SQAP For Valves - 01 May 20
SQAP For Valves - 01 May 20
ISSUING AUTHORITY
1
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 02
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--
NEW DELHI - 110 011 /2020/REV 1 DATE JUL 20
RECORD OF AMENDMENTS
2
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 03
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
SQAP NO.
DGQA/DQA (WP)/VALVES/…/2020/REV 1
(A George)
Rear Admiral
ADGQA (WP)
Jul 20
Promulgated by
3
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 04
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
CONDITION OF RELEASE
1. This Standard Quality Assurance Plan (SQAP) has been formulated for reference
of the Order Placement Agencies, Inspection Authority, Inspection Agencies and the
Industry. No alteration is to be made to this SQAP except by the issue of authorised
amendment by DQA (WP).
4. The SQAP has been prepared on the basis of decisions made during the collegiate
meeting held at DQA(WP) with leading manufacturers of Valves and representatives of
Professional Directorates and Production Directorates of the IN. Any user of this Standard
QAP within DGQA/ IN or in industry may propose an amendment to it with valid
justification. Proposals not applicable to particular contract can be sent directly to DQA
(WP), New Delhi, and those directly applicable to a particular contract are to be dealt with
using contract procedures.
5. The specifications and standards laid out in the SQAP are indicative only. The
specifications/ parameters and standards given in the Statement of Technical
Requirement (SOTR) / Technical Specifications (TSP) / MoM of TNC / Approved drawings
will be final and binding.
6. DQA(WP) reserves the right to amend or modify the contents of this SQAP without
consulting or informing any holder of this document.
7. In case the SQAP is incorporated into contracts, users are responsible for their
correct application while complying with contractual and other statutory requirements.
Compliance with SQAP does not of itself confer immunity from legal obligations.
4
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 05
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
CONTENTS
5
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 06
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
STANDARDS INVOKED
Note:- The Standards given are indicative only. The specifications / parameters given in
the SOTR / Technical Specifications (TSP) / MoM of TNC / Approved drawings will be
final and binding
6
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 07
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
SPECIFIC REQUIREMENTS
4. Shooting sketch indicating critical test zones and test zones are to be submitted
prior to testing.
5. NDT.
(b) Other NDT Procedures. Other tests like UT, MPT and DPT can be
performed by ASNT / ISNT Level - II/ III qualified technician as per procedure
approved by ASNT / ISNT Level - III qualified technician and the report can be
endorsed by ASNT / ISNT Level - II/ III qualified technician.
6. Make of the Items should be as per approved PIL / Detailed Bill of Material
(DBOM) or IN approved sources.
7. The outsourced components in the SQAP are indicative only. OEM is to categorize
the outsourced components, specific to their product, in the QAP as per the approved
DBOM / Drawings and in accordance with Chapter-5 of QAD-01 R01.
8. Imported items will be accepted against following import documents as per DQA(N)
letter No. 66301/Policy/DQA(N)/SG dated 14 Nov 17: -
(a) Copy of one among Bill of Lading/ Shipping Bill/ Airway Bill.
(b) Invoice by OEM or Country of Origin certificate of equipment with packing
list.
(c) Bill of Entry for Warehousing.
(d) The certificate of Conformity (CoC) indicating governing specifications and
values to which the items are tested along with OEM Test Certificates/ Test
Reports/ Catalogue/ Data Sheet.
7
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 08
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
(e) Guarantee/ Warrantee certificate from the supplier/ OEM as per supply
order.
9. ESS test (Thermal Cycling, Random Vibration and Burn in / Endurance) shall be
conducted for electrically operated valves as per DQA(N) policy vide letters 66301/Policy-
07/DQA(N)/QA-07 dated 09 Aug 16.
11. Tests for chemical composition and mechanical properties are to be done at NABL
accredited labs only.
12. TTand ET will be done at Government/PSU test centers or NABL accredited labs.
EMI/EMC Acceptance Test Plan is to be duly vetted by NEC Mumbai.
13. If TTand ET have already been done in earlier projects on identical units, it will not
be done again & the reports of earlier tested units will have to be provided for review of
Inspection Agency.
14. Shock Testing is mandatory for Hull Valves. For System Line Valves Shock
Test shall be undertaken if specified in the SOTR.
17. Packing material should not contain environmentally hazardous material prohibited
by law/ regulation.
18. Post promulgation of this SQAP, separate QAP approval for Valves is not required.
The manufacturer shall be required to submit confirmation to concerned QA Agency and/
or OPA, towards acceptance of SQAP either in totality or with some design specific
inclusions and/or exclusions w.r.t. SQAP, if any. The SQAP along with proposed
inclusions/ exclusions approved by DQA(WP) shall be deemed as the approved QAP for
the particular PO.
8
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 09
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
ABBREVIATIONS
9
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 10
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
SCOPE
Scope of Quality Assurance. The scope of QA includes witness / review at all stages of
manufacturing viz., raw material stage, in-process stage and final stage. The scope also
covers witness / review of Type Testing, wherever applicable.
The SQAP contains comprehensive list of inspections and/or trials that are
applicable for QA of the equipment. In addition, QA of the equipment will also be
governed by specific conditions laid down in SOTRs and ‘Approved Drawings’. The
inspections/ tests / trials must be contemporary to latest technology/ techniques available
in the industry at the time of placement of purchase order.
The following QA activities will be carried out for the Marine Valves: -
(a) Visual Inspection.
(b) Dimensional Inspection.
(c) Witness of pouring in absence of integral test bar.
(d) Review of Lab Test Certificates.
(e) Witness of in-house Lab Testing, if applicable.
(f) Witness of Non-destructive Testing viz. UT,DPT & MPT.
(g) Review of RT films and reports.
(j) Review of Heat Treatment Charts.
(k) Review of Shock Test and SBN & ABN reports for qualification of TypeTest,
as applicable.
(l) Review of Draft documentation and witness/ stamping of final
documentation, as applicable.
(m) Issue of CHP clearance.
(n) Issue of Dispatch Clearance or Issue of Form-IV,as applicable.
10
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 11
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE JUL 20
SYSTEM DESCRIPTION
1. Valves are devices that regulate, direct or control the flow of fluids viz., gases,
liquids, fluidized solids or slurries by opening or closing or partially obstructing various
passageways. The various categories of valves conventionally used onboard IN ships and
submarines are briefly introduced below.
11
MARINE VALVES FOR LOW
MINISTRY OF DEFENCE / DGQA PAGE 12
PRESSURE FLUIDS
DIRECTORATE OF QUALITY STANDARD QAP NO. REV. NO. 0
ASSURANCE (WARSHIP PROJECTS) DGQA/DQA(WP)/ VALVES/--/
NEW DELHI - 110 011 2020/REV 1 DATE FEB 20
The following generic information must generally be provided on each QAP as its
identity:-
Part - II.
12
APPENDIX-A
(Refers to Part-II)
SQAP FOR ISOLATION VALVES - BALL, PLUG, BUTTERFLY AND GATE VALVES
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
1.0.0 SECTION I: DRAWINGS AND DOCUMENT INSPECTION
1.1.0 Drawings & Documents Verification of drawings/ 100% PO, SOTR/ TSP & TNC PO, SOTR/ List of R Manufacturing drawings will
- GA drawings with DBOM documents Minutes TSP & TNC documents be vetted with reference to
- Manufacturing drawings Minutes approved GA drawings and
DBOM in OEM premises
1.1.2 Type Test Report Verification 01/ Type PO, TSP/ SOTR & TNC Equipment is Type Test R For Shipyard Orders:
Minutes Type Tested reports If equipment is not Type
and reports Tested OR reports are not
are held held, Type Test shall be
undertaken as per SQAP.
13
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
(d) Gate Valve- Body, Marking on Body by 100% Conformity to IR R
Bonnet, Gate, Wedge, engraving (Direction of specifications
Cover, Back Seat, Seat flow, Nominal Dia,
Ring, Stuffing Box, Gland, Pressure Rating, Firm’s
Gate Nut, Body Seat, monogram, Mfg. Date
Adaptor Plate, Gear Box
Casing, Wedge Nut, Side
Cover etc.
2.1.1 Hand Wheel Chemical composition 01 sample TSP/ SOTR, Approved Conformity to NABL TC R
and Mechanical / heat Drawings, Manufacturing specifications
properties Drawings & TNC
2.1.2 Forged/ Rolled/ Machined Chemical analysis of Bar 01 sample Minutes Conformity to Mill TC R
valve components stock / heat/ lot specifications
Including but not limited to
the following: -
Heat Treatment (If 100% Conformity to HT Chart/ R
applicable specifications Report
(a)Ball Valve- Spindle/
Stem, Backing plate,
Gland, Handle, Rod Chemical composition 01 sample Conformity to NABL TC CHP
gearing etc. and Mechanical / heat/ lot specifications for R
properties
(b)Plug Valve- Gland,
Stem/ Spindle, Rod LPT 100% Conformity to NDT CHP
Gearing, Handle, Stopper, specifications Report for W
Rod Gearing etc. UT (Spindle/ Stem, Gear 100% Conformity to NDT CHP
shaft, Extended Shaft) specifications Report for W
(c) Butterfly Valve-
Spindle/ Stem, Disc Pin,
Body Seat, Soft seat,
Gland Bush, Wedge Pin,
Gland Hex Nut, Bracket,
Spacer, Bearing, Worm &
Worm Wheel etc.
15
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
3.0.0 SECTION III- IN-PROCESS INSPECTION
3.1.0 Casted valve components VI & DI 100% TSP/ SOTR, Approved Conformity to IR R
Drawings, Manufacturing specifications
3.2.0 Forged, Rolled & VI & DI 100% Drawings & TNC Conformity to IR R
Machined components Minutes specifications
3.3.0 Valve Body Hydrostatic Pressure 100% Satisfactory IR R
Test Completion
4.0.0 SECTION IV- TYPE TESTING
4.1.0 Valve Assembly VI – Surface Finish 01 unit / TSP/ SOTR, Approved Conformity to TTR CHP
type/ size Drawings, Manufacturing specifications for W
DI Drawings & TNC Conformity to TTR CHP
Minutes specifications for W
Weight Conformity to TTR CHP
specifications for W
Operability/ Functional Conformity to TTR CHP
Test specifications for W
Body Assembly – Conformity to TTR CHP
Hydrostatic Test specifications for W
Seat – Hydrostatic Test Conformity to TTR CHP
specifications for W
Air Bubble Test Conformity to TTR CHP
specifications for W
Obturator Strength Test Conformity to TTR CHP
specifications for W
Initial Torque Test Conformity to TTR CHP
specifications for W
Delayed Torque Test Conformity to TTR CHP
specifications for W
Cyclic Test (10000 Conformity to TTR CHP To be conducted with
Cycles) specifications for W actuator, if applicable
Repeat Initial Torque Conformity to TTR CHP
Test and Seat – specifications for W
Hydrostatic Test
Pressure Drop/ Flow Conformity to TTR CHP
Measurement specifications for W
Complete strip – VI for Conformity to TTR CHP
corrosion/ wearing & DI specifications for W
16
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
Shock & Vibration Conformity to TTR CHP
Testing specifications for R
ET (for electrically Conformity to TTR CHP
operated valves) specifications for W
Fire-safe characteristics, Conformity to TTR CHP
if applicable specifications for W
Electrical Continuity Conformity to TTR CHP
specifications for W
Antistatic Test Conformity to TTR CHP
specifications for W
Noise Signature Conformity to TTR CHP
specifications for R
5.0.0 SECTION V- FINAL INSPECTION
5.1.0 Valve Assembly VI – Surface Finish 100% TSP/ SOTR, Approved Conformity to IR CHP
Drawings, Manufacturing specifications for W
DI Drawings & TNC Conformity to IR CHP
Minutes specifications for W
Weight Conformity to IR CHP
specifications for W
Body Assembly – Conformity to IR CHP
Hydrostatic Test specifications for W
Seat – Hydrostatic Test Conformity to IR CHP
specifications for W
Pneumatic Test Conformity to IR CHP
specifications for W
Disk Strength Test (for Conformity to IR CHP
Butterfly Valves only) specifications for R
Repeatability Test (25 Conformity to IR CHP To be conducted with
Cycles followed by specifications for W actuator, if applicable
Hydrostatic Test)
Performance Test Conformity to IR CHP
specifications for W
5.2.0 Preservation, Packing and Verification 100% PO, TSP/ SOTR Conformity to IR R
Marking specifications
5.3.0 Submission of as-made Verification 100% PO, TSP/ SOTR Conformity to IR R
drawings & other specifications
documentation, if applicable
17
APPENDIX-B
(Refers to Part-II)
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
1.0.0 SECTION I: DRAWINGS AND DOCUMENT INSPECTION
1.1.0 Drawings & Documents Verification of drawings/ 100% PO, SOTR/ TSP & TNC PO, SOTR/ List of R Manufacturing drawings will
- GA drawings with documents Minutes TSP & TNC documents be vetted with reference to
DBOM Minutes approved GA drawings and
- Manufacturing drawings DBOM in OEM premises
1.1.2 Type Test Report Verification 01/ Type PO, TSP/ SOTR & TNC Equipment is Type Test R For Shipyard Orders:
Minutes Type Tested reports If equipment is not Type
and reports Tested OR reports are not
are held held, Type Test shall be
undertaken as per SQAP.
20
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
3.3.0 Valve Body Hydrostatic Pressure 100% Satisfactory IR R
Test Completion
4.0.0 SECTION IV- TYPE TESTING
4.1.0 Valve Assembly VI – Surface Finish 01 unit / TSP/ SOTR, Approved Conformity to TTR CHP
type/ size Drawings, specifications for W
DI Manufacturing Drawings Conformity to TTR CHP
& TNC Minutes specifications for W
Weight Conformity to TTR CHP
specifications for W
Operability/ Functional Conformity to TTR CHP
Test specifications for W
Body Assembly - Conformity to TTR CHP
Hydrostatic Test specifications for W
Seat - Hydrostatic Test Conformity to TTR CHP
specifications for W
Air Bubble Test Conformity to TTR CHP
specifications for W
Obturator Strength Test Conformity to TTR CHP
specifications for W
Initial Torque Test Conformity to TTR CHP
specifications for W
Delayed Torque Test Conformity to TTR CHP
specifications for W
Cyclic Test (10000 Conformity to TTR CHP To be conducted with
Cycles) specifications for W actuator, if applicable
Repeat Initial Torque Conformity to TTR CHP
Test and Seat – specifications for W
Hydrostatic Test
Pressure Drop/ Flow Conformity to TTR CHP
Measurement specifications for W
Complete strip – VI for Conformity to TTR CHP
corrosion/ wearing and specifications for W
DI
Shock & Vibration Conformity to TTR CHP
Testing specifications for R
ET (for electrically Conformity to TTR CHP
operated valves) specifications for W
21
Sl No Material/ Component Characteristic/ Type of Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity Check of Check Criteria Record by
QAE
Firesafe characteristics, if Conformity to TTR CHP
applicable specifications for W
Electrical Continuity Conformity to TTR CHP
specifications for W
Antistatic Test Conformity to TTR CHP
specifications for W
Noise Signature Conformity to TTR CHP
specifications for R
5.0.0 SECTION V- FINAL INSPECTION
5.1.0 Valve Assembly VI - Surface Finish 100% TSP/ SOTR, Approved Conformity to IR CHP
Drawings, specifications for W
DI Manufacturing Drawings Conformity to IR CHP
& TNC Minutes specifications for W
Weight Conformity to IR CHP
specifications for W
Body Assembly - Conformity to IR CHP
Hydrostatic Test specifications for W
Seat - Hydrostatic Test Conformity to IR CHP
specifications for W
Pneumatic Test Conformity to IR CHP
specifications for W
Repeatability Test (25 Conformity to IR CHP To be conducted with
Cycles followed by specifications for W actuator, if applicable
Hydrostatic Test)
Performance Test Conformity to IR CHP
specifications for W
5.2.0 Preservation, Packing and Verification 100% PO, TSP/ SOTR Conformity to IR R
Marking specifications
5.3.0 Submission of as-made Verification 100% PO, TSP/ SOTR Conformity to IR R
drawings & other specifications
documentation, if
applicable
22
APPENDIX-C
(Refers to Part-II)
SQAP FOR DIRECTIONAL/ CHECK VALVES - SWING, LIFT& DUAL PLATE VALVE
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
1.0.0 SECTION I: DRAWINGS AND DOCUMENT INSPECTION
1.1.0 Drawings & Documents Verification of 100% PO, SOTR/ TSP & TNC PO, SOTR/ List of R Manufacturing drawings will
- GA drawings with DBOM drawings/ documents Minutes TSP & TNC documents be vetted with reference to
- Manufacturing drawings Minutes approved GA drawings and
DBOM in OEM premises
1.1.2 Type Test Report Verification 01/ Type PO, TSP/ SOTR & TNC Equipment is Type Test R For Shipyard Orders:
Minutes Type Tested reports If equipment is not Type
and reports Tested OR reports are not
are held held, Type Test shall be
undertaken as per SQAP.
23
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
Dressing of Castings 100% Conformity to IR R
by sand/ shot blasting specifications
Marking on Body by 100% Conformity to IR R
engraving (Direction of specifications
flow, Nominal Dia,
Pressure Rating,
Firm’s monogram, Mfg.
Date
2.1.1 Hand Wheel Chemical composition 01 sample TSP/ SOTR, Approved Conformity to NABL TC R
and Mechanical / heat Drawings, Manufacturing specifications
properties Drawings & TNC
2.1.2 Forged/ Rolled/ Machined Chemical analysis of 01 sample Minutes Conformity to Mill TC R
valve components Bar stock / heat/ lot specifications
Including but not limited to
the following: -
Heat Treatment (If 100% Conformity to HT Chart/ R
applicable specifications Report
(a) Swing&Storm Valve -
Spindle/ Stem, Disc, Disc
Pin, Rod Gearing, Hinge Pin Chemical composition 01 sample NABL TC CHP for R NABL
etc and Mechanical / heat/ lot TC
properties
(b) Lift Valve- Spindle/Stem,
Disc etc. LPT 100% Conformity to NDT CHP
specifications Report for W
(c) Dual Plate Valve- Disc, UT (Spindle/ Stem, 100% Conformity to NDT CHP
Hinge Pin, Hinge Pin, Stop Hinge Pin and Disc) specifications Report for W
Pin, Retainers, Stop Pin
Retainers etc
2.1.3 Soft Seat Chemical composition 100% Conformity to MTC R
(polymer) & Physical specifications
properties
2.2.0 BOUGHT-OUT AND COTS COMPONENTS (As per approved drawing, including but not limited to the following)
2.2.1 Rubber components Chemical composition 100% TSP/ SOTR, Approved Conformity to MTC/ CoC R
(polymer) & Physical Drawings, Manufacturing specifications
properties Drawings & TNC
2.2.2 Gaskets/ Gland or Teflon/ Chemical composition 100% Minutes Conformity to MTC/ CoC R
PTFE Packing etc (polymer) & Physical specifications
properties
24
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
2.2.3 Fasteners (Locking screw, Chemical composition 100% TSP/ SOTR, Approved Conformity to MTC/ CoC R
stud, nuts & bolts, washers & Physical properties Drawings,Manufacturing specifications
etc.) including Proof Stress Drawings & TNC
Torque Test 100% Minutes Conformity to MTC/ CoC R
specifications
2.2.4 Bush Material Conformity 100% Conformity to MTC/ CoC R
specifications
2.2.5 Bearings Material Conformity 100% Conformity to MTC/ CoC R
specifications
25
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
Initial Torque Test Conformity to TTR CHP
specifications for W
Delayed Torque Test Conformity to TTR CHP
specifications for W
Cyclic Test (10000 Conformity to TTR CHP
Cycles) specifications for W
Repeat Initial Torque Conformity to TTR CHP
Test and Seat – specifications for W
Hydrostatic Test
Pressure Drop/ Flow Conformity to TTR CHP
Measurement specifications for W
Complete strip – VI for Conformity to TTR CHP
corrosion/ wearing and specifications for W
DI
Shock & Vibration Conformity to TTR CHP
Testing specifications for R
ET (for electrically Conformity to TTR CHP
operated valves) specifications for W
Firesafe characteristics, Conformity to TTR CHP
if applicable specifications for W
Electrical Continuity Conformity to TTR CHP
specifications for W
Antistatic Test Conformity to TTR CHP
specifications for W
Noise Signature Conformity to TTR CHP
specifications for R
5.0.0 SECTION V- FINAL INSPECTION
5.1.0 Valve Assembly VI – Surface Finish 100% TSP/ SOTR, Approved Conformity to IR CHP
Drawings, Manufacturing specifications for W
DI Drawings & TNC Conformity to IR CHP
Minutes specifications for W
Weight Conformity to IR CHP
specifications for W
Body Assembly - Conformity to IR CHP
Hydrostatic Test specifications for W
Seat - Hydrostatic Test Conformity to IR CHP
specifications for W
26
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
Pneumatic Test Conformity to IR CHP
specifications for W
Repeatability Test (25 Conformity to IR CHP
Cycles followed by specifications for W
Hydrostatic Test)
Performance Test Conformity to IR CHP
specifications for W
5.2.0 Preservation, Packing and Verification 100% PO, TSP/ SOTR Conformity to IR R
Marking specifications
5.3.0 Submission of as-made Verification 100% PO, TSP/ SOTR Conformity to IR R
drawings and other specifications
documentation, if applicable
27
APPENDIX-D
(Refers to Part-II)
SQAP FOR PRESSURE VALVES -PRESSURE REDUCING AND PRESSURE RELIEF VALVES
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
1.0.0 SECTION I: DRAWINGS AND DOCUMENT INSPECTION
1.1.0 Drawings & Documents Verification of drawings/ 100% PO, SOTR/ TSP & TNC PO, SOTR/ List of R Manufacturing drawings
- GA drawings with DBOM documents Minutes TSP & TNC documents will be vetted with
- Manufacturing drawings Minutes reference to approved GA
drawings and DBOM in
OEM premises
1.1.2 Type Test Report Verification 01/Type PO, TSP/ SOTR & TNC Equipment is Type Test R For Shipyard Orders:
Minutes Type Tested reports If equipment is not Type
and reports Tested OR reports are not
are held held, Type Test shall be
undertaken as per SQAP.
30
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
Test and Seat – specifications for W
Hydrostatic Test
Pressure Drop/ Flow Conformity to TTR CHP
Measurement specifications for W
Complete strip – VI for Conformity to TTR CHP
corrosion/ wearing & DI specifications for W
Shock & Vibration Conformity to TTR CHP
Testing specifications for R
Fire-safe characteristics, Conformity to TTR CHP
if applicable specifications for W
Electrical Continuity Conformity to TTR CHP
specifications for W
Antistatic Test Conformity to TTR CHP
specifications for W
Noise Signature Conformity to TTR CHP
specifications for R
5.0.0 SECTION V- FINAL INSPECTION
5.1.0 Valve Assembly VI – Surface Finish 100% TSP/ SOTR, Approved Conformity to IR CHP
Drawings, Manufacturing specifications for W
DI Drawings & TNC Minutes Conformity to IR CHP
specifications for W
Weight Conformity to IR CHP
specifications for W
Body Assembly - Conformity to IR CHP
Hydrostatic Test specifications for W
Seat - Hydrostatic Test Conformity to IR CHP
specifications for W
Seat Tightness Test Conformity to IR CHP
(for Relief Valves only) specifications for W
Pneumatic Test Conformity to IR CHP
specifications for W
Repeatability Test (25 Conformity to IR CHP
Cycles followed by specifications for W
Hydrostatic Test)
Performance Test Conformity to IR CHP
specifications for W
31
Sl No Material/ Component Characteristic/ Type Quantum Reference Documents Acceptance Format of Action Remarks
Quality Activity of Check of Check Criteria Record by
QAE
5.2.0 Preservation, Packing and Verification 100% PO, TSP/ SOTR Conformity to IR R
Marking specifications
5.3.0 Submission of as-made Verification 100% PO, TSP/ SOTR Conformity to IR R
drawings and other specifications
documentation, if applicable
32