Construction Plan Overview

This document is a land key plan showing the layout of multiple bus shelters on a site. The plan shows the locations and orientations of 13 bus shelters arranged in two phases. Notes provide information on dimensions, materials, and references.

Uploaded by

Shoaib Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views1 page

Construction Plan Overview

This document is a land key plan showing the layout of multiple bus shelters on a site. The plan shows the locations and orientations of 13 bus shelters arranged in two phases. Notes provide information on dimensions, materials, and references.

Uploaded by

Shoaib Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

LAND KEY:

BUS SHELTER
BUS SHELTER BUS SHELTER BUS SHELTER

BUS SHELTER

BUS SHELTER
BUS SHELTER

BUS SHELTER
BUS SHELTER
PHASE 1B PHASE 1A

9.40M
X T.O.P
BUS SHELTER
BUS SHELTER BUS SHELTER

BUS SHELTER
BUS SHELTER

BUS SHELTER
BUS SHELTER

Sharp corner not accepted

8.40M GENERAL NOTES:


T.O.P 8.40M 1. All dimensions are in millimeters (mm) (U.N.O)
As per site condition/measurment +8.25M FFL +8.25M FFL T.O.P 2. Steel Grade = S275JR
+7.90M SSL +7.90M SSL 3. All connection bolts are High Strength Bolts, Grade 8.8
4. Mechanical & Chemical bolts Grade 5.6
5. Steel Finish = Painted

REFERENCE DRAWINGS & SPECIFICATIONS:

IFC BN-03-00001-01-11-AR-NEB-DG-A1MR906 28-10-2020

SPECS.
SD

REVISION HISTORY:

01 RE-ISSUE FOR APPROVAL 22.12.2021


DET B 00 ISSUE FOR APPROVAL 19.10.2021
Z Z
REV NO. DESCRIPTION. DATE

OWNER:

DET A

+4.45M FFL +4.45M FFL


+4.35M SSL +4.35M SSL
MASTER DEVELOPER:
Welding reliability to be
confirmed and included in
Ca Cb
structural calculations.

PMC:

Y Y
Parsons International Limited
Cb Abu Dhabi
United Arab Emirates
P.O. Box 5498
Ca LEAD DESIGN & SUPERVISION CONSULTANT:
Suite No. 706
Al Gaith Tower
Hamdan Street
Abu Dhabi, 47094
United Arab Emirates
T +971 2 401533
+0.61M F +971 2 6270734
W www.mottmac.com
+0.61M GROUND LVL
GROUND LVL
MAIN CONTRACTOR:

TROJAN GENERAL CONTRACTING L.L.C


Cb - Cb P.O Box 111059
Tel:+971 2 509 7300
X Fax:+971 2 509 7301
Ca - Ca Abu Dhabi - U.A.E

CAT LADDER - 3D VIEW SUB-CONTRACTOR:


RETRACTABLE LADDER RELEASED CAT LADDER - CROSS SECTION CAT LADDER - ELEVATION
P.O. Box 7856
[TYPE-1] TYPE-1 TYPE-1 [X - X] Al-Mafraq, Abu Dhabi
RETRACTABLE LADDER E-mail: info@almahami.ae
Website : www.almahamodular.ae
ROLLER DETAIL Phone : +(971 2) 509 7396

PROJECT NAME:
BANIYAS NORTH
-Contractor to confirm the provided revised details of Cat Ladder are in line
DEVELOPMENT-PHASE 1
with the approved structural calculation, otherwise new structural calculations (CONSTRUCTION)
to be submitted for approval. ZONE:
- Contractor to confirm pin can secure ladder in retracted state.
- Final approval on Cat ladder design, material & fixing detail is subject to Mock BANIYAS NORTH
up approval by Engineer & Client.
SECTOR NO : PLOT NO :

HOUSING P7a
PROJECT DESCRIPTION:

VILLAS CONSISTS OF GROUND


AND FIRST FLOOR
DRAWING TITLE

CAT LADDER - 3D VIEW, CROSS SECTION,


Status Stamp:
ELEVATION AND SECTION DETAILS [TYPE-1]
LOCKABLE DRAWING NUMBER:
OPENING DETAIL
SECTION - Z - Z BN-03-00001-03-11-AR-TGC-SD-000550
SECTION - Y - Y Aa
CHECKER: APPROVER:
MHC MHC
SUBMISSION DATE: SCALE: REVISION NO:

22.12.2021 N.T.S. 01
ENGINEER Sign: Date:
Ba Ba PROJECT NUMBER: DRAWING SIZE:
Dana Talal 12/01/2022
B1N-2020-002394 A1
OFFICIAL USE ONLY :
Aa - Aa
Ba - Ba Aa Consultant Comments :
Comments:

DETAIL - B DETAIL - A

+7.90M SSL
+4.35M SSL
+4.45M FFL
+0.61M
GROUND LVL
T.O.P
8.40M
+8.25M FFL
X
X
DET A
CAT LADDER - CROSS SECTION
TYPE-1
DET B
C