Villa Khalifa HSE Inspection Report

1) Workers were observed working at height without safety harnesses or fall protection, which is required by OSHAD regulations. They must wear full body harnesses and provide industrial ladders for safe access. 2) Scattered shuttering material created tripping hazards. The material must be organized properly. 3) The contractor was reminded to comply with all health, safety, and environmental legislation and client requirements. Actions from inspection findings must be addressed and the contractor will submit a closeout report.

Uploaded by

Rakesh Sidhu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
682 views2 pages

Villa Khalifa HSE Inspection Report

1) Workers were observed working at height without safety harnesses or fall protection, which is required by OSHAD regulations. They must wear full body harnesses and provide industrial ladders for safe access. 2) Scattered shuttering material created tripping hazards. The material must be organized properly. 3) The contractor was reminded to comply with all health, safety, and environmental legislation and client requirements. Actions from inspection findings must be addressed and the contractor will submit a closeout report.

Uploaded by

Rakesh Sidhu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SITE HSE INSPECTION REPORT

SECB Supervision Projects

Note: Contractors are hereby reminded that they must comply with health, safety and environmental legislation of the
country and / or Client Requirements as specified. The contractor should take appropriate action and submit a
closeout report to SECB on or before the close out date. All actions shall be tracked by SECB.

1) INSPECTION OVERVIEW
Project: Villa Khalifa Ahmed Saif Al Suwaidi SECB Project No: 1922

Location Plot 46, Sector W42 Date / Time: 16.12.2020


Who attended inspection? Engr. Shadi – Rama Real-estate Report No. SECB/HSE/1922/08

2) ACTION PRIORITY DEFINITION


HIGH (H) = Immediate Immediate same day action is required to avoid the high risk of an accident or incident
MEDIUM (M) = Within 24 Hrs Urgent action is required within the next 24 hours of the finding
LOW (L) = Within 3 Days Action is required within the next 3 days of the finding
IMPROVEMENT (I) = As agreed Improvement action required to meet best practice and continually improve standards
POSITIVE (POS) = As agreed Well done - good practice or good behaviours have been observed.
3) INSPECTION FINDINGS
PRIO ACTION
OBSERVATION ACTIONS REQUIRED RITY
REF PHOTO BY
(Hazard / Location / Requirement) (What must be done & recommendations) (H / M
/ L) (Name)

Health & Safety


Corrective action
Workers have been observed
 All the workers working at height must PM
working at height without
comply with full body safety harness Rama
01
wearing safety harness , Safe
 Industrial ladders should be provided HIGH Real-
access /egress and edge
for safe access and egress. estate
protection has not provided
 Edge protection should be provided
Contractor is required to comply
with OSHAD SF Cop-23.0 work
at height

Health & Safety

De-shuttering material is PM
Corrective action
MEDIUM

scattered here and there. Rama


 Shuttering material should be
02 Eloping tripping hazard. Real-
organised.
Contractor is required to comply estate
with OSHAD SF Cop-08.0
general work amenities

Page 1 of 2
SITE HSE INSPECTION REPORT
SECB Supervision Projects

Designation Name (PRINT) Date Signature


SECB HSE Engineer / 16.12.2020
Specialist / Rep.
Rakesh Kumar
SECB Resident Engineer / 16.12.2020
Project Manager:
Makin Alhadid
Reports issued to Contractor 16.12.2020
PM :
Mr. Hassan

Page 2 of 2

SITE HSE INSPECTION REPORT 
SECB Supervision Projects 
 
 
 
 
 
 
 
 
           Page 1 of 2 
 
 
 
    
Note:  Contractor
SITE HSE INSPECTION REPORT 
SECB Supervision Projects 
 
 
 
 
 
 
 
 
           Page 2 of 2 
 
Designation 
Name (PRINT)

You might also like