Work Flow

The document outlines the process flow for a site visit involving scaffolding erection, insulation removal, and inspection. It references specific procedures and standards, including KESB-MN-003-00 and PTS 15.13.01 (2018), with notes on required reporting, repairs, and touch-up painting. The flow concludes with scaffolding dismantling and job completion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views1 page

Work Flow

The document outlines the process flow for a site visit involving scaffolding erection, insulation removal, and inspection. It references specific procedures and standards, including KESB-MN-003-00 and PTS 15.13.01 (2018), with notes on required reporting, repairs, and touch-up painting. The flow concludes with scaffolding dismantling and job completion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Process Flow For PDT Site Visit / Visual Scaffolding Erection Insulation Removal

Inspection If Required If Required

KESB-MN-003-00 PTS 15.13.01 (2018)


(KMZ Procedure) (Waiting to get from
Petronas)

UTTM / Phonon Phonon Diagnostic Reporting / Repair If Touch Up Painting If


Preparation Testing Required Required

API 570 / 574 / ASME KMZ-PDT-TEC- P01 ???


V / ASNT (KMZ Procedure) (KMZ Procedure)

Scaffolding Dismantle Job Complete


Insulation

PTS 15.13.01 (2018) KESB-MN-003-00


(Waiting to get from (KMZ Procedure)
Petronas)