A Details of the Applicant
Sr. No. Particulars
1 Name of the Applicant
Constitution Legal Status of Applicant :
(i.e. Govt. organization, NGO, Co-operative
2 society, Company, Partnership Firm,
Proprietorship firm, Individual, FPO, Self Help
Group, etc.)
3 Registration No. of Applicant/CIN
4 GST No. of Applicant
5 Date of Establishment/ Incorporation
6 Address of the registered office
7 PAN No. of Applicant
8 Address of the proposed site
9 District
10 State
11 Pin Code
12 Whether lead promoter belong to SC/ ST/
Woman/Minority
B Details of associates/allied firms, if any may also be provided
Details
any may also be provided
Details of Promoter/Partners/Directors/Members
A Contact Details
Name of
Sr. No. Address Telephone No.
Applicant/Partner/Directors
1
2
3
4
B Personal Details
Name of
Sr. No. Aadhaar No. PAN
Applicant/Partner/Directors
1
2
3
4
C Relative experience of the Applicant/Promoter(s)/Partner(s)/Directors(s)/ Members
Sr No. Name of Details of experience Details of Turnover
Applicant/Partner/Directors (year wise)
D Details of Existing Banking and Credit facilities of the Applicant/ Promoter(s)/ Partner(s)/ Directors(s)
Name of Bank and
Sr. No. Type of facility Limits
Branch
1 Cash credits
2 Term loans
3 Others
*Information pertaining to credit rating (internal /external) may also be shared along with the aforementioned in
E Details of GST Returns submitted, if any or status of registration
Mobile No. Email id Any other details
Academic qualifications Net worth DIN No. Credit Rating
Supporting Document
attached, if any
(Yes/No)
s)/ Partner(s)/ Directors(s)
Outstanding as on
Securities Rate of Interest Repayment terms
dd/mm/yyyy
ng with the aforementioned information
Partner profit
Date of share holding
sharing ratio
Purpose
Project Details
Sr. No. Particular Detail
A Objective of Proposed project
B Category of proposed infrastructure as per the Scheme
Sr. No. Component Yes/No
1 Subsidy chain
2 Warehouses
3 Silos
4 Pack houses
5 Assaying unit
6 Sorting & Grading unit
7 Cold chain
8 Logistics facilities
9 Primary Processing centers
10 Ripening chambers
11 Organic input production
12 Bio stimulant production unit
13 Infrastructure for Smart and precision
agriculture
Projects identified for providing supply chain
14 infrastructure for clusters of crops including
export clusters
Projects promoted by Central/State/Local
15 Governments or their agencies under PPP
for building community farming assets or
post-harvest management projects.
16 Any other (please Specify)
C Type of Operating Model (Rental, PPP, captive, Lease, Franchise etc.) and details
Land Details
Sr. No. Particular Detail
1 Land Area
2 Status of Legal title & Possession
3 if leased, Period of lease
4 Coordinates of location
5 Details of CLU
6 Connectivity to roads i. State Highway (in
Km.) ii. National Highway (in Km.)
7 Availability of Water
8 Availability of Power
Proposed facilities
(i) Details of proposed facility
Sr. No. Type of facilities proposed to be created No. of Units
1 Warehouses
2 Silos
3 Pack houses
4 CA store
5 Cold Store
6 Frozen Store
7 Pre-cooling Chambers
Assaying, Sorting, Grading, Waxing,
8 Weighing, Packing facility [Modify as per
actual]
9 Ripening Chambers
10 IQF
11 Blast Freezing
12 Refrigerated Vehicles/ Reefer vans
13 Mobile Pre-coolers
14 Insulated/ non-insulated distribution vehicle
15 Irradiation Facility
16 Organic input production
17 Bio Stimulant production units
18 Others (Specify)
(ii) Details of technology
Particular Deatails
Details of technologies to be used/
alternative technologies
(iii) Flow chart of activity process
e etc.) and details
Total Capacity [MT, Ltrs,
No. of Days of operation of
MT/Hr. where ever,
each facility in a year
applicable]
Detailed timeline for construction of proposed project and proposed date for
A commencement of operation
Sr no Particular Details
Proposed Project Financials
A Estimated project cost Details
Sr No. Items Amount (in Rs.)
1 Site development
2 Civil works
3 Technical Civil Works/Errection etc.
4 Plant & Machinery (P&M)
Fixed cost on power supply connection or/ and
5
Generator set/solar system etc.
6 Common Utilities like Water/ETP/ STP, etc
7 Pre-operative Expenses
8 Interest During Construction
9 Working Capital
10 Contingencies
11 Add other items not listed above
Total Project Cost
B Means of finance
Sr No. Items Amount (in Rs.)
1 *Promoter’s Equity
2 Capital Subsidy/ Benefit from other Central/ State
Scheme
3 Loan
Total
*The source of the owned funds and also the capacity of the promoter to support the project in the event of cost
C Basic Revenue Projections (₹ in lakh)
Sr No. Items Year 1
1 Turnover
2 Cost of Operation
3 Gross profit
4 Earnings Before Interest, Tax, Depreciation and
Amortization (EBITDA)
5 Profit before taxation
6 Profit after taxation
D Financial Parameters
Sr No. Partiulars Details (Ratio %)
1 Internal Rate of Return (IRR) [(a) With and (b) without
grant/ subsidy]
2 Avg. Debt Service Coverage Ratio (DSCR)
3 Break Even Point (BEP)
4 Debt-Equity Ratio ( TTL/TNW)
5 Fixed Assets Coverage Ratio
E Credit Facilities proposed
Sr no Particulars Details
1 Fund Based
2 Term Loan
Working Capital (Attach Assessment of working capital,
3
if proposed)
4 Non Fund Based
F Collateral Security proposed to be offered and its approximate value for the applicable cases. (To be fu
Sr no Particular Deatails
1 Is security offered
2 Details of offered security
3 Approximate value of security
G Repayment schedule(Including moratorium period)
Sr. No. Repayment Amount Date of Payment
F Details of Statutory/other approvals/registrations (status)
Sr. No. Particular Details
Percentage
t the project in the event of cost escalations due to time overruns should also be mentioned
Year 2 Year 3 Year 4 Year 5
Additional Details
or the applicable cases. (To be furnished only in case of loans above Rs.2 crore)
Availability of Raw Materials in the Catchment Area - provide details such
A as Adequate Volume, Wider Mix of Raw Materials, Days of Operation in a
Year along with supporting data. Based on this information
feasibility/viability of the project should be justified.
Sr no Particular
1 Adequate Volume
2 Wider Mix of Raw Materials
3 Days of Operation in a Year along with supporting data.
B Details of the catchment area of the Project
Location of the Catchment
SR No (Primary/Secondary
Details
Name Quantities to be sourced
Village/Dist/APMC Commodities to be sourced (MT per annum)
Details of existing demand of the product and marketing arrangements
A (including e-trading), possibility of for leasing with FCI/CWC/SWC/e-
commerce players / retailers for assured cash flows if any
Sr. No. Partiulars
1 Existing demand of the product
2 Marketing arrangements (including e-trading
possibility of for leasing with FCI/CWC/SWC/e-commerce players / retailers
3 for assured cash flows if any
B Employment Generation projections
Sr. No. Particular
1 Direct Employment: (Skilled and Semi-skilled)
2 Contractual Employment with no. of days:
3 Indirect Employment (specify):
Details of renewable/ alternate energy sources including solar energy, if any,
C proposed to be used for operating the project including inter alia, details of
power generation.
sr no Particular
Details
Details
Details
A.Details of pollution issues (if any) and adoption of modern technology for reducing the carbon footprints and in
Basic cost
Sr no Name of Technology/items
(Excluding taxes etc.)
B.List of Manufacturers/ Suppliers of P&M (enclose quotations
Sr no Particular Details
odern technology for reducing the carbon footprints and increasing operational efficiency:-
How the technology will help in reducing carbon footprint
and/or increase in operational efficiency