The Karian Dam project is located in Lebak, Banten with a total investment of Rp. 1,264 trillion from the state budget. It is planned to have a capacity of 314.7M3 and irrigate 21,454 hectares of land. The dam is expected to supply 9.10 M3/second of raw water and generate 0.65 MW of electricity. Construction began in 2015 with a planned commercial operation date of 2019, and it has currently reached 30.44% physical progress and 21.60% financial progress.

Uploaded by

Eko Budi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views3 pages

Karian Dam - KPPIP

The Karian Dam project is located in Lebak, Banten with a total investment of Rp. 1,264 trillion from the state budget. It is planned to have a capacity of 314.7M3 and irrigate 21,454 hectares of land. The dam is expected to supply 9.10 M3/second of raw water and generate 0.65 MW of electricity. Construction began in 2015 with a planned commercial operation date of 2019, and it has currently reached 30.44% physical progress and 21.60% financial progress.

Uploaded by

Eko Budi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

9/2/21, 2:33 PM Karian Dam - KPPIP

 

KARIAN DAM

Name of the : Karian Dam


Project

Total : Rp.1,264 Trillion


Investment

APBN-APBD : State Budget


Source

Private Source : –

Source Not Yet : –


Determined

Funding Scheme : –

Location : Lebak, Banten

Implementing : Ministry of Public Works and Public


Agency Housing

Planned : 2015
Construction
Commencement
Date

Planned : 2019
Commercial
Operation Date

Latest Status :  

Physical Progress: 30,44%

Finance 21,60%

Diversion Tunnel Inlet, Diversion


Tunnel Output, spillway, side spillway,
Intake Tower, Main DAM, Saddle SAM,
Access Road to DAM site

https://kppip.go.id/en/national-strategic-projects/p-dam-project-and-irrigation-network/karian-dam/ 1/3
9/2/21, 2:33 PM Karian Dam - KPPIP

DESCRIPTION OF PROJECT

Karian Dam is located in Banten province, in the district/city of


Lebak. The dam is planned to have the capacity of 314.7M³. It is
also expected to irrigate 21454 Ha land, provide 9,10 M³/second
raw water supply and generate 0,65 MW electrical power.

COMMITTEE FOR ACCELERATION OF PRIORITY


INFRASTRUCTURE

Gedung Pos Ibukota, Blok A, 6th fl

Jl. Lapangan Banteng Utara No. 1

Pasar Baru, Jakarta Pusat 10710

T. +62 21 345 3171 , +62 21 345 3164 F. +62 21 345 3155

E. [email protected]

ABOUT KPPIP

About KPPIP
Vision & Mission

Composition and Organizational Structure of KPPIP


Progress of Infrastructure Development in Indonesia

KPPIP Achievements
Contact Us

SOCIAL MEDIA

   

@2016 Komite Percepatan Penyediaan Infrastruktur Prioritas

Kementerian Koordinator Bidang Perekonomian Republik Indonesia

https://kppip.go.id/en/national-strategic-projects/p-dam-project-and-irrigation-network/karian-dam/ 2/3
9/2/21, 2:33 PM Karian Dam - KPPIP

https://kppip.go.id/en/national-strategic-projects/p-dam-project-and-irrigation-network/karian-dam/ 3/3

You might also like