C 03 Backfilling

The checklist summarizes the key steps for backfilling at a project site. It includes verifying that: 1) the soil used has been approved and layer marking done; 2) the area has been cleared of debris before filling; and 3) pre-work like waterproofing and utilities have been completed. It also checks that layers are properly compacted according to specifications and compaction tests are performed and documented on every layer.

Uploaded by

Kamal Kks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views1 page

C 03 Backfilling

The checklist summarizes the key steps for backfilling at a project site. It includes verifying that: 1) the soil used has been approved and layer marking done; 2) the area has been cleared of debris before filling; and 3) pre-work like waterproofing and utilities have been completed. It also checks that layers are properly compacted according to specifications and compaction tests are performed and documented on every layer.

Uploaded by

Kamal Kks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BACKFILLING CHECKLIST

PROJECT/FACILITY NAME:

CONTRACTOR: DATE: TIME:

DOCUMENT NUMBER: AFS/QMS/C/03/00 REVISION NO: 00


REF. DRAWING/SPECIFICATION: GRID/LOCATION:

[Link]. Description YES NO NA

A Prior To Backfilling

1 Is the soil used for backfilling approved? (MDD Test)


Has the layer-by layer marking done? (300MM) or as per
2
specification
Has the area cleared from debris/dried concrete/ steel/ boulders &
3
slush before initiate the back filling?
The area to be backfilled dewatered completely before starting the
4
activity of backfilling?
Has all the pre activities (water proofing, plumbing & electrical line
5
etc.) completed?

B During Backfilling

Has the layer height maintained as per the specification/method


1
statement?
Are the stone free materials been used for layer wise backfilling to
2
avoid damage to water proofing?
Is the appropriate equipment employed for each layer of compaction
3
as per specification/BOQ?
Is the Compaction ensured where the compacting equipment cannot
4
be accessed?
5 Compaction test done on every layer of back filling and recorded?
Is the number of core cut taken for compaction test is as per
6
specification?
C After Backfilling
Compaction test conducted (prior placing next layer) and the results
1
observed above 95 % of Maximum Dry Density.
Earth filled compacted in layers not more than 300 mm with optimum
2
water content or as recommended in contract specification.
3 Check level of backfilling is as per required drawing.

Observations:
Whether the above points checked and in order? YES NO
Corrective Action Proposed and Enclosures

Checked by: Contractor Witnessed by: PMC Reviewed by: AFS

Sign:

Issue Date: 01/05/2022 Page 1 of 1