Underground

This document provides information on underground piping systems. It discusses various types of underground piping systems commonly found in chemical, petrochemical, and refinery plants including cooling water systems, oily water sewers, contaminated rainwater sewers, closed blowdown sewers, amine blowdown sewers, and fire water systems. Key details covered include typical pipe sizes, burial depths, protection methods, drainage collection points, and system components.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
462 views31 pages

Underground

This document provides information on underground piping systems. It discusses various types of underground piping systems commonly found in chemical, petrochemical, and refinery plants including cooling water systems, oily water sewers, contaminated rainwater sewers, closed blowdown sewers, amine blowdown sewers, and fire water systems. Key details covered include typical pipe sizes, burial depths, protection methods, drainage collection points, and system components.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Cover Sheet
  • List of Illustrations
  • General
  • Types of Underground System
  • Key Words
  • Piping Arrangement - Underground

TRAINING MANUAL- PIPING DOC No.

: 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 1

CONTENTS

Page

0.0 Cover Sheet 1

List of illustrations 2

1.0 General 3

2.0 Types of underground system 3-5

3.0 Key words 5-6

4.0 Piping Arrangement - Underground 6-7

Applicable Revision:
Prepared: Checked: Approved:

Date: Date: Date:


First Edition: R0
Prepared: AKB Checked: RUD Approved: RUD

Date: Date: Date:


File Name: Server: PUNE: KUMUS 207 VKO: KUMUS 209
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 2

LIST OF ILLUSTRATIONS

SR.NO. DWG.NO. DESCRIPTION


1 UGP1 PROCESS COOLING WATER AND POTABLE WATER SYSTEM

2 UGP2 COOLING WATER CROSSOVER PIPING

3 UGP3 COOLING WATER AT EXCHANGERS

4 UGP4 COOLING WATER AT PUMPS

5 UGP5 EMERGENCY EYEWASH AND SAFETY SHOWER

6 UGP6 TRENCH PIPING

7 UGP7 HYDRANT AND MONITOR INSTALLATIONS

8 UGP8 TYPICAL GRADE-MOUNTED FIRE MONITOR

9 UGP9 CATCH BASIN

10 UGP10 TYPICAL SEWER BOX or MANHOLE

11 UGP11 DYKED AREA DRAIN

12 UGP12 LIFT STATION

13 UGP13 INDICATIVE PFD FOR OILY WASTE SEWER &


CONTAMINATED
DRAIN WATER SEWER & PROCESS LINE

14 UGP14 INDICATIVE PFD FOR OWS , CRWS ( NOTES FOR DWG. NO.
UGP13 )
15 UGP15 G.A.FOR UNDERGROUND PIPING (DETAILS)

16 UGP16 G.A.FOR UNDERGROUND PIPING (NOTES FOR DWG. NO.


UGP15)
17 UGP17 PLOT SUBDEVIDED INTO DRAINAGE AREAS

18 UGP18 OILY WATER AND STORM WATER SYSTEM

19 UGP19 PROCESS DRAINS : CLOSED SYSTEM

20 UGP20 PLAN FOR A CLOSED DRAIN SYSTEM

21 UGP21 CLOSED DRAIN SYSTEM : CROSS SECTION

22 UGP22 CLOSED DRAIN SYSTEM : SUMP

23 UGP23 UNDERGROUND CABLE DUCT


TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 3

1.0 GENERAL
1.1 The piping system is taken underground generally for the utility services like cooling water
supply to various units and cooling water return to cooling tower for line sizes normally above
18 inch NB, other water services with big pipeline sizes, big oil supply lines and various
sewer systems in the process units of the chemical, petrochemical and refinery type of
plants. The term "underground" applies to the piping - both buried or in trenches. The
underground system consist of gravity flow drainage system carrying process waste,
spillage, reclaimable hydrocarbons, sanitary and storm water, firewater and drinking water
system.
1.2 Good engineering practice, local code / regulations, specific client requirements shall govern
the design of the underground piping system in the plant.
1.3 The following are the common underground services in a chemical / petrochemical / refinery
plants.
- Cooling water (line size normally =18" NB)
- Fire Water
- Contaminated water sewer from process catchment area.(CRWS)
- Oily water sewer (OWS)
- Liquid Effluent to the Effluent Treatment Plant.
- Closed Blow down system (CBD)
- Sanitary system
- Storm Water
- Equipment drainage to slop tank
- Electrical cables
- Instrument cables

2.0 TYPES OF UNDERGROUND SYSTEM


Various underground systems can be described in the following way both for Utility system and
sewer system.
2.1 Cooling Water System (CWS & CWR)
This is generally a buried system with protective wrapping and coating or with cathodic
protection or both.
Any valve for isolation of a part of the cooling water system shall be enclosed in a valve pit.
The normal compacted earth cover shall be 1200 mm over the top of the pipeline. The earth
cover over pipe (back-fill) shall be compacted to at least 95% Proctor compaction Index to
protect the pipe from aboveground loadings as per ASTM D-698.
2.2 Oily Water Sewer (OWS)
This system collects waste, drips and leaks from equipment and piping in areas that contain
process equipment in non corrosive services. The layout engineer should consult the
process engineer to fully identify all such equipment and provide a drain hub at each item.
The piping engineer should locate the oily water drain hubs using the above ground piping
studies, setting each invert elevation and routing the line with relevant components / fittings.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 4

Oily water sewer shall collect oily waste / drain from pump, equipments through funnel
points and shall run with separate headers and manholes in the units. The regular oil
contamination areas shall also be segregated and discharge from these areas shall be
collected in catch basins to be joined in oily water sewer. Oily water sewer shall consist of
carbon steel sewer, funnel points, clean outs, RCC catch basins, RCC manholes, vent
pipes, flame arrestor etc.
2.3 Contaminated Rainwater Sewer (CRWS)
The areas which are contaminated due to floor wash drains etc. inside unit boundaries shall
be demarcated. Contaminated areas collected in catch basin shall be drained through
CRWS while un-contaminated areas, normally at periphery of the units shall be drained
through ditches covered with grating.
CRWS shall consist of undergound carbon steel sewer with corrosion protection, funnel
points, clean outs, RCC catch basins, RCC manholes, vent pipes, flame arrestor etc.
Open ditches of units should have a bypass either to the CRWS or to storm water, drains of
offsite.
This system collects surface drainage from areas containing hydrocarbon - bearing
equipment. This water must pass through a treatment facility before being discharged into
an uncontaminated system or natural body of water e.g. river or a stream.
2.4 Closed Blow Down (CBD) sewer
This system picks up drains around boilers and steam drums and is run as a separate
system preferrably to the battery limit.
The system shall be designed as per P&ID and the effluent collected from equipments
through funnel points and underground piping system shall be connected to the underground
CBD drum.
2.5 Amine Blow Down (ABD) sewer
The amine blow down system (ABD) shall be designed as per P&ID.
The effluent shall be collected from equipments through above ground points into close
funnels connected to underground system. The main header shall be connected to the
underground Amine sump / drum.
2.6 Fire Water Sytem
This system consists of a fire hydrant network around a process unit or equipment, with
branches as required for hydrants or monitors to protect the unit in case of fire.
This is a close loop system starting from Firewater storage and pump to the specific
location of hydrants and monitors. This is always kept under a predetermined working
pressure level.
2.7 Potable Water System
This water is used for drinking, emergency eye washes and safety shower facilities.
2.8 Sanitary Sewer System
Sanitary sewer system collects waste from all toilet facilities provided in various plants and
non-plant buildings and shall be discharged to WWTP (Waste Water Treatment Plant)
Acids, caustics, hydrocarbons, rainwater or other chemical waste shall not be discharged to
this system.
This system is routed to normally to a septic tank.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 5

2.9 Underground Electrical and Instrument ducts


In the beginning of a project, the decision to route the major electrical and instrument
conduits - above ground in the piperack or buried below grade shall be taken.
In case underground route is selected, electrical and instrument engineers shall be
consulted for the optimum layout of ducts by the plant layout engineer.
Where conduits enter the unit through a pull box and cables come above ground for routing
upto the terminal points, the space shall be kept free of piping, equipment or associated
maintenance access.
3.0 KEY WORDS
3.1 Catch Basin
This device is used to collect surface drainage with an outlet liquid seal and sediment trap.
The sketch UGP1 illustrates a typical catch basin feature and UGP2 illustrates a typical
location of catch basins.
The maximum area coverage of a catch basin is approx 150 sqm. ie. 12mx12m or
15mx10m.
The area covered by a catch basin should be of square configuration, as far as possible.
The catch basin should be located in the middle of the area as far as possible.
Scope of pavement 1 in 100, e.g. HPP (Ridge of catch basin area = 100.00) and LPP (at
catch basin peripherial drain = 99.85)
No catch basins or manholes should be located within 15m radius of heaters.
No vent pipes should be located within 15m of the heaters.
Area drainage around heater areas shall be done by pavement sloping towards open ditches.
Each catch basin shall be connected to manhole and shall be provided with fire seal.
3.2 Sealed Manholes
Sealed manholes shall be provided at
a. Unit battery limit and
b. Junction of sewers and at change in size of main header.
These devices are provided so that the unit area is isolated from any fire in offsite
area/sewer.
Within the unit area, sealed manholes in main headers should be provided in such locations
so that each sub-unit within the unit is isolated from the other areas. In case, this
demarcation is difficult, one sealed manhole for every 30m length of main sewer in the unit
shall be provided.
Sealed manhole with bent pipes seal type shall be used for carbon steel pipes upto size 16"
NB and for greater than dia 16" NB and for all diameters of RCC pipes double compartment
type manholes should be used.
3.3 Invert elevation
This term, usually associated with any underground line, refers to the elevation of the inside
bottom of the line. Because of the wide range of materials used in the underground piping
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 6

system / drainage system with varying wall thickness, it is the constant that is used to set
the elevation on construction drawings.
The starting invert level of CRWS shall be normally 750mm below HPP (High Point of
Paving)

The invert level at outlet point of CRWS and OWS shall be normally 1500mm below FGL.
3.4 Cleanout
A cleanout is a piping connection in a sewer system that is located at grade level for
inspections or for cleaning the system.
3.5 Vent Pipes
Vent pipes shall be located along piperack columns or building columns and should be
taken 2m above the building parapet or last layer of pipes on a piperack.
3.6 Valve Pit / Maintenance pit for flanges and instruments.
When the underground system needs valves for isolation and instruments for control, the
normal practice is to enclose these valves and instruments in a RCC pit with cover. These
valves and instruments in a pit can be operated as well as maintenance work can be done
with ease.

4.0 PIPING ARRANGEMENT - UNDERGROUND


4.1 The overall Plot Plan allocates the space for the major underground services in the beginning
of the project.
The cooling water supply from cooling water pump discharge to the various units as well as
the cooling water return from the various units to the top of cooling tower is routed in a
simple, straight orientation at a suitable depth avoiding any major road crossings.
A typical cooling water and potable water system is illustrated in sketch UGP1.
Cooling water cross over piping is illustrated in sketch UGP2.
Cooling water lines at heat exchangers are typically illustrated in sketch UGP3.
Cooling water lines at pumps for various cooling requirements is illustrated in sketch UGP4.
4.2 The potable water system supplies to various units and a branch is taken to the emergency
eyewash and safety shower station as illustrated in sketch UGP5.
4.3 Fire water system protects each piece of equipment by providing water through hydrants,
monitors or deluge spray systems.
Each process unit will have its own underground firewater piping loop system.
4.4 A typical hydrant and monitor installations are illustrated in sketch UGP7 and a typical fire-
monitor is shown in sketch UGP8.
4.5 Normally, chemical process units will have multiple drain systems designed to collect all
corrosive or toxic chemical waste as well as surface drainage around the equipment.
Drain / sewer system in a plant can be categorised as :
- Uncontaminated storm water
- Contaminated storm water
- Oily water sewer
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 7

- Chemical and process sewer


- Sanitary sewer
- Blowdown system
- Uncontaminated storm water system generally collects all service water from equipment
areas, access ways, roadways to equipment. This collection is done through area drains,
catch basins, roof rain water downcomers.
- Contaminated storm water system collects surface drainage from areas containing
hydrocarbon processing equipment. This system water must pass through a treatment
facility before being discharged into an uncontaminated system or natural body of water viz.
river or a stream connected to a river.
- Oily water sewer system collects waste, drips, leaks from equipment and piping in non
corrosive process equipment area. The designer should identify all the specific drain points
in consultation with the process engineer.
- Chemical and process sewer system recovers acid or chemical drains from equipment /
piping as well as surface drainage by providing curbing and drain sump around such
equipment.
- Sketch UGP19 depicts a typical process drains - closed system.
- Sketch UGP20 illustrates a typical cross-section of a closed or chemical drain system.
- Sanitary sewer system collects raw waste from lavatories and is either connected to the
municipal battery limit or routed to a septic tank.
- Blowdown system picks up drains around boilers amd steam drums and is run as a
separate system. It is permissible to connect the bowdown system to a sewer box in oily
water sewer system downstream of drainage from a furnace.
4.6 Trench Piping
Occasionally, drain piping or process piping should be run below grade but not buried.
Sketch UGP6 illustrates two insulated lines A and B running below grade to a drain tank.
The top of the trench is covered with grating but could be covered with RCC slab depending
on the traffic load estimated in the area.
The width of trench should allow adequate clearance to valves and drains as required.
4.7 A typical catch basin is illustrated in sketch UGP9.
A typical sewer box or manhole is illustrated in sketch UGP10.
A typical Dyked area drain sump is illustrated in sketch UGP11.
A typical lift station by vertical pump is illustrated in sketch UGP12.
4.8 A process area for the purpose underground drainage is subdivided into block areas with
high point ridge and low point catch basins / pits.
The low point catch pits are connected to manholes.
The manholes are interconnected by sloping piping and led to the battery limit valve pit and
finally discharged into the treatment pond.
Sketch UGP13-14, UGP15-16, UGP17 illustrates the details of the subdivision of the
process area into blocks with explanatory notes.
Sketch UGP18 illustrates how to handle oily water and storm water system.
4.9 Closed drain system is illustrated by various sketch UGP19-20, UGP21, UGP22.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1010
PIPING STUDY
Rev. : R0
UNDERGROUND PIPING
Uhde India Limited Page : 8

4.10 The underground electrical and instrument cables passing under a road or paved area is
taken through ducts embeded in lean concrete. Sketch UGP23 shows a typical
arrangement of such underground cabling details.
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP1

CATCH BASIN

UNPAVED AREA PAVED AREA

GRAVEL or CRUSHED LOW POINT-FINISHED GRADE


STONE EL. 99'-6"(MAX.) / EL. 99.850

CATCH BASIN

DRAIN LINE INVERT ELEVATION


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP2

PLOT SUBDIVIDED IN TO DRAINAGE AREAS

NORTH BATTERY LIMIT

UNPAVED AREA
SLOPE OF
UNPAVED AREA
(TYP.)

PAVED AREA
WEST BATTERY LIMIT

EAST BATTERY LIMIT


HIGH POINT
EL.+0.00

PAVED AREA

CRICKET LINES HIGH POINT CATCH BASIN


(TYP.) OF PAVING (HPP) (TYP.)

SOUTH BATTERY LIMIT


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP3

OILY WATER AND STORM WATER SYSTEM

NORTH BATTERY LIMIT

LOW POINT TYPICAL DRAIN


OF PAVING HUBS
UNPAVED AREA
COOLING WATER SLOPE OF
EXHIBIT UNPAVED AREA
(TYP.)

PAVED AREA
WEST BATTERY LIMIT

EAST BATTERY LIMIT


MH MH PULL BOX

CLOSE
DRAIN
ELECTRICAL SYSTEM
DUCT EXHIBIT

MH

CATCH
BASIN

PAVED AREA

CRICKET LINES HIGH POINT CATCH BASIN


(TYP.) OF PAVING AT LOW POINT
(TYP.)

SOUTH BATTERY LIMIT


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP4

PROCESS DRAINS : CLOSED SYSTEM

PUMP

PUMP PUMP

GRADE

SUMP DRAIN SYSTEM


(TYP.)
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP5

PLAN FOR A CLOSED DRAIN SYSTEM

NORTH BATTERY LIMIT

UNPAVED AREA CLOSED DRAIN


SYSTEM (TYP.)

PAVED AREA
WEST BATTERY LIMIT

EAST BATTERY LIMIT


SUMP PUMP
EXHIBIT
WP CLEL.97'-9"

PAVED AREA

UNPAVED AREA

SOUTH BATTERY LIMIT WP = WORKING POINT


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP6

CLOSED DRAIN SYSTEM : CROSS SECTION

DRAIN LINE FROM


VESSEL
INSTRUMENTS

LOW POINT DRAIN

3/4"

GRADE EL. 100'-0"


EL. 100.000

4"/.100
DRAIN HUB
(REDUCER)

SLOPE MIN. 1/2" TO 12"


or 0.006 TO 0.300

COLLECTION HEADER
TO SUMP (SIZED BY
PROCESS ENGINEERS)
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP7

CLOSED DRAIN SYSTEM : SUMP

103-J 104-L
SUMP PUMP SUMP
4"/.100

TOP EL.

FGL GRADE
SIZED BY CIVIL ENGINEERS

0.250-3"-CIA

BOTTOM EL.94'-9"

WORKING POINT
CL EL. 97'-9"

PLAIN END
CL EL. 96'-0"

FGL = FINISHED GROUND LEVEL


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP8

PROCESS COOLING WATER AND POTABLE WATER SYSTEM

NORTH BATTERY LIMIT

OILY WATER SEWER


& STORM SYSTEM
UGP-3
CL EL.98'-0
EMERGENCY EYEWASH
& SAFETY SHOWER

CW

HW

CL EL.98'-0
WEST BATTERY LIMIT

EAST BATTERY LIMIT


11/2"POTABLE WATER C EL.(AS
L REQD.)

CW CL EL.98'-9" CL EL.98'-0
HW CW

HW

CL EL.97'-0

CL EL.98'-0
HOT WATER RETURN (HW)

COLD WATER SUPPLY (CW)

SOUTH BATTERY LIMIT


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP9

COOLING WATER CROSSOVER PIPING

PLAN

45°
45°

ELEVATION

ACCEPTABLE ELEVATION FOR SHORT RUNS

PREFERED ELEVATION FOR LONG RUNS


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP10

COOLING WATER AT EXCHANGERS

CL EXCHANGER

ABOVE GROUND ABOVE GROUND


PIPING PIPING

FACE ELEVATION OF FLANGE


BEVEL END
300

FGL FIN. GRADE EL.

UNDERGROUND UNDERGROUND
PIPING PIPING

CL COOLING WATER SUPPLY (CWS)

CL COOLING WATER RETURN (CWR)


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP11

COOLING WATER AT PUMPS

ABOVE GROUND PIPING


UNDERGROUND PIPING

COOLING WATER RETURN (CWR)

COOLING WATER SUPPLY (CWS)


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP12

EMERGENCY EYEWASH AND SAFETY SHOWER

FOOT PEDAL

DRAIN

11/2" POTABLE WATER


FROM UNDERGROUND
PLAN

SHOWER HEAD

CLOSED
POSITION
STAY OPEN
BALL VALVE
(TYP.)

OPEN
POSITION

EYE WASH

CLOSED

OPEN

DRAIN

FOOT PEDAL

ABOVE
GRADE
UNDER-
GROUND

POTABLE WATER INLET

SIDE VIEW FRONT VIEW


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP13

HYDRANT AND MONITOR INSTALLATIONS

NOZZLE

HANDLE

MONITOR

HYDRANT

CL FIRE HOSE
CONNECTIONS

GUARD POST

9"/.230
GRADE

BUFFALO
BOX

GUARD
POST
SUPPORT
(BY CIVIL
ENGINEER)

45°
P.) BLOCK
(TY VALVE
0

FIRE HOSE
90
3'/.

CONNECTIONS
MONITOR
CL HYDRANT

CL GUARD POST DRAIN GRAVEL


VALVE
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP14

TYPICAL GRADE-MOUNTED FIRE MONITOR

NOZZLE

HANDLE

VENDOR
DRAIN VALVE
CONTRACTOR
1200 ABOVE GRADE

CL VALVE
(4'-0")

(2'-0")
600
6"/.150

GRADE

1800 SQUARE
(6'-0")

ALTERNATIVE SUPPORT
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP15

UNDERGROUND CABLE DUCT

CONDUIT TO
OTHER USERS

ELECTRICAL
PULL BOX

CL HIGH POINT
PAVING
EL. 100-1"

SIZED BY
ELECTRICAL
ENGINEERS ELECTRICAL CONDUIT
ENCASED IN LEAN
CONCRETE

ELEVATION BY PLANT
LAYOUT DESIGNER
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP16

TRENCH PIPING

LINE "A" LINE "B"

CL DRAIN
TANK
A A

B 1/4 B B
GRATING INV.EL.97'-11"
COVER
1/8 B
6"CI

INV.EL.97'8" CONCRETE
1/8 B COVER

CATCH INV.EL.97'-2"
BASIN

PLAN

AS REQUIRED

GRATING CONCRETE
LINE "B" COVER COVER
EL. 100'-0"
1/2"/.015

1/4 B

INV.EL.97'-11"
SECTION "A-A" (INV.=INVERT)

SECTION "B-B"
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP17

TYPICAL SEWER BOX or MANHOLE

4" VENT TO
ATMOSPHERE
(CARBON STEEL)

UNPAVED AREA PAVED AREA

8"/.200 2'/.600 4"/.100

TOP (BY CIVIL


ENGINEER)

48" MINIMUM (1200)


PRE-CAST CONCRETE
PIPE CLASS-II C76

1/8 or 1/16 BEND

8"/.200
6"/.150

CL OUTLET
1/8 BEND

1/8 or 1/16 BEND

FIELD CUT &


15"/.380

SUPPORT

INSIDE BOTTOM
ELEVATION
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP18

DYKED AREA DRAIN

STORAGE TANK

SLOPE

A
SLOPE
DYKE SUMP

A
DRAIN LINE

PLAN

INSIDE DYKE

EXTENSION STEM

PLATFORM

BUFFALO BOX
SUMP

GRADE

DRAIN LINE

VALVE USUALLY
CLOSED

SECTION `A-A'
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP19

LIFT STATION

VERTICAL PUMP

ACCESS
HATCH
DISCHARGE LINE

LADDER
RUNGS

1/8 BEND

CAST IRON

INVERT EL.94'-2" WP CLEL.97'-6"


CARBON STEEL PIPE

CAPACITY SIZED BY
SYSTEMS ENGINEERS
: 29040-PI-UPS-1010

: R0

UNDERGROUND PIPING :1

: UGP20

G.A.FOR UNDERGROUND PIPING

1 2

MATCH LINE W ---- DRG. K2-A1-5101


10

39 1921 KC-100 (NPS 4)


0(N
PS
4) 39PC-103B CL. 5
HP.

39 1920 KC-100 (NPS 4)S =


CO

39 1901 KC-525 (NPS 21)


CO

10
100 (NPS 4)

0(
S=

10

NP
100 (NPS 4)

0(N

S4
OF 4-150 (NPS 6)

PS

)
39PC-103A
4)

39 1933 KC-100 (NPS 4) S=


15 CL.
W= CL. 39PC-105B

(TYP)

39 1934 KC-100 (NPS 4)


10
0(N

CO
PS

CL. 39DM-101
4)

100 (NPS 4)
APRON
39PC-104 CL.
10

S= 100 (NPS 4)

MATCH LINE S ---- DRG. K2-A1-5100


0(N

DF3-150(NPS 6) CO
PS
4)

CO
CL.

S=
CL K2 PS-104 3 5
39PC-105A 2
CL.

10
HP.

0
(N
PS
39 1919 KC-100 (NPS 4) 100 (NPS 4)

4)
IL

CO
CL. S=

ONLY WATER SEWER 39 1903 KC-200 (NPS 8) IL K2-CB-3-109 CL.


S= W
CO 100
SL

IL (NP K2 PS-119
OP

39VL-102 9 CO S4 CL.

)
E
MATCH LINE S ---- DRG. K2-A1-5105

S4
CL. IL )

NP
100 (NPS 4)

0(

39 1912 KC-100 (NPS 4) S=


CL. 39PC-105

10

S=
39 1932 KC-100 (NPS 4)
CL. K2-CB- 39 1902 KC-200 (NPS 8)
W= 3-108 39DM-105 5
* SUBLATERAL

4)
CL.

IL

PS
39 1918 KC-100 (NPS 4)

(N

HP.
100 (NPS 4)
0
CO S= K2-PS-102 10 CO

100 (NPS 4)
CL.
* BRANCH

CO
S=

CL.
CL.
BOTTOM OF TRENCH HP.
CL. PS COLS

EL.
S=

K2 PS-118
39 1930 KC-100 (NPS 4)
4)

39 1901 KC-525 (NPS 21) S=

1 LATERAL * CL.
S
NP

39 VL-101
CL. * LATERAL SUBLATERAL

CL.
CO
0(

CL.
10

AND BRANCH ARE CALLED


CL. PS COLS

OUT ON THIS DRG. FOR


BOTTOM OF TRENCH 8
EXAMPLE ONLY AND CO CO
EL. SHOULD NOT BE CALLED
HP

OUT ON UNDER GROUND


CL.

PIPING DRAWINGS. 39ES 101 A&B


HP
S=0.017
CL. S=

100 (NPS 4)

100 (NPS4)
19
(TYP)

11
CL. K2-PS-101 IL 8
39-PC-101B 8
ELECTRICAL TRENCH

CL. CO CO
IL
39 1911 KC-200(NPS 8) K2 CB-3-107 39 1928 KC-100 (NPS 4) CO
100 (NPS 4) OF 4-150 (NPS 6)
39 1916 KC-100 (NPS 4)

S= W= S=
39 1917 KC-100 (NPS 4) 19
4 1 IL 5 100 (NPS 4) 100 (NPS 4)
ELECTRICAL TRENCH

S=

CO
HP

100 (NPS 4) CO 10 1
39FT-101A 39FT-101B
39-PC-101A CL.
CL.
IL * SUBLATERAL
HP

(TYP) HP FINISHED SURFACE


7
CL. K2-CB-3-106 W= 39 1907 KC-200 (NPS 8) EL.
IL S=

MATCH LINE W --------- DRG. K2-A1-5100

11 NOTES:-
1. FOR GENERAL NOTES LEGEND AND DETAILS SEE DRAWINGS STDD-00-A1-5003 &
STDD-00-A1-5004
12 2. ALL CHANGES OF DIRECTION AND ELEVATION IN SEWER SYSTEMS SHALL BE MADE WITH 1/8
(45°) BENDS AND/OR 45° PLAIN JUNCTIONS EXCEPT AS NOTED OR SHOWN OTHERWISE ON
PLAN OR DETAIL DRAWINGS.
15 3. UNLESS NOTED OTHERWISE ALL DRAIN FUNNELS
SHOWN ARE DF-1
SHOWN ARE DF-2
15
4. UNLESS NOTED OTHERWISE ALL CLEANOUTS ARE CO-1.
7 5. UNLESS NOTED OTHERWISE TOP OF ALL CATCH BASIN SHALL BE AT EL.
6. UNLESS NOTED OTHERWISE EACH BRANCH RUN SHALL START AT AN INVERT LEVEL (IL) OF AT
THE UPPERMOST DRAIN FUNNEL WHERE THE SLOPE IS NOT INDICATED IN STALL THE LINE WITH A
UNIFORM SLOPE BETWEEN SPECIFIED INVERT LEVELS (ELEVATIONS)
13 7. UNLESS NOTED OTHERWISE ALL UNDERGROUND STEEL LINES WITH AN ABOVE GROUND CONTINUATION
SHALL TERMINATE 300 ABOVE HIGH POINT OF FINISHED SURFACE
16 8. JOINTS AND/OR WELDS ON UNDERGROUND PRESSURE SYSTEMS
SHALL BE LEFT EXPOSED UNTIL THE LINE HAS BEEN
HYDROSTATICALLY TESTED PER SP-50-9 K2-A1-5103
16 9. FOR THE TESTING OF UNDERGROUND GRAVITY SEWER A. AREA AND UNIT NUMBER. K2-A1-5101
K2-A1-5104
SYSTEMS SEE SP-00-11.
B. SHEET NUMBER TO CORRESPOND WITH THE THIS
10. ALL LINES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH LAST TWO DIGITS OF THE DRAWING NUMBER K2-A1-5105 DRAWING
THIS DRAWING ISOMETRIC DRAWINGS OF THE FOLLOWING LINES
ONLY HAVE BEEN PREPARED TO ASSIST IN INSTALLATION. C. DRAWING NUMBERS SHALL BE INDICATED KEY PLAN
ON EACH INDIVIDUAL BILL OF MATERIAL.
11. FOR PIPING MATERIAL OF LINES NOT ON ISOMETRIC REFER TO 16
THE PIPING BILL OF MATERIAL OF THE APPLICABLE LINE NO.
12. UNLESS NOTED OTHERWISE ALL DRAIN FUNNELS WILL BE
LOCATED PER STANDARD DRG. STDD-00-A1-5003.
13. UNLESS NOTED OTHERWISE ALL NPS 4 LINES SHALL SLOPE AT 0.016.
14. UNLESS NOTED OTHERWISE ALL NPS 6 LINES SHALL SLOPE AT 0.013. * DIMENSIONS IN mm. UNLESS OTHERWISE STATED.
: 29040-PI-UPS-1010

: R0

UNDERGROUND PIPING :1
: UGP21

G.A.FOR UNDERGROUND PIPING

PURPOSE : 10 ELEVATIONS

THIS DRAWING IS INTENDED TO ILLUSTRATE THE INFORMATION THAT SHALL


SHOW INVERT LEVELS (IL) FOR SEWERS AND BOTTOM OF PIPE (B.O.P.)
BE SHOWN ON AN UNDERGROUND PIPING PLAN DRAWING ENGINEERING
ELEVATIONS FOR PRESSURE LINES AT KEY POINTS.
JUGEMENT MUST BE USED TO INSURE THAT ALL THE INFORMATION THAT

SHALL BE REQUIRED BY CONSTRUCTION HAS BEEN PROVIDED ADDITIONAL 11 SEWER LINE SLOPES

NOTES DATA, DETAILS TEC. SHALL BE ADDED AS NECESSARY TO MEET


SHOW SLOPE FOR MAINS, LATERALS, SUBLATERALS AND LONG BRANCH
THIS REQUIREMENT.
RUNS (eg 0 017, 0.011 ETC.)

1 CO-ORDINATES
12 FITTINGS
CO-ORDINATES SHALL BE GIVEN FOR MATCH LINES, CENTRE LINES OF
MAIN HEADERS, MANHOLES AND CATCH BASINS FOUNDATION CENTRE LINES IDENTIFY THE PREDOMINANT TYPES OF FITTINGS BY THE USE OF A NOTE

ARE NOT CO-ORDINATED BUT ARE USED AS REFERENCE LINES FOR EXCEPTIONS OR ROUTING THAT REQUIRES CLEARIFICATION SHALL BE

DIMENSIONS THAT LOCATE UNDERGROUND PIPING. CALLED OUT ON THE DRAWING.

2 MATCH LINES 13 STUB-UPS

ALL MATCH LINE CO-ORDINATES AND DRAWING NUMBERS SHALL BE WHERE PIPING IS CONTINUED ABOVE GROUND NOTE THE METHOD OF THE
PLACED OUT SIDE OF THE MATCH LINES ALL MATCH LINES SHALL CARRY TERMINATING UNDER GROUND STUB-UPS EXCEPTIONS TO THE NOTE
DRAWING CONTINUATION NUMBERS WHEN THERE IS NOT AN ADJACENT SHALL BE CALLED OUT ON THE DRAWING SHOW ABOVE GROUND LINE
DRAWING TO REFER TO THE UNDER GROUND PIPING DRAWING INDEX NUMBER. NUMBERS ON THE DRAWING.

3 FOUNDATION OUTLINE 14 DIMENSIONS

PORTIONS OF FOUNDATIONS THAT ARE LOCATED BELOW GROUND SHALL GIVE SUFFICIENT PLAN DIMENSIONS TO LOCATE ALL CHANGES OF
BE SHOWN TO CORRECT SCALE. DIRECTION AND ELEVATION NOT COVERED BY A CO-ORDINATE.
PROPER CALLED OUT ON THE DRAWING.
4 ELECTRICAL TRENCHES AND PIPE TRENCHES

CONCRETE ELECTRICAL TRENCHES AND CONCRETE PIPE TRENCHES SHALL 15 DETAILS

BE SHOWN TO SCALE CLEARANCE WITH ADJACENT PIPING SHALL BE IDENTIFY THE DETAILS USED PREDOMINANTLY BY THE USE OF A NOTE
CAREFULLY CHECKED. EXCEPTIONS TO THE NOTE SHALL BE IDENTIFIED BY A PROPER CALL OUT

ON THE DRAWING.
5 PAVING

LIMITS OF PAVED AREAS HIGH POINTS AND VALLEYS SHALL BE SHOWN IN 16 PRESSURE TEST DATA

SUFFICIENT DETAIL TO GIVE ASSURANCE THAT DRAINAGE PATTERN AGREES


REFER TO TO THE APPROPRIATE SPECIFICATIONS FOR THE TESTING OF
WITH STRUCTURAL GRADING AND PAVING DRAWINGS.
UNDERGROUND PIPING SYSTEMS.

6 MANHOLES CATCH BASINS


17 NOTES

SHOW OUT LINE OF CONCRETE MANHOLES AND CATCH BASINS TO SCALE


NOTES APPLICABLE TO ALL OF THE UNDERGROUND PIPING PLANS OF AN
SEE DRG STDD-00-A1-5003 FOR PROPER CALLOUTS AND SYMBOLS.
AREA SHALL BE SHOWN ON ONE OF THE DRAWINGS WITH IN THAT AREA

7 PAVING OR FINISHED SURFACE ELEVATIONS (eg. NOTES 1 TO 9 ) ALL OTHER PLANS WITH IN THAT AREA SHALL

HAVE A NOTE REFERING TO THAT DRAWING PLUS ANY ADDITIONAL NOTES


HIGH POINT OF FINISHED SURFACE OR PAVING IS SHOWN IN A BLOCK AT
THE LOWER RIGHT HAND PORTION OF THE DRAWING LOW POINT OR TOP PERTINENT TO THAT INDIVIDUAL DRAWING(eg. NOTES 10 TO 11).

OF CATCH BASIN ELEVATION MAY BE COVERED BY A NOTE WHERE TOP


18 KEY PLAN
OF CATCH BASIN ELEVATION IS DIFFERENT FROM THAT STATED IN THE

NOTE IT SHALL BE SHOWN ON THE DRAWING. SHOW A KEY PLAN ON EACH UNDERGROUND PIPING PLAN.

8 LINE NUMBERS
19 PIPE AND FITTING SIZES

LINE NUMBERS ARE GIVEN FOR ALL PRINCIPLE HEADERS, SEWER MAINS, NOMINAL SIZES FOR STEEL PIPE AND FITTINGS SHALL BE GIVEN IN INCHES
LATERALS AND SUBLATERALS AND FOR BRANCHES CONNECTING DIRECTLY NOMINAL SIZES FOR PIPE AND FITTING OTHER THAN STEEL (eg. VITRIFIED
TO CATCH BASINS AND/OR MANHOLES. CLAY AND CONCRETE) SHALL BE GIVEN IN MM.

9 SYSTEM IDENTIFICATION
20 PIPING BILLS OF MATERIAL

SHOW SYSTEM NAME OR SERVICE IDENTIFICATION FOR EACH SYSTEM ON


PIPING BILLS OF MATERIAL WILL ACCOMPANY EACH INDIVIDUAL PIPING PLAN
THE PRINCIPLE HEADER.
DRAWING THE FOLLOWING INFORMATION SHALL BE DESIGNED ON THE
BILL OF MATERIAL.
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP22

INDICATIVE PFD FOR OILY WASTE SEWER & CONTAMINATED


DRAIN WATER SEWER & PROCESS LINE

DWF
DIA.
SCOPE
SLOPE SLOPE
VELOCITY
DIA. DIA.
FUNNEL POINT TOTAL FLOW
FLOW FLOW (TYP.)
NOTE-6 & 16
NOTE-6 NOTE-6 (TYP.)

UNCONTAMINATED AREA

MANHOLE
NOTE-5

REFER
NOTE-14
REFER
NOTE-4
SEALED MANHOLE

CATCHPIT
HPP FGL
6.05 5.75

CONTAMINATED
AREA
TWO WAY
CATCHMENT HOG GRATING NC VALVE PIT
AREA 150SQ.M. UNCONTAMINATED AREA
(TYP.) NO

TO STORM
WATER
STORM WATER DRAIN DRAIN
FOR COLLECTION OF
SURFACE DRAINAGE FROM
UNCONTAMINATED AREAS

HOOK-UP WITH MANHOLE


SHALL BE CONTRACTORS
RESPONSIBILITY
(TYP.)

LEGENDS
DWG - DRY WEATHER FLOW
WWF - WET WEATHER FLOW

OWS - OIL WASTE SEWER

CRWS - CONTAMINATE DRAIN WATER SEWER


HPP - HIGH PAVEMENT POINT

FGL - FINISHED GROUND LEVEL

NC - NORMALLY CLOSE
NO - NORMALLY OPEN

* FOR NOTES REFER DWG. NO. UGP23


TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1010

Rev. : R0
PIPING STUDY
Uhde India Limited UNDERGROUND PIPING Page :1
DWG. NO. : UGP23

INDICATIVE PFD FOR OILY WASTE SEWER & CONTAMINATED


DRAIN WATER SEWER & PROCESS LINE

NOTES :
1. THE PFD IS FOR CONTRACTORS REFERENCE ONLY.

2. THE CONTRACTOR, WHILE PREPARING THE PFD,


SHALL SUPERIMPOSE ON THE EQUIPMENT PLOTPLAN.

3. CATCH PITS ARE PROVIDE TO COLLECT SURFACED RANGE &


FUNNEL POINTS ARE PROVIDED TO COLLECT PROCESS WASTE &
OIL DRAIN FROM EQUIPMENT & PUMPS.

4. PFD SHALL FURNISH THE FOLLOWING AT EACH SEGMENTS OF CRWS


A. DRY WEATHER FLOW
B. WET WEATHER FLOW
C. DIA OF PIPE
D. SLOPE
E. TOTAL FLOW
F. VELOCITY

5. THE INVERT LEVELS OF THE PIPE MANHOLES SHALL BE LOCATED.

6. THE DATA SPECIFIED SHALL BE FURNISHED FOR ALL SEGMENTS.

7. PFD FOR WASTE COLLECTION SYSTEM SHALL BE FURNISHED


SEPARATELY FOR ALL PROCESS UNITS.

8. DESIGN RAINFALL INTENSITY = 125MM/HR.

9. ALL FUNNEL POINTS SHALL BE AS PER PIPING GAD / PROCESS P&ID.

10. SEALED MANHOLES SHALL BE PROVIDED AT FOLLOWING LOCATION.

a) AT UNIT BATTERY LIMIT.


b) AT JUNCTION OF SEWERS AND AT CHANGE IN SIZE OF MAIN HEADER
ADDITIONALLY ALTERNATE MANHOLES SHALL BE SEALED MANHOLES.

11. ALTHOUGH VENT PIPES NOT SHOWN HERE, HOWEVER ALL SEALED
MANHOLES SHALL HAVE VENT PIPES AS PER DESIGN BASIS.

12. CATCHPIT SHALL BE JOINED TO A MANHOLE CONNECTING CATCHPIT


TO CTCH PIT IS NOT ACCEPTABLE.

13. NO CATCH PIT, MANHOLE, DRAIN FUNNELS ETC. SHALL BE PROVIDED


WITHIN 15.0M FROM HEATER, FURNACE, REACTOR ETC.

14. PFD SHALL FURNISH THE FOLLOWING AT EACH SEGMENTS OF OWS/CRWS

A. PROCESS FLOW
B. DIA. OF PIPE
C. SLOPE
D. VELOCITY

15. STARTING INVERT LEVEL OF CRWS SHALL BE 750MM BELOW HPP.

16. INVERT LEVEL AT OUTLET POINT OF CRWS & OWS SHALL BE 1500MM BELOW FGL.

17. LEVELS FURNISHED ARE TO CHART DATUM.

* FOR DETAILS REFER DWG. NO. UGP22

TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
TRAINING MANUAL- PIPING
PIPING STUDY
UNDERGROUND PIPING
  
  Uhde India Limited
DOC No. : 29040-PI-UPS-1010
Rev.
: R0
Page
:
DOC NO.
Rev.
Page
Uhde India Limited
TRAINING MANUAL - PIPING
PIPING STUDY
DWG. NO.
UNDERGROUND PIPING
: 29040-PI-UPS-1010
:
DOC NO.
Rev.
Page
Uhde India Limited
TRAINING MANUAL - PIPING
PIPING STUDY
DWG. NO.
UNDERGROUND PIPING
: 29040-PI-UPS-1010
: