FILINVEST AXIS TOWER 4 – RALGO PUNCHLIST
26th FLOOR
25th FLOOR
2ND FLOOR
14th FLOOR
15th FLOOR
11th FLOOR
- PULLBOX / ELECTRICAL BOX COVER PLATE - ORGANIZE / ARRANGE NEATLY ALL THERMOSTAT WIRING
- CONFLICT INSTALLATION SPRINKLER DROPPING AND DUMPER (DUCTING)
- ADJUST DUCTING HEIGHT NOT TO CONFLICT ON THE REQUIRED CEILING HEIGHT
- TAPPING OF WIRE TO FCU NEAR COMMON AREA