Process Flow For PDT Site Visit / Visual Scaffolding Erection Insulation Removal
Inspection If Required If Required
KESB-MN-003-00 PTS 15.13.01 (2018)
(KMZ Procedure) (Waiting to get from
Petronas)
UTTM / Phonon Phonon Diagnostic Reporting / Repair If Touch Up Painting If
Preparation Testing Required Required
API 570 / 574 / ASME KMZ-PDT-TEC- P01 ???
V / ASNT (KMZ Procedure) (KMZ Procedure)
Scaffolding Dismantle Job Complete
Insulation
PTS 15.13.01 (2018) KESB-MN-003-00
(Waiting to get from (KMZ Procedure)
Petronas)