Site Security Barricading Procedure-SPEDI

This document outlines materials and procedures for barricading construction sites to protect public safety. It details the necessary safety equipment like fencing, signs, and tools. The procedure involves securing work areas, preparing signage and barricades, and laying out barricades using pipes and concrete blocks to support fencing. Specific signage is placed outside temporary fencing to warn the public of hazards within barricaded areas under construction. Photos are provided as examples of barricading setups.

Uploaded by

Ryan Dizon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views2 pages

Site Security Barricading Procedure-SPEDI

This document outlines materials and procedures for barricading construction sites to protect public safety. It details the necessary safety equipment like fencing, signs, and tools. The procedure involves securing work areas, preparing signage and barricades, and laying out barricades using pipes and concrete blocks to support fencing. Specific signage is placed outside temporary fencing to warn the public of hazards within barricaded areas under construction. Photos are provided as examples of barricading setups.

Uploaded by

Ryan Dizon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SPEDI CONSTRUCTION, INC.

MATERIALS AND PROCEDURE IN BARRICADING THE SITES


PROTECTION OF THE GENERAL PUBLIC WITHIN VICINITY

A. PURPOSE
The purpose of this procedure is to establish minimum standard requirements for the
regulation of entry/exit into areas that may contain specific safety, health, or environmental
hazards and to provide a warning that such hazards may be present.

B. TOOLS AND EQUIPMENT

B.1 SAFETY EQUIPMENT: TOOLS:


1. B.I. Pipe 1. Wrench
2. Corrugated Sheet fence1.8m x 3m 2. Pliers
3. Plain Sheet fence 1.8m x 2m 3. Hammer
4. C-Clamp
5. Angle Bar
6. Concrete Blocks

B.2 SIGNAGES
1. 12 Life Saving Rules 6. Pardon our dust as we build future
2. Complete PPE (Man) 7. Danger men at work
3. No Trespassing 8. Red Zone
4. Danger hard hat required in this area 9. Service Gate
5. Notice Construction on-going 10. Delivery Gate

C. PROCEDURE:
1. Toolbox meeting at warehouse and Mobilization at site
2. Secure and discuss Work Clearance Form and Job Hazard Analysis prior to start the work.
3. Conduct toolbox talk regarding to activity and hazard as specified at the WCF
4. Preparation of work area ( site clearing )
5. Preparation of tools, equipment and specific signage to be use
6. Lay outing and markings where you put the barricade
7. Put a B.I. pipe with a hook that has a depth of 1 feet as a post or put in a concrete block
8. Place the corrugate fence with the hook lock, be sure is not moving.
9. Use another B.I. pipes as a brace in triangle position and put C-clamp to make the fence firm
10. Finally put the specific signage outside of the corrugated temporary fence
11. Housekeeping ( checking all tools and equipment used before putting back on warehouse)

Pro-Barricading-027
Spedi-procedures
1
D. PHOTOS

Pro-Barricading-027
Spedi-procedures
2