0% found this document useful (0 votes)
707 views6 pages

Defect Rate Monitoring: Part Name: Checked By: Part Number: Customer Month Approved by

The document is a defect rate monitoring sheet that tracks rejection quantities and defect rates for parts over a 31 day period in September, October and November 2019. It shows the rejection quantity, total checks, defects identified and defect rate for each part on a daily basis. The overall defect rate for the period shown is 10%.

Uploaded by

Parthiban D
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
707 views6 pages

Defect Rate Monitoring: Part Name: Checked By: Part Number: Customer Month Approved by

The document is a defect rate monitoring sheet that tracks rejection quantities and defect rates for parts over a 31 day period in September, October and November 2019. It shows the rejection quantity, total checks, defects identified and defect rate for each part on a daily basis. The overall defect rate for the period shown is 10%.

Uploaded by

Parthiban D
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Defect Rate Monitoring Overview: Introduces the defect rate monitoring framework for quality control measurements.
  • Defect Rate Monitoring Sheet - November: Sheet for recording defect rates and quantity rejected for each day in November.
  • Defect Rate Monitoring Sheet - October: Sheet for October to document and analyze daily rejection quantities and defect rates.
  • Defect Rate Monitoring Sheet - September: Monthly monitoring sheet capturing daily rejection data for parts in September.

SSPL DEFECT RATE MONITORING

100

90

80

70
Rejection Qty.

60

50

40

30

20

10

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Date
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Rejection Qty

Part Name: Checked By:


Part Number:
Customer
Month Approved By:
Doc. No.:

DEFECT RATE MONITORING SHEET Rev. No. : 00


Rev. Date:
10
9
8
7
6
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Part Number Part Name
Month & Year Nov-19
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Rejection Qty 0
[Link] Defects Date Vs Rej Qty
1

10

11

12

13

14

15

Prepared by : Page 2 of 6
Total Rejection 0

Total Check 2018 ###

Defect Rate 0

Prepared by : Page 3 of 6
Doc. No.:

DEFECT RATE MONITORING SHEET Rev. No. : 00


Rev. Date:
10
9
8
7
6
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Part Number Part Name
Month & Year Oct-19
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Rejection Qty 0
[Link] Defects Date Vs Rej Qty
1

10

11

12

13

14

15

Prepared by : Page 4 of 6 Approved by : jkj;ljkhjkfghggkk


Total Rejection 0
Total Check 3011 ###

Defect Rate 0

Prepared by : Page 5 of 6 Approved by : jkj;ljkhjkfghggkk


Doc. No.:

DEFECT RATE MONITORING SHEET Rev. No. : 00

Rev. Date:
10
9
8
7
6
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Part Number Part Name
Month & Year Sep-19
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Rejection Qty 0
[Link] Defects Date Vs Rej Qty
1 short length
45

grommet
2 damege 10

10

11

12

13

14

15

Total Rejection 10
Total Check 100 ###

Defect Rate 10

Prepared by : Page 6 of 6 Approved by :hjkhjkhlkjjjhljhh

You might also like