- General Specifications
- Operational Mechanisms
- Diesel Engine and Electrical Aspects
- Brake Systems and Safety
- Additional Equipment and Testing
- Annexures
- Visual Annexure
FP te.
4
i 7
ee eee ee A ae
Pe AER ee
PA Ne PRO ANE oR
Ref: QO-D-7.1-2 Ver. 7.0 | Page1of50 | Date of issue: 3) August 2018 | Specification No.
| TM-215/May-2018
SPECIFICATION FOR 96 STONE RAIL GRINDING MACHINE (RGM)
(Specification No. TM-215/May-2018)
S. | Month & Year of | Revision/Amendment Reason for Amendment
No. Approval
a May-2018 Nil ae t Issue
2, August-2018 Ist Amendment Railway Board Letter No.
2018/Track-HII/13 dated
| | 27.07.2018
Signature cs Vie. [wen f, Ad. | pesenge
Frincekawmy Dikip kr|Musin Mad Om Prekath| $2. Sxivachave
Name & Sst) Kev Ssehm | ARE be o™ IE Evi™
Designation _ | Prepared Bi Checked By Approved Bs
Issued By
Track Machine & Monitoring Directorate
Research Designs and Standard Organization
Manak Nagar, Lucknow-226011Ref: Q0-D-7.1-2 Ver.7.0 | Page 20f50 | Date of Issue: 31-August 2018 | Specification No.
TM-215/May-2018
Specification of 96-Stones Rail Grinding Macl
(Specification No. TM-215/May-2018)
Pe
1 General
>
>
1.1, These specifications provide the technical requirements of Indian Railways to the
manufacturers and supplier for supply, testing, commissioning, maintenance and operation
of a self propelled rail-grinding machine of minimum 96 stones module (here after referred
as machines) for use on the tracks of Indian Railways. Self-propelled is defined as “power
transmission to the machine shall be from fully integrated power car of the machine”. The
Rail Grinding Machine to be supplied is meant for grinding the rails in corrective mode and
preventive mode, to improve the worn profile of rail head, rail wheel contact band, its
location, to remove fatigued material having micro cracks and other surface defects on the
rail head and remove corrugations. The Rail Grinding Machine shall be able to effectively
grind rail in track on Indian Railways. The consist of RGM shall include two rest vans and
‘one water wagon. The supplier shall furnish all details and itemizes cast about delivery,
warranty, operation and maintenances including supply of the 96 stone Rail-Grinding
Machines as per these specifications and tender conditions
yt a
2
)
12. The Technical Specifications have been drafted to cover the performance and quality
Tequirement of the equipment. Tenderers are requested to carefully study the specifications
and assure that their equipment fully comply with these specifications. Thereafter, if a
tenderer feels that his equipment can substantially meet the performance and quality
Pe requirement of the specification in general but does not fully satisfy a particular
specification, he should immediately seek clarification from the purchaser prior to
'e.>
ry submission of bids as to whether such deviation is substantive or not. Whenever there are
A any such deviation(s), tenderer should mention the same in the statement of deviation from
ix the specification to be submitted along with bid and should clarify how his equipment will
oe meet the functional requirement of such clause.
A 1.3. The tenderer shall specify the model offered and furnish a detailed Technical Description of
7 the same, System/sub-systems of the working mechanisms of the Rail Grinding Machine as
per para’3 of this specification & Annexure and all the items of the specifications in general
shall be described in detail in the “Technical Description”, along with the sketches to show
the manner in which the requirement of the specifications are accomplished by the machines
ee (models) offered.
ny 1.4. Photographs and video (in compact disc//Pen drive) of the type of machine offered in
a working mode (showing the working of machine in real time under field conditions) be
ts enclosed with the offer. This shall also show close-ups of various working
assemblies/systems and the full machine, Tenderer shall also submit the names of countries
& Railways where the offered machines are working and their working can be seen if felt
a necessary by the purchaser.
2. Dimensional and Operating requirements:
~ 2.1. The diesel-powered engine for self-propelled Rail-Grinding Machine shall be robust, reliable
and suitable for working on Indian Railways. The design and dimensions of the machine
2 : otFi eo
2
>
Ref: QO-D-7.1-2 Ver. 7.0 | Page 3 of 50 l Date of Issue: August 2018 | Specification No.
TM-215/May-2018
za
2.4,
components shall be to SI (International) System of Units standards and also comply with
provision of Indian Railways BG schedule of Dimensions-2004 incorporating all correction
slips issued .Quality assurance during manufacturing of the machine shall be according to
1S0-9001.The welding standard followed for manufacturing of machine should be to
1S0:3834, EN:15085 or any other equivalent standard. The manufacturer should specify the
standard followed and certify that it meets the welding standard mentioned above
The Rail Grinding Machine shall be Diesel powered (preferably indigenous) self-propelled
bogie type vehicle(s) with minimum 4 axles (2 bogies) for each vehicle. It should be reliable
and suitable for working on Indian Railway’s straight, transitions and curved track up to 10°
curves on broad gauge (1676 mm), Shared 2 axle bogies between two grinding cars and/or
between two grinding buggies/carriages are not acceptable,
The profile of the on-track machines longitudinally and in cross section during transfer as
self-propelled vehicle or towed in train formation shall be within the Indian Railways
standard metric BG schedule of Dimensions-2004 incorporating all correction slips up to
date, The minimum and maximum moving dimensions are enclosed in Amnexure-IIL. The
tenderer shall provide sketches of the machines in plan and cross-section and shall give
calculations to show the extent of lateral shift at the ends, centre and any other relevant cross
section and to prove that the machines do not cause infringement while moving on a 10°
curve at any cross section.
Where an infringement to Indian Railways Standard BG Schedule of Dimensions (metric)-
2004 incorporating all correction slips up to date is considered necessary by the
manufacturer as intrinsic to the design of the machine for meeting the work performance
requirements laid down in this specification while meeting the safety and operational
requirements of IR, the same shall be done with the prior approval of the Purchaser and
decision of the Purchaser in permitting any such infringement shall be final and binding on
the manufacturer. Tenderers may note that acceptance of any such deviation during
consideration of preliminary design details in the offer is only in principle acceptance and
the final decision will be taken by the Purchaser at the stage of consideration of machine
design for issuing speed certificate. In the past, IR have condoned certain infringements to
such dimensions as Rigid wheel Base, Length of stocks, Distance apart of bogie centres and
maximum height of floor above Rail level in certain track machines after due consideration
of their design features vis-a-vis safety and operational requirements of IR. However,
condonation of an infringement in another track machine in the past does not by itself entitle
the manufacturer to assume acceptance of the same in other track machines by IR.
Adequate clearance shall be allowed so that no component infringes the Minimum clearance
of 102 mm from rail level while travelling,
Wherever applicable, axle load shall be less than 20.32 T with minimum axle spacing of
1.83m. Load per meter shall not exceed 7.67 tones. Axle loads up to 22.82t and lower axle
spacing may be permitted, provided the load combinations do not cause excessive stresses in
the track and bridges of IR. A preliminary check in this regard will be conducted at the stage
of technical acceptance of offers. Further at the stage of consideration on machine design for
issuing speed certificate, stresses in the track and bridges shall be calculated by IR/RDSO
based on design data submitted by the firm as per Annexure-VIII A.B&C and decision of
IR/RDSO shall be final in this regards.- Ref: QO-D-7.1-2Ver.7.0 | Page4of50 | Date oflssue: 51-August 2018 | Specification No.
nN TM-215/May-2018
2.7. The Machines shall have a desirable wheel diameter of 914mm or more (new wheel profile).
r However, lesser diameter up to 760 mm for Rail Grinding machine can be permitted
nq provided it meets the condition laid down in clause 2.5 at its condemnation limit as per
4 design and provided the rail wheel contact stresses for 72 UTS rails are within permissible
oe limits. The.new wheel shall have a minimum wear margin of 50 mm before reaching
condemnatida limit, Forged wheels to Indian Railways profile shall be provided on the
A machine. The worm out wheel diameter (condemning wom out diameter) based on the
A criteria of rail wheel contact stresses for various maximum axle loads are as under:
- Maximum Minimum
Axle load wheel
ry (tone) diameter (mm)
ry 22.82 908
a 22.00 878
za 21.50 860
21.00 841
ry 20.32 316
A ie 805
A 19.5 787
ie 19.0 768
18.5 SO e|
o 18.0 eT3E
n 175 713 a
a 17.42 710
ms 17.0 700
= Permitted worn out wheel diameter should be specified by the manufacturer. The diameter of
wheel for assessment of permitted axle load will be the wom out wheel diameter. The new
fy wheel profile shall be as per Indian Railway standard wheel profile provided in Annexure-V.
2.8. Wheels shall be conforming to Indian Railway Standard R-19/93 or European Standard EN
13262 or any other equivalent standard (for product requirement) and design shall duly
conform to European Standard EN 13979 or other equivalent standard. The supplier shall
submit detailed design calculation along with material parameters at the time of supply of the
A machine.
2.9. The non-powered axles shall be conforming to Indian Railway Standard R-16/9S or
A European Standard EN 13261(EAIN) or any other equivalent standard. The supplier shall
me submit detailed design calculation along with material parameters at the time of supply of the
machine,
5 2.10, The powered axles shall be conforming to Indian Railway Standard R-43/92 or European
be Standard EN 13261(EA4T) or any other equivalent standard (for product requirement). The
design shall conform to EN: 13104 or any other equivalent standard. The supplier shall
submit detailed design calculation along with material parameters at the time of supply of the
A machine. -
4 M4Ref: QO-D-7.1-2 Ver. 7.0 Page 5 of 50 Date of Issue: _31-August 2018 | Specification No.
TM-215/May-2018
2.11. The machines shall be capable of negotiating curves up to 10° curvature (175 m radius),
super elevation up to 185 mm and gradients up to 3% in travel mode. The supplier shall
specify the minimum attainable speed under the above limiting conditions, which in any
case shall not be less than 25 kmph. Water wagon and camping coaches shall be considered
as part of consist/formation while travelling up to 3 % gradient.
2.12. The machines shall be capable of continuous operation during the varying atmospheric and
climatic conditions occurring throughout the year in India. The range of climatic conditions
is as follows
Ambient temperature -5° to 55°C
* Altitude Sea level 101800 m
+ Humidity upto 100%
* Maximum rail temperature: 70°C
All the system components on the machine shall be covered by roof or other suitable sturdy
covering so that the system & components vulnerable to moisture ingress are not adversely
affected during rains and the machine is able to work continuously even during rains.
2.13. The Rail Grinding Machine in consist/formation (in composition with all its integral part)
shall be capable of travelling at a speed of 80 knvh in either direction when travelling on its
‘own power. In train formation, it should be capable of being hauled at a speed of 100 knwh.
It shall be possible to haul the machines in both directions at the same speed. Since the
machines are likely to cover long distances on their own power, the travel drive system
should be robust to sustain these requirements during the life of the machine without much
break down/failure.
2.14. The machines shall be capable of working without requiring power block in electrified
sections. 25KV or 2x25 KVAC power supply is used for traction through an overhead wire
at 5500mm above rail level. On bridges and tunnels, the height is restricted to 4800mm. The
accuracy of measurement by measuring equipment/systems of the machine shall not be
affected in any manner due to overhead electricity and also due to track circuit voltage (12 V
& 1 AMP).
2.15. The machines and any of its parts shall not infringe the adjoining track as per ‘BG Schedule
of dimensions of Indian Railways (metric)-2004 print with latest corrigendum and up to date
correction slips issued while opening and closing of work. The machine shall be equipped
with pneumatically operated brake blocks acting on all wheels.
2.16. In the work mode, no part of the machines should rise beyond 4265 mm. above rail level for
safe working in the electrified sections.
2.17. While working on double line sections, the machines shall not infringe the adjoining track
and it shall be possible to permit trains at full speed on that track. Minimum spacing of track
is 4265mm.
3. WORKING MECHANISM OF RAIL GRINDING MACHINE 3
3.1. The working mechanism of the rail grinding machine shall be equipped with
3.1.1. Rail grinding mechanism of 96 stone modules
20>
>
Se 9: D>
7
35 3D,
eS ed 577
>
553.9 3099) 2s oS OOS :
>
x
Ref: QO-D-7.1-2 Ver. 7.0 | Page 6of50 | Date of lssue: a1-August 2018 | Specification No.
TM-215/May-2018
3.1.2. Control system for rail grinding mechanism :
3.1.3. Optical rail profile measurement system and_ its transfer to onboard computer
3.2,
33
34.
35,
3.6.
39.
The machine should be capable of producing good longitudinal profile of the railhead
continuously in one pass on plain track as well on curve track.
The machine should be capable of grinding operations on plain track and curves, track in
tunnels, track on bridges having guard rails without removing the guard rails, and track on
platform lines. It should also be capable of grinding operations on track on level crossings
having check rails and curves with check rails after removing check rails. Maximum grind
speed should not be less than 22kmph on plain track.
The machine shall also be capable of grinding only one of the rails, if required, of the track
as in the case of curves ete.
The machine shall be capable of grinding profile of UIC 60 Kg rail section, 52 Kg rail
heads in 72/90/110 UTS strength and Head Hardened rails and able to upgrade for UIC
65Kg, and 67kg. rail sections inclusive of fish plated joint, insulated joints and welded
joints in long welded rails and short welded rails laid on pre stressed concrete sleepers,
steel sleepers, composite sleepers and wooden sleepers. It shall also function effectively on
rails having surface defects such as wheel burns, shelling etc. The number of grinding
stones and grinding units of the machine shall be such as to carry out controlled grinding of
all rail corrugation defects and also defects of long wave length to produce a smoot) cross.
sectional profile without creating any sharp edge between the rail table and gauge face
The supplier shall ensure that the offered rail grinding machines shall be capable of
modular up gradation at a later stage and shall have such computer hardware and software
which shall facilitate easy up gradation
The rail grinding mechanism should be electric driven, drawing power from an on-board
diesel generating set.
All the components of the rail grinding machine must be robust and capable of continuous
operation upto 8 hrs in one spell under the field working conditions. They must be
shielded against heavy heat accumulation in the work area and good collection system of
metallic dust generated at the work site
To achieve the target profile with smooth curvatures, with minimum points of singularities,
the Rail grinding machine shall have a minimum of 96 grinding stones (48 per rail), which
can be configured in various configurations to achieve different target profiles,
3.10.Each grinding module shall be controlled by a hydraulic/pneumatic cylinder for its
up/down movement
3.1L.It is mandatory that hydraulic fluid used for grinding applications in the machine shall be
fire resistant water glycol fluid for safe working and to prevent fire hazards due to the
extreme environmental condition and heat accumulation near grinding area,
ela5
Pe De ee ae
2
>
Ref: Q0-D-7.1-2Ver.7.0 | Page 7 0f50 | Date oflssue: 31 -August 2018 | Specification No.
TM-215/May-2018
3.12. The machine shall be equipped with an inbuilt mechanism to stop the grinding and lift the
grinding stones/carriages when the operating speed falls below a certain minimum speed to
avoid metallurgical damage due to heat accumulation. The minimum speed, at which the
grinding shall stop automatically, shall be as per supplier's design but it shall be mentioned
in the offer.
3.13.Each grinding module shall comprise of a ring shaped stone and a grinding motor with
suitable positioning mechanism to control the stone position, to achieve the target profile
by the various grinding module configurations. Firm shall submit their module
arrangement; configuration should have a fully adjustable angle range of +70° toward
gauge face side and -20° to field side of the rail, independently controlled from the operator
station in the cab. Each grinding motor spindle angle shall be accurate within +0.25°
(plus/minus one quarter of a degree) of the designed spindle axis positioning angle. Each
module shall contain one or 2 max. grinding motors with, independent tilt cylinder for each
module and must have the capability of being positioned by the control system independent
of any other grinding module. In each module grind motors\tilt cylinder should be
separated by certain angle so that heating or other impact does not take place on rail. The
tilting cylinders should not be shared with adjacent modules and must be independent for
cach module.
3.14,At the work location, the prevailing temperature may be higher than the specified
maximum temperature of 55°C. The peak load on the grinding motors, under the most
demanding conditions shall not be more than 80% of the continuous load rating of the
motor, at the prevailing temperature conditions. The supplier shall furnish the peak load
for the motors at various locations and the continuous load ratings of the motors under the
operating conditions, as per the manufacturer’ catalogues,
3.15. The grinding motor power shall be as per the supplier's design to achieve the output
parameters laid down below and may vary with the total number of grinding motors
provided on the rail grinding machine (not less than 96). However, the total grinding
power provided on the rail grinding machine (number of motors x continuous load rating of
each motor) shall not be less than 2880 HP.
3.16.The machine shall be capable of removing, a minimum of 20 sq, mm material from each
rail (40 sq. mm for both the rails) per pass, from the rail top of a 60 kg. UIC (90 UTS) rail
section, with top surface work hardened to BHN 315 to 380, while operating at a speed of
18 kmph, While assessing the rail grinding machines performance, the test rail profile
(after grinding) shall be close to the target profile and the metal removal shall be fairly
uniform over the entire rail surface to be ground
3.17.The capacity of rail grinding machine regarding depth of grinding per pass, for 60 kg 90
UTS work hardened rail top while grinding uniformly over full width and gauge faces at
various working speeds, shall not be less than as mentioned below
22 kmph 0.13 mm
18 kmph 020mm
3.18, While achieving the above progress rate, the overall combination of grinding stones
pressure, RPM and travel speed should be such that no chattering or uneven removal of the
- oteo ye hy oe
ee
)
St 38 Ji
)
Ref: QO-D-7.1-2Ver. 7.0 |Page8of50 ] Date of issue: as -August 2018 | Specification No.
TM-215/May-2018
material occurs at high speeds nor are there any metallurgical changes or bluing of the rail
top at the minimum operating speed.
3.19. The machine must be capable of bi-directional grinding i.e
same track without loss of metal removal capacity or produ
simultaneously or either rail independently
both the directions on the
, while grinding both rails
3.20.To ensure Gauge Face correction without flattening the root curve, all of the grinding
modules shall have the ability of attaining spindle axis orientation with respect to the rail
axis, up to 70° on the gauge side and 20° on the field side. At all angles the grinding effort
must potentially be 100%,
3.21. While the machine is operating at full grinding load at the maximum working speed, the
minimum life of each stone shall not be less than 5 hrs grinding time
3.22. Each module shall be provided with a stone stop mechanism to prevent accidental contact
between the rail and grinding motor shaft chuck when the stone has completely worn out,
to prevent damage to rail or the shaft.
3.23.Machine driving controls must be at both extreme ends of the rail grinding machine,
irrespective of driving direction. However grinding controls can be housed in one cabin.
3.24. The unit must be capable of travelling and grinding under the following track conditions:
(Maximum grade 3%
Gi) Maximum curve 10 :
3.25. The unit must be capable of grinding a variety of profiling and re-contouring patterns
depending on varying rail wear conditions. Such pattern changes and adjustments should
be made instantly from an on board central control panel,
3.26.The unit must have the following controls/display the following operating data at the
operator's console:
(@) © Starv/stop buttons for individual motor and master stop button (to stop all grinding
motors),
(b) Current meters for various grinding modules and motor grinding power control.
(©) Grinding Module/Grinding carriage up/down control
(4) Operating speed monitor and control.
() Stone condition monitor.
(© Deviations in motor spindle angles.
(g) Any other data monitor/control required for proper operation and control of the
working, depending on the supplier’s design.
(h) Angle setting of different grinding module.
oud.Refi QO-D-7.1-2Ver.7.0 | Page90f50 | Dateoflssue: 31-August 2018 | Specification No.
TM-215/May-2018
3.26.8
3.266.
3.26.6.
There shall be computer controlled monitoring of input and output of different
electrical/electronic devices with the facility of display of
putloutput so as to
monitor the functioning of electrical/electronic devices.
The gomputer controlled functions may be as per the supplier's design, but as a
representative illustration, the following functions shall be computer controlled
fa)
)
()
@)
©
@
Auto horsepower adjustment of grinding stones with change in pattern
Carriage Raising and lowering
Module raising and lowering
Pattern data input from Rail Profile measurement units.
Storage of Profiles,
Grinding pattern selection and down loading to grinding controls
‘The computer controlled system shall have the facility of System diagnostics in
operator’s cabin (at least in one cab) which should be able to do following:
(@)
()
©
Detection of short circuit, open circuit conditions and measurement of amperage
in connection to control devices.
Diagnostics modules shall be provided for trouble shooting of various eleetronic
printed circuit boards used up to card/board level fault finding.
Communication between various sub systems used in the system shall be
provided as a diagnostics feature.
The on board computer will monitor the main system of rail grinding machine and
maintain a log of following items
(@)
)
(©)
(d)
(©)
®
Grinding Motor performance (amps).
Stone usage.
Grinding Motor idle amp.
Stone spark time.
Motor life.
Performance monitoring,
Quantitative assessment of metal removal fom each km oftrack to achieve
target profile.
Percentage deviation of ground profile from target profile
ee‘Specification No.
Ref: QO-D-7.1-2 Ver. 7.0 Page 10 of 50 | Date of Issue:
TM-215/May-2018
= Grinding speed and no of grinding passes.
= Quantum of work done in pass km
~,, History of existing rail profile, target profile and grinding pattern followed for a
given km of track
3.28. The rail grinding machine must be capable of automatic adjustment of grinding patterns
from the operator’s cab. The supplier shall furnish details of all possible number and
patterns subjected to minimum of 100 patterns, The on-board computer must be capable of
storing all these grinding patterns and changing from any of these patterns to any other
within the length of the grinding consist.
3.29.It shall also be possible to record the grinding length vis-d-vis time on a print out to obtain
information on the rail grinding machine output. The system shall be able to produce
performance parameters and progress of work such as grind length, speed of grinding,
number of passes done, pattern used, pre/post Grind Quality Index (GQI) etc in a way that
should facilitate its transfer to pen drive at the end of day’s work
3.30.The grinding method must ensure the complete re-profiling of the railhead by metal
removal.
3.31.Alll the grinding stones shall be equipped with an automatic vertical control or locking
device preserving the stone from dropping into pitch corrugation
3.32. All the grinding units shall be so designed that it can be lowered or raised from grind cabin.
Lowering and rising of grinding units should be automatic, electronically operated, which
can be applied either on one rail or on both rails simultaneously
3.33. The rail grinding machine shall be equipped with Rail Grinding templates for Board Gauge
(1676 mm)with different profiles. Further the machine shall be equipped with special track
location templates for different profiles as required. After study of efficacy of existing
grinding program and existing rail and wheel profiles, the supplier shall design the target
rail profiles and software required for it and supplies the templates for the same for
different routes of IR. This rail grinding profile design study shall be done by the supplier
and shall part of the contract and it shall be completed before commissioning of the
machine. The supplier shall ascertain the agency for this study, if any external agency is
used. Acceptance of the study on IR, BG track required approval of IR officials.
3.34.To ensure minimum vibration of the rotating grinding stones, a self-centering system for
holding the stones shall be provided.
3.35. The grinding trolley shall be designed for raising and lowering operation fom grinding
control cabin.
3.36. The grinding power output per grinding stone shall be minimum25 Horse Power.
3.37. The rail grinding machine must be equipped with an obstacle sensing/detection system
with manual lifting of the grinding carriages through controls from operators’ cabin before
approaching the obstacle and restarting of the grinding process after the clearance of the
eo>
Rh ke REI tA ke ok Oe Sd 3 On en ek ok
Be ee a SE ee
7
Ref: QO-D-7.1-2 Ver. 7.0 | Page 110f 50 | Date oflssue: 31-August 2018 | Specification No.
‘TM-215/May-2018
obstacles. The supplier shall specify the distance left ungrounded after the clearance of the
obstacles at various operating speeds. This distance shall not be more than 12 m for an
operating speed of 22kmph after obstacle clearance and restarting command
3.38. The rail grinding machine must be capable of setting down or picking up grinding stones in
curves also
3.39, Grinding carriages should be capable of being raised and lowered and locked into position
on curved track up to 10 degrees,
3.40. The grinding stone must be centered over the grinding spot at all intended grinding angles.
To ensure proper positioning and angle of the grinding stone, the support structure must be
equipped with pivot to permit the angular adjustment of the motor/stone in relation to the
rail for centering of the stone over the area with adequate force to produce desired grinding
power.
3.41.The grinding motors shall be controlled through suitable starter control for
starting/stopping of motor.
3.42, Grinding patterns must be balanced and not change with curve super elevation of the track
on which the rail grinding machine is operating except for changes will made from system
The rail grinding machine must be equipped with a system to maintain a positive pressure
and constant reference to the gauge face of the rail
3.43.The rail grinding machine must be equipped with a vertical rate of correction feature,to
restrict the grinding in corrugation valleys, while smoothening the crests. For maximum
grinding effort on rail running surface variations, the unit must be equipped with selective
vertical stability control. The tenderer shall furnish the details of the mechanism to achieve
this.
3.44. The unit must be capable of grinding any worn rail profile to shapes within plus or minus
0.30 mm of the selected target profile.
3.45. Metal removal rates must not vary more than 25% between grinding of rail with hardness
ranging from 280-380 BHN,
3.46.The surface finishes after the grinding shall be that corresponding to RMS value of 12
microns roughness or less.
3.47. The rail grinding machine must be supplied with adequate lighting to perform grinding at
night safely and efficiently
3.48. The rail grinding machine shall be equipped with suitable spark arresters to prevent sparks
from flying around and be a potential fire hazard, The spark arresters shall be suitably
designed to withstand the heat generated at the work spot and the flying metal sparks.
3.49. The rail grinding machine should have adequate water capacity to prevent and fight fires,
and to carry on grinding irrespective of terrain or dry weather conditions. A minimum
20000 liters water storage capacity should be available on the rail grinding machine. There
shall be separate arrangement of 55000 liters storage of water container in the rail grinding,
CaeRef: QO-D-7.1-2Ver. 7.0 | Page 12 0f 50 | Date of issue: 31-August 2018
| TM-215/May-2018 S|
machine consist by way of a separate wagon for use during prevention of fire. It should be
possible to connect the water storage on the attached wagon with the rail grinding machine
storage and use it for arresting fire as and when required. The visibility requirement of the
rail grinding machine as specified in clause 13.1 shall not be obstructed on this account
3.50. The rail grinding machine shall be equipped with two water cannons (one in front and
another in rear) of capacity up to 600 liters each per minute throughout with a reach of 40
meters. The rail grinding machine shall also be equipped with separately controlled sleeper
and ditch spray, for front and rear.
3.51. There should be an installed, integrated backup of the following critical sub-systems to
ensure maximum availability and minimal chances of disruption of rail grinding machine
operations:
a, Water system/pumps
b, Hydraulic pumps/motors
c. Air compressors
A suitable by-pass mechanism should be installed and integrated to main system to operate
the rail grinding machine with backup assembly.
3.52. The rail grinding machine shall be provided with a set of optical rail profile measuring
system integrated with the onboard computer both in front of the rail grinding mechanjsm
as well as rear of the rail grinding mechanism,
a, The profile measurement system should be able to capture rail profile both ahead of and
behind the grinding machine and should have capacity to store data of rail profile at
Jeast 200 km of track length for real time comparison of rail profile before grinding and
afier grinding. Optical rail profile measurement system should have facility to transfer
data to onboard computer without human interface.
b. The on board profile measurement system, in a real time basis, should show the actual
rail profile ahead of work and after the work and difference between the measured
profile and selected target profile, The system should save the captured rail profile data
along with input location data such as milepost, curve-data, grinding, speed patterns
used ete.
¢. Electronic/computerized rail profile data processing system and software plug-ins to
grind the existing rail profile to a selected target rail profile shall be provided on board
to Rail Grinding Machine. Rail Grinding Machine should be equipped with required
following hardware and software-
i. To capture, store and process rail profile data from other measuring devices of rail
profile,
ii, Optional merit given to supplier having quantitative assessment of metal removal
per meter of rail to achieve target rail profile,
iii, Recommended grinding pattern to achieve a target rail profile
iv. Comparative picture of target profile and profile achieved after grinding on real
time basis, s
OtRef: QO-D-7.1-2 Ver. 7.0 | Page 13 of 50 | Date of Issue: _ 3)-August 2018 | Specification No.
TM-215/May-2018__}
41.
42.
43
44
v. Quantitative assessment of deviation of ground profile fom target profile,
d. The rail grinding machine should be provided with the necessary software and hardware
system to store a library of desired railhead profiles (templates) and to calculate on real
time basis the amount of rail grinding to be done. The supplier shall be responsible to
provide technical support and services for software maintenance and up gradation
during warranty and subsequent working life of the rail grinding machine (minimum 15
years)
e. It should give:
(@)__Best/optimum pattern to use for grinding,
(ii) Number of grinding passes needed in order to achieve a predefined acceptance
envelope
Gili) Grinding speed for suggested pattern and profile
£ To develop library of target profiles for various rail sections on different route, supplier
of rail grinding machine will design the target rail profiles for all the locations where it
will be deployed to work. The system should be equipped to store data of rail profile
before grinding, its target profile and rail profile after grinding in an integrated way so
that it could be retrieved for any given location of track.
3.53.The machine should be equipped with GPS, GSM/GPRS based remote monitoring
capabilities for various track parameters and vital parameters of track machine, It
should also have facility to interface with Human Machine Interface (HMI) / Display
and various other sensors. The data transfer unit should be compatible with the Track
Management System (TMS) of IR.
DIESEL ENGINE/ELECTRIC GENERATOR:
The machines shall be powered by diesel engine(s) preferably indigenous, with proven
record of service in tropical countries with wide service network in India. Robust
construction and low maintenance cost are of particular importance. The manufacturer of
the ‘engine shall have acquired quality assurance certification of ISO 9001, Adequate
allowance shall be made to provide adequate reserve power to take care of the working of
machines under most adverse climatic conditions, heavy grinding requirements on steep
gradients, and to provide backup power in case of failure of one of the engines,
The supplier shall furnish the details of diesel engine and its controls to assess its
conformity with the engines already operating on track machines on Indian Railways. The
engine should be of such design /brand which are being manufactured indigenously and/or
such designs having after sale service facilities available in India. The supplier should
furnish the information regarding agency which will provide after sales service support and
availability of spares in India,
Diesel tank fuel capacity of the rail grinding machine should not be less than 24000Its. or
40 hrs of working. Tenderer should mention the fuel storage capacity and average fuel
consumption of machines.
The engine shall be mounted on suitable Anti-Vibration Mountings.
“tale| Ref Q0-D-7.1-2 Ver. 7.0 | Page 14 0f 50 Date of Issue: 31-August 2018 | Specification No.
| TM-215/May-2018
45.
46.
47.
43.
49.
4.10.
4.11
4.12.
4.13
4.14,
415
High speed diesel oil to Indian Standard Specification shall-be normally used
Sight glass type fuel measuring gauge preferably of full height shall be provided on the fuel
tank or any electronic safe device built in to show the actual fuel quantity available in
machine.
For starting the engines, storage batteries of well-known make shall be provided. The
engine Shall be push button start type or key type.
Since the engines are to work outdoor under extreme dusty condition, the air intake system
shall be designed suitably so as not to allow dust through air intake system
There is likelihood of dust deposition over the engine body and surrounding area over the
lubricants spill-over. These should be easy to access for daily cleaning and routine
maintenance. In case, air cooled engines are proposed by the supplier, maintenance
equipment for cleaning and maintenance of the air cooling fins shall be provided by the
supplier along with the machine
The engine parameter monitoring system like temperature, rpm, lube oil pressure shall be
in electrical/mechanical gauges in the operator’s cabin showing the absolute readings along
with safe limits suitably coloured. There shall be audio visual warning (safety mechanism)
to the operators in case of any of these parameters exceeding the safe limit, and engine
should shut down automatically
Suitable and rugged mechanism should be provided to start the prime mover at minimum /
no load and gradual loading after the start of the prime move
The diesel engines of Rail Grinding Machine shall be coupled to the electric generator(s) of
a continuous rating to suit machine-operating requirements, Suitable cooling arrangement
for the generator shall be provided. The electric generation parameter monitoring gauges
shall be provided like wattmeter, voltmeter, ammeter, frequency meter etc. Generator shall
have over voltage protection
The grinding power distribution shall be either on a common bus or any other such suitable
system so as to ensure grinding with all grinding modules may continue in case of failure
of one of the engines / generators. The supplier shall furnish the details of power
requirement for working under normal conditions as specified in clause 3.15 and total
power provided on the machine.
In order to adhere to pollution control norms, all the diesel engines provided on RGM
consist shall be electronically controlled emmissionized engine with minimum compliance
to tier 2 stage
The engine should have Electronic Control Module (ECM) or similar arrangement for
taking out operating parameters on real time basis such as RPM, load, temperature,
pressure and diagnostic data as well as trip and historical data, These data should be
displayed and stored on a centralized computer and monitoring system, It should also be
possible to transfer these data on USB device through the centralised computer based
control,Ref: QO-D-7.1-2 Ver. 7.0 | Page 15 0f 50 | Date of issue: 31-August 2018 | Specification No.
TM-215/May-2018
416
gil
5.2,
53,
55
56.
57.
58,
59.
The engine should be enclosed in a weather protective, sound and dust resistant enclosure
to minimise engine noise and to prevent oozing out of oil spills etc. from engine area to the
adjacent machine components, hoses, electrical cables fittings as a protection against fire
All doors on the enclosure shall be strategically located in areas as to allow ease of
maintenance of the engine and allow good access to and visibility of instruments, controls,
engine gauges, etc. Sufficient louvers shall be provided to allow the total engine cooling air
requirements used in this application.
DRIVE MECHANISM.
The machine should be provided with an efficient traction drive system for traction during
the operation, The machine’s driving system shall be through electric / hydro dynamically /
hydrostatic capable of achieving full speeds in travel mode in both the directions, The
system should be so designed that all the driving wheels work in synchronization and there
is no slippage / skidding of the wheels during the work drive.
The driving mechanism, in working mode, shall be adequately designed to handle the
acceleration and braking forces
Suitable differential systems may be provided between coupled wheels on the same bogie
Suitable throttling arrangement may be provided to equalize the tractive effort amongst
different bogies.
The supplier shall provide the necessary technical details including circuit diagrams and
detailed technical specifications of all electrical/electronic parts to confirm the above
requirements
Adequate gauges to monitor driving and working performance of machine should be
provided in working and driving cabins near operator's seat. Solenoid valves shall be
provided near linkage assembly, for indication, flow control and carrying out necessary
adjustment in the field, To the extent possible hydraulic and pneumatic
component/assembly should be fixed at suitable location preferably on the side frame of
the machine so as to avoid the need of going on top of the machine for day-today
maintenance schedules,
The pneumatic circuit should be provided with air dryer for the smooth working of
pneumatic components.
The machine shall be equipped with adequate safety circuit such that if any unit/part which
may endanger the safety is unlocked and the air pressure in brake circuit is less than 5 bars,
the machine shall not move during run drive. The indication of locking and unlocking of all
units should be displayed in the cabin
Onboard system for online filtration and monitoring the quality of water glycol base
hydraulic oil in hydraulic circuit should be provided. The gauge should clearly indicate if
the hydraulic fluid is contaminated beyond the permissible limits and requires immediate
replacement. oeRef: QO-D-7.1-2 Ver. 7.0 | Page 16 of 50 | Date of Issue: 3rAugust 2018 | Specification No.
TM.215/May-2018
61
6.2,
1.
71
Te
ia
TA,
15.
8.
81
COOLING SYSTEM: x
The cooling system shall be efficient and designed for a maximum ambient temperature of
55°C. Supplier must note that the machine shall be working under extreme dusty conditions
and the cooling mechanism should be maintainable under these conditions.
Adequate heat transfer arrangement shall be designed and provided so that the system oil
temperature does not go beyond specified range.
REST VANS:
One No’s crew rest van having total resting capacity of about 12 to 15 persons will be
integral part of the Rail Grinding Machine and shall be supplied with the same and for
second rest van with driving control as a last vehicle of the RGM
Typical layouts of coaches, with/without operational controls are given at Annexure I & II
of the Technical Specification. These layouts are for guidance of tenderer in respect of the
facilities required and general arrangement thereof
Tenderer can propose modifications in layout as a part of technical proposal while
providing the required facilities as per typical layout, Overall dimensions of the rest van
will be within (+/-) 10% of the typical layout subjected to conformity to the Indian
Railways standard metric BG schedule of Dimensions-2004 incorporating all correction
slips up to date. The modifications proposed by tenderer will be discussed with tenderer
during technical evaluation and necessary modifications required by IR will be
incorporated by the tenderer as per mutual consent, If any further modifications are
required by the successful contractor at the stage of detailed design, the same will be
subjects to approval of RDSO.
Rest vans should be air conditioned and fully furnished for comfortable stay of operation &
maintenance crew and IR personnel.
Minimum amenities to be provided in rest vans, its color scheme and other details shall be
as per IRTMM-2017. A Washing machine, Microwave oven and communication gadgets
are also to be provided
BRAKES:
Machine shall be equipped with compressed air brake system applying brakes equally on
all wheels and provision shall be made to connect air brake system of the machine to that
of camping coach/wagons when the machine is hauling it. Fail safe braking mechanism
system shall be provided so that in case of any failure of brake circuit, will result in
automatic application of brake. The pneumatic parking brake should also be spring loaded
so that in case of drop in pneumatic pressure below certain value the brake will be
automatically be applied. The brakes shall be protected from ingress of water, grease, oil or
other substances, which may have an adverse effect on them. The brake lining shall be
suitable for high ambient temperature of 55°C. The force required for operating the brake
shall not exceed 10 kg at the handle while applying by hand. In addition, mechanical
brakes shall also be provided for parkingRef: QO-D-7.1-2 Ver. 7.0 | Page 17 of 50 | Date of issue: 31 -August 2018 | Specification No.
TM-215/May-2018
8.2.
83.
84.
85.
86,
91
9.2.
93.
The rail grinding machine shall have provision for suitable air brake system in the driving
cabins to brake the entire consist including camping coach/crew rest van and water wagon
attached as a part of its consist/formation. Fail safe braking mechanism system shall be
provided so that in case of any failure of brake circuit will result in automatic application of
brake. The pneumatic parking brake should also be spring loaded so that in case of drop in
pneumatic pressure below certain value the brake will be automatically be applied
The machines shall be equipped with suitable air brake valves so that while working in
train formation, machines can be braked by the traction vehicle
There should be provision of emergency brake application in the machine either travelling
alone or coupled with the coach/wagons, in addition to the normal braking system of the
machine, using the compressed air. The emergency braking distance (EBD) of the machine
on the Indian Railway Track, at the maximum design speed on level track shall not be more
than 600 m. Design calculations for the braking effort and EBD at the maximum design
speed of the machine on level track & at falling grade of 1 in 33 should be provided by the
supplier,
Provision of “Manual operated hand brake” system shall be provided.
Clearly visible brake lights shall be provided at both the ends of the machine, which will be
automatically operated when brake is applied and switched off when brake is released. This
will be to alert the operator of machine following this machine when the machines are
working in groups.
HORN, HOOTER ANDSAFETY MECHANISM:
The Machines shall be provided with dual tone (low tone & high tone) electric horns! at
suitable locations facing outwards at each end of the machine for use during travellingto
warn the workmen of any impending danger Controls/switches shall be provided in close
proximity to the driver permitting the driver to operate either horn individually or both
horns simultaneously. The horns shall be distinctly audible from a distance of at least 400
m from the machine and shall produce sound of 120-125 dB at a distance of 5 meter from
horn (source of sound). The higher tone horn shall have fundamental frequency of 370 +15
hertz. These electric horns shall be operated by means of push buttons provided in the cabs.
‘The Machines shall have arrangement for flasher lights at both ends.
Pheumatically/electrically operated hooters capable of producing intensity of sound
between 105-110 dB at a distance of S meter (when measured in still air in a closed room)
and variation in intensity of sound shall not be more than S dB. The hooter shall be
provided facing outwards at each end of the machine at suitable locations, operated by
means of push buttons provided in the cabins to warn the staff working on/around the
machine about approaching train on adjoining track. Additionally switches for such hooter
shall be provided outside on the machine frame and near the both side exit gates so that it
can be operated by staff present at work site near the machine. The hooter shall also be
operatable from remote point at a distance of at least 300 m from the hooter.Ref: Q0-D-7.1-2 Ver.7.0 | Page 18.0f50 | Date of Issue: 3 August 2018 | Specification No.
TM-215/May-2018
94,
95,
96.
97.
98.
9.9.
9.10.
10.
.
Safety equipments like jacks, pullers, tinfor and other such equipments specific to the
machines for restoring failed units of the machines during working, shall be provided on
the machines, The tenderer should submit the list of safety equipment to be provided
Adequate numbers of safety stop/ switches should be provided all around so that in case of
any danger fo worker as well as hitting of any obstructions by working unit like signalling
cable, joggle fish plate etc. during work, so that the operator can be warned or the machine
can be stopped immediately.
In addition, separate electric horns with push bottom type switches shall be provided at
suitable locations in all cabin(s) and on machine body for communication between the
machine staff about infringement/malfunctioning or any other trouble
Machines shall be provided with emergency backup system to wind up the machines in the
event of failure of prime mover or power transmission system of the machine. The
emergency backup system should able to be operated manually and may also use a manual
hydraulic power pack in addition to the emergency generator / battery based electric
hydraulic system.
‘The grinding carriages of rail grinding machine should have non-flammable shields and
guards so as to avoid damage due to sparks, grinding dust and flying debris.
The rail grinding machine shall have a UV and Temperature based fire detection system
that will alert the operator also there shall be an arrangement that the fire extinguisher is
activated. If electronic control of engine detected malfunction, the engine automatically
shuts down
There shall be arrangement on rail grinding machine to prevent dust from the grinding
process from escaping into the air. A suitable and efficient “dust collection system” shall
be provided on the machine
HOOKS AND BUFFERS:
The machines shall be fitted with transition CBC couplingas per RDSO specification no
56-BD-07 with latest revision along with side buffers to RDSO drawing no. RDSO/SK-
98145, with latest alterationon both the ends for coupling it with other vehicles for running
it in train formationand for attachment with the coach, locomotives and wagon.
HEAD LIGHT, FLASHER LIGHT AND OTHER LIGHTING ARRANGEMENTS:
The electrical equipment to be provided on machines shall conform to relevant standard
specifications and shall be suitable for Indian climatic conditions. The machine shall be
equipped with Twin beam headlight assembly conforming to RDSO’s specification no.
ELRS/SPEC/PR/0024 Rev-1, Sept 2004 with latest amendments ensuring a light intensity
of 3.2 lux at ground level at track centre at a distance of 305 m. away on a clear dark night,
at cach end and with two front and rear parking lights, which can be switched to red or
white according to the direction of the travel. Powerful pressurize floodlights shall also be
provided to illuminate the working area sufficiently bright for efficient working during
night.In addition minimum eight power point locations shall be provided on outside frame
of the machine two in front, two in rear and two on both sides for providing lighting
oyRef: Q0-D-7.1-2Ver.7.0 | Page 19 0f50 | Date of Issue: _ar-August 2018 | Specification No.
TM-215/May-2018
ils
152,
13.3,
13.4.
13.7.
138.
arrangements during night working, The umber colour LED based flasher lights producing
not less than 500 lux at | meter and $5 lux at 3 meter in line measurement in axial direction
from flasher light shall be provided at both ends on the machine to give indication for the
train arriving on the other line
CHASSIS AND UNDERFRAME:
The chassis of machines shall be fabricated from standard welded steel section and of steel
sheets, so as to permit transportation of the machine in train formation without endangering
safety of the train. The under frame shall be constructed with rolled steel section and/or
plates and shall be designed to withstand a maximum static squeeze test load of 102t at
buffers i.e, 51t at each buffing point without any permanent distortion. The under frame
shall be sufficiently robust for safe travel of the machine in train formation.
CABINS:
The machines shall be equipped with fully enclosed air conditioned and pressurized cabins
with safety glass window at both the ends. The noise level in the cabins should be less than
70 dB for operator’s comfort. It shall be possible to have a clear view of the track ahead
while driving the machine in both the directions from the cabins at either end. The cabin
layout shall be such that, before leaving the machine, the operating staff has full view on
both the sides, to avoid any danger to them from trains on the adjacent tracks,
‘The gauges, instruments and controls panel shall be suitably located in the operator’s cab
so that they can be observed without undue fatigue to the operator.
‘The operator's cabin shall be ergonomically designed to have easy access to all controls,
Screen wipers preferably operated by compressed air or electricity shall be provided on the
windscreens
Suitable number of fire extinguisher shall be provided in all the vehicles. The chemicals
used for extinguishing fire by such fire extinguishers shall not chemically react with
electronic equipments/components, PCBs, cables etc
The machines shall be provided with well-defined space for keeping the tools and spares
required for at least one week of operation and onsite repair of the machine to attend the
breakdowns and other working requirements
Large window shall be provided in both cabs of the rail grinding machine at low level to
ensure good visibility for the operator controlling working and driving of machines to
observe the track features and to operate the controls based on the features/obstructions
being approathed and cleared Facility of driving the machine for travelling purpose shall
be from both the cabins. All travelling and grinding control shall be housed in the air-
conditioned cabins
Inter-communication system wired/wireless shall be provided inter-connecting all the
cabins and coaches and outside of machine should be so oriented that the operator, seating
on the seat of either cabins/working cabin, can distinctly hear the conversation and
communicate with other staff. ed.Ref: QO-D-7.1-2 Ver. 7.0 | Page 200f50 | Date of Issue: _31-August 2018 | Specification No.
TM-215/May-2018 |
13.9.
14,
141
144.
14.5,
14.6.
147,
The machine shall be equipped with speed indicator and recording equipment of range
between 0 - 120km/h for recording the speed of the machine in real time basis, The
recorded data should be retrievable on computer through memory card/pen drive. It should
be provided in the driving cabin at suitable place and recording system should have
sufficient memory to keep the speed record of minimum 15 days which should always be
stored for retfieving as per requirement
TOOLS AND INSTRUCTION MANUALS:
Each machine shall be supplied with a complete kit of tools required by the operator in
emergency and for normal working of the machines. The list of tools to be provided shall
also include all tools necessary for maintenance and repair of the entire machine including
specialized equipment, like hydraulic jacks, welding equipment, wheel truing shoes,
refractometer, power tools, air hoses/wands, etc. all special tools shall be listed and
catalogued illustrating the method of application.The list can be modified to suit the
purchaser's requirement, while examining the offer. The supplier shall include all items,
tools and accessories required for proper operation, servicing, maintenance, assembly
overhauling, periodical overhauling of the machine along with the offer and not mentioned
in these specifications and supply the same along with the machine.
Detailed operating manual, maintenance and service manual shall be specifically prepared
in English Language and four copies of these shall be supplied with each machine.
The manufacturer shall also supply circuit diagrams of electrical hydraulic, pneumatic and
electronic circuits used on the machine. Trouble shooting diagram/tablé shall also be
sup} In addition, the supplier shall provide dimension drawings with material
description of items like rubber seals, washers, springs, bushes, metallic pins etc., main
features such as type, RPM & discharge etc. of items like hydraulic pump-motors, and the
tenderer shall furnish the details of such other bought out components/assemblies. These
shall be specially prepared in English language and four copies of these shall be supplied
with each machine.
‘Complete technical literature in English to be supplied with the machines should be sent 3
‘months in advance of inspection of the first machine to RDSO for their review regarding
adequacy and manner of detailing. Necessary modifications and further detailing as per
RDSO’s comments should be carried out and compliance should be reported to RDSO as
well as the Inspecting officer of the first machine
‘The firm shall provide detailed technical drawings and specifications of wheels and axles
used on the machines. The above details shall be provided in four sets with each machine.
One set each of all the manuals and diagrams should be sent to the PrincipalARTMTC/
Allahabad, — ED/TM/RDSO/Lucknow, DTK — (MC)/Railway Board and
Director/IRICEN/Pune along with supply of first machine. In case there is any subsequent
amendment in above documents based on field performance, the amendment/amended
documents should also be sent to above mentioned authorities.
Each machine should be supplied with following Equipments-
a, Two contact based rail profile measuring equipment shall be supplied by
‘manufacturer along with machine as per RDSO Specification no. TM/SM =323
20Ref: QO-D-7.1-2 Ver. 7.0 | Page 21 0f 50 | Date of issue: stAugust 2018 | Specification No.
TM-215/May-2018
15.3.
16,
16.1
17.
11
18,
18.1
19,
19.1
19.2,
Bar gauge with appropriate templates :
Digital inclinometer
Rail Hardness measuring equipment
Rail Roughness measuring equipment
SPARE PARTS:
‘The expected life of the components shall be advised along with their condemning limits,
‘The manufacturer shall be responsible for the subsequent availability of spare parts and
gtinding stones to ensure trouble free service for the life of the machine. (Minimum 15
years)
For indigenous parts and bought components and assemblies, the source (original
equipment manufacturer's reference and part no.) and other relevant technical details shall
be supplied while offering the first machine for inspection.
MAKER'S TEST CERTIFICATE:
Copies of maker’s certificate guaranteeing the performance of the machine shall be
supplied in duplicate along with the delivery of each machine.
OPERATORS:
The number of operators and allied staff for working of the machines under normal
condition shall be indicated, specifying their duties and minimum qualifications,
OPTIONAL EQUIPMENT:
Tenderer is expected to quote for optional equipment separately for each item giving the
advantages/functions of such optional equipment. Tenderer shall also indicate whether
such equipment is already in use on machines elsewhere indicating the user Railway
system.
INSPECTION:
While inspecting the machine before dispatch from the supplier’s premises, the inspecting
officer to be nominated by the purchaser shall verify the conformity of the machine
respect to individual clause of technical requirements laid down in this specification. The
machine’s conformity/non-conformity with respect to each item shall be jointly recorded,
before the issue of the “Inspection certificate and approval for dispatch of the machine” as
per Annexure-VI enclosed
Following arrangements shall be made by the supplier/Manufacturer at the inspection
premises for carrying out inspection of the machine by inspecting officials:
i. Machine to be stabled on straight & level BG track. The length of the track should be
at least 10 m more than buffer to buffer length of machine.
ii, In order to check Maximum Moving dimensions in cross section, a sturdy frame of IR
‘Max Moving Dimensions shall be provided by the manufacturer and passed over the
- betPage 22 0f50 | Date oflssue: 3'-August 2018 | Specification No.
TM-215/May-2018
19.3,
19.4,
machine holding it perpendicular to track, centre alignéd with track centre.
Adequate arrangements shall be made to the satisfaction of inspecting official.
The following documents shall be provided to the Inspecting Officer at least 30 days in
advance of the date of inspection,
i. One copy of complete technical literature mentioned in clause 14, in English language,
including operation, service and field maintenance manuals/instructions and complete
electrical, hydraulic and pneumatic circuit diagrams, troubleshooting charts,
component drawings/ description and other relevant technical details as a reference
documents for the inspecting officer.
ii. Cross section of the machine super imposed on IR maximum moving dimensions
envelope shall be provided to 10 in advance.
iii, Clause by clause comments of the manufacturer to be sent to Inspecting Officer (IO) in
advance for his review. Comments should state manufacturer's conformity of
compliance of each of the requirement stated in each clause, elaborating where
necessary the details/manner in which the requirement has been complied. The
proforma of draft inspection report for the clause-wise comments is given below:
Clause No. Clause | Comments of |Comments of — Inspecting
Supplier/manufacturer | Officer
(To be filled by inspecting
officer)
iv. Manufacturer's Internal Quality Inspection Report of the machine.
v. Manufacturer's quality certificate and/or test reports for bought out assemblies/ sub-
assemblies to be provided to IO, containing serial number wherever applicable.
vi, Draft: Inspection Report to be prepared by the manufacturer, containing all annexure
mentioned at para 19.4.
vii, Details of arrangements made for checking Maximum Moving Dimensions for his
approval
Supplier will incorporate amendments/further clarification in the above documents to the
satisfaction of the Inspecting Officer keeping in view the Inspecting Officer’s comments, if
any
List of documents to be annexed in the draft Inspection Report should include
i Maker’s Test Certificate.
ii, Manufacturer’s Internal Quality Inspection Report
Quality Certificates of Bought out assemblies! sub-assemblies
Cross section of the machine super imposed on the IR MMD
Vogel’s diagram
vi, List of spare parts to be dispatched along with the machine
vii, List of tools to be dispatched along with the machine pRef: QO-D-7.1-2Ver.7.0 | Page 23 of 50 | Date of Issue: 3!-August 2018 | Specification No. |
TM-215/May-2018
20.
20.1
20.2.
viii, List of Manuals, Drawings, Spare Parts Catalogues, etc. to be dispatched along
with the machine, duly indicating the number of sets of each.
Above documents shall be part of final inspection report
SPEED CERTIFICATE:
Provisional Speed certificate:
Whenever a new rolling stock is introduced in Indian Railways, a provisional speed
certificate is issued by RDSO, based on certain design parameters of the vehicle. Final
speed clearance of the vehicle is given after conducting detailed oscillation trial of the
vehicle, which is a time taking process. Therefore, issue of provisional speed certificate for
the vehicle becomes a necessity and based on the same, the approval of running of the
vehicle on Indian Railway track is taken from Commissioner of Railway Safety. For issue
of provisional speed certificate, the following actions are required to be taken by the
suppliers.
A- Current suppliers, whose models are approved:
‘The supplier shall give details of the model, year of introduction in Indian Railway,
details of speed certificate issued ete. The supplier shall certify that no change has taken
place in the model being offered with respect to design of under carriage i.e. suspension
system /arrangement, wheel & axle assembly, bogie, braking arrangement loading
pattem of the vehicle etc. and the distribution of axle loads, lateral forces, unsprung
mass and braking force coming on rail is the same. If, there is any ‘change in above
respect, the action shall be taken as detailed in para (B) below.
B- Current suppliers, whose models are not approved / or new:
As soon as the supplier completes the design of the machine as per specifications, the
technical details as per Annexure (VIIA, B & C) shall be supplied for processing of
provisional speed certificate for the machine so that it can be permitted to move on
track. On case-to-case basis, more technical details (other than mentioned in Annexure
VIIA, B & C) can also be asked for issue of provisional speed certificate for the
machine.
C- New suppliers, whose models are new:
The technical details shall be supplied as detailed in para (B) above.
Final Speed certificate:
Final speed clearance of the vehicle is given after conducting detailed oscillation trials of
the vehicle.. For this purpose railway shall conduct running speed test on the Indian
Railway main line track on one of the machine supplied to them preferably within
warranty, in accordance with procedure outline in Annexure-VIIA with the machine
running up to speed 10% higher than the maximum speed mentioned in clause 2.13 above.
OLRef: QO-D-7.1-2Ver.7.0 | Page 24.0f50 | Date of sue: 31-August 2018 | Specification No. ]
‘TM-215/May-2018
a
2
2
1
3,
22
200,
MARKING & COLOUR: .
The machine body shall be painted in golden yellow colour, conforming to RDSO
specification No M & C/PCN/109/88 (with latest amendment) to minimum DFT of 80 mm.
Colour cade to be ISC: 356.
Following should be written on the machine at appropriate location (as per Annexure IX)
(i) Indian Railway’s logo of height between 300 mm to 600 mm as suitable on all four
faces of the machine.
(ii) On both side faces, below the Indian Railways logo, the text “ INDIAN
RAILWAYS” to be written in Bold and in Black colour of size equal to or slightly
smaller than the size of logo but of size not less than 250 mm,
(iii) Below the text “INDIAN RAILWAYS” mentioned above, Machine model and
manufacturing Year should be written in black color and in letter of size less than
the size in which Indian Railways is written but not less than 200 mm in any case.
(iv) If desired by the Manufacturers, his Name may be written in size not more than 150
mm and should not be at more than four locations. Also the Manufacturers Logo
may be provided at not more than two Locations and should be of size less than
200mm,
Acceptance test-The acceptance test as below shall be carried out at the time of
commissioning of machines in India at the consignee Railway.
Rail Grinding Machine ; The acceptance test of Rail Grinding Machine shall consist
oft
Dimensional test of the loading gauge, maximum moving dimensions, buffer heights,
clearances etc.
Testing for negotiability of 10-degree curve and 1 in 8.5 turnouts.
Train running speed tests (light running) on the Indian Railway main line track in
accordance with the procedure outlined at Annexure —VITA
Construction and engineering of the machine.
Output performance quality tests with High carbon 90 UTS/110 UTS H.H. rails with
60-kg/52 kg UIC section
Profile of the rail section shall not be deformed.
For the purpose of metal removal capability of the machine (clause 3.17), 5 sites of
minimum 500m cach shall be selected. At each site measurement of both left and right
rail shall be taken
i. At each site, the machine shall grind a length of at least 500 meters to ensure that the
stones are not heated up
ii, The profile of the rail shall be close to the desired profile.
iii, ‘The rail hardness shall be measured and recorded.
iv. A each site, on the test rails, 5 X-sections shall be selected on both rails. These X-
sections shall be atleast 2 meters eway from any weldfish plated joint and notin
heavily corrugated rail.
¥. The X-sectional area shall be recorded, at each X-section, before the grinding, and
after 1 grinding pass. The working speed, while grinding shall be maintained as
specified. on
ro op
amRef: QO-D-7.1-2Ver. 7.0 | Page 250f50 | Date of issue: _3)-August 2018 | Specification No.
TM-215/May-2018
vi. The average material removal per pass for the site shall be the average of material
removal per pass at 5 X-sections.
vii, The average material removal per pass at the specified speed at cach of the 5 sites both
left and right rail separately shall be more than that specified in clause 3.16.
H. For the purpose of depth of metal removal capability of the machine (clause 3.17), 5
sites “Of minimum 500m each shall be selected for carrying out tests at the speeds
mentioned in clause 3.17. At each site, measurement of both left and right rail shall be
taken:
i, At each site, the machine shall grind a length of at least 500 meters to ensure that the
stones are not heated up.
ii, The profile of the rail shall be close to the desired profile.
iii, The rail hardness shall be measured and recorded,
iv. 5 points shall be chosen at 5 locations across the X-section, one towards gauge face
side, three in the middle of rail top and one towards non-gauge face side such as to
cover full width of rail head, at 5 X-sections on both rails at each of the 5 sites.
v. The working speed, while grinding shall be maintained as specified. The depth of
metal removed shall be measured by measuring the depth of cut before and after 1
grinding pass (as per para no. 21.1/G/v). Measurement to be done with Contact based
Rail profile measurement Device with or better precision/accuracy
vi. The average of the 25 observations at each site for each rail shall be worked out. The
average depth of metal removal per pass for the site shall be the average depth of
material removed for all 25 test points.
vii, None of the average depth of metal removal per pass for a site, out of 5 selected sites
for both rails should be less than as specified at clause 3.17 for the respective grinding
speed.
1. Stoppages of work not attributable to machine shall be discounted
J. The difference in the target profile and ground profile ie profile achieved after
grinding, shall not more than + 1% in terms of cross sectional area of rail head.
K, The machine will also be operated at suitable locations in wor
continuous 5 hours to ensure the machine’s continuous working capabil
of work and test the life of the grinding stones as specified at clause 3.21
22.2. Should any modifications be found necessary as a result of the tests, these shall be
23.
2a
23.2.
carried out by the supplier at his own expense.
TRAINING
The supplier shall impart professional training to IR Personnel in various aspects of
operation, maintenance and management of the machine, planning and designing rail
grinding program, inspection, monitoring, quality control and review as per the brief scope
defined in Annexure-IV.
‘The tenderer will submit detailed program covering scope and coverage in detail, place and
manner in which the training will be imparted so that a satisfactory level of knowledge and
skill is developed by IR Personnel for satisfactory implementation of grinding program
E-Learning courses module should be arranged for imparting training to railway operators
In addition, the service engineer shall provide hands on training to railway staff in
calibration operation, repairing and maintenance of the machine in field to make them fully
: OrtFi Re
d
Ref: QO-D-7.1-2 Ver. 7.0 Page 26 of 50 | Date oflssue: 3!-August 2018 | Specification No. 3
TM-215/May-2018 |
conversant with the machine. The engineers shall also advise the Railways on appropriate
maintenance, testing, operating, repair and staff training facilities that are necessary for the
efficient performance of the machines.
24. WARRANTEE AND POST WARRANTY OPERATION AND MAINTENANCE
CONTRACT
The machine shall be warranted for 24 months from date of commissioning at ultimate
destination in India. Design modification made in any part of the machine offered, the
warranty period of 24 months would commence from the date of modification and proving
test of machine for the purpose of that part and those parts which may get damaged due to
defects in the new replaced part. The cost of such modification should be borne by the
supplier
Other warrantee and post warranty clause wise term and conditions are attached as
Annexure -X1. 0Ref: Q0-D-7.12 Ver. 7.0 | Page 270f50 | Date of Issue: _31-August 2018 | Specification No.
TM-215/May-2018
TAD Pe aap es Be es Ps ee ade Dt ee ey
Be ke DY De Be Ds) OR Ds Bel De he Do ao
Annexure I
rarew
RE
“ae we Te
aS TET
Tee
F HN
' {
Br I
im
f @
fl ae (Annexure I
TM-215/May-2018
31-August 2018 | Specification No.
%
6 RGI CAMP COACH -LAYOUT PLAN
3 me ee
f jeepers
5 saaraneee i
g = — |
z
2
re : <
3 PROPOSED TYPICAL LAYOUT FORRGICAMP COACHES [auiw [omewa™ [aw maura
a AT RAYANAPADU (A.P) & ALLAHABAD (U.P) [emoeneow _femvanine | netoummeraosemanene
5 ae a
3
8
2
CL CCCCECCL CX CCC SiC Ree CR Ot ee eee ee eeC
Annexure II
‘TM-215/May-2018
‘31-August 2018 | Specification No.
Page 29 of 50. | Date of Issue:
Ref: Q0-D-7.1-2 Ver. 7.0
DIAGRAM No. ID CE DO/T-2232)
MAXIMUM MOVING DIMENSIONS
a3 MAX
167$mm GAUGE
1170 MIN-=
4 RAIL far LEVEL
|
ig
NOTE a4
ALL DIMENSIONS ARE IN MILLIMETRES Ni
EXCEPT WHERE OTHERWISE SHOWN.
Cr rit eo
c
c
2
Ca «oeRef: Q0-D-7.1-2Ver.7.0 | Page 30 0f50 | Date of issue: 3August 2018 | Specification No.
TM-215/May-2018
me > Annexure- IV
Sec ining to be impar by Manufacturer/Suy wv to IR Personnel
< ‘The training program shall consist of the following modules-
oO 1. For Serlior Engineering officers of IR-
Four senior IR personnel shall be given training for a period of two weeks in
® manufacturing plant of manufacturer/supplier and/or affiliated institute/training centers
and field operation where the machines are already in operation. Broad scope of this
training shall be to provide quality training in the areas of management of grinding,
machine familiarization, machine utilization, managerial aspects of operation and
maintenance of the machine, grinding strategy, best practices for optimal performance,
% reporting, quality control, producing quality rail profiles, progressive review of grinding
3 strategy program, important safety aspects, vendor support.
2. For Track Machine organization Personnel —
This training will cover operation and maintenance of the machine. The broad scope of
a this training will be as under:
* Machine's general arrangement including air systems, mechanical systems, hydraulic
He systems, electrical systems, rail measurement systems, controls ete
os * Operation of the machine in working mode (grinding) and travel mode.
* Maintenance and overhauling of rail grinding machine,
a * Recording of rail profiles, use of Rail Inspection data and preparing the grinding
" program.
5 * Trouble shooting skills.
a + Responses of emergency situations
ot ‘* Basics of producing quality rail profiles.
o The training will be conducted as per following sub-modules-
A 2.1, 12 IR, personnel shall be given training for a period of Three weeks at contractors
A manufacturing premises about machine assembly line in different shops, operation,
5 repair and maintenance. Also they will be given on-site training in field operation
Bw abroad where same type of machine is already in operation for the contract.
ie 22, In India, training of 12 IR personnel per machine for four weeks will be given in
o operation and maintenance of the machine, Out of four weeks, at least two weeks
As training will be imparted at the site of commissioning of the machines and has to be
5 completed before commissioning of machines, The remaining period of training will be
imparted in one or two modules spread over warranty period in the form of
reffesher/updating training at the time of delivery of each machine, Details of the
proposed program should be given in the offer.
is 3. For P-Way Personnel —
a This training will cover design, planning, quality control, monitoring and review of
grinding program. The broad scope of this training will be as under: t
fs eeSP SPREE ST SP SS
as
>
0)
723963
d
Fe (eave!
J
Di
es. F 2 oF
RefiG0-0-7.4-2 Ver.7.0 | Page 31 of50 | Date of usue avAugust 2018 | Specification No.
| ‘TM-215/May-2018
Bal
3.2,
* Technical aspects of Rail Grinding and the benefits ~
«Rail grinding functions and best practices for optimal performance.
* Basics of producing quality rail and wheel profiles.
#, Rail and wheel interaction.
** Technical aspects of rail lubrication, and planning the lubrication strategies.
© Understanding and development of rail grinding program based on RCF,
surface defects and profile deterioration.
* Monitoring of rail grinding result, its benefits and review of the grinding
program.
+ Rail Grinding Implementation and quality control.
© Track inspection and data collection for rail grinding,
* Designing of optimal rail- wheel profiles
Establishment of test sites and monitoring
* Designing rail grinding strategies and program
‘The training will be conducted as per following sub-modules-
12 IR personnel shall be given three weeks training at manufacturer's premises and/or
affiliated institute/training centre, this training shall include taking rail profile, wheel
profile, work on simulation software for different contact location of rai-wheel
interface, designing theory for developing required rail profiles, different pattem for
achieving the required rail profile and calculate rail life and such other aspects in the
contract.
In India training for 12 IR personnel per machine for six weeks will be given at site of
grinding / railway premises. This training includes taking rail profile pre-post grind
and use of other handheld gadgets for inspection of grounded rail and contact bend
before and after, how to maintain data base for grind quality, for establishing efficient
Rail Grinding Management system on Indian Railways for each machine. This module
of training may be staggered in suitable phases prior to supply of machines, post
supply and mid warranty review/reiresher.
Tenderers are required to submit detailed proposal of the training program along with
their offer. The topics, detailed content of training, demonstrations, site visits and
hhands-on experience should be elaborated in detail in the offer. The names of
manufacturing premises, affiliated institute/training centre where abroad training is
proposed to be conducted should be detailed in the training proposal in the offer.
Further details of places where field visits, demonstrations, hands on experience etc are
proposed to be conducted may be submitted within 90 days of signing the contract
agreement.
All the cost for arranging and facilitating the training are to be borne by the supplier.
Tenderers are required to quote the prices for training as per tender conditions
However training as per 2.2 and 3.2 will be at suppliers cost and nothing extra shall be
paid for the same. The cost of boarding, lodging and air fare of IR personiiel shall be
bome by the purchaser and should not be included in tenderer’s quote.
get2, DRAW SEMIACIRCLE OF 14.5R TANGENTIAL
TO INE
2. DRAV LINE 1:2.5 TANGENTALLY 10. 14.5R
SEM~CIRCLE,
4. DRAV A HORIZONTAL.
FROM THE TOP of
LOOTE PLA AT 63:
UNE X—Y,
5. FROM Pt. A LOCATE CENTRE ‘BOF af
OF §30R ON A VERTICAL UNE AT
FROM X-¥,
DRAV ARC OF 330R FROM CENTRE ‘6B’
LociTE CENTRE
| a eter e9) CEDURE OF DRAWING zg
5 1. DRAV A VERTICAL LINE ¥-Y.
TM.215/May-2018
Annexure- V
3) -August 2018 | Specification No.
zs
130
<
et S
3OOR WiNH CENTRE AS 'C!
DRAW ARC OF RADIUS 14mm TANGENT:
3 i 3
I
|
i
|
|
Date of Issue:
‘ORAV UNE 1:20 TANGENTALLY TO 3308
ARC.
DRAY A VERTICAL LINE AT A DISTANCE
OF “30mm FROM THE FLANGE. END.
NOTE: soe eee Se
agers ara oc, eee —
‘ARE BASED ON NOMINAL DIMENSION
OF asi.
(© [74+ [onension 73.7 oeseren | 3/0
[ene [ee ean :
©O-ORDNAES OF ME SHON] 3/5 z mel Sire
Page 32 of 50
olen
TIAUTH. [DESCRIPTION pate]
Ref: QO-D-7.1-2 Ver. 7.0
Race NCR ROR aC RC yc ec PCC RC ACS SC AC RC Cae ee AC Ae RAC Ce EC ac CC a aa
A
a
)
2g ae ae
AF F327 DAS OSD
1
Beat ea oe ae a a ae Oe oe
Ref: Q0-0-7.1-2 Ver. 7.0 | Page 330f50 | Date oflssue: 31-August 2018 | Specification No.
| 1M-215/May-2018
Annexure-VI
INSPECTION CERTIFICATE
CERTIFICATE OF INSPECTION OF TRACK MACHINE( )
BY INSPECTING OFFICAL AND APPROVAL FOR DESPATCH OF MACHINES
(STRIKE OUT WHICHEVER NOT APPLICABLE)
This is to certify that I have inspected the machin
(type)
~-from (date) —
{at place) —-— for its conformity/non-
conformity with respect to the laid down Technical Specifications in contract Agreement
No. dated ~ ~ between President of India through Director
Track(Machines) and M/s (Name of Supplier}
The detailed inspection Note regarding its conformity/non-conformity to the laid
specifications is enclosed along with an Annexure “A’. I is observed that (strike out
whichever is not applicable):-
The machine conforms to all laid down specifications.
© The machine conforms to all the laid down specifications except those at
SINo. ~
‘The above deviations are minor/major affecting/not affecting the performance
of the equipment in substantial way
The following T and P/manuals/drawings are to be supplied along with the machine:
1
2.
3
Based on the above, the machine is certified/not certified to be conforming to the
specifications.
The machine is approved/not approved for dispatch to
(consignee) Indian Railway
SIGNATURE AND DATE
For Mis INSPECTION OFFICIAL
(NAME AND DESIGNATION)
For and on behalf of President of India
okRef: Q0-D-7.1-2 Ver.7.0 | Page 34 of 50 | Date of Issue: _#"-August 2018 | Specification No.
TM-215/May-2018
ii)
iii)
vi)
> ANNEXURE-VIIA
CCEPTANCE CRITERIA DURING OSCILLATION TRIALS
The spted potential of the machine offered by the firm should be established based
upon oscillation trials conducted in India The tests will be conducted at speed
usually 10% higher than the maximum speed potential indicated by the firm for the
machine under consideration and the following criteria satisfy for the same. For
conducting the tests, a section of mainline track will be selected over which there is
no temporary speed restrictions and which is considered by the Railway as being in a
generally run down condition for mainline standards, but without speed restrictions.
The vehicle will be tested generally for new and worn clearance conditions and
where relevant for operation in the forward and backward directions, ‘The vehicle
selected for tests will be one in average condition for normal maintenance.
‘The criteria applicable for establishing speed potential will be as follows:
A lateral force lasting more than 2 meters should not exceed the Prud Homme"s
Timit of 0.85 (1+P/3) where P is the axle load.
Isolated peak values exceeding the above limit are permissible provided the record
shows establishing characteristics of the vehicle subsequent to the disturbance.
A derailment coefficient should be worked out in the form of ratio between the
lateral force (Hy) and the wheel load (Q) continuously over a period of 1/20"
second; the value Hy/Q shall not exceed 1
‘The values of acceleration recorded in the cab at location as near as possible to the
bogie pivot (as near as possible to axle in case of four wheelers) shall be limited to
0.55g both in vertical and lateral directions. The peak values upto 0.6 g may be
permitted if the records do not indicate a resonant tendency in the region of peak
value.
In the case of such vehicles where measurement of forces is not possible, the
evaluation shall be in terms of ride index based on the accelerations measured as
detailed in Para 2 (iv) above which shall not be greater than 4.5 but a limit of 4.25 is
preferred.
‘A general indication of stable running characteristics of the vehicle as evidenced by
the movement of the bogie in straight and curved track and lateral force and
derailment coefficient of accelerations as the case may be.yO
)
Ref: Q0-0-7.1-2 Ver. 7.0 | Page 35 0f 50 | Dateofissue: 31-August 2018 | Specification No.
TM-215/May-2018
Annexure-VIB
BRAKE DESIGN DETAILS OF THE MACHINE FOR CALCULATION OF
& EMERGENCY BRAKING DISTANCE,
[Tare & gross weight of the machine in Kilograms
| Brake power in Kilograms
[Type of Brake blocks
[Brake block area in Square Centimetres
| Brake Rigging Diagram e
UType_ of Brake systemRef Q0-D-7.1-2Ver.7.0 | Page 360F50 | Dateofissue: 31-August 2018
TM.215/May-2018
6
b)
* Annexure: VIILA
Particulars Required in Respect of the Rolling Stock Under Consideration
A diagram showing elevation salient dimensions
Wheel Spacing, Wheel diameter, bogie centers,
and axle load.
i) Overall length of the vehicle
ii) Length over head stock
iif) Length over buffers
iv) Distance apart for Centre of buffers
v) Max/Min. height of centers of buffers
above rail level
i) Wheel base
ii) Axle load (max)
iii) Bogie Centers
Wheel dimension
i) New
ii) Wom out
i) Tread and flange profile of the wheel
indicating clearly whether it is Indian
Railway standard profile or differs from
standard flange profile.
ii) Wheel gauge dimension —
(back to back of tyre Mange).
Whether the stock is designed to be used as
a general purpose or in a closed circuit in
specified sections under defined conditions,
Maximum design speed
i) Own Power
ii) Intrain formation
Unsprung weight per axle in tonnes
i) Driving axle
it) Running axle
Expected lateral force in tonnes per axle
at maximum design speed.
Method of operation -Ref: Q0-D-7.1-2 Ver. 7.0 | Page 37 0f50 | Date of issue: 3!-August 2018 | Specification No.
‘TM-215/May-2018
10,
ul
13.
4
15.
Whether single only or coupling together is :
possible. If coupling is possible, the number
which can be coupled and what is trailing load.
Maximum tractive effort at start and at the speed
of operation -
i) at working drive at start
at operation speed
ii) attransfer drive at start
al maximum speed
Maximum braking force coming on to the rails per wheel
a) at working axle
b) at transfer axle
Drawing indicating suspension arrangement details
of bogie and axle.
Height of centre of gravity fom rail level
Height of floor from rail level
‘Type of coupler provided -Indian Railways Standard
Coupling
Buffer
Any infringement to the moving dimensions
Sketch provided in the Indian Railways Standard
Schedule of Dimensions ~ Chapter IV (A),5
OR Ae
Pee
Ref: Q0-D-7.1-2 Ver. 7.0 | Page 380f50 | Dateofissue: 30 -August2018 | Specification No. |
TM-215/May-2018
Annexure: VIIIB
Following information as detailed below is also required along with the information
required as per Annexure °A’ for processing the case for issue of provisional speed
certificaté for new vehicle.
S.No ee Tem
1a) Brake System details
~b) | Gross Braking Ratio
2. | Brake rigging arrangement drawing and calculation of braking force
3. | Maximum Braking Effort. at start and at the speed of operation -
a) at working drive at start
at operation speed
b) attransferdrive at start
at maximum speed
4. | Characteristies of springs used in suspension indicating free height, working height,
dynamic range, stiffitess and locations etc.
5. | ‘Characteristics of the dampers if used, and over all damping factors and locations of
dampers.
Calculation of the following frequency of the vehicle to be attached :-
|i) Bouncing ii) Pitching ~ iii) Rolling
Wave length of free axle and bogie
6. | Write up and salient design calculation on suspension system, type of suspension-
whether it is of coil suspension with or without dampers and laminated bearing
| springs and double link suspension.
7. | What are lateral clearance of axle box / hom, wheel flange’rail and other locations
for the negotiability of the vehicle on curve and tum out (enclose Vogels Diagram
“for negotiability on maximum degree of curve and tum out permitted on Indian
Railways) of new and won out wheel
& | Wheel and axle assembly drawings
19. | Calculation for flange force
10. Technical specifications of Vehicle supplied.
TI, | Calculation of natural frequency
}
12. | Calculation of spring characteristics and critical speed of the vehicle. |
13.__| Simulation result showing ride index, lateral force and acceleration results.
14. [A certificate regarding the speed of the vehicle for which it has been désigned.
QeRef: Q0-D-7.1-2 Ver. 7.0 | Page 39 of SO Date of issue: _31-August 2018 | Specification No. ]
TM-215/May-2018
* Annexure VIHC
Machine details required for simulation of machine on NUCARS or similar Track-vehicle
simulation software
SL.
Component’s Name Parameters required
“G. of component in x,
/, Z direction from rail
-vel in mm (Referenced
joint 1" axle)
Mass in Kg
m2 of
‘Mass moment of inertias in Kg-
component in three dimension space about their
CG
ass ix ivy a
Super structure with
vehicle frame (machine
structure kept on
secondary suspension of |
front and rear bogie)
Front Bogie frame
including brake rigging
Rear Bogie frame
including brake rigging
‘Transmission system
device (hydraulic
‘Mechanical or electrical
traction motors)
Wheel axle set including
axle boxes which
constitute the unsprung
| mass
Mass of Items included
in unsprung mass,
partially or fully along
with their name per axle
|
Total
unsprung
mass in
tonnes
Total weight of
Front bogie [Rear bogie lachine Full weight of vehicle
oata
=
Ref.QO-D-7.1-2Ver.7.0 [Page 40050 | Dateofissue: 3tAugust 2018 | Specification No.
cane TM-215/May-2018
‘components intonnes [full assembly full assembly frame “(front bogie + rear bogie
| vehicle car body or super
pu structure)
structure
Lea
8. | Suspension stiffness Primary suspension element stiffhess Secondary suspension element
details in Ke/mm tiffiness
er axle box between bogie and axle
ee side between bogie and machine
te
fertical stiff feral [Longitudi [Vertical [Lateral
tiff al stiff bist if
|
|
ea {
6. | Damping force details |
(ifhydraulic damper
used give there rating
force per meter/second) |
10. | Clearance in mm or fertical direction Lateral [Longitudi cae Rotation [Rotation about
radian provided for lirection yut bout longitudinal
motion between bogie irection vertical — Jateral axis axis
frame and machine frame} sis:
for relative motion ES
(motion stopper) |
{ |
|I1. | Dimension of location of [Detail of location of suspension springs [Detail of location of suspension springs
suspension elements and dampers and shock absorbers with and dampers and shock absorbers with
support drawing support drawing
fI2. | Details of centre pivot Provide detail arrangement drawing and description
arrangement working
and location
13. | Set of drawings and ‘oncerning with general arrangement of vehicle, bogie general arrangement,
design description suspension arrangement details, suspension clearances drawing, detail written
9f vehicle bogie.
lescription of configuration and loading pattern accompanies design particular
asRef: Q0-D-7.1-2 Ver. 7.0 | Page 41 of 50 | Date of Issue: 2 -August 2018 | Specification No.
TM-215/May-2018
Annexure-IX,
300 to 600 mm
NDIAN RAILWAYS cee
Series NO.--- -------. I 200 mm in black color
Manufacturing Year ------- 2 | 200mm
Manufacturers Name apis i 200 mm
aRef: Q0-D-7.1-2 Ver. 7.0 | Page 42 0f50 | Date cf issue: 31 August 2018
Specification No.
TM215/May-2018
List of Track features
Km post,
TP/OHE Mast,
PL& Crossing In
PL& Crossing out
Level Crossing,
Switch Expansion Joint,
Fish plated joint
Axle counter
Bridge Q In,
Bridge 0 Out
Curve In,
Curve Out,
Tunnel [n,
Tunnel Out,
10 spare keys as user options
Platform () In
Platform () Out.
Annexure-X,PSSVITFDIFIAVITFISISOWIFVIGIOS IPSS SISGITFIIFGIDIAAPPIAIIAIWIG
Ref GO-D-7.12 Ver. 7.0 | Page 43 0f50 | Date of issuer # August 2018 | Spedfication No
| Tw.215/May-2018
Ll
12
13
L4
1s
Annexure-XI
OPERATION AND MAINTENANCE CONTRACT (DURING WARRANTY
PERIOD)
‘The following clauses outline the key requirements of the O&M conditions for Indian
Railways to be met by the supplier for a period of 24 months post commissioning:
‘The supplier or their designated Indian agent/Indian counterpart has to execute
works of Operation & maintenance of 96 stones Rail Grinding Machine which will
be deployed over many Zonal Railways as per the instructions of Consignee Zonal
Railways office. During the execution of the contract fuel, oil, water and lubricants
are to be provided by Zonal Railways free of cost to the supplier.
‘The operation & maintenance clause is included in the specification of the 96 stone
Rail Grinding machine for fully utilizing its potential. The tenderer is responsible
for ensuring the availability of machine for 08 hour every day for grinding operation
(which might be increased upto 2 to 3 hours depending on traffic condition over IR
during operation). During maintenance shift, the stipulated maintenance of RGM
stipulated preventive checks and schedule maintenance of RGM machine including
all assemblies (like engines, generators, electrical control system etc.) or sub-
assemblies (various water & HSD oil pumps sensors etc) as specified by
OEM/supplier updated time to time to ensure it’s upkeep shall be carried out.
‘The supplier or their designated Indian agent/Indian counterpart has to provide
sufficient number of skilled/semi-skilled staff (Minimum 12 staff including 6
supervisors at a time) required for operation and maintenance of RGM. Grinding
operator shall be certified by the OEM and with valid competency certificate in train
operation issued by ZRTVIR and medically fit in A-I Category. In case
initial/refresher course to be done for G & SR from ZRTW/IR during the currency of
this contract, the same shall be got done for the operators by the contractor and it
shall payable as applicable. Zonal Railways shall facilitate in expediting the process,
All the operators shall have valid PME certificate issued by IR and all the cost for
medical examination connected with PME, shall be payable by the contractor.
One 4 wheeler vehicle in good condition with proper road permit and
insurance(Safari/ Scorpio or similar) for transporting men and material required for
day to day working will be provided by tenderer during O&M period for use by O
& M crew and IR crew (on RGM) without any extra payment
‘The contractor must ensure the care /safety/health hazards of the labours engaged by
him/her during the course of the execution of work. Necessary safety equipment
/gadget shall be provided by the contractor for the staff engaged by the tenderer and
also for 2-4 IR official nominated on this machine. No extra amount is payable
toward this.
Railway shall provide adequate and appropriate security at their disposal to protect
and preserve the RGM Machine from anti-social elements especially in insurgency
defined areas, where the machine maybe required to operate from time to time
oH[ Ref:Q0-D-7.1-2 Ver. 7.0 | Page 44 of 50 | Date of issue: 31-August 2018 | Specification No.
‘TM-215/May-2018
7
18
19
1.10
12
The contractor's staff & labour’ shall not have any claims of appointment in
Railways in future.
Authorized Railway's representative having route learning of the particular section
Where the RGM is working will be present for supervising the grinding work and to
mofiitor the movement of the RGM from one section to another. RGM shall not be
moved without authorized Railway's representative. The same would be provided
free of charge
All tools and plants, drawings, manuals which are supplied by the manufacturer to
the Railways will be handed over to the contractor free of cost for use along with
the machine. All these to be handed over back in good condition after expiry of the
contract period to authorized Railways
RGM shall be made available for grinding operation for minimum period of 22 days
ina month, keeping in mind typical international norms and 66days in consecutive 3
‘months. The balance 24 days are meant for maintenance functions during which
time all maintenance activities are to be completed by the tenderer. While the RGM
is on transit from one station to another or waiting for loco for hauling, it will be
considered as availability unless the RGM is under breakdown preceding to this.
‘The supplier will be responsible for ensuring the availability of machine for eight
hours every day for at least 22 days a month, minimum 132 days to maximum]50
days in total six months spell and the availability certificate will be rendered (as per
enclosed Annexure - A). During these 8 hours (which may be in two shifis with one
break of maximum upto 2 to 3 hours) of daily availability of machine, the working
hours (actual grinding) will in general for about 4 hours per day.
The machine availability for penalties purposes will be worked out by taking
average availability of machine after 6 months (132 days over 6 months)
Availability of machine for work less than 132 days in half year on account of
supplier during the warranty period will invite a penalty of Rs 30,000/- per day and
the penalty certificate will be rendered (as per enclosed Annexure - B)
When the RGM is on transit with its own power from one station to another, since
there will be no routine maintenance, and RGM shall be made available for
movement in two shifts of 10 hours each (2x10 hours) in 24 hours time frame till it
reaches destination. The staff of operation and maintenance shall be so redistributed
to perform transit work with sufficient staff.
All the fixtures in Camping coach shall be maintained in good condition. Special
cleaning of camping coach (once a month) to be carried out so as to maintain in
excellent condition. All electrical, plumbing, furniture, electronics,
computers/laptop, TV&DVD, Genset, Washing machine, freezer, geysers,
microwave/oven, communication and all other fixtures available in camping coach
to be maintained at all times in good feitle and at the end of the contract period. The
fixtures would be handed over the Zonal Railways in good condition, as-received at
the beginning of the contract.J ae
)
FO ht
Ref: Q0-D-7.1-2 Ver. 7.0 | Page 45 0f50 | Date of issue: 8 August 2018 | Specification No.
TM215/May-2018
114
11s
1.16
LI8
119
1.20
1.21
1.22
Special cleaning of RGM to be carried out once a month (as far as possible) with
detergents and other cleaning agents to remove all soot, dust and to keep the entire
‘machine in good appearance. RGM will be stabled at a place so that adequate water
(to be provided by Zonal Railways) & non-OHE siding are available so as to ensure
proper cleaning. Patch panting at rusted locations should be done after cleaning with
matching colour. No amount is separately payable towards this,
Complete and up to date records for daily, weekly and monthly maintenance will be
maintained by the contractor and countersigned by IR officials, The
daily/wweekly/monthly and all progress report in the special format shall be mailed to
division/zone/RDSO/Rly board daily.
The daily progress, grind history shall be mailed to the nominated IR official along
with weekly and monthly progress reports in the existing format
Contractor shall furnish adequate VHF sets for crew communication for safe
operation of RGM. This should include at least 6 hand held devices.
Spares for repair/maintenance and consumables would be supplied by Railways,
Each party agrees to indemnify, defend. and hold harmless the other party from all
liability, cost or expense (including any court costs) caused by the joint and/or
concurring negligence of the parties, arising on account of injury to or death of any
employee, agent or representative of the indemnifying party during the performance
of the Services or who shall, if not performing Services, be present as a bystander or
otherwise on the property of either party, provided always, however, that if the
injury or death to an employee of an indemnifying party is caused solely by the
negligence of the other party then this indemnity and hold harmless provision shall
be null and void, and the party who solely caused the injury or death shall bear the
cost or expense. Notwithstanding any provision herein to the contrary, Tenderer
total cumulative liability for any or all claims arising out of this agreement shall not
exceed the three month value of this contract.
If there is deficiency of staff on RGM w.r.t, minimum stipulated staff in operation
and maintenance (minimum staff. in © & M shift put together), penalty of Rs
3000.00 per head per shift or part thereof shall be imposed, For maintaining
attendance of the staff for this purpose, the contractor has to provide one finger print
attendance system in the camping coach & shall ensure it is working condition
always. No extra payment shall be admissible on this account.
‘The maintenance role encompasses undertaking all schedule/periodic/ routine of
RGM machine including all assemblies (like engines, generators, electrical control
system etc.) or sub-assemblies (various water & HSD oil pumps, sensors etc) as
specified by Supplier / OEM updated time to time, either by day or night. OEM
recommended spares will be provided by Zonal Railway on the machine and the
released spares/material shall be retumed to Zonal Railway on the machine. The
transport of spares would be done by Zonal Railways. -
‘Scheduled Maintenance:
Daily maintenance will be strictly followed after grinding operations. Other
schedule maintenance (weekly, monthly, two monthly, quarterly, half yearly, yearly
SL= Ref: QO-D-7.1-2 Ver. 7.0 | Page 46 of 50 Z| Date of issue: 3) -August 2018 | Specification No.
| TM-215/May-2018
A and two yearly checks) are to be performed at appropriate time intervals in the
balance time available afler offering the RGM for operational activities.
ii, Routine maintenance of undercarriage systems shall be undertaken by the tenderer
iii, Tenderer shall be responsible towards mounting and dismounting of unserviceable
= ‘components/ parts / materials on the RGM. Zonal Railway shall be responsible for
providing serviceable components! paris/materials on the RGM.
iy. Wheel and Bogie tumings (if needed) will be coordinated and executed by Zonal
A Railway and wheel turing charges of as applicable by wishop per wheel would be
oe paid by the tenderer.
ry 1.23 Maintenance of Records
a i, Maintenance records during Schedule and breakdown maintenance shall be
maintained in hard copy as well as soft copy as per format provided and updated
.% time to time.
5 ii, ‘These records shall be provided to Zonal Railway crew on the machine in a timely
a manner.
iii, ‘Tenderer shall complete a standard daily report accurately depicting operational
times, delays, and machine availability. Zonal Railway crew/ representative has to
sign daily report based on satisfactory completion of daily operational services. The
signed daily report shall be the basis for invoicing and shall constitute Zonal
Railway's acceptance of day to day work apart from the completion of scheduled
5 maintenance in timely manner.
So 1.24 Test Site Management:
Ki (i As part of the O&M Services provided by the tenderer or their designated Indian
= agent, 12 test sites would be actively managed by them. This would include atleast 4
mild curves, 4 sharp curves and 4 tangents. Breakup would be as follows:
0 = 2 mild curves at same location on UP Line and DOWN Line = 4 Total
- 2sharp curves at same location on UP Line and DOWN Line = 4 Total
~ 2 tangents at same location on UP Line and DOWN Line = 4 Total
0 Final = 12 test sites and would be jointly selected by IR/Zonal Railways in tenderer.
‘These locations should be maintained as permanent test sites and should be re-
marked periodically by proper paint by Zonal Railways, Format for Test site
a location marking by paint has been shown as Annexure C.
Gi)_As part of requirement of the Test site management, tenderer or their designated
Indian agent shall note the following for each test site:
is Pre Grinding MiniProf, surface photograph and dye penetrant test, within 10 days
before grinding
- Post Grinding MiniProf, surface photograph and dye penetrant test, within 10 days
afier grinding
aS ~ Maintaining proper record of the same.
= Sharing run on run analysis for all 12 test site locations.
- _ Review of grinding pattern changes needed, if any post analysis
A ~ Review for further changes in profile and grinding cycle. <
(iii) As part of this exercise, any existing templates would also be reviewed and
A modified as needed.
- Ore4)
ma
A
REODT Iver. 7.0 | Page a7 of50 | Date ofiesue: s-August 2018 ] Specification No
| TM-215/May-2018
1.25. During the currency of the O&M period, the supplier or its Indian agent may seek
documents for importing spare parts/material/testers/manuals/equipment’s on
required basis for Customs clearance. These will be provided by Consignee Zonal
Railways in required format for speedy clearance on arrival at port
1.26 Spare Parts:
Complete OEM spare parts list broken down to the last level for 96 stone Rail
Grinding Machine classified into:
i. Recommended ~ these are those parts covered under warranty period and will be
either replaced/repaired. During repaired/replacement period, Recommended parts
held on Railway Inventory can be fitted on the machine on returnable basis and is
provided by IR only to ensure machine uptime.
ii, Essential - resulting from fair, wear and tear and do not necessarily constitute a
warranty claim,
iii, Consumables — are those which will be as per actual consumption/supply during the
2
21
warranty period is to be provided.
It may be noted that the Spare Paris List indicates for O&M Period must indicate the
anticipated quantity of use. This would be used to establish a budget and the total
budget per machine would remain fixed, while actual used quantities may vary based
on usage. During the 24 month O&M period, in case spares beyond the budget need to
be used, the additional spares would be supplied free of cost by the supplier. Cost of
Spares needed for the 24 month O&M period would be considered as part of price
calculation for the determination of successful bidder.
11 is important to note that spares not included in the list would be provided by the
supplier free of charge during the O&M period. The supplier must ensure that spares,
are properly budgeted keeping in mind the IR working and environmental conditions,
Tenderer should insure availability of spares for machine stipulated service life of 15
years by providing. ware house or store in India for uninterrupted working of machine.
Furthermore, spares per year per machine should generally not exceed 5% of machine
price,
POST-WARRANTY OPERATION & MAINTENANCE CONTRACT:
The supplier shall quote for a two year extension of O&M services after the expiry of
the warranty period. The additional extension for 2 years is on the sole discretion of
Railway Board / Zonal Railways.
All terms and condition for post warranty O&M of RGM shall be same as in case O&M
of RGM tnder warranty, except clause for spare parts(1.18, 1.26)
Spare Parts:
Spares for repair/maintenance and consumables would be supplied by Railways. Rate
contract for supply of spares is to be decided by respective Zonal Railways separately.
ontRef: Q0-D-7.1-2Ver.7.0 | Page 48 of 50 | Date ofissue: 3) -August 2018 | Specification No.
TM-215/May-2018
ANNEXURE A
~ QUARTERLY AVAILABILITY CERTIFICATE FORMAT
“THE OPERATION AND MAINTENANCE OF RAIL GRIDING MACHINE HAS
SATISFACTORILY PERFORMED FOR DAYS DURING THE SIX
CONSECUTIVE MONTHS / 180 DAYS PERIOD FROM TO FOR
WHICH PAYMENT INSTALMENT IS CLAIMED”,
‘The details of RAIL GRINDING MACHINE availability in SIX MONTHS are furnished
below
| Month MC MIC Non- Remark
Period = | From To | Availability | Availability
| Days Days
Ist Quarter | |
| |
TI Quarter |
Total days |
Average no of days available/month = Days
Dy CE/TM/Lines
C/-CE/TM For kind information.
C/- Supplier,
ey.Ref: Q0-D-7.1-2Ver. 7.0 | Page 490f50 | Date of Issue: 3-August 2018 | Specification No.
‘TM-215/May-2018
ANNEXURE B :
HALF YEARLY PENALTY DEDUCTION CERTIFICATE FORMAT
“AMOUNT OF PENALTY DEDUCTION TO BE MADE AS PER CLAUSE NO 1.11
(Annexure XI) OF THE TECHNICAL SPECIFICATION TO RAILWAY BOARD
CONTRACT AGREEMENT NO. Is
Dy CE/TM/Lines
C/- CETM For kind information.
C/- Supplier,
ot-2 Ver. 7.0 | Page 50 of SO
Date of Issue:
‘Bi August 2018
Specification No.
TM.215/May-2018
ANNEXURE C