1.0 PURPOSE
The purpose of this SOP is to define the Tolerances for Fabrication of Steel Structures.
2.0 SCOPE
This Standard Operating Procedure is applicable to entire Madhav Udyog Pvt. Ltd.
3.0 RESPONSIBILITIES
Incharge – QA&I is overall responsible
4.0 PROCESS DESCRIPTION
Sr. Operation Inspection Parameters Tolerances
No.
1 Cutting/Cropping Total Length as per Job Card +2.0 mm
End Skewing +1.0 mm
2 Hole Diameter +0.5 mm
Edge Security ±2.0 mm
Punching & Back Mark ±1.0 mm
Drilling Hole to Hole Distance ±1.0 mm (consecutive )
±2.0 mm (cumulative)
3 As per Sketch N.A
Stamping Impression from top to bottom Refer limit sample ( if
required)
4 +5.0 mm on specified length
Notching Size of Notch
5 Heel Grinding Size of Grinding In length ±5.0%
In Thickness ±1.0 mm
6 Bending Bending ±2.0 mm in 300 mm lg.
7 Distance between Hols ±1.0 mm
Hole After Bending Back Mark ±1.0 mm
Distance from Hole to Bend Line ±1.0 mm
8 Welding Surface Preparation As per WPS
Fillets Size As per Shop Drawing
Prepared by: Reviewed by: Approved by:
Engineer QA-HOD Head - Operation
1
INTEGRATED MANAGEMENT SYSTEM
STANDARD OPERATING PROCEDURE
FABRICATION TOLERANCE CHART
DOC. NO. MUPL-IMS-QA-19
Issue No.: 01 Issue date: Revision date : -- Revision No. : 00
01/07/2019