0% found this document useful (0 votes)
129 views8 pages

Addendum-1 Anwar Ispat

Construction of New 230/33kV GIS Substation at Kashimpur & Boardbazar (Anwar Ispat) with associated Transmission Lines and bay extension at Rajendrapur Substation

Uploaded by

Pranoy Barua
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views8 pages

Addendum-1 Anwar Ispat

Construction of New 230/33kV GIS Substation at Kashimpur & Boardbazar (Anwar Ispat) with associated Transmission Lines and bay extension at Rajendrapur Substation

Uploaded by

Pranoy Barua
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

POWER GRID COMPANY OF BANGLADESH LIMITED (PGCB)

Construction of New 230/33kV GIS Substation at Kashimpur & Boardbazar(Anwar


Ispat) with associated Transmission Lines and 132kV GIS Bay Extension at
Existing Rajendrapur 132/33kV Substation on turnkey basis
Contract No.: PGCB/[Link]/2020/SS
IFB Ref. No.: 27.21.0000.[Link].2883

Addendum No.: 01
(Date: February 11, 2021)

Following revisions/changes are made in the Bid Document which will form part of the Bid Document.

Volume 2 of 3 (Substation)

1) SEC 01: SCOPE OF WORK, Vol.2, Page No. 1/5, Clause 1.6.3 Minimum Substation
Clearances :

Minimum insulator creepage distance for heavy polluted area shall be 31 mm/kV (at rated voltage
between phases). Page no.-1/5 is revised & replaced by enclosed revised page 1/5 (Rev.1)
[Enclosure-1].

2) SEC 01: SCOPE OF WORK, Vol.2, Page No. 1/9, Annex 1-2: Terminal Points, Clause No. 1.3.1:

Annex 1-2: Terminal Points, page no.-1/9 is revised & replaced by enclosed revised page 1/9 (Rev.1)
[Enclosure-2].

3) Section 03A: 230kV GIS

A) Page No. 3/14, Clause no. 3.8.16- Gas Handling Equipment and Clause no. [Link].1 - Circuit
Breaker: General:

Gas Handling equipment items description has been revised. Moreover, provision regarding circuit
breaker operating mechanism has been revised. Page no.-3/14 is revised & replaced by enclosed
revised page 3/14 (Rev.1) [Enclosure-3A].

B) Page No. 3/22, Clause no. 3.9.3- Current Transformer:

The text “IEC 60044” and "150% of the rated current" are replaced by revised text “IEC 61869” and
"rated thermal current" respectively.

C) Page No. 3/27, Clause no. 3.9.3, Surge Arresters and New Annexure- 3.1:

Specification for outdoor AIS surge arrester has been added. Page no.-3/27 is revised & replaced by
enclosed revised page 3/27 (Rev.1) and new annexure-3A-1(Outdoor AIS Surge Arrester) is enclosed.
[Enclosure-3B].

D) New Clause no. 3.11, 3.12, 3.13 and 3.14:

New clause for GIS design review, partial discharge monitoring, GIS extension and GIS bushing has
been added. Page no.-3/32 is revised & replaced by enclosed revised page 3/32 (Rev.1) and new
pages 3/33, 3/34 and 3/35 has been added. [Enclosure-3C].
Page 1 of 8
4) Section 03B: 33kV Indoor GIS, Clause No. 8.1-Circuit Breaker:

The words “O-3min.-C0-3min.-CO" is replaced by "O-0.3s-CO-3 min-CO".

5) Section 4: Transformers

A) Clause no. 4.4.3 Bushings, Page 4/10:

The title words “(ii) Tertiary Windings” is replaced by “(ii) Tertiary Windings(Not applicable)”.

B) Clause no. 4.9.1 Bushings, Page 4/24:

Transformer bushing description has been revised. Page no.-4/24 is revised & replaced by enclosed
revised page 4/24 (Rev.1) [Enclosure-4A].

C) Clause no. 4.9.5 Tertiary and Neutral Terminations, Page 4/25:

The title words “(i) Delta Connected Tertiary Windings” is replaced by “(i) Delta Connected Tertiary
Windings (Not applicable)”.

D) Clause no. 4.14, Page 4/31:

The title of clause no. 4.14 shall be “4.14A Earthing Transformers (Not Applicable)” instead of “4.14
Earthing/Auxiliary Transformers”.

E) New Clause no. 4.14B , Page 4/32:

New clause for cast resin type auxiliary transformer has been added. Page no.-4/32 is revised &
replaced by enclosed revised page 4/32 (Rev.1). [Enclosure-4B].

F) Clause no. 4.16.3, Page 4/34:

Tile of Clause has "Fire Wall" has been revised to "Blast Wall and a new paragraph has been added at
the end of the clause. Page no.-4/34 is revised & replaced by enclosed revised page 4/34 (Rev.1).
[Enclosure-4C].

6) Section 7: Earthing System, Electrode Connections

A) Page No. 7/15, Clause no. 7.101, LIGHTNING PROTECTION:

Provision of lightning protection has been revised. Page no.-7/15 is revised & replaced by enclosed
revised page 7/15 (Rev.1). [Enclosure-5A].

B) New Clause no. 7.12 for GIS Earthing:

New clause for GIS earthing provision has been added. New pages 7/16, 7/17 and 7/18 has been
added. [Enclosure-5B].

7) Section 10A: Building and Civil Engineering Works (For AIS)

A) Page No. 10/5, Clause no. 10A.1.4, Site Survey Drawings and Page No. 10/25, Clause no.
10A.3.23, Blast Wall

Page 2 of 8
Provision of Site Survey Drawings and blast wall have been revised. Page no.-10/5 and 10/25 are
revised & replaced by enclosed revised pages 10/5(Rev.1) and 10/25 (Rev.1). [Enclosure-6A].

8) Section 10B: Building and Civil Engineering Works (For Indoor GIS)

B) New Annexure 10B.2

New technical specification for Lift has been enclosed as Annexure-10B.2 [Enclosure-6B].

C) Page No. 10/5, Clause no. 10B.1.4, Site Survey Drawings and Page No. 10/25, Clause no.
10B.3.25, Blast Wall

Provision of Site Survey Drawings and blast wall have been revised. Page no.-10/6 and 10/27 are
revised & replaced by enclosed revised pages 10/6(Rev.1) and 10/27 (Rev.1). [Enclosure-6C].

9) Section-12: Lighting, small power, heating and ventilation, Clause no. 12.30.4, Mechanical
Ventilation:

The words "Switchgear room” is replaced by “Switchgear room (excluding room for Switchgear with
built-in relay)”.

10) Section-14: Power cables and cable terminating accessories:

Since, Section-14A and Section-14B are available for HV and MV cables and accessories, Section-14
has been deleted.

11) Section 17: Bid Drawings:

A) Page 1 and 2 of drawing list has been updated and enclosed [Enclosure-7A].
B) The drawing nos.
(1) PGCB/DESIGN/2020/KASHBBRAJ/E02 (Rev.0),
(2) PGCB/DESIGN/2020/ KASHBBRAJ/E03 (Rev.0),
(3) PGCB/DESIGN/2020/KASHBBRAJ/E04 (Rev.0),
(4) PGCB/DESIGN/2020/ KASHBBRAJ/E05 (Rev.0),
(5) PGCB/DESIGN/2020/KASHBBRAJ/E06 (Rev.0),
(6) PGCB/DESIGN/2020/KASHBBRAJ/E07 (Rev.0),
(7) PGCB/DESIGN/2020/KASHBBRAJ/E20 (Rev.0),
(8) PGCB/DESIGN/2020/ KASHBBRAJ/C01A (Rev.0),
(9) PGCB/DESIGN/2020/ KASHBBRAJ/C01B (Rev.0),
(10) PGCB/DESIGN/2020/ KASHBBRAJ/C02 (Rev.0)
(11) PGCB/DESIGN/2020/ KASHBBRAJ/C03 (Rev.0),
(12) PGCB/DESIGN/2020/ KASHBBRAJ/C04 (Rev.0),
(13) PGCB/DESIGN/2020/ KASHBBRAJ/C05 (Rev.0),
(14) PGCB/DESIGN/2020/ KASHBBRAJ/C06 (Rev.0),
(15) PGCB/DESIGN/2020/ KASHBBRAJ/C07 (Rev.0),
(16) PGCB/DESIGN/2020/ KASHBBRAJ/C08 (Rev.0) and
(17) PGCB/DESIGN/2020/ KASHBBRAJ/C09 (Rev.0) are replaced by revised drawing no.
(1) PGCB/DESIGN/2020/ KASHBBRAJ/E02 (Rev.1),
(2) PGCB/DESIGN/2020/KASHBBRAJ/E03 (Rev.1),
(3) PGCB/DESIGN/ 2020/KASHBBRAJ/E04 (Rev.1),
(4) PGCB/DESIGN/2020/KASHBBRAJ/E05 (Rev.1),
(5) PGCB/ DESIGN/2020/KASHBBRAJ/E06 (Rev.1),
(6) PGCB/DESIGN/2020/KASHBBRAJ/E07 (Rev.1),
(7) PGCB/DESIGN/2020/KASHBBRAJ/E20 (Rev.1),
(8) PGCB/DESIGN/2020/ KASHBBRAJ/C01A (Rev.1),

Page 3 of 8
(9) PGCB/ DESIGN/2020/KASHBBRAJ/C01B (Rev.1),
(10) PGCB/DESIGN/2020/ KASHBBRAJ/C02 (Rev.1),
(11) PGCB/DESIGN/2020/ KASHBBRAJ/C03 (Rev.1),
(12) PGCB/DESIGN/2020/ KASHBBRAJ/C04 (Rev.1),
(13) PGCB/DESIGN/2020/ KASHBBRAJ/C05 (Rev.1),
(14) PGCB/DESIGN/2020/ KASHBBRAJ/C06 (Rev.1),
(15) PGCB/DESIGN/2020/ KASHBBRAJ/C07 (Rev.1),
(16) PGCB/DESIGN/2020/ KASHBBRAJ/C08 (Rev.1) and
PGCB/DESIGN/2020/ KASHBBRAJ/C09 (Rev.1) respectively [Enclosure-7B].
C) New drawing nos.
(1) PGCB/DESIGN/2020/KASHBBRAJ/C01C (Rev0),
(2) PGCB/DESIGN/2020/ KASHBBRAJ/C10 (Rev.0),
(3) PGCB/DESIGN/2020/ KASHBBRAJ/C11 (Rev.0),
(4) PGCB/DESIGN/2020/ KASHBBRAJ/C12 (Rev.0),
(5) PGCB/DESIGN/2020/ KASHBBRAJ/C13 (Rev.0),
(6) PGCB/DESIGN/2020/ KASHBBRAJ/C14 (Rev.0),
(7) PGCB/DESIGN/2020/ KASHBBRAJ/C15 (Rev.0) and
(8) PGCB/DESIGN/2020/ KASHBBRAJ/C16 (Rev.0) has been attached [Enclosure-7C].

Volume 2 of 3 (Transmission Line Part)

12) Section 1 Scope of Works and General Information

Annex 1-2: Terminal Points

Page -2-8- is replaced by enclosed revised page -2-8-Rev. 1 [Enclosure-8].

13) Section 3 Quality Assurance

Annex 3-3: Certificate of Conformity

Page -3-5- is replaced by enclosed revised page -3-5-Rev. 1[Enclosure-9].

14) Section 7 Foundations

7-A2 (5): Foundation Overload Factor: 230kV Twin Mallard Double Circuit Towers
(Medium Wind Zone)

Page -7-38- is replaced by enclosed revised page -7-38-Rev. 1[Enclosure-10].

15) Section 8 Towers

(i) Annex 8-12(2): Proto Assembly Test Requirement

Page -8-47- is replaced by enclosed revised page -8-47-Rev. 1[Enclosure-11].

(ii) Annex 8.13(3): 230kV Double Circuit Towers

Page -8-49- is replaced by enclosed revised page -8-49-Rev. 1 [Enclosure-12].

Page 4 of 8
16) Section 22 Bid Drawings

i. The drawing (Drawing No.: SLD/230kV TL LILO–Kashimpur & ANWAR ISPAT SS,
Rev. 0) is added after clause no. 22.1.4 (v) [Enclosure-13]..

ii. The following drawings are added after clause no. 22.2, 1.4(d) [Enclosure-14].

1.4(e) Structural Details of Tower Type ‘2DT6’

Sl. Drawing Description Drawing No. Sheet Rev.


No. No.
1 Structural Details of Auxiliary X-arms for (Top, Middle & Bottom) 28/2DT6/80 1 1
for Tower Type ‘2DT6’
2 Structural Details of Top Cross-arm (Part-P2) for Dead End Tower 28/2DT6/81 1 1
with Auxiliary X-arm for Tower Type ‘2DT6’
3 Structural Details of Middle Cross-arm (Part-P4) for Dead End 28/2DT6/82 1 1
Tower with Auxiliary X-arm for Tower Type ‘2DT6’
4 Structural Details of Bottom Cross-arm (Part-P6) for Dead End 28/2DT6/83 1 1
Tower with Auxiliary X-arm for Tower Type ‘2DT6’

Volume 3 of 3 (Substation Part)

1) Schedule A: INTRODUCTION & PREAMBLE TO THE PRICE & TECHNICAL SCHEDULES:

A) Item 1.1A1 and 3.1A1


Current rating and BIL of overhead line circuit bays shall be 2000A and 1050kVp instead of 3000A
and 650kVp respectively.
B) Item 1.1A2 and 3.1A2:
BIL of transformer circuit bay shall be 1050kVp instead of 650kVp respectively.
C) Item 1.1A3, 1.1A4, 1.1A5, 3.1A3, 3.1A4 and 3.1A5:
Current rating and BIL of Bus coupler circuit bay, Double busbar shall be 3150A and 1050kVp
instead of 3000A and 650kVp respectively.
D) Item 1.1E7 and 3.1E7:
The text "provisions for One future 230/33kV power transformers" shall be replaced revised text "
provisions buscoupler bay and four future 230kV line bays".
E) Item 2.0C3, 2.0C4, 2.0C5, 4.0C3, 4.0C4, 4.0C5,
Current rating of Bus coupler circuit bay, Double busbar, Bus sectionalizer circuit bay shall be
3150A instead of 2500A.
F) Item 1.1D2, 2.0D2, 3.1D2 and 4.0D2
The text “33/0.415kV, 300kVA three phase outdoor oil type station auxiliary transformers” shall be
replaced by revised text “33/0.415kV, 300kVA three phase cast resin/dry type station auxiliary
transformers”.
G) Item 2.0E2 and 4.0E2
The text “two (2) sets” shall be replaced by revised text “three (3) sets”.
H) Item 1.1P1 and 3.1P1
The text “National Load Despatch Center (NLDC) at Aftabnagar” shall be replaced by revised text
“National Load Despatch Center (NLDC) at Aftabnagar and back up NLDC at Biddut
Bhaban/Siddhirganj”.
I) Item 2.0P1 and 4.0P1
The text “National Load Despatch Center (NLDC) at Aftabnagar and Biddyut Bhaban” shall be
replaced by revised text “National Load Despatch Center (NLDC) at Aftabnagar and back up NLDC
at Biddut Bhaban/Siddhirganj”.
J) Item 5.0P1
Page 5 of 8
The text “National Load Despatch Center (NLDC) at Rampura” shall be replaced by revised text
“National Load Despatch Center (NLDC) at Aftabnagar and back up NLDC at Biddut
Bhaban/Siddhirganj”.
K) Item 1.1H, 2.0H, 3.1H, 4.0H and 5.0H
The text “0.6/1.1kV” shall be replaced by revised text “0.6/1.0kV”.
L) item 1.1Q and 3.1Q :
The following title “Mandatory spares, Erection & Test Equipment” is replaced by “Mandatory
spares, tools & Test Equipment”.

2) SCHEDULE-A, DESCRIPTION OF WORKS, the following paragraph

SCOPE SECTION-7: Transmission Line (LILO) for Kashimpur 230/33kV Substation:

Design, supply, delivery, installation, testing & commissioning of Construction of Aminbzar-


Kaliakoir 230kV Transmission line double circuit LILO at Kashimpur 230/33kV GIS Substation
(Approx. 2.0km)

is replaced by the following paragraph

SCOPE SECTION-7: Transmission Line (LILO) for Kashimpur 230/33kV Substation:

Design, supply, delivery, installation, testing & commissioning of Construction of Aminbzar-


Kaliakoir 230kV Transmission line double circuit LILO at Kashimpur 230/33kV GIS Substation
(Approx. 4.38km).

3) Schedule B, (PRICE SCHEDULES)

A) Item 1.1A1 and 3.1A1 under Schedule 1, 2 and 4: Current rating of line circuit bays shall be
2000A instead of 3000A.
B) Item 1.1A3, 1.1A4, 3.1A3 and 3.1A4 under Schedule 1, 2 and 4: Current rating bus tie bay and
main busbar shall be 3150A instead of 3000A.
C) New item 1.1Q1 & 3.1Q1 xi), xii), xiii) & xiv) under Schedule 1 and 2: Three gas handling item
and one PD measurement item has been added
D) New item 1.1Q2 & 3.1Q2 vv) under Schedule 1 and 2: Item for collapsible oil container has
been added.
E) Item 2.0C1.2 and 4.0C1.2 under Schedule 1, 2 and 4: The number of Control, Protection, SAS
and metering system sets for auxiliary transformer bays shall be three (3) sets instead of two (2)
sets.
F) Item 2.0E2 and 4.0E2 under Schedule 1, 2 and 4: The number of sets for auxiliary transformer
bays shall be three (3) sets instead of two (2) sets.
G) New item 2.0L3 & 4.0L3 iv) under Schedule 4: Item for passenger lift has been added.
H) New item 1.1L2 xvi) under Schedule 4: Item for existing boundary wall dismantling has been
added.
I) New item 1.1M2, 2.0M1, 3.1M2, 4.0M1 iv) under under Schedule 1, 2 and 4 : Item for building
fire protection equipment has been added.
J) Item. 1.1K4 under Section-1, Schedule 1, 2, 4: “11kV XLPE cable” shall be replaced by “33kV
XLPE cable”.
K) Item no.-1.1Q4, 2.0Q4, 3.1Q4, 4.0Q4 under Schedule 1, 2:: Items under ttile Test Equipment has
been deleted.
L) Item 1.1K4 and 3.1K4 under Schedule 1, 2 and 4: Surge arrester has been deleted from item
description.
M) Item 1.1M2, 2.0M1, 3.1M2, 4.0M1 iii) Building air-conditioning & ventilation system under
under Schedule 1: Since, the Item have to be supplied from Bangladesh only, it has been deleted
from Schedule 1 (Supplies from Abroad) .
Page 6 of 8
Accordingly, Schedule 1, 2 and 4 are replaced by enclosed Schedule 1 (Rev.1), 2 (Rev.1) and 4
(Rev.1) [Enclosure-15].

4) SCHEDULE-B, Bid Prices

The revised forms of Bid Prices are enclosed herewith:

(i) Section-6: 230kV Transmission Line (LILO) for Anwar Ispat 230/33kV Substation (Rev. 1)
[Enclosure-16].

(ii) Section-7: 230kV Transmission Line (LILO) for Kashimpur 230/33kV Substation (Rev. 1)
[Enclosure-17].

5) Schedule E, item [Link] and item [Link]: Surge Arresters 230kV, Voltage Transformer 230kV,
Pages: SE-3, SE-4 and SE-5

A) Maximum continuous operating voltage of surge arrester shall be 160kV instead of 154kV.
B) No. of core for VT shall be 3 instead of 2.
C) Rated secondary voltage of VT winding I, II, III shall be 110/√3.
C) Accuracy class of VT winding I, II, III shall be 0.2, 3P, 3P.
D) Rated power of winding I, II, III shall be 10VA.
E) Rated continuous thermal current (40°C) has been revised.
F) The GIS surge arrester item 6.0 has been considered as not applicable.
D) The minimum data requirement for AIS surge arrester (item 3.4 Maximum Residual Voltage) has
been deleted and mentioned as bidder insert item.

Accordingly, the pages SE-3, SE-4 & SE-5 are revised & replaced by enclosed revised page SE-3
(Rev.1), SE-4 (Rev.1), SE-5 (Rev.1) [Enclosure-18].

6) Schedule E, item [Link], GIS Switchgear 132kV, Pages: SE-6, SE-7, SE-8
A) Rated current of busbar & buscoupler bay shall be 3000A (as per existing SS) instead of 3150A.
B) Rated current of line bay & transformer bay shall be 1250A (as per existing SS) instead of 2000A.
C) Rated power shall be 30 VA for all CT’s core (as per existing substation).
D) Accuracy class for voltage transformer of winding II shall be 3P.
E) Rated power for voltage transformer of winding I, II shall be 30VA (as per existing substation).
F) Rated continuous thermal current (40°C) has been revised.

Accordingly, the pages SE-6, SE-7, SE-8 are revised & replaced by enclosed revised page SE-6
(Rev.1), SE-7 (Rev.1), SE-8 (Rev.1) [Enclosure-19].

7) Schedule E, item [Link], Surge Arrester 132kV, Pages: SE-9

A) Maximum continuous operating voltage shall be 102kV.


B) The minimum data requirement for AIS surge arrester (item 3.4 Maximum Residual Voltage) has
been deleted and mentioned as bidder insert item

Accordingly, the page SE-9 is revised & replaced by enclosed revised page SE-9 (Rev.1) [Enclosure-
20]

8) Schedule E, item [Link], GIS Switchgear 33kV, Pages: SE-10

A) Rated current for Busbar, Bus coupler bay, Bus Sectionalizer bay & Transformer bay shall be
3150A instead of 3000A.
B) Location of CT’s cores are mentioned.

Page 7 of 8
C) Rated power of CT has been updated.
D) Duration of rated short circuit current shall be 3 sec instead of 1 sec.
E) Accuracy class of VT winding core I shall be 0.2, 3P, 3P.
F) Item 5.1: type of voltage transformer shall be GIS/indoor instead of GIS/outdoor

Accordingly, the pages SE-10, SE-11, SE-12 are revised & replaced by enclosed revised page SE-10
(Rev.1), SE-11 (Rev.1), SE-12 (Rev.1), [Enclosure-21].

9) Schedule E, item [Link], 33/0.415kV 200kVA,Dyn11, Auxiliary Transformer Pages: SE-18

A) Rated power shall be 300kVA as per existing substation instead of 200kVA.


B) Short circuit withstand current shall be 31.5kA/3 sec instead of 25kA.
C) Type shall be cast resin type/dry type instead of oil-immersed and indoor type.
D) New item 3.5.4: Impedance voltage has been added.

Accordingly, the page SE-18 is revised & replaced by enclosed revised page SE-18 (Rev.1)
[Enclosure-22].

10) Schedule E, item [Link], 230kV XLPE Cable (2000 mm2), Pages: SE-80 and [Link], 230kV
XLPE Cable (2000 mm2), Pages: SE-83

Extrusion Process for insulation of 132kV & 230 kV cable shall be “VCV/CCV” instead of “VCV”.

Accordingly, the page SE-80 & SE-83 is revised & replaced by enclosed revised page SE-80 (Rev.1) &
SE-83 (Rev.1) [Enclosure-23].

11) Schedule E, New item [Link]: 33kV 1Cx800 Sqmm cable, SE-94 to SE-96:

Technical particular guarantee (GTP) for 33kV 1Cx800 Sqmm, Cu cable’s has been added
[Enclosure-24].

12) Schedule E, New item [Link], 33kV, 3Cx240 Sqmm cable, SE-97 to SE-99:

Technical particular guarantee (GTP) for 33kV, 3Cx240 Sqmm , Cu cable’s GTP has been added
[Enclosure-25].

13) Schedule I: DRAWING AND DOCUMENTS TO BE SUBMITTED WITH BID

Item No. 1.7 (ii): GIS Switchgear (a)


The text “One Complete Switchgear (for 33 kV)” is replaced by “One Complete Switchgear”

Consequently, Page SI-4 is replaced by SI-4(Rev-1) [Enclosure-26].

All other terms and conditions of the Bidding Document shall remain un-altered.
The above addendum will form part of the Bidding Document.

Encl.: As stated.