0% found this document useful (0 votes)
40 views2 pages

03 Integration Management

The document is a Work Breakdown Structure (WBS) template for the Global Treps Project, outlining key phases including Site Development, Site Construction, Site Integration and Test, and Site Presentation & Launch. Each phase includes specific tasks such as gathering requirements, obtaining hardware and software, designing site layouts, creating content, and ensuring browser compatibility. The WBS serves as a structured approach to project management and execution.

Uploaded by

Bereket
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views2 pages

03 Integration Management

The document is a Work Breakdown Structure (WBS) template for the Global Treps Project, outlining key phases including Site Development, Site Construction, Site Integration and Test, and Site Presentation & Launch. Each phase includes specific tasks such as gathering requirements, obtaining hardware and software, designing site layouts, creating content, and ensuring browser compatibility. The WBS serves as a structured approach to project management and execution.

Uploaded by

Bereket
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2021

BIT-415

Work Breakdown Structure Template


Project Name: Global Treps Project
1.0 Site Development
1.1 Gather Requirements
1.1.1 Technical Requirements
1.1.2 User Requirements
1.2 Project Management
1.2.1 Planning
1.2.2 Role Assignments
1.2.3 Meetings
1.2.4 Administration
1.3 Obtain Hardware
1.4 Obtain Software
2.0 Site Construction
2.1 Design
2.1.1 Site Layout
2.1.2 Content Layout
2.1.3 Fonts
2.2 Content
2.2.1 Create Content
2.2.2 Establish Content Details
2.2.3 Create Client Page Back End
2.2.4 Create Client Page User Interface
2.3 Live Video Platform
2.3.1 Build Back End Configuration
2.3.2 Build User Interface
2.3.2 Create Libraries and Live Links
2.4 Live Finance Monitor
2.4.1 Create Finance application
2.4.2 Link Finance Application to Finance Monitor
2.4.3 Link Finance Monitor to Client Pages
3.0 Site Integration and Test
3.1 Browser Compatibility
3.2 Allow User Registration
3.2.1 Contact Forms
3.2.2 FAQ
3.2.3 Support Area
3.3 Live Monitor Wizard
3.4 Training Materials
4.0 Site Presentation & Launch
4.1 Create Launch Date
4.2 Roll Out Site Privately
4.2.1 Roll Out Site to Organizations
4.3 Roll Out Site Live

You might also like