0% found this document useful (0 votes)
732 views1 page

ITP-002 For Survey Works

The document is an inspection test plan for survey works related to piling works for residual utilities and offsite facilities for an HRRL project. It lists 6 activities that will be checked or tested, including battery limit marking, field calibration of surveying instruments, surveying to transfer benchmarks and coordinates, protection of control pillars and benchmarks, and review of test and inspection documents. It specifies whether each check will be a hold point, witness point, review of documents, or surveillance inspection and whether the checking will be done by the contractor or EIL/owner.

Uploaded by

arpit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
732 views1 page

ITP-002 For Survey Works

The document is an inspection test plan for survey works related to piling works for residual utilities and offsite facilities for an HRRL project. It lists 6 activities that will be checked or tested, including battery limit marking, field calibration of surveying instruments, surveying to transfer benchmarks and coordinates, protection of control pillars and benchmarks, and review of test and inspection documents. It specifies whether each check will be a hold point, witness point, review of documents, or surveillance inspection and whether the checking will be done by the contractor or EIL/owner.

Uploaded by

arpit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

M/s AKASHGANGA

INFRAVENTURES INDIA LTD.


PILING WORKS-II, A & B FOR RESIDUAL UTILITIES
AND OFFSITE (RU&O) FACILITIES FOR HRRL PROJECT
Doc No. AGIIL/QA-QC/EIL/B229/ITP-02,Rev.00

INSPECTION TEST PLAN FOR SURVEY WORKS

AGENCY REMARKS
SNO ACTIVITY/NATURE OF CHECK/TEST
AGIL EIL

Battery Limit marking and submission of


1 WC S Drgs / Sketches
drawings/sketches

Review of Calibration Certificates of surveying


Instruments /Testing equipment
2 WC HP

Field Calibration if any


3 WC W

Surveying for transfer of BM & Co-ordinates on


4 reference pillars WC S

Protection of Control pillars, permanent bench


5 WC S
marks and regular rechecking.

6 Review of test and inspection documents WC RW As per records

LEGEND:

HP – HOLD POINT
W – WITNESS POINT
RW – REVIEW OF CONTRACTOR’S DOCUMENTS
S – SURVELLANCE INSPECTION BY EIL/OWNER
WC – 100% EXAMINATION BY CONTRACTOR

M/s AKASHGANGA
INFRAVENTURES INDIA LTD.
PILING WORKS-II, A & B FOR RESIDUAL UTILITIES 
AND OFFSITE (RU&O) FACILITIES FOR HRRL

You might also like