Legend and Symbol: Plumbing Notes: Catch Basin Det. P L A N

The document contains plumbing notes and details for a construction project. It includes legends for plumbing symbols used in the plans. All plumbing work must follow Philippine plumbing codes and regulations. Materials used must be new and conform to specifications. PVC pipes underground must be anchored with concrete. Slopes for horizontal pipes must maintain at least a 1% grade. The main pipe connecting to the septic tank should have a 20mm incline per meter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
486 views1 page

Legend and Symbol: Plumbing Notes: Catch Basin Det. P L A N

The document contains plumbing notes and details for a construction project. It includes legends for plumbing symbols used in the plans. All plumbing work must follow Philippine plumbing codes and regulations. Materials used must be new and conform to specifications. PVC pipes underground must be anchored with concrete. Slopes for horizontal pipes must maintain at least a 1% grade. The main pipe connecting to the septic tank should have a 20mm incline per meter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

0.60 0.

60

0.10 0.40 0.10 0.75 THK. [Link] W/ 0.10 0.40 0.10


10mmØ LIFTING BAR HANDLE
40M x 40M
150MMØ DRAINAGE PIPES MANHOLE

0.08
0.10
PLUMBING NOTES 10M THK CONCR. SLABS WITH

0.42
0.60

0.40

0.60
10mmØ HOR. AND VERT. BARS

LEGEND AND SYMBOL: 40M x 40M


MANHOLE
10M THK CONCRETE

0.10

0.10
ALL PLUMBING WORKS INCLUDED HEREIN SHALL CHB W/ 10mmØ RSB
EXECUTED ACCORDING TO THE PROVISION GRAVEL BEDDING
LC LEACHING CHAMBER OF THE PHILIPPINE PLUMBING CODE, RULES AND
REGULATIONS OF THE LOCAL COMMUNITY
SC SETTLING CHAMBER
CONCERNED ON SANITATION.
DC DIGESTIVE CHAMBER P L A N CATCH BASIN DET.
SCALE: 1:20 M. SCALE: 1:20 M.
CWS COLD WATER SUPPLY ALL MATERIALS TO BE USED AND INSTALLED SHALL
BE BRANDNEW, THE DIMENSION AND TYPE SHALL
DWS DRAINAGE WASTE VENT CONFORM WITH THE PLANS AND SPECIFICATIONS.
GV GATE VALVE

CV CHECK VALVE PVC PIPES ON THE GROUND SHALL BE ANCHORED


FIRMLY WITH CONCRETE BLOCKS.
.10M THK CONR. COVERING WITH 2.50
FD FLOOR DRAIN
1.75 0.55
CO CLEAN OUT ALL SLOPES FOR HORIZONTAL PIPES SHALL MAINTAIN .10M THK CONR. FLOOR SLABS W/

0.10
1% PERCENT MINIMUM UNLESS OTHERWISE
SHO SHOWER 50 M X 50 M 50 M X 50 M
INDICATED IN THE PLAN.
MANHOLE MANHOLE
PVC OUTLET
F FAUCET

0.10
LIQUID LEVEL
fKS FAUCET / KITCHEN SINK THE MAIN PIPE LINE CONNECTING TO THE SEPTIC PVC INLET
TANK SHALL HAVE AN INCLINATION OF ABOUT 20mm
PVC OUTLET PVC INLET
VTTR VENT TUBE THRU ROOF PER METER.

1.55
PVC PIPES

1.85
fLAV FAUCET / LAVATORY
ALL PLUMBING WORKS AND INSTALLATION SHALL BE 50 M X 50 M
50 M X 50 M

1.50

1.30
WC WATER CLOSET DONE UNDER THE DIRECT SUPERVISION OF A MANHOLE MANHOLE
VERT. BARS SP. @ 0.60M.O.C.
DULY LICENSED MASTER PLUMBER.
SETTLING
SV SHOWER VALVE CHAMBER
DIGESTIVE CHAMBER
ST SEPTIC TANK

CB CATCH BASIN

0.20

0.10
DS DOUNSPOUT
.10M THK CONR. FLOOR SLABS W/
WATER LINE

SEWER & DRAINAGE LINE


1.85 0.40 0.25
SCALE
PLAN 1:25MTS

M WATER METER
SEPTIC TANK DETAIL
SCALE 1:25MTS

SIGNED: PRC NO. PROJECT : APPROVED BY: SHEET CONTENTS: SHEET NO.

CADD BY: PTR NO

APPROVED BY: DATE ISSUED. LTO PANDAN OFFICE JEREMY S. CHNY AS SHOWN P
REVISION: PLACE ISSUED. 2
MASTER PLUMBER TIN. LOCATION: JINALINAN, PANDAN , ANTIQUE OWNER
DATE: