -
HDPE Dia 63 (laying ) M - 23.74 -
HDPE Dia 75 (laying ) M - 23.74 -
HDPE Dia 90 (laying ) M 3,58,002 23.74 84,98,967.48
HDPE Dia 110 (laying ) M 72,442 23.74 17,19,773.08
HDPE Dia 125 (laying ) M - 23.74 -
HDPE Dia 140 (laying ) M 19,186 23.74 4,55,475.64
HDPE Dia 160 (laying ) M 32,036 23.74 7,60,534.64
Attached Annexure - A , ( Non Schedule Item Rates Approved by Deptt vide Letter No.
9
8611 Dated 06.06.2016 ),Page -2 , S No. 17

17 i DI-K7 Dia 100 Length (tytan jointing ) (Length/5 M av.) nos. - 110.02
-

17 ii DI-K7 Dia 150 Length (tytan jointing ) (Length/5 M av.) nos. - 150.71
-

17 iii DI-K7 Dia 200 Length (tytan jointing ) (Length/5 M av.) nos. 14,996 179.44 26,90,882.24

MaRS Planning Engineering Services Pvt. Ltd.


17 iv DI-K7 Dia 250 Length (tytan jointing ) (Length/5 M av.) nos. 2,986 179.44 5,35,807.84

17v DI-K7 Dia 300 Length (tytan jointing ) (Length/5 M av.) nos. 969 189.58 1,83,703.02

17v DI-K7 Dia 350 Length (tytan jointing ) (Length/5 M av.) nos. - 264.07 -

Double Flanged Sluice valve (P.N.1.0) (with Wheel)


10 Annexure A,Page - 4 , S No. 28
(including 15% OH. & C.P.)
100 mm dia Each - 5,489.62 -
150 mm dia Each - 8,592.45 -
200 mm dia Each 76 12,917.97 9,81,765.85
250 mm dia Each 16 19,788.68 3,16,618.87
300 mm dia Each 6 25,912.97 1,55,477.83
350 mm dia Each - 49,180.94 -
63 mm dia (HDPE) Each - 1,890.50 -
75 mm dia (HDPE) Each - 2,350.20 -
90 mm dia (HDPE) Each 360 3,460.80 12,45,888.00
110 mm dia (HDPE) Each 74 3,460.80 2,56,099.20
125 mm dia (HDPE) Each 1 3,460.80 3,460.80
140 mm dia (HDPE) Each 21 3,460.80 72,676.80
160 mm dia (HDPE) Each 34 3,460.80 1,17,667.20
Providing and fixing CI Scour /sluice valve ( with Cap )
11 Annexure A,Page - 4 , S No. 28 complete with bolts,nut,rubber insertions etc.( the tail
pipe if required will be paid separately ).PN-1.

100 mm dia Each 116 5,489.62 6,36,796.23

Providing ,installing and giving satisfaction field testing


of flanged ends Bulk water meter of following type and
as mentioned below in (a) and (b) with FGI -250 cast
Attached Annexure - C ,Page 1
iron body ,class "B" confirming to I.S 2373 or as per ISO
12 ( MJP E & M SOR-Section B (a)iii
4064 , marked to read in metric system , along with
)
manufacturer,s test and guarantee certificate including
cost of all material with ISI mark or EEC mark (Enclosed
type as per IS 2373)

100 mm dia Each 30 10,007 3,00,210.00


Fitting & Fixing cast iron sluice valve (PN -1.0)with
double flanged end for water works purpose of the
13 Annexure A,Page - 3 , S No. 28 following rating & nominal diameter excluding the cost
of C.I. sluice valve but including cost of nut & bolts &
rubber insertion. Etc.

MaRS Planning Engineering Services Pvt. Ltd.


Sluice valve
i 100 mm dia Each - 706.70 -
ii 150 mm dia Each - 1,096.10 -
iii 200 mm dia Each 76 1,271.22 96,612.72
iv 250 mm dia Each 16 1,867.09 29,873.44
v 300 mm dia Each 6 2,067.29 12,403.74
v 350 mm dia Each - 2,397.29 -
63 mm dia (HDPE) Each - 706.70 -
75 mm dia (HDPE) Each - 706.70 -
90 mm dia (HDPE) Each 360 706.70 2,54,412.00
110 mm dia (HDPE) Each 74 706.70 52,295.80
125 mm dia (HDPE) Each 1 706.70 706.70
140 mm dia (HDPE) Each 21 706.70 14,840.70
160 mm dia (HDPE) Each 34 706.70 24,027.80
Scour Valve Each
100 mm dia Each 116 706.70 81,977.20

Rate Analysis as per attached


Construction of Sluice Valve Chamber of size 0.90 mt. x
Annexure-B (External Water
14 0.90 mt.x 1.50 mt.including cost of all labour , materials Each 604 21,654 1,30,79,016.00
Supply Analysis PHE Odisha),S
,cariage ,royality, etc.complete.
No .1,Page 10
Carrage of Materials
Cement 3,192.20 47.00 1,50,033.40
Sand 4,433.60 367.84 16,30,855.42
Chips 8,867.10 439.18 38,94,252.98
Total 55,61,09,862.60
Say Total 55,61,09,863

Junior Engineer Assistant Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


Annexure add(C.P+OH
Dia of Pipe Type of pipe deduction add final Rate
Rate C)
786.40 100 D.I-K7 0% 0% 15% 904.36
1122.90 150 D.I-K7 0% 0% 15% 1291.34
1413.60 200 D.I-K7 0% 0% 15% 1625.64
1851.70 250 D.I-K7 0% 0% 15% 2129.46
2336.40 300 D.I-K7 0% 0% 15% 2686.86
2828.80 350 D.I-K7 0% 0% 15% 3253.12
3387.30 400 D.I-K7 0% 0% 15% 3895.40
4047.50 450 D.I-K7 0% 0% 15% 4654.63
4788.10 500 D.I-K7 0% 0% 15% 5506.32
6219.50 600 D.I-K7 0% 0% 15% 7152.43
Annexure add(C.P+OH
Dia of Pipe Type of pipe deduction add final Rate
Rate C)
892.40 100 D.I-K9 0% 0% 15% 1026.26
1293.20 150 D.I-K9 0% 0% 15% 1487.18
1663.60 200 D.I-K9 0% 0% 15% 1913.14
2216.10 250 D.I-K9 0% 0% 15% 2548.52
2804.20 300 D.I-K9 0% 0% 15% 3224.83
3428.80 350 D.I-K9 0% 0% 15% 3943.12
4092.40 400 D.I-K9 0% 0% 15% 4706.26
4848.30 450 D.I-K9 0% 0% 15% 5575.55
5718.60 500 D.I-K9 0% 0% 15% 6576.39
7353.40 600 D.I-K9 0% 0% 15% 8456.41
9694.90 700 D.I-K9 0% 0% 15% 11149.14
12015.30 800 D.I-K9 0% 0% 15% 13817.60
15259.43 900 D.I-K9 0% 0% 15% 17548.34
19379.48 1000 D.I-K9 0% 0% 15% 22286.40
D.I Specials
Annexure add(C.P+OH
deduction add
Rate C)
187 15% 28% 15% 239.36
Calculation of Rate per meter of Different sixes of Marked HDPE pipes as per I.S:4984/2016 (with Ammendent No-1 to5)
Material Grade PE-100 98.87 Rupees One Hundred & Two - Paise Twenty Two Only
Pressure rating PN.4 Pressure rating PN.6 Pressure rating PN.8 Pressure rating PN.10
Pipe Contractor
Carriage @ Total Weight per
S.No. Diameter Weight per Amonunt Weight per Amonunt Profit Amonunt Weight per Amonunt
7.50% Amount Meter (in
(in mm) Meter (in KG.) (Rs.) Meter (in KG.) (Rs.) 7.50% (Rs.) Meter (in KG.) (Rs.)
KG.)
1 63 0.491 48.55 0.577 57.05 4.28 4.28 65.61 0.874 86.42 1.054 104.21
2 75 0.671 66.35 0.825 81.57 6.12 6.12 93.81 1.237 122.31 1.488 147.12
3 90 0.974 96.30 1.172 115.88 8.69 8.69 133.27 1.772 175.20 2.119 209.51
4 110 1.445 142.87 1.775 175.50 13.16 13.16 201.83 2.612 258.25 3.159 312.34
5 125 1.841 182.02 2.268 224.24 16.82 16.82 257.88 3.367 332.90 4.098 405.17
6 140 2.305 227.90 2.841 280.89 21.07 21.07 323.03 4.219 417.14 5.142 508.39
7 160 3.026 299.19 3.726 368.39 27.63 27.63 423.65 5.530 546.76 6.704 662.83
8 180 3.845 380.16 4.682 462.91 34.72 34.72 532.35 6.996 691.70 8.452 835.65
9 200 4.707 465.39 5.800 573.45 43.01 43.01 659.47 8.608 851.08 10.425 1,030.72
Material Consumption Statement-1
Stone Stone Chips
Sl.No Item Unit Cement Sand Bricks Quantity Cement (M3) Sand ( M3) Bricks (Nos)
chips (M3)
1 Sand cum 0 1 0 0 0.000 0 0.000 0 0
2 P.C.C. 1:4:8 cum 0.120 0.480 0.960 — 0.000 0.000 0.000 0.000 —
3 P.C.C. (1:3:6) cum 0.156 0.470 0.940 — 0.000 0.000 0.000 0.000 —
4 R.C.C. (1:2:4) cum 0.225 0.450 0.900 — 9852.261 2216.759 4433.518 8867.035 —
5 R.C.C. (1:1½:3) cum 0.286 0.430 0.860 — 0.000 0.000 0.000 0.000 —
6 R.C.C. (1:1:2)m25 cum 0.293 0.425 0.858 0.000 0.000 0.000 0.000
7 m30 0.299 0.420 0.857 0.000 0.000 0.000 0.000
8 B/w (1:3) cum 0.100 0.300 — 406 0.000 0.000 0.000 — 0
9 B/w (1:4) cum 0.080 0.320 — 406 0.000 0.000 0.000 — 0
10 B/w (1:6) cum 0.057 0.340 — 406 0.000 0.000 0.000 — 0
11 B/w (1:8) cum 0.044 0.360 — 406 0.000 0.000 0.000 — 0
12 6 mm C.P. (1:4) sqm 0.0018 0.0075 — — 0.000 0.000 0.000 —
13 12mm C.P. (1:3) sqm 0.0045 0.014 — — 0.000 0.000 0.000 —
14 12mm C.P. (1:4) sqm 0.0036 0.0146 — — 0.000 0.000 0.000 —
15 12mm C.P. (1:6) sqm 0.0026 0.0156 — — 0.000 0.000 0.000 —
16 12mm C.P. (1:8) sqm 0.0020 0.017 — — 0.000 0.000 0.000 —
19mm C.P. (1:3)
17 sqm 0.0069 0.015 — — 0.000 0.000 0.000 —
water proof
Cement flush
18 sqm 0.0015 0.0045 — — 0.000 0.000 0.000 —
pointing (1:3)
1.5 mm neat cement
19 sqm 0.0015 — — — 0.000 0.000 — —
punning
20 Brick on edge soling sqm 0.03 — 54 0.000 — 0.000 — 0
Brick on edge
21 sqm 0.011 0.044 — 54 0.000 0.000 0.000 — 0
soling(1:4)
22 Brick flat soling sqm 0.015 — 32.5 0.000 — 0.000 — 0
23 50 mm floring sqm 0.0122 0.023 0.0456 — 0.000 0.000 0.000 0.000
24 25 mm floring sqm 0.0076 0.009 0.0232 — 0.000 0.000 0.000 0.000
Dri rammed khoa 150
25 sqm 0.0010 0.038 0 152 0.000 0.000 0.000 — 0
mm thick
63 mm Chhajja
26 sqm 0.0180 0.027 0.0542 0.000 0.000 0.000 0.000 0
1:1.5:3
27 25 mm D P C 1:1.5:3 sqm 0.007 0.011 0.0215 0.000 0.000 0.000 0.000 0

28 63 mm Chhajja 1:2:4 sqm 0.0142 0.0284 0.0567 0.000 0.000 0.000 0.000 0
29 25 mm D P C 1:2:4 sqm 0.006 0.011 0.023 0.000 0.000 0.000 0.000 0
30 Dain 250mm wide pm 0.021 0.093 0.0530 67 0.000 0.000 0.000 0.000 0
31 Dain 150mm wide pm 0.011 0.045 0.0290 29 0.000 0.000 0.000 0.000 0
Total Qty — 2216.759 4433.518 8867.035 0.00
Bags 65198.79 X1440 Cement in KG — 3192132.661
Cement
1440 kg/m3 Cement in MT— 3192.13
MS rod Kg 0.000
MS rod MT 0.000
Total MT 3192.133
say 3192.20 4433.600 8867.100 0.000
STAFF QUARTER

MaRS Planning Engineering Services Pvt. Ltd.


Staff Quarter
Sno SOR NO Description Unit Quantity Rate Amount
Earth work in excavation of foundation in all kinds of soil within initial lead&lift
R.A.2018
1
(A) For 250 mm thick wall
Room L/W (4 X4.6=18.4)
S/W (4X3.1) =12.4)
(4X0.225 =0.90)
Kitchen L/W ( 4X2.65 =10.6)
S/W (2X1.3)=2.6)
Varandh (2 X1.425 =2.850)
Passage (2X1.5750 =3.15)
Total Quantity (1 X 50.9 X0.750 X0.900=34.3575)
(B)For 125 mm thick wall
Court yard side wall (2 X3.2125=6.425)
Portion wall (1X5.95=5.95)
Rear Wall (1X9.8=9.8)
Laboratory L/W (2 X 1.325=2.65)
S/W (2X0.4=0.8)
Open bath L/W (2 X 1.625 = 3.250)
S/W (2X0.812 =1.632)
Total Quantity (30.507X0.625X0.900 = 17.1601)
(C) Columns 300 mm x 300 mm
24 Nos.
1.944
(D) Columns 200 mm x 200 mm
8 Nos.
0.576
Cum 54.030 147.19 7952.68
Providing ,coarse clean sand in filling in foudation trenches /in Plinth including
ramming & watering in layers not exceeding 150 mm thick with all leads lift
R.A.2018
including cost of all materilas ,labour , royalty & taxes all complete as per building
2 specification & direction Of E/I
For 250 mm thick wall Foundation (50.9 X 0.75 X0.075)

MaRS Planning Engineering Services Pvt. Ltd.


For 125 mm thick wall Foundation (30.50X 0.625 X0.075) Cum 4.293 512.04 2,198.19
For Columns 300 x 300 mm Cum 0.162 512.04 82.95
For Columns 200 x 200 mm Cum 0.048 512.04 24.58
Providing designation 75 A one brick flat soiling joints filled with local sand including
cost of watering taxes royalty all complete as per building specification & direction of
3 E/I
For 250 mm thick wall Foundation (50.9 X 0.75 )=38.175
For 125 mm thick wall Foundation (30.50X 0.625 )=19.063 Sqm 57.237 272.21 15,580.37
Cement Concrete(1:3:6)) in foundation using 40mm size C.B.H.G.metal
R.A.2018
4
For 250 mm thick wall foundation (50.9X0.75X 0.15) =5.726
For 125 mm thick wall foundation (30.50 X 0.625 X0.15)=2.859 Cum 8.585 4,514.82 38,759.73
Providing designation 75 A brick work in C.M. (1:6) in foundation 7 Plinth with
approved quality of clean coarse sand of F.M 2 to 2.5 including Providing 10 mm
thick mortar joints ,Cost of screening , materials , Scaffolding , raking out joints to 15
mm depth curing , taxes & royalty all complete as per building specification &
5 direction of E/I
(i) First footing
(A) For 250 mm thick wall foundation
Room L/W (4X4.475 =17.9)
S/W (4X3.225)=12.9
(4X0.288= 1.152)
Kitchen L/W ( 4X2.65 =10.6)
S/W (2X1.425=2.85)
Varandh (2 X1.613 =3.226)
Passage (2X1.7=3.4)
Total Quantity (52.028X0.625X0.300= 9.7552)
(B) For 125 mm thick wall foundation
Court yard side wall (2X3.4625= 6.925)
Portion wall (1X6.0375 =6.0375 )
Rear wall (1X9.975 =9.975)
Laboratory L/W (2 X 1.325=2.65)
S/W (2X0.575=1.150)
Open Bath L/W (2X1.625= 3.250)
S/W (2X 0.987 =1.974)

MaRS Planning Engineering Services Pvt. Ltd.


Total Quantity (31.9615 X 0.500X 0.300 =4.794)
(ii) Second footing
(A) For 250 mm thick wall foundation
Room L/W (4X4.35 =17.4)
S/W (4 X3.35 =13.4)
(4 X0.35 =1.4)
Kitchen L/W ( 4X2.65 =10.6)
Kitchen S/W ( 4X1.55=6.2)
Varandh S/W (2X1.675 =3.350 )
Passage (2 X 1.825 =3.650)
Total Quantity (56.00X0.5 X0.3 = 8.4)
(B) For 125 mm thick wall up to GL
Court yard side wall (2X3.4875 =6.975)
Partition wall (1 X 6.1375 =6.1375)
Rear wall (1X10.175 =10.175)
Laboratory L/W (2X 1.325=2.650)
S/W (2 X0.775 =1.550)
Open Bath L/W (2 X 1.625 =3.250)
S/W (2X1.187 =2.374)
Total Quantity (33.115X 0.375X0.3 =3.7250)
(iii) Plinth
(A) For 250 mm thick wall
Room L/W (4X 4.225=16.9)
S/W (4 X3.475 =13.9)
(4X0.413 = 1.652)
Kitchen L/W (4X2.65 =10.6)
S/W (2 X1.8 =3.6)
varandh (2X1.738=3.476)
Passage (2X1.95=3.9)
Total Quantity (54.028 X 0.375 X 0.450 =9.117)
(B) For 125 mm thick wall up to PL
Court yard side wall (1X6.1375 =6.1375)
Rear wall (1X 10.175 =10.175)
Laboratory L/W (2 X1.325 =2.650)
S/W (2 X0.775 =1.550)

MaRS Planning Engineering Services Pvt. Ltd.


Open bath L/W (2 X 1.625 =3.250)
S/W (2X 1.187 =2.734)
Total Quantity (33.115X0.25X0.15=1.2416) Cum 37.033 3914.39 144961.60
Providing 25 mm thick damp proof coarse with cement concrete M-150 with
nominal mix of (1:2:4) with approved quality of stone chips of 20 mm to 6 mm size
graded and clean coarse sand of F.M 2.5 to3 including screening , shuttering mixing
R.A.2018 cement concrete in mixer with 5% cico or any other approved water proffing
compound and placing in position , vibrating , striing , curing , taxes & royalty all
complete as per building specification & direction of E/I
6
For 250 mm thick wall (54.028 X 0.375)
For 125 mm thick wall (33.115 X0.25) Sqm 28.539 316.29 9026.73
.B.Brick masonry in C.M.( 1:6 ) in Super structure using K.B.Brick of 25cm.x 12cm.x
R.A.2018
7 8cm.size and having crushing strength not less than 95kg / sqcm.
(A) For 250 mm thick wall
Room L/W (4 X4.1 =16.4)
S/W (4 X 3.6 =14.4)
(4X0.6 =2.4)
Kitchen L/W ( 4X2.65 =10.6)
S/W (2 X 1.8 =3.6)
Varandh (2 X1.8 =3.6)
Passage (1 X2.075 =2.075)
Total Quantity (53.075 X 0.25X3=39.8062)
(B) For 125 mm thick wall
Court yard side wall (2X3.55X7.1)
Portion Wall (1 X 6.325 =6.325)
Rear wall (1X10.425=10.425)
Laboratory L/W (2X1.325 =2.650)
S/W (2X0.9 =1.8)
Open bath L/W ( 2 X 1.625=3.250)
S/W (2 X 1.313 =2.626)
Total Quantity (34.176 X 0.125 X2.25 =9.612)
( C ) Extra B/W for Pillar
(3.5 X 0.25 X0.25 X 2.25 =0.4921)
Total Quntity (39.8062+9.6117+0.4921 =49.91)

MaRS Planning Engineering Services Pvt. Ltd.


Deduction
Door & Windows
D6 No.(6X 1.95 X1.05X0.25=3.071)
D1 to D2 No (4 X 1.95 X0.75X0.125 =0.731)
W6 No (6X 1.2X0.9X.25=1.62)
W1 to W2 No (2 X0.9X0.6X0.25 =0.27)
For Lintel
D (6X1.55X0.15X0.25=0.349)
D1 (2 X1.4 X0.15 X0.25 =0.105)
D2 (4 X 1.25 X0.15 X0.125=0.0938)
Grill Gate ( 2 X 1.55X 0.15X0.25=0.11625)
W (6X 1.4 X0.15X0.25=0.315)
W1 (2X 1.1 X0.15X0.25= 0.0825)
RCC Jali (4 X0.3X 0.3X0.25=0.09)
For Ventilation (2 X 0.3 X0.3X.125=0.0225)
(2 X1.95X1.05X0.25=1.023)
Total Deduction= 8.7675
Total Quantity (49.9102 -8.7675 = 41.1427) 41.142 3581.78 147361.59
Providing R.C.C M-150 with nominal mix of (1:2:4) in lintel level with approved
quality of stone chips 20 mm to 6mm size graded & clean coarse sand of F.M 2.5 to
including making drip course in concreteing , screening , concreting shuttering and
mixing cement concrete in mixer & placing in position vibrating striking excluding
the cost of reinforcement ) taxes & royalty all complete as per building specification
8 of (E/I.
Lintel beam (1X 54.028X 0.25X 0.15 =2.026 )
(1X33.115 X 0.125 X 0.15 =0.6208)
Shelves ( 2X 1.7 X0.25X0.15= 0.128)
Gate (2 X 1.55 X0.25X0.15 = 0.116) Cum 2.891 5832.84 16862.74

MaRS Planning Engineering Services Pvt. Ltd.


Providing average 63 mm thick R.C.C M -150 with nominal mix (1:2:4) chajja in
shelves with approved quality of stone chips 20 mm to 6 mm size graded & clean
coarse sand of F.M 2.5 to 3 including making drip course in concrete , screening ,
centering shuttering & mixing cement concrete in mixer & placing in position
vibrating ,striking ,6 mm cement plaster (1:4) in celling & sides of chajja with sand of
F.M 1.5, Curing ( But excluding the cost of reinforcement ) taxes and royalty all
complete as per building specification of E/I
9
Chajja Over
W (6X1.125 X0.45=3.0375)

W1 (2X1.4X0.45=1.26)
D (4X1.3X0.45=2.34)
Shelves in kitchen (2X3.75X0.575=4.3125)
Shelves in room (10 X1.4X0.575=8.05) Sqm 19.001 1103.545 20968.46
Providing R.C.C M-200 with nominal mix of (1:1.5:3) in roof slab with approved
quality of stone chips 20 mm to 6 mm size Graded & Clean coarse sand F.M 2.5 to
including screening , shuttering ,mixing cement concrete in mixer & placing in
10 R.A.2018
position , vibrating ,striking, curing (but excluding the cost of reinforcement) taxes &
royalty all complete as per building Specification & direction of the E/I

Room (2X4.1X4.1X0.1=3.362)
Kitchen (2X2.65 X2.3X0.1=1.219)
Varandh (1X5.95X1.975X0.1)=1.1751)
Lavatory (1X2.775X1.15X0.1=0.3191) Cum 6.075 5361.87 32573.36
Providing R.C.C M-200 with nominal mix of (1:1.5:3) in plinth level with approved
quality of stone chips 20 mm to 6 mm size Graded & Clean coarse sand F.M 2.5 to
including screening , shuttering ,mixing cement concrete in mixer & placing in
10 R.A.2018
position , vibrating ,striking, curing (but excluding the cost of reinforcement) taxes &
royalty all complete as per building Specification & direction of the E/I

Cum 2.891 5361.87 15501.17

MaRS Planning Engineering Services Pvt. Ltd.


Providing R.C.C M-300 with in columns level with approved quality of stone chips 20
mm to 6 mm size Graded & Clean coarse sand F.M 2.5 to including screening ,
shuttering ,mixing cement concrete in mixer & placing in position , vibrating ,striking,
10 R.A.2018
curing (but excluding the cost of reinforcement) taxes & royalty all complete as per
building Specification & direction of the E/I

Cum 12.964 5794.44 75119.12


Dressed seasoned sal wood work in Choukath including cost of all labour, materials,
R.A.2018
11 T&P etc.complete.
D (6X4.95X0.1X0.075=0.22275)
D1 (2X4.8X0.1X0.075= 0.072)
D2(4X4.65X0.1X0.075=0.1395)
W (6X4.2X0.1X0.075=.1890)
W1 (2X3X0.1X0.075=0.045) Cum 0.669 52043.81 34817.31
Supplying fitting and fixing 250X20X6 mm L-type M.S Clamp properly fish tailed
.including making holes and setting the same in 375 X125X75 mm cement concrete
block (1:2:4) with cost of all labour and materials and taxes as per building
specification and diection of E/I @6 for each door & 4 for each window Total
12 Quantity -(2X3X6+2X4X4)=68 nos
For 6 No Doors @ for each Door (6X6)
For 8 No Window @ 4 for each windows (8X4) 104 65.86 6849.44
38 mm.thick piasal wood pannel shutter of 38mm style and 22m .to 25mm. thick
pannel plank complete iron fittings and wooden hinged cleats windows including all
R.A.2018
labour charges but excluding the cost of the iron fittings.
13
D (6X1.95X1.05=12.285)
D1 (2X1.95X0.9=3.51)

D2 (4X1.95X0.75=5.85)
W (6X 1.2X0.9 =6.48)
W1 (2X0.9X0.6 =1.08) Sqm 29.205 4059.03 118543.97

MaRS Planning Engineering Services Pvt. Ltd.


Supplying , fittings & fixing M.S /Gril made of 20X6 mm M.S flat as per approved
design & drawing properly fabricated with joints continous filllet welded and
finshed smooth , carriage of grill to work site hoisting as per the building
14 specification and direction of E/I ( where materials is not supplied by the Deptt .)
@ 40 Kg/ sqm (40X7.56 M2) Per Kg 302.400 74.12 22413.89

Providing 25 mm thick pre cast R.C.C M-150 with nominal mix of (1:2:4) in jali with
approved quality to stone chips of 6mm nominal size and clean coarse sand of FM
2.5 to 3 with 1.6 mm thick M.S wire as per approved design and drawing and placing
the same in position true to plumb and level and properly grouted with cement
mortar (1:3) including cost of curing , Scaffolding and finishing all complete as per
15 building specification and direction E/I
In room (4 X0.3X0.3 =0.36)
In laboratory (2X 0.3X 0.3=1.8) Sqm 0.540 244.164 131.85

Providing and fixing fan hook of 16 mm dia M.S bar 1 meter long bent to reqired size
and shape placed in position and fixing in R.C.C slab/beam at the time of casting all
16 complete as per building specification of E/I where material is not supplied by cheet
In room 2 No
In Varandh 2 No Each 4.000 115.61 462.44
Supplying all materials, labour T&P and fixing of fabricated M.S door, windows & grill
R.A.2018
17 in wall
Grill Gate per Sqm (2X1.05X1.95X4.095) Sqm 4.095 437.12 1790.01
6mm thick C.P.(1:4) to RCC surface finished smooth including closed deep chiping and
R.A.2018
18 slury treatment.
Room (2X 3.6X 3= 21.6)
(2X 0.6 X 2.75=3.3)
Kithchen (2 X 2.4X1.8=8.64)
Varandh (2 X2.85X1.73=9.861)
Laboratory (2X1.2X0.9 =2.16) Sqm 45.561 120.06 5470.05
R.A.2018
19 12mm.thick C.P.(1:6) to outer brick wall surface including curing etc.complete.
In Slide Plaster
Room

MaRS Planning Engineering Services Pvt. Ltd.


L/ W(4X3.6=14.4)
S/W (4X3 =12.0)
(4X0.6=2.4)
Kitchen L/W (4X2.4 =9.6)
S/W (4X1.8 =7.2)
Varandh (4 X1.725 =6.9)
(4X2.85 =11.4)
Total Quantity (63.9X 3 =191.7)
Laboratory L/W & open bath
Laboratory L/W (4X1.2 =4.8)
S/W (4X0.9 =3.6)
Open bath L/W (4 X1.5 =6.0)
S/W (4 X1.312 =5.248)
Total Qunatity (19.684 X 2.25 = 44.208)
Total of A = 191.7 +44.208 =235.908
(B) Outside Plaster
Room & Kitchen
(2 X6.788 =13.576)
(1X10.425 =10.425)
(4X0.6 =2.4)
(2X3.85 =7.7)
(1X10.425 =10.425)
(2X0.6=1.2)
Total Quantity (45.726 X3 =131.178)
Court yard & Open bath
(4 X3.55 =14.2)
(2X10.425 =20.85)
(2X2.65 =5.3)
Partition wall (2X3.55 =7.1)
Total Qunatity (47.45 X 2.25 =106.7625)
Total of B = 137.178 +106.763=243.941
(c ) Deduction
D to 6 no ( 6X 1.95 X1.05 =12.285)
D1 to 2 no (2 X1.95X0.9 =6.48)
W to 6 no (2X1.95 X0.9 =3.51)

MaRS Planning Engineering Services Pvt. Ltd.


W1 to 2 no (2 X0.9X0.6 =1.08)
Grill gate (2X1.95 X1.05 =4.095)
RCC Jali (6X0.3X0.3 =0.54)
Total Deduction (33.84)
Net Plaster Work (A+B+C=435.659) Sqm 446.008 135.65 60500.99

20 R.A.2018 12mm thick C.P. ( 1:3 ) on brick work including cost of materials
Plinth (2 X 10.313 X0.6 =12.3756)
(4X 10.425 X0.6 =25.02)
(4X0.6X0.6 =1.44)
Dado in room (8X3.6X0.15=4.32)

Kitchen (2X2.4X0.15=0.72)
(2X1.8X0.15 =0.54)
Varandh (4X 1.725X0.15=1.035)
(4X2.85X0.15 =1.71)
Laboratory (4X0.9X0.15 =0.54)
(4X1.2X0.15 =0.72 )
Open Bath (4 X1.5 X0.15 =0.90)
(4 X1.312 X0.15 =0.7872) Sqm 50.108 158.36 7935.10
Providing average 115 mm thick lime tracing (24 lime :36 shurki :100 brick khoa )
well beaten and compacted including maintaing proper level & slope ,making ghundi
with finishing treatment ,cost of carriage , curing ,royalty & taxes all complete as per
21 specification & direction Of E/I
Room (2 X4.1 X 4.1 =33.62)
Kitchen (2 X 2.65 X2.3 =12.19)
Varandh (1 X5.95 X1.98 =11.751)
Laboratory (1 X 2.755 X1.15 =3.168) Sqm 60.759 633.63 38498.73
Filling foundation & plinth with excavated earth materials including watering and
R.A.2018
22 ramming(2/3rd rate of respective item)
In foundation trenches 20 % of earth work quantity Item no1
Room (2 X 3.6 X3X0.325 =7.020)
(2x0.85X0.6x0.325 =0.332)
Kitchen (2 X2.4 X 1.8 X0.325=2.808)
Varandh (2 X2.85X1.725X0.325 =3.196)

MaRS Planning Engineering Services Pvt. Ltd.


Open Bath (2X1.5X1.132X0.325=1.279)
Laboratary (2 X1.2X2.325X0.325 =0.702)
Passage (1 X3.6X2.325X0.325 =2.72)
Court Yard (2X 3.9X3.6 X0.075 =2.106)
(2X1.5X1.312X0.075=0.295 )
Less (2 X 1.8 X0.6X 0.075 =0.162) Sqm 30.599 184.64 5649.80
2.5 cm. thick A.S.flooring (1:2:4) using 12mm.size H.G.C.B .chips.
R.A.2018
23
Room (2 X3.6X3 =21.6)
(2X1.3X0.6 =1.56)
Kitchen (2 X2.4X1.8 =8.64)

Varandh (2 X 2.85 X1.725 =9.833 )


Laboratory (2X1.2X0.9 =2.16)
Open bath (2X1.5X1.31=3.93) 47.723 239.55 11432.04
Providing designation 75 A one brick on edge flooring in C.M (1:4)with top surface
flush approved quality of clean coarse sand of F.M 2 to 2.5 including the cost of
screening ,raking out joints to 15 mm depth , curing taxes,royalty all complete as
24 per building specification and direction (E/I)
Court yard (2X3.9X3.6 =28.08)
(2X1.5X1.312=3.936)
Less Kitchen Projection (2X1.8X0.6 =2.16)
Passage (1X 3.6X 2.325 =8.370) Sqm 38.226 590.81 22584.23
White washing three coats with shell lime including cost of all Labour & materials.
R.A.2018
25
Chhajja as per item 9
Quantity as per item 18
Quantity as per item no 19A
Less 50% of item 18 (c ) Sqm 273.171 15.70 4288.78
Colour washing 2 coats over a coat of white washing for new work.
R.A.2018
26
Quantity as per item no 18 (B)
Less 50% of item 18(C ) Sqm 227.021 19.62 4454.15
Painting 2 coats with approved Enamel paint inluding cost of paint
R.A.2018
27
Quantity as per item no 13X 2.25 i.e (29.205 X2.25) Sqm 65.711 124.78 8199.42

MaRS Planning Engineering Services Pvt. Ltd.


Priming 1 coat with any approved primer including cost of primer
R.A.2018
28
(As per item no 14+17 ) 2X (7.56+4.10) Sqm 23.320 39.12 912.28
Painting Two coats with Aluminium paint on Iron work
R.A.2018
29
(As per item no 29) Sqm 23.320 162.25 3783.67
Providing for steel reinforced as per approved design and drawing excluding carriage
of tor rod to work site including cutting bending and binding with annealed wire with
R.A.2018 cost of wire with cost of wore removal of rust placing the rods in position all
complete as per building specification and direction of E/I @ 1.2% ( JH-SOR Item
30 No.5.5.5 a)
Lintel (2.891)
Roof slab (6.075)
Chajja & Shelves (1.197)
Total RCC work (2.89+6.075+1.197=10.163)
Quantity of MS Tor Rod (10.163 X1.2 %X7.85 =0.957 per mt 0.957 51811.71 49583.81
Sub Total 935275.21
31 12 % for water supply and sanitation work 935275.21 112233.03
32 10 % for Internal electrification. 935275.21 93527.52
Carriage of material from divisional store are kiln side or quality side to work
including contractor profit loading ,unloading transportation are complete @ 935275.21 93527.52
33 10%.(To be deducted in B.O.Q item vised)
Total 1234563.28
Say Total 12,34,564

Junior Engineer Asst. Executive Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.


BOUNDARY WALL

MaRS Planning Engineering Services Pvt. Ltd.


SUB ESTIMATE OF COMPOUND WALL
Abstract
S.N SOR NO Description Qty. Unit Rate (Rs) Amount (Rs)
Earth work in excavation of foundation in Ordinary soil
1 R.A.2018 within initial lead & lift

For Stiffener - 2x1.20x1.20x1.05 81.77 m3 147.19 12,035.73


2 Filling in foundation&plinth with sand including
R.A.2018 watering &ramming Qty.= 100 x 0.75x 0.10=7.50 m3

For Stiffener-2x1.20x1.20x0.10 = 0.288 M3 7.788 m3 184.64 1,437.98


3 Providing designation of 75A one brick flat soling, joints
filled with local sand including cost of watering, taxes
royalty all complete as per building specification and
direction of E/I. Qnty= 100 x 0.75= 75.00 m2

For stiffiner - 2x1.20x1.20 = 2.88 M2 77.88 m2 272.21 21,199.56


4 Cement Concrete(1:3:6)) in foundation using 40mm
size C.B.H.G.metal
R.A.2018 Qnty in Foundation: 100 x 0.75x 0.125= 9.38 m3

For Stiffiner -2x1.20x1.20x0.125 =0.36M3 9.74 m3 4514.82 43,974.35


K.B.Brick masonry in C.M.( 1:6 ) in F&P using K.B.Brick
of 25cm.x 12cm.x 8cm.
size and having crushing strength not less than 95kg /
5 R.A.2018 sqc. Qnty.=Step -1 100 x 0.50 x 0.30 = 15.00 m3
Step -2 100 x 0.375 x 0.45 = 16.88 m3 Step -3
100 x 0.25 x 0.30 = 7.50 m3 Total = 39.38 m3

39.38 m3 3914.39 1,54,148.68


Providing 25 mm thick damp proof course with cement
concrete M - 150 with norminal mix of (1:2:4) with
approved quality of stone chips of 20 mm to 6 mm size
graded and clean coarse sand of F M 2.5 to 3 including
screening , shuttering , and mixing cement concrete in
6 mixer with 5% cico or any other approved water
proffing compound and placing in position striking ,
curing , taxes and royalty all complete , as per building
specification and direction of E/I. 25mm DPC -
100 x 0.25 x = 25.00 m2
25.00 M2 316.29 7,907.36
7 K.B.Brick masonry in C.M.( 1:6 ) in Super structure using
K.B.Brick of 25cm.x 12cm.x 8cm.size and having
crushing strength not less than 95kg / sqcm Qnty.
R.A.2018 Wall - 95.50x0.125x1.50= 18.09 Additional for
Pillars 34(0.25-0.125)x0.25x1.50=1.59m3 Total =
19.68 m3
19.68 m3 3934.12 77,423.48
8 Providing R.C.C. M-150 with nominal mix of (1:2:4) in
band at lintal level with approved quality of stone chips
20 mm to 6 mm size gaded and clean course sand of
F.M 2.5 to 3 including screening, shuttering, mixing,
R.A.2018 cement concrete in striking,curing(but excluding the
cost of reniforcement, taxes and royalty all complete as
per building specifiction and direction of E/I.

Qnty.in coping above wall (96.50x0.25xx0.075 3


1.80 M 4792.90 8,627.22
9 Providing R.C.C. M-150 with nominal mix of (1:2:4) in
band at lintal level with approved quality of stone chips
20 mm to 6 mm size gaded and clean course sand of
F.M 2.5 to 3 including screening, shuttering, mixing,
R.A.2018
cement concrete in striking,curing(but excluding the
cost of reniforcement, taxes and royalty all complete as
per building specifiction and direction of E/I.

Qty. =2x1.20x1.20x0.15 =0.432 M3


3
2x0.45x0.45x0.60x= 0.243 M
3
2x0.30x0.30x2.0 = 0.36 M
total = 1.035 M3 1.035 M3 4792.90 4,960.65
10 Providing tor steel reinforcement of 10 mm, 12 mm ,
&16 mm dia bars as per approved design and drawing
excluding carriages of F.M. Rods (straight or in coils) to
work site, cutting, bending and binding with annealed
wire with cost of wire, removal of rust, placing the rods
in position all complete as per building specifiction and
direction of E/I.

2.835x1.0%x7.85 = 0.22 MT 0.22 MT. 5,71,408 1,25,709.83


11 Supplying fitting & Fixing 20 Gauge G.C.I. sheet gate
fitted on M.S. angle frame of size 60x60x6 mm
including cost of fabrication,providing necessary
locking arrangement with haskal and domny duly fixed
in P.C.C (1:2:4) blocks of required size, applying a
priming red lead paint over steel work , taxes all
complete as per direction of E/I. Qnty. 3.50x2.0x1 No.
= 7.0 m2
7.00 m2 2821.52 19,750.64
12 Cost of 50x50x6 mm M.S Angle including all taxes and
royalty and carriage as per specifictionand direction of
E/I. 40 Nos. x1.0m =40.0 m @4.50 kg/m Total =180kg
0.18 MT. 51811.71 9,326.11
13 Cost of barbed wire of 4 point 2 ply 12 SWG 150 mm
apart. 96.50m x 4 rows +40x(2x2.57) = 591.60 m @
0.158 kg/m Total 93.47 kg. 93.47 kg 74.42 6,956.04
14 Labour of cutting of M.S Angle iron pots to required
lenth one end splitted as fishtailed in a lenth of 150
mm comlete as per building specifiction and direction
of E/I. 35.00 Each 21.19 741.65
15 Drilling 6 mm angle iron fixing of staples etc. as per
building specifiction &direction of E/I. (40x4 = 160)
160.00 Each 4.44 710.40
16 Supplying ,fitting & fixing straining bolt with nut size 25
cmx 10 cm dia tighten the barbed wire corner post
complete as per building specifiction and direction of
E/I. 40.0x4.0 = 160.0
160.00 Each 6.94 1,110.40
17 Labour for fitting and fixing barbed wire fencing in four
rows horizontal up to height of 1.25 m and two
diagonals including fixing of post in cement concrete at
2.5 m .centers including cost of staples ( but excluding
the cost of cemene cemente angle iron post its cutting
and making holes, nut and bolts) all complete as per
specifiction and direction of E/I.)
96.50 M 33.11 3,195.12
18 12mm.thick C.P.(1:6) to outer brick wall surface
including curing etc.complete. Qnty. Wall 2 x 96.50x
R.A.2018 2.0 = 386.00 M2 Pillars 2x 34x 0.125x 2.00=17.00 M2
Stiffiner 2x(0.30+0.175)x2.0 =1.90M2 Total = 404.90

404.90 m2 106.45 43,101.61


19 Colour washing 2 coats over a coat of white washing
R.A.2018 for new work.
404.90 m2 23.19 9,389.63
Sub total 5,51,706.42
20 Carriage of material from divisional store are kiln side or quality side to
work including contractor profit loading ,unloading transportation are complete @ 55,170.64
10% ( To be deducted in B.O.Q item vised)
Total Cost for 100m 6,06,877.07
Total Cost for 1m 6,068.77
Total Cost for WTP 1x(120 x 120),For ESR-1 to 32=12x(20X20), & 2 Nos. Clear Water
Scheme-1 1,95,41,442
Sump-2 (40 x 40) Total =3,360 Rmt. Diduction for Gate-140 Rmt.

Junior Engineer Asst.Executive Engineer Executive Engineer


System Requirement
The objective of the system is to effectively and efficiently monitor and control the WTP, Intake Well Pumping
Station, ESR- I to ESR 51. The central SCADA system is installed at the WTP, thus the WTP PLC system will be installed
locally with respect to the central SCADA system and all the remaining sites will be installed at different locations. The
remote sites will communicate with the central SCADA system over mobile or V-SAT network depending upon
suitability. Then, the WTP SCADA System which is collecting data from Intake Well Pumping Station, ESR- I, ESR- II, ESR-
III and ESR- IV will communicate with SCADA system installed at the JUIDCO office. The total system should record and
report the failure events so that corrective actions can be implemented immediately. The system should reliably
communicate with real time data transmission from all the remote sites. All data from all the remote sites should be
effectively centralized at the central SCADA system, which can be further utilized for various types of report
generation.
The system should have following operational features:
a) The remote units should work either on GPRS/3G/VSAT broadband and should send the status of the inputs and
outputs. There also should be provision to control the input and outputs.
The system should monitor the following parameters:-
(1) Voltage each phase
(2) Current each phase
(3) PF each phase
(4) Frequency of power supply
(5) KWH cumulative
c) Further the system should be able to indicate various faults:-
(1) Number of operational Pumps
(2) Number of non- operational Pumps
(3) Status of incoming supply (power failure)
(4) High, low Voltage status
d) There should be options for event, alarm and data logging and it should also allow customization for further analysis
of various faults, i.e., fault duration and type of fault.
e) The SCADA Software should provide report of various inputs and outputs as per the requirement with time intervals
starting from 2 seconds. f) In case of GPRS/3G/VSAT broadband failure,
the remote units should store all the data for at least 30 days and send it to the server in FIFO order as soon as the
network resumes.
g) The DATA sent by the unit should have real time stamping of data at the remote units and this time stamped data
should be logged in the central SCADA system.
Rate analysis for Providing,Installing, commissioning of SCADA System
Sr No Description Qty Unit Rate Amount
Intake Well
a) Power Supply for the PLC system should be 24 V DC with an
1
effective range of 19.2 V DC to 30 V DC (including all tolerances,
including ripple). There should be provision for surge voltage
protection with Input protective diode, pulse load up to 1500 W
and polarity reversal with parallel diode in the lead path of the
power supply unit.
b) The PLC should have an Ethernet interfaces with transmission
speed of 10/100 Mbps (half and full duplex (automatic
detection)).
c) The PLC should have a processing speed 1.5 milli Seconds for 1 1 Nos 9,00,000 9,00,000
k bit instructions. The shortest cycle time for cyclic task should be
1 milli Seconds.
d) The Program memory in the PLC must not be less than 512
Kbyte, Mass storage not less than 512 Kbyte and Retentive mass
storage not less than 48 kbyte.
e) The PLC should have an integrated real time clock with
accuracy of +/- 1 m /week at 25°C and power reserve for the RTC
should be at-least 7 days.

MaRS Planning Engineering Services Pvt. Ltd.


WTP
1 The SCADA software should have the following features:-
a)Full SCADA (Supervisory Control And Data Acquisition) function
with visualization, trend representation, and alarm management
b) Control coupling with OPC and 2 direct drivers
c) Direct driver connection to controllers, e.g., to Siemens S7 or
via Modbus/TCP and Modbus/RTU
d) Data logging, trend display, and recipe management
e) Scripts can be created in VBA and IL
f) Fully scalable process diagrams for using one design on
different devices and monitor sizes 1 Nos 4,20,000 4,20,000
g) Multilingual software and projects, thanks to Unicode support
and online selection
h) Access protection with user management
i)Real-time database coupling with ODBC to MS ACCESS, MS
EXCEL and SQL server
J)FDA CFR 21 Part 11 compatible
k) Statistical alarm function

2 a) Power Supply for the PLC system should be 24 V DC with an


effective range of 19.2 V DC to 30 V DC (including all tolerances,
including ripple). There should be provision for surge voltage
protection with Input protective diode, pulse load up to 1500 W
and polarity reversal with serial diode in the lead path of the
power supply unit.
b) There must be protection against voltage failure, i.e., bridging
time in the event of voltage interruptions 200 ms, i.e., 150 ms for
backing up retain data (assigned by system) + 50 ms for executing
event task (to be parameterized by user).
c) The PLC should have two Ethernet interfaces with transmission
speed of 10/100 Mbps (half and full duplex (automatic
detection)).
d) The PLC should have the options to configure it as a PROFINET
controller (conformance class- B and performance class- RT) and 1 Nos 12,00,000 12,00,000
PROFINET device, though it also should support Modbus/TCP
(UDP), TCP/IP (UDP).
e) The PLC should have a processing speed 7 milli Seconds for 1 k
mix instructions. The shortest cycle time for cyclic task should be
1 milli Seconds.
f) The Program memory in the PLC must not be less than 1 Mbyte
and Retentive mass storage not less than 64 kbyte.
g) The PLC should have an integrated real time clock with
accuracy of +/- 1 s /day at 25°C and power reserve for the RTC
should be at-least 7 days.
h) The Degree of protection of the PLC should be IP20 and
Protection class should be class III, IEC 61140, EN 61140, VDE
0140-1.

ESR-32 Nos.

MaRS Planning Engineering Services Pvt. Ltd.


1 a Power Supply for the PLC system should be 24 V DC with an
effective range of 19.2 V DC to 30 V DC (including all tolerances,
including ripple). There should be provision for surge voltage
protection with Input protective diode, pulse load up to 1500 W
and polarity reversal with parallel diode in the lead path of the
power supply unit.
b) The PLC should have an Ethernet interfaces with transmission
speed of 10/100 Mbps (half and full duplex (automatic
detection)). 32 Nos 1,60,000 51,20,000
c) The PLC should have a processing speed 1.5 milli Seconds for 1
k bit instructions. The shortest cycle time for cyclic task should be
1 milli Seconds.
d) The Program memory in the PLC must not be less than 512
Kbyte, Mass storage not less than 512 Kbyte and Retentive mass
storage not less than 48 kbyte.
e) The PLC should have an integrated real time clock with
accuracy of +/- 1 m /week at 25°C and power reserve for the RTC
3 should
VAG be Altitude/level
PICO at-least 7 days.Control Valve 200 mm,Rating 25. 32 Nos 3,06,327 98,02,464
Total Rs 1,74,42,464

MaRS Planning Engineering Services Pvt. Ltd.


Estimate of Approach Road
S.No Description Quantity units Rate Amount
1 Construction of embankment with approved material obtained from
borrow pits with all lifts and leads, transporting to site by mechanical
means within a lead of 5 Kms spreading grading to required slope and
compacting to meet requirement of table 300-2 & Clause 305 of
MoSRT&H specifications for Road & bridge works (4th revision)

100X(9.05+5.0)/2X1.35-100X(3.0X0.35+2X0.15X0.50) 828.375 Cum 269.3 2,23,097.96


2 Granular sub base with well Graded Material (400.1)
Construction of granular sub-base by providing close graded
granular sub-base Grading-III material as per table 400-1,
spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC and
compacting with vibratory roller to achieve the desired density
complete as per Clause 401 of MoSRT&H Specifications for Road &
Bridge works (4th Revision).
100 x 3 x 0.2 60.0 Cum 570.42 34,225.20
3 Contruction of un-reinforced dowel joints at expansion and contruction
joint only plain cement concrete pavement thickness as per design over a
with shovels rakes compacted using prepared sub base with 43 grade
cement or any other type as per clause 1501.2.2 M30 (grade) coarse and
fine aggregates conforming to IS 383 maxium size coarse not exceeding
25 mm mixid in concrete mixer of not less than 0.2 cum capacity and
appropnate weigt bacher using approved mix design laid in approved
fixed side fromwork (steel channal laying and fixing of 125 micron thick
polythene film wedges steel plates including leveling the fromwork as
per drawing ), spreading the concrete with shovels rankes compacted
using needle seed and plate vibratos and finished in contraction and
expansion contraction joints applying debonding strips primer sealant
dowel bars near approches to bridge / culvert and contraction joints
admixtures as approved curring of concrete slabs for 14 days using
curing compound (where specified ) and water finishing to lines and
grade as per drawing and technical Specification

100 x 3 x 0.15 45 Cum 5143.32 2,31,449.40


4 Providing and laying boulder apron for bed protection with stone
boulders of minimum size and weight as per table 1300. 1 no frament
weighing less than 25 kg laid dry comlete as per drawing and technical
specification .
2 x 100X0.15 x 0.50 15 Cum 1052.32 15,784.80
SUB TOTAL 5,04,557.36
Carriage of material from divisional store or quarry site to work site
including contractor profit loading transportation are complete @ 10%. 10%
50,455.74
Total 5,55,013.09
Say Total 5,55,014.00
Cost of 100 M Length 5,55,014.00
Cost of 1 M Length 5,550.14
Total 6,66,017

Junior Engineer Asst. Executive Engineer Executive Engineer


Sub Estimate of Railway Crossing-Scheme-3
Sr. Rate Amount
Discription of Item Quantity Unit
No. (Rs.) (Rs.)
1 Manufacturing providing and supplying spiraly welded / ERW / SAW /
Fabricated M.S. Pipes (Commercial Quantity) including procurements of
Plates. Gas cutting to required size rolling tack welding assembling in
suitable lenghths to form pipes, welding on automatic welding machine
and forming 'v' edge on both ends of pipe including all taxes (Central and
Local), railway freight, Insurance unloading form railway wagon, loading
into truck transport to stores / site,unloading,stacking etc.complete as
per IS - 3589 and IS - 5504 as applicable as per specifications (No
negative tolerance in thickness is permissible).MJP DSR ,Item no.2 ,
Page 167..

A) 500 mm dia 10 mm thk (For Casing) (3 Nos.) (40 Mx3=120 M) 120 m 7,570 9,08,400.00
2 Pushing of M.S.pipe of following dia for road crossing and Raiway
crossing by push through method in all types of strata by using hydraulic
jack and drilling machine of required diameter below 3.0 m depth
including lowering, laying, jointing of M.S. casting pipe including cost of
labour, fuel and material, required welding machinery, tripod, chain
pulley block crane, blower,etc. transportation and dewatering etc.
complete as directed by Engineer in charge but excluding cost of M.S.
pipe.

MJP DSR ,Item no.14 Page 48


1) 500 mm dia 120.00 Rm 28,435.00 34,12,200.00
3 Providing and applying primer first coat of inferol 49 W emaline 05/ 58
pipe cost or any other equivelent approved pain to the internal surface
of pipe line at sight.
MJP DSR 13-14,pg no185 it no 21 )For
500mm 320m X 3.142 X 0.5 X 2 surfaces
First Coat 377.04 Sqm 52.00 19,606.08
Second Coat 377.04 Sqm 43.00 16,212.72
TOTAL 43,56,418.80
Say Total 43,56,419

MaRS Planning Engineering Services Pvt. Ltd.


HOUSE CONNECTION

MaRS Planning Engineering Services Pvt. Ltd.


Estimate for House Connection
Description Unit Quantity Rate Amount

As Per EIC Estimate of House Connection 50%


No. 19,221 2,250 4,32,46,531
RWSS Conceded Along the Pipe Line
Bhubanesh Estimate of House Connection 50%
war Letter Conceded Opposite Site Line with Road No. 19,221 2,950 5,67,01,008
No-MC- Cutting
57/2019,29
22/Dated - 38,441
06/05/2020
Total 9,99,47,539

Junior Engineer Asst. Executive Engineer Executive Engineer

MaRS Planning Engineering Services Pvt. Ltd.

You might also like