0% found this document useful (0 votes)
87 views18 pages

BDM 00 Toc

The DelDOT Bridge Design Manual provides comprehensive guidelines for the development, design, and maintenance of bridge projects. It covers various aspects including design specifications, project development processes, hydrology, hydraulics, load rating, and superstructure design. The manual serves as a resource for ensuring safety, efficiency, and compliance in bridge engineering practices.

Uploaded by

Carolina Fonseca
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views18 pages

BDM 00 Toc

The DelDOT Bridge Design Manual provides comprehensive guidelines for the development, design, and maintenance of bridge projects. It covers various aspects including design specifications, project development processes, hydrology, hydraulics, load rating, and superstructure design. The manual serves as a resource for ensuring safety, efficiency, and compliance in bridge engineering practices.

Uploaded by

Carolina Fonseca
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DelDOT Bridge Design Manual

Table of Contents
Page
Chapter One - Introduction
1.1 INTRODUCTION ..........................................................................................................1-1
Chapter Two - Bridge Project Development
2.1 INTRODUCTION ..........................................................................................................2-1
2.2 DESIGN SPECIFICATIONS .........................................................................................2-1
2.3 SOURCES OF BRIDGE PROJECTS ............................................................................2-1
2.3.1 BRIDGE MANAGEMENT PROGRAM ..................................................................2-2
[Link] Deficiency Ranking.............................................................................................2-2
[Link] Funding................................................................................................................2-2
2.3.2 PROJECT DEVELOPMENT PROJECTS ................................................................2-3
2.3.3 EMERGENCY AND MAINTENANCE PROJECTS ...............................................2-3
[Link] District Maintenance Forces................................................................................2-3
[Link] Contracts..............................................................................................................2-4
2.3.4 PROJECTS FOR OTHER AGENCIES AND MUNICIPALITIES ..........................2-4
2.3.5 PEDESTRIAN and highway BRIDGE OVERPASSES ............................................2-4
2.4 BRIDGE TYPE SELECTION........................................................................................2-4
2.4.1 GUIDELINES ............................................................................................................2-5
2.4.2 ALTERNATIVE DESIGNS ......................................................................................2-5
2.4.3 VALUE ENGINEERING ..........................................................................................2-6
2.5 DESIGN CONSIDERATIONS ......................................................................................2-6
2.5.1 DESIGN REQUIREMENTS .....................................................................................2-6
2.5.2 MAINTENANCE OF TRAFFIC ...............................................................................2-6
2.5.3 CONSTRUCTIBILITY..............................................................................................2-7
2.5.4 DESIGN FOR MAINTENANCE ..............................................................................2-7
[Link] Maintainability ....................................................................................................2-7
[Link] Provisions for Inspection.....................................................................................2-8
2.5.5 FUTURE WIDENING ...............................................................................................2-9
2.5.6 CONTEXT SENSITIVE DESIGN ............................................................................2-9
2.6 DESIGN LOADS............................................................................................................2-9
2.6.1 LIVE LOADS ............................................................................................................2-9
2.6.2 DEAD LOADS ..........................................................................................................2-9
2.7 BRIDGE LOAD RATING .............................................................................................2-9
2.8 PLAN PRESENTATION ...............................................................................................2-9
2.8.1 DRAFTING STANDARDS.....................................................................................2-10

May 2005

Table of Contents i

DelDOT Bridge Design Manual


2.8.2 PLAN SHEET SEQUENCE ....................................................................................2-10
2.8.3 BRIDGE SHEET PREPARATION .........................................................................2-10
[Link] General and Project Notes.................................................................................2-10
[Link] Bridge Sheets.....................................................................................................2-11
2.8.4 MINIMUM-DETAIL PLANS .................................................................................2-11
2.8.5 OTHER PLAN SHEETS .........................................................................................2-11
2.9 BRIDGE DESIGN PROCEDURES .............................................................................2-11
2.9.1 INTRODUCTION....................................................................................................2-11
[Link] Designed-In Value.............................................................................................2-11
[Link] Documentation of Design..................................................................................2-12
[Link] Stewardship Agreement ....................................................................................2-13
[Link] Design Consultants............................................................................................2-13
2.9.2 PROJECT INITIATION ..........................................................................................2-14
[Link] Design Responsibility .......................................................................................2-14
[Link] Scoping Meeting ...............................................................................................2-14
[Link] Project Initiation................................................................................................2-15
[Link] Public Involvement ...........................................................................................2-17
2.9.3 DATA ACQUISITION ............................................................................................2-27
[Link] Topographic Survey ..........................................................................................2-27
[Link] Processing Survey Data.....................................................................................2-27
[Link] Survey Plans......................................................................................................2-29
[Link].1 Survey Plan Distribution ............................................................................2-29
2.9.4 PERMITS AND ENVIRONMENTAL CONSIDERATIONS ................................2-29
[Link] Responsibilities .................................................................................................2-29
[Link] U.S. Coast Guard Permits .................................................................................2-30
[Link] Corps of Engineers (COE) Permits ...................................................................2-30
[Link] Department of Natural Resources and Environmental Control (DNREC) .......2-31
[Link].1 Division of Water Resources......................................................................2-31
[Link].1a Wetlands & Subaqueous Lands Section...............................................2-31
[Link].1b Water Supply Section...........................................................................2-31
[Link].2 Division of Soil and Water Conservation .................................................2-32
[Link].2a Sediment and Stormwater Management Section..................................2-32
[Link].2b Delaware Coastal Management Program .............................................2-32
[Link].3 Division of Parks and Recreation..............................................................2-32
[Link].4 Division of Fish and Wildlife Restrictions................................................2-32
[Link].5 Division of Air and Waste Management....................................................2-33
[Link] Section 106 Of The National Historic Preservation Act ...................................2-33
[Link] New Castle County............................................................................................2-34
[Link] Federal Highway Administration ......................................................................2-34
[Link] Environmental Documentation .........................................................................2-35
[Link].1 Categorical Exclusion ................................................................................2-35
[Link].2 Environmental Assessment (EA) ...............................................................2-35
[Link].3 Environmental Impact Statement (EIS) .....................................................2-35
2.9.5 PRELIMINARY DESIGN.......................................................................................2-48
[Link] Drainage and Foundation Reports.....................................................................2-48
[Link].1 Hydraulic Report ........................................................................................2-48
Table of Contents ii

May 2005

DelDOT Bridge Design Manual


[Link].2 Scour Evaluation Report ............................................................................2-48
[Link].3 Foundation Report......................................................................................2-48
[Link] Pre-TS&L and Conceptual Plans ......................................................................2-48
[Link] Aesthetic Considerations...................................................................................2-48
[Link] Design Exceptions.............................................................................................2-49
[Link] TS&L Plans .......................................................................................................2-49
[Link] Preliminary Plans ..............................................................................................2-50
[Link] Preliminary Plans Review .................................................................................2-50
[Link].1 Preliminary Utility Plans............................................................................2-54
[Link].2 Traffic Design Request...............................................................................2-54
[Link] Public Information.............................................................................................2-54
2.9.6 AGREEMENTS .......................................................................................................2-54
[Link] Types and Purposes of Agreements ..................................................................2-54
[Link].1 Town Agreements .....................................................................................2-54
[Link].2 Railroads.....................................................................................................2-55
[Link].3 Utilities .......................................................................................................2-55
[Link].4 Right-of-Way .............................................................................................2-55
[Link].5 Noise Ordinance Waivers...........................................................................2-55
[Link] Designer Responsibility ....................................................................................2-55
[Link] Responsibility of Other Sections.......................................................................2-55
2.9.7 SEMI-FINAL SUBMISSION ..................................................................................2-56
[Link] Semi-Final Right-of-Way Plan..........................................................................2-56
[Link] Semi-Final Construction Plan Submittal Requirements....................................2-56
[Link] Utilities Submission ..........................................................................................2-56
[Link] Semi-Final Construction Plan Review ..............................................................2-56
2.9.8 SPECIAL PROVISIONS AND CONTRACT DOCUMENTS ...............................2-57
2.9.9 FINAL PLANS AND ESTIMATES........................................................................2-57
[Link] Final Plans .........................................................................................................2-57
[Link] Final Plans Review Meeting .............................................................................2-57
[Link] Title Sheet Signatures........................................................................................2-58
2.9.10 PS&E SUBMISSION.............................................................................................2-58
2.9.11 PS&E APPROVAL AND FUNDING ...................................................................2-58
2.9.12 ADVERTISING .....................................................................................................2-58
2.9.13 PRE-BID MEETINGS ...........................................................................................2-58
2.9.14 ADDENDUMS ......................................................................................................2-58
2.9.15 BID OPENING AND BID REVIEW ....................................................................2-59
2.9.16 REVISIONS ...........................................................................................................2-59
2.9.17 AS-BUILT PLANS ................................................................................................2-59
Chapter Three - Hydrology and Hydraulics
3.1 INTRODUCTION ..........................................................................................................3-1
3.1.1 POLICY AND COORDINATION ............................................................................3-1
3.1.2 DESIGN RESPONSIBILITIES .................................................................................3-2
3.1.3 HYDRAULIC ASSESSMENT CHECKLIST...........................................................3-3
3.1.4 TOPOGRAPHIC SURVEY .......................................................................................3-3
3.1.5 HYDRAULIC REPORT ............................................................................................3-8
3.2 HYDROLOGY ...............................................................................................................3-8
May 2005

Table of Contents iii

DelDOT Bridge Design Manual


3.2.1 INTRODUCTION......................................................................................................3-8
3.2.2 DOCUMENTATION.................................................................................................3-8
3.2.3 ESTIMATING FLOOD RUNOFF AND MAGNITUDES .......................................3-8
[Link] USGS Method .....................................................................................................3-9
[Link] TR-55 ..................................................................................................................3-9
[Link] Recorded Data .....................................................................................................3-9
[Link] Published Reports..............................................................................................3-10
[Link] The Rational Method.........................................................................................3-10
[Link] TR-20 ................................................................................................................3-10
3.2.4 DESIGN FLOOD FREQUENCY ............................................................................3-10
3.2.5 FREQUENCY MIXING ..........................................................................................3-10
3.2.6 SPILLWAY DESIGN ..............................................................................................3-12
3.3 HYDRAULICS.............................................................................................................3-12
3.3.1 CULVERT HYDRAULICS.....................................................................................3-12
3.3.2 BRIDGE HYDRAULICS ........................................................................................3-13
[Link] HEC-RAS..........................................................................................................3-13
[Link] WSPRO .............................................................................................................3-14
3.3.3 STREAM CHANNEL..............................................................................................3-14
3.3.4 ICE AND DEBRIS...................................................................................................3-14
3.3.5 TIDAL HYDRAULICS-BRIDGES AND CULVERTS .........................................3-14
3.3.6 BRIDGE DECK DRAINAGE .................................................................................3-15
3.3.7 TAX DITCHES........................................................................................................3-16
3.4 SCOUR EVALUATION AND PROTECTION...........................................................3-19
3.4.1 EVALUATION CRITERIA ....................................................................................3-19
[Link] Analysis Procedure............................................................................................3-19
[Link] Scourability of Rock..........................................................................................3-20
[Link] Scour Evaluation Report ...................................................................................3-21
[Link] Plan Presentation ...............................................................................................3-21
3.5 STREAM STABILITY.................................................................................................3-22
3.5.1 STREAM STABILITY ANALYSIS .......................................................................3-22
3.5.2 BANK PROTECTION.............................................................................................3-22
3.5.3 CHANNEL MODIFICATIONS ..............................................................................3-23
3.6 PLAN PRESENTATION............................................................................................3-24
Chapter Four - Bridge Load Rating
4.1 INTRODUCTION ..........................................................................................................4-1
4.1.1 RESPONSIBILITY....................................................................................................4-1
4.1.2 ASSUMPTIONS ........................................................................................................4-1
4.1.3 LOAD RATING LEVELS.........................................................................................4-2
4.1.4 LOAD RESTRICTION POSTING ............................................................................4-2
4.2 BRIDGE INSPECTIONS ...............................................................................................4-5
4.2.1 INSPECTION TYPES ...............................................................................................4-5
4.2.2 INSPECTION FILES.................................................................................................4-6
4.3 BRIDGE REPLACEMENT AND REHABILITATION RATING ...............................4-6
4.3.1 REQUIRED RATINGS .............................................................................................4-6
4.3.2 RATED STRUCTURES AND ELEMENTS ............................................................4-6
4.4 LOAD RATING METHODS .........................................................................................4-7
Table of Contents iv

May 2005

DelDOT Bridge Design Manual


4.4.1 ANALYSIS METHODS............................................................................................4-7
[Link] Load Factor Method ............................................................................................4-7
[Link] Working Stress Design Method ..........................................................................4-7
[Link] Load and Resistance Factor Method ...................................................................4-7
4.4.2 TOOLS .......................................................................................................................4-7
[Link] BRASS Data Set..................................................................................................4-7
[Link] Data Set Standards ..............................................................................................4-8
4.4.3 LOAD TESTING .......................................................................................................4-8
4.5 ANALYTICAL STEPS IN LOAD RATING...............................................................4-13
4.5.1 RATED MEMBERS ................................................................................................4-13
4.5.2 PLAN SHEET RATING NOTES ............................................................................4-13
4.6 LIVE LOADS ...............................................................................................................4-13
4.6.1 LOAD DISTRIBUTION..........................................................................................4-14
4.7 LOAD RATING EXAMPLE ......................................................................................4-14
4.8 LOAD RATING REPORT ...........................................................................................4-14
Chapter Five - Superstructure Design
5.1 INTRODUCTION ..........................................................................................................5-1
5.2 DESIGN CRITERIA ......................................................................................................5-1
5.2.1 BRIDGE AND APPROACH GEOMETRY..............................................................5-1
[Link] Design Standards.................................................................................................5-1
[Link] Length..................................................................................................................5-1
[Link] Width...................................................................................................................5-2
[Link] Skew ....................................................................................................................5-2
[Link] Clearances ...........................................................................................................5-2
[Link].1 Vertical Clearance ........................................................................................5-2
[Link].2 Horizontal Clearance and Clear Zone ..........................................................5-2
[Link].3 Railroad Clearance .......................................................................................5-3
5.2.2 Structural Analysis .....................................................................................................5-6
[Link] AASHTO Method ...............................................................................................5-6
[Link] Refined Method...................................................................................................5-6
5.2.3 DESIGN LOADS .......................................................................................................5-6
[Link] Live Loads and Lane Loads ................................................................................5-6
[Link] Dead Loads..........................................................................................................5-6
[Link] Dynamic Load Allowance...................................................................................5-6
[Link] Combinations of Loads .......................................................................................5-6
5.2.4 DESIGN METHODS .................................................................................................5-6
5.2.5 TEMPERATURE RANGE ........................................................................................5-6
5.2.6 DEFLECTIONS .........................................................................................................5-7
5.3 CONCRETE BRIDGE DECKS .....................................................................................5-7
5.3.1 DESIGN OF CAST-IN-PLACE DECKS ..................................................................5-7
[Link] Materials..............................................................................................................5-7
[Link] Design..................................................................................................................5-7
[Link] Thickness.............................................................................................................5-7
[Link] Concrete Cover....................................................................................................5-7
[Link] Reinforcement .....................................................................................................5-9
[Link] Stay-in-Place Forms ............................................................................................5-9
May 2005

Table of Contents v

DelDOT Bridge Design Manual


[Link] Pouring Decks .....................................................................................................5-9
5.3.2 DESIGN OF PRECAST SLABS AND DECK PANELS .........................................5-9
[Link] Materials............................................................................................................5-10
[Link] Design................................................................................................................5-10
[Link] Thickness...........................................................................................................5-11
[Link] Concrete Cover..................................................................................................5-13
[Link] Reinforcement Splices.......................................................................................5-13
[Link] CIP Concrete .....................................................................................................5-13
5.3.3 DESIGN OF COMPOSITE ACTION DECKS .......................................................5-13
5.3.4 FINISHED DECK ELEVATIONS ..........................................................................5-14
5.3.5 JOINTS.....................................................................................................................5-14
[Link] Transverse Joints ...............................................................................................5-16
[Link].1 Strip Seals...................................................................................................5-16
[Link].2 Finger Joints ...............................................................................................5-16
[Link] Longitudinal Joints ............................................................................................5-16
[Link] Construction Joints ............................................................................................5-16
5.3.6 DECK PROTECTIVE SYSTEMS...........................................................................5-21
[Link] Overlays ............................................................................................................5-21
5.3.7 MISCELLANEOUS DECK ITEMS........................................................................5-21
[Link] Bridge Rails.......................................................................................................5-21
[Link].1 Policies .......................................................................................................5-21
[Link].2 Types of Bridge Rails.................................................................................5-22
[Link].3 Materials.....................................................................................................5-29
[Link].4 Cover ..........................................................................................................5-29
[Link].5 Guardrail to Barrier Connections ...............................................................5-29
[Link] Screening and Shields .......................................................................................5-29
[Link] Sidewalks ..........................................................................................................5-29
[Link] Curbs .................................................................................................................5-33
5.4 STEEL BEAMS AND GIRDERS ................................................................................5-33
5.4.1 TYPES......................................................................................................................5-33
5.4.2 MATERIALS ...........................................................................................................5-34
5.4.3 DESIGN ...................................................................................................................5-34
[Link] Redundancy Requirements................................................................................5-34
[Link] Beam Spacing....................................................................................................5-34
[Link] Fatigue Design Criteria .....................................................................................5-34
[Link] Beam Design .....................................................................................................5-35
[Link] Welding and Welding Procedures.....................................................................5-35
[Link] Shear Connectors...............................................................................................5-35
[Link] Stiffeners, Diaphragms, and Bracing ................................................................5-35
[Link] Field Connections..............................................................................................5-47
5.4.4 CAMBER DIAGRAMS...........................................................................................5-50
5.4.5 PROTECTIVE COATINGS ....................................................................................5-50
5.5 PRESTRESSED CONCRETE BEAMS.......................................................................5-53
5.5.1 TYPES......................................................................................................................5-53
5.5.2 MATERIALS ...........................................................................................................5-53
5.5.3 DESIGN ...................................................................................................................5-53
Table of Contents vi

May 2005

DelDOT Bridge Design Manual


[Link] Beam Spacing....................................................................................................5-54
[Link] Composite Design .............................................................................................5-54
[Link] Shear Developers...............................................................................................5-54
[Link] Continuity for Live Load...................................................................................5-57
[Link] Diaphragms .......................................................................................................5-57
[Link] Strand Design ....................................................................................................5-57
[Link] Camber Diagram ...............................................................................................5-57
5.6 BEARINGS...................................................................................................................5-58
5.6.1 BEARING DEVICES ..............................................................................................5-58
5.6.2 SEISMIC PROVISIONS..........................................................................................5-74
5.7 SLAB BRIDGES ..........................................................................................................5-74
5.7.1 MATERIALS ...........................................................................................................5-74
5.7.2 DESIGN ...................................................................................................................5-74
5.7.3 THICKNESS ............................................................................................................5-74
5.7.4 CONCRETE COVER ..............................................................................................5-74
5.8 APPROACH SLABS....................................................................................................5-75
5.8.1 MATERIALS ...........................................................................................................5-75
5.8.2 DESIGN ...................................................................................................................5-75
5.8.3 THICKNESS ............................................................................................................5-75
5.8.4 CONCRETE COVER ..............................................................................................5-75
Chapter Six - Substructure Design
6.1 INTRODUCTION ..........................................................................................................6-1
6.1 SUBSURFACE INVESTIGATIONS.............................................................................6-1
6.1.1 INFORMATION NEEDED BY THE DESIGNER...................................................6-1
6.1.2 REQUESTS FOR BORINGS ....................................................................................6-1
6.1.3 MATERIALS AND RESEARCH SECTION TESTS...............................................6-4
6.1.4 SOIL SAMPLES ........................................................................................................6-8
6.1.5 GROUND WATER MONITORING.........................................................................6-8
6.1.6 BORING LOGS .........................................................................................................6-9
6.1.7 SOILS DEFINITIONS .............................................................................................6-16
6.1.8 GEOTECHNICAL REPORTS ................................................................................6-18
6.1.9 FOUNDATION REPORTS .....................................................................................6-19
6.2 FOUNDATION DESIGN.............................................................................................6-19
6.2.1 SPREAD FOOTING FOUNDATIONS...................................................................6-21
6.2.2 PILES .......................................................................................................................6-21
[Link] Determining the Need for a Pile Foundation ....................................................6-21
[Link] Types and Details ..............................................................................................6-23
[Link].1 Precast-Prestressed Concrete Piles.............................................................6-23
[Link].2 Precast-Prestressed Concrete Cylinder Piles..............................................6-25
[Link].3 Cast-in-Place Concrete Piles.....................................................................6-25
[Link].3.1 Steel Shell Piles........................................................................................6-25
[Link].3.2 Steel Pipe Piles.........................................................................................6-26
[Link].4 Steel H-Piles..............................................................................................6-29
[Link].5 Timber Piles ..............................................................................................6-29
[Link] Selection of Pile Type ...................................................................................6-30
[Link] Pile Bearing Capacity....................................................................................6-30
May 2005

Table of Contents vii

DelDOT Bridge Design Manual


[Link].1 Resistance Factors ......................................................................................6-37
[Link].2 Lateral Loads on Piles ................................................................................6-37
[Link].3 Static Analysis............................................................................................6-37
[Link].4 Dynamic Formula.......................................................................................6-38
[Link].4.1 GRLWEAP..............................................................................................6-39
[Link].4.2 Input Information ....................................................................................6-39
[Link].4.3 Damping and Quake................................................................................6-39
[Link].4.4 Output......................................................................................................6-39
[Link].5 Pile Driving Analyzer.................................................................................6-40
[Link].6 Pile-Soil Interaction....................................................................................6-40
[Link].7 Pile Load Tests ...........................................................................................6-41
[Link] Pile Protection ...............................................................................................6-42
6.2.3 PILE-SUPPORTED FOOTINGS ............................................................................6-42
6.2.4 DRILLED SHAFT FOUNDATIONS......................................................................6-42
[Link] Types of Drilled Shafts .................................................................................6-43
[Link] Application of Drilled Shafts ........................................................................6-43
6.3 SEISMIC DESIGN AND RETROFITTING................................................................6-43
6.4 ABUTMENT DESIGN.................................................................................................6-44
6.4.1 CANTILEVER ABUTMENTS ...............................................................................6-46
6.4.2 STUB ABUTMENTS ..............................................................................................6-46
6.4.3 INTEGRAL ABUTMENTS ....................................................................................6-47
6.4.4 DESIGN METHODOLOGY ...................................................................................6-47
6.4.5 DESIGN LOADS .....................................................................................................6-47
6.5 PIER DESIGN ..............................................................................................................6-47
6.5.1 FRAME AND MULTI-COLUMN PIERS ..............................................................6-47
[Link] Reinforcement ...................................................................................................6-48
[Link] Construction Joints ............................................................................................6-48
[Link] Column Spacing ................................................................................................6-48
[Link] Pier Caps ...........................................................................................................6-48
6.5.2 SOLID OR HOLLOW SHAFT PIERS....................................................................6-54
6.5.3 PILE BENTS............................................................................................................6-54
6.6 RETAINING WALL DESIGN ...................................................................................6-54
6.6.1 TYPES......................................................................................................................6-56
[Link] Post and Plank Walls.....................................................................................6-56
[Link] Sheet Pile Walls ............................................................................................6-56
[Link].1 Steel Sheet Piles .........................................................................................6-56
[Link].2 Concrete Sheet Piles...................................................................................6-56
[Link] Reinforced Concrete Walls ...............................................................................6-57
[Link] Proprietary Retaining Walls ..............................................................................6-57
6.7 APPROACH ROADWAY EMBANKMENT..............................................................6-58
6.7.1 SETTLEMENT ........................................................................................................6-58
6.7.2 SLOPE STABILITY ................................................................................................6-60
6.7.3 SLOPE AND BANK PROTECTION......................................................................6-62
[Link] General ..........................................................................................................6-62
[Link] Geosynthetics ....................................................................................................6-63
[Link] Rock Riprap.......................................................................................................6-63
Table of Contents viii

May 2005

DelDOT Bridge Design Manual


6.7.4 MISCELLANEOUS.................................................................................................6-64
6.8 ARCHITECTURAL TREATMENTS..........................................................................6-64
6.9 SUBSTRUCTURE DRAINAGE..................................................................................6-64
Chapter Seven - Culvert, Rigid Frame and Arch Design
7.1 INTRODUCTION ..........................................................................................................7-1
7.2 GENERAL POLICY ......................................................................................................7-1
7.2.1 CULVERT HYDRAULICS.......................................................................................7-4
7.2.2 FOUNDATION DESIGN ..........................................................................................7-4
7.2.3 HEADWALLS ...........................................................................................................7-4
7.2.4 WINGWALLS ...........................................................................................................7-4
7.2.5 CUTOFF WALLS......................................................................................................7-5
7.2.6 SCOUR APRONS......................................................................................................7-5
7.2.7 GUARDRAIL ATTACHMENTS..............................................................................7-5
7.2.8 MISCELLANEOUS...................................................................................................7-5
7.3 CONCRETE CULVERTS..............................................................................................7-5
7.3.1 MATERIALS .............................................................................................................7-5
7.3.2 DESIGN .....................................................................................................................7-6
7.3.3 REINFORCED CONCRETE BOX CULVERTS......................................................7-6
[Link] Precast Box Culverts ...........................................................................................7-6
[Link] Cast-In-Place Box Culverts.................................................................................7-7
7.3.4 Rigid Frames ............................................................................................................7-11
7.3.5 CONCRETE PIPE CULVERTS..............................................................................7-16
[Link] Material .............................................................................................................7-16
[Link] Design................................................................................................................7-16
7.3.6 CONCRETE ARCHES ............................................................................................7-16
[Link] MATERIALS ....................................................................................................7-16
[Link] DESIGN ............................................................................................................7-16
[Link] THICKNESS .....................................................................................................7-17
[Link] CONCRETE COVER .......................................................................................7-17
7.3.7 PRECAST PROPRIETARY STRUCTURES .........................................................7-17
7.4 METAL CULVERTS ...................................................................................................7-17
7.4.1 CORRUGATED METAL PIPES ............................................................................7-17
7.4.2 STRUCTURAL PLATE PIPE STRUCTURES ......................................................7-18
7.4.3 STRUCTURAL PLATE BOX CULVERTS ...........................................................7-18
7.5 HIGH DENSITY POLYETHYLENE PLASTIC PIPES .............................................7-18
7.5.1 MATERIAL .............................................................................................................7-18
7.5.2 DESIGN ...................................................................................................................7-18
Chapter Eight - Timber Structures Design
8.1 INTRODUCTION ..........................................................................................................8-1
8.1.1 ADVANTAGES AND DISADVANTAGES OF TIMBER BRIDGES....................8-1
8.1.2 TIMBER AS A BRIDGE MATERIAL .....................................................................8-1
[Link] TIMBER BEAM SUPERSTRUCTURE ............................................................8-2
[Link] LONGITUDINAL DECK SUPERSTRUCTURES............................................8-2
8.2 PHYSICAL PROPERTIES OF STRUCTURAL TIMBER ...........................................8-3
8.2.1 LUMBER SPECIES...................................................................................................8-3

May 2005

Table of Contents ix

DelDOT Bridge Design Manual


8.2.2 DIRECTION OF GRAIN...........................................................................................8-3
8.2.3 MOISTURE CONTENT............................................................................................8-3
8.2.4 DENSITY...................................................................................................................8-4
8.2.5 KNOTS.......................................................................................................................8-4
8.2.6 DURABILITY ...........................................................................................................8-4
8.3 MECHANICAL PROPERTIES .....................................................................................8-4
8.3.1 SAWN LUMBER GRADING ...................................................................................8-4
[Link] Grading Rules......................................................................................................8-5
[Link] Specifying Allowable Timber .............................................................................8-5
8.3.2 LUMBER SIZES........................................................................................................8-7
8.3.3 MECHANICAL PROPERTIES OF GLUE LAMINATED TIMBER (GLULAM) .8-7
[Link] Product Standards................................................................................................8-7
[Link] Adhesives ............................................................................................................8-8
[Link] Joints....................................................................................................................8-8
[Link] Quality Control....................................................................................................8-8
8.3.4 TABULATED DESIGN VALUES ...........................................................................8-8
[Link] Allowable Stress Values for Glulam Timber ......................................................8-9
[Link] Adjustments to Tabulated Values .......................................................................8-9
8.4 PRESERVATIVE TREATMENTS..............................................................................8-10
8.4.1 TYPES OF WOOD PRESERVATIVES .................................................................8-10
[Link] Creosote.............................................................................................................8-10
[Link] Pentachlorophenol (Penta) ................................................................................8-11
[Link] Waterborne Preservatives..................................................................................8-11
[Link] Copper Naphthenate ..........................................................................................8-11
8.4.2 TREATED TIMBER SPECIFICATIONS...............................................................8-11
[Link] Design Considerations.......................................................................................8-12
8.5 HARDWARE ...............................................................................................................8-12
8.6 SUPERSTRUCTURE DESIGN CRITERIA................................................................8-13
8.6.1 LOADS.....................................................................................................................8-13
[Link] Load Distribution ..............................................................................................8-14
[Link] Impact................................................................................................................8-14
[Link] Buoyancy...........................................................................................................8-14
8.6.2 DEFLECTION .........................................................................................................8-14
8.7 LONGITUDINAL DECK DESIGN.............................................................................8-14
8.8 RAILING FOR TIMBER DECKS ...............................................................................8-23
8.9 HOT-MIX WEARING SURFACES FOR TIMBER DECKS .....................................8-24
8.10 SUBSTRUCTURE DESIGN......................................................................................8-24
8.10.1 TIMBER ABUTMENTS .......................................................................................8-24
8.10.2 TIMBER BENTS ...................................................................................................8-25
8.10.3 TIMBER FENDERS ..............................................................................................8-25
Chapter Nine - Rehabilitation of Existing Bridges
9.1 INTRODUCTION ..........................................................................................................9-1
9.2 ENVIRONMENTAL CONSIDERATIONS ..................................................................9-2
9.2.1 REPAINTING ............................................................................................................9-2
9.2.2 RECYCLING .............................................................................................................9-3
9.2.3 DEMOLITION...........................................................................................................9-3
Table of Contents x

May 2005

DelDOT Bridge Design Manual


9.3 BRIDGE DECKS............................................................................................................9-3
9.3.1 CONCRETE DECKS.................................................................................................9-3
[Link] Condition Survey.................................................................................................9-3
[Link].1 Visual Inspection..........................................................................................9-3
[Link].2 Chloride Content Analysis ...........................................................................9-4
[Link].3 Freeze-Thaw Test .........................................................................................9-5
[Link].4 Half-Cell Analysis........................................................................................9-6
[Link].5 Delamination Survey....................................................................................9-7
[Link].6 Coring...........................................................................................................9-7
[Link].7 Petrographic Analysis ..................................................................................9-7
[Link] Deck Condition Evaluation .................................................................................9-7
[Link] Concrete Removal ...............................................................................................9-9
[Link] Concrete Deck Rehabilitation .............................................................................9-9
[Link].1 Patching......................................................................................................9-10
[Link].1.1 Repair by Patching ..............................................................................9-10
[Link].2 Overlay .......................................................................................................9-11
[Link].3 Waterproofing ............................................................................................9-12
[Link] Concrete Deck Replacement .............................................................................9-12
[Link].1 Cast-in-Place Concrete ...............................................................................9-12
[Link].2 Precast Concrete .........................................................................................9-12
[Link].3 Orthotropic Decks ......................................................................................9-13
9.3.2 STEEL GRID DECKS .............................................................................................9-13
[Link] Steel Grid Deck Evaluation...............................................................................9-13
[Link].1 Connection Failure .....................................................................................9-14
[Link].2 Reduced Skid Resistance ...........................................................................9-14
[Link].3 Fatigue Evaluation......................................................................................9-14
[Link].4 Corrosion....................................................................................................9-14
[Link].5 Delamination of Surfacing .........................................................................9-14
[Link] Steel Grid Deck Replacement ...........................................................................9-14
9.3.3 TIMBER DECKS.....................................................................................................9-15
[Link] Timber Deck Survey and Evaluation ................................................................9-15
[Link] Timber Deck Replacement................................................................................9-15
9.3.4 DECK PROTECTIVE SYSTEMS...........................................................................9-15
[Link] Waterproofing ...................................................................................................9-15
[Link] Cathodic Protection ...........................................................................................9-15
[Link] Epoxy-Coated Reinforcing Steel.......................................................................9-16
[Link] Overlays ............................................................................................................9-16
9.3.5 SAFETY CONSIDERATIONS ...............................................................................9-16
9.4 RAILINGS....................................................................................................................9-16
9.5 JOINT REPAIR/REPLACEMENT ..............................................................................9-17
9.6 APPROACH SLABS....................................................................................................9-18
9.7 BEAMS AND GIRDERS .............................................................................................9-18
9.7.1 CONVENTIONALLY REINFORCED CONCRETE BEAMS ..............................9-18
[Link] Concrete Beam Repairs.....................................................................................9-18
[Link] Repair Materials ................................................................................................9-19
[Link] Surface Preparation ...........................................................................................9-19

May 2005

Table of Contents xi

DelDOT Bridge Design Manual


[Link] Surface Patching................................................................................................9-20
[Link] Deep Repairs .....................................................................................................9-20
[Link] Pneumatically Placed Concrete .........................................................................9-22
[Link] Pressure Injection ..............................................................................................9-22
9.7.2 PRESTRESSED CONCRETE BEAMS ..................................................................9-22
[Link] Damage Evaluation ...........................................................................................9-22
[Link] Repairs...............................................................................................................9-24
[Link] Preloading..........................................................................................................9-24
[Link] Beam Replacement............................................................................................9-28
9.7.3 STEEL BEAMS AND GIRDERS ...........................................................................9-28
[Link] In-Depth Investigation.......................................................................................9-28
[Link] Corrosion...........................................................................................................9-29
[Link] Brittle Fracture ..................................................................................................9-29
[Link] Fatigue Cracks...................................................................................................9-29
[Link] Fire Damage ......................................................................................................9-29
[Link] Collision Damage ..............................................................................................9-30
9.7.4 REMEDIAL MEASURES .......................................................................................9-30
[Link] Cleaning and Painting .......................................................................................9-30
[Link] Cathodic Protection ...........................................................................................9-31
[Link] Strengthening ....................................................................................................9-31
[Link] Crack Repair......................................................................................................9-32
[Link] Peening ..............................................................................................................9-32
[Link] Bolting Splice Plates .........................................................................................9-32
[Link] Heat Straightening.............................................................................................9-32
[Link] Member Replacement .......................................................................................9-33
9.7.5 BEARINGS ..............................................................................................................9-33
[Link] Types of Problems.............................................................................................9-33
[Link] Seismic Requirements .......................................................................................9-33
[Link] Bearing Rehabilitation Methods........................................................................9-33
[Link].1 Cleaning and Painting ................................................................................9-34
[Link].2 Jacking and Resetting.................................................................................9-34
[Link].3 Lubrication .................................................................................................9-34
[Link] Bearing Replacement ........................................................................................9-34
9.8 FOUNDATION AND SUBSTRUCTURE...................................................................9-35
9.8.1 CRACK REPAIR.....................................................................................................9-35
9.8.2 REPLACEMENT OF DETERIORATED CONCRETE .........................................9-35
9.8.3 BEARING SEAT REPAIR ......................................................................................9-35
9.8.4 REPAIR OF CONCRETE SUBSTRUCTURES OVER WATER ..........................9-40
[Link] Underwater Repairs...........................................................................................9-40
[Link] Splash Zone Repairs..........................................................................................9-40
[Link] Above-Water Repairs ........................................................................................9-43
9.8.5 PILE REPAIRS ........................................................................................................9-43
[Link] Timber Pile Rehabilitation ................................................................................9-43
9.8.6 SCOUR AND UNDERMINING .............................................................................9-46
[Link] Riprap (Stone or Sacked Concrete)...................................................................9-46
[Link] Bagged Concrete ...............................................................................................9-47
Table of Contents xii

May 2005

DelDOT Bridge Design Manual


[Link] Sheeting and Filling ..........................................................................................9-48
9.8.7 STABILIZATION AND UNDERPINNING...........................................................9-48
[Link] Driven Piling and Needle Beams ......................................................................9-49
[Link] Structural Frames ..............................................................................................9-50
[Link] Tie Backs and Deadmen....................................................................................9-50
9.8.8 UNDERDRAIN REPAIR ........................................................................................9-50
9.8.9 SLOPE PAVING......................................................................................................9-50
9.9 RETAINING WALLS ..................................................................................................9-55
9.9.1 REINFORCED CONCRETE...................................................................................9-55
9.9.2 PROPRIETARY WALLS........................................................................................9-55
9.9.3 GRAVITY WALLS .................................................................................................9-55
9.9.4 STEEL SHEET PILING ..........................................................................................9-55
9.9.5 GABIONS ................................................................................................................9-56
9.10 MAINTENANCE AND PROTECTION OF TRAFFIC ............................................9-56
9.11 UTILITIES..................................................................................................................9-56
Chapter Ten RESERVED
Chapter Eleven RESERVED
Chapter Twelve Computer Applications
12.1 INTRODUCTION ......................................................................................................12-1
12.2 SOFTWARE APPLICATIONS..................................................................................12-1
12.2.1 SOFTWARE APPROVAL ....................................................................................12-1
12.3 COMMON STANDARDS .........................................................................................12-2
12.4 COMPUTER FILE ADMINISTRATION..................................................................12-2
12.4.1 FILE MANAGEMENT..........................................................................................12-2
12.4.2 AS-BUILT PLANS ................................................................................................12-2
12.4.3 ARCHIVES ............................................................................................................12-2
12.4.4 CONSULTANT CADD REQUIREMENTS .........................................................12-3
12.5 MISCELLANEOUS RESOURCES ...........................................................................12-3
12.5.1 OFFICE OF INFORMATION TECHNOLOGY (OIT) ........................................12-3
12.5.2 SPECIAL PROVISIONS .......................................................................................12-3
12.5.3 PLANNING ...........................................................................................................12-3
[Link] Mapping ..........................................................................................................12-3
[Link].1 Geographic Information System (GIS) INFORM....................................12-4
Chapter Thirteen Construction Coordination
13.1 INTRODUCTION ......................................................................................................13-1
13.2 DELDOT CONSTRUCTION.....................................................................................13-1
13.2.1 CONSTRUCTION GROUP ..................................................................................13-1
13.3 MATERIALS AND RESEARCH SECTION ............................................................13-2
13.4 DESIGN......................................................................................................................13-2
13.5 SAFETY SECTION....................................................................................................13-3
13.6 DELDOT CONSTRUCTION MANUAL ..................................................................13-3
13.7 STANDARD SPECIFICATIONS ..............................................................................13-3
13.8 NEW PRODUCT EVALUATION.............................................................................13-3

May 2005

Table of Contents xiii

DelDOT Bridge Design Manual


13.9 CONSTRUCTION SUPPORT ...................................................................................13-3
13.9.1 PRECONSTRUCTION MEETING.......................................................................13-3
13.9.2 KEY CONSTRUCTION ACTIVITY MEETINGS...............................................13-4
13.9.3 TEST PILE DRIVING ...........................................................................................13-4
13.9.4 PRE-DECK POUR MEETING..............................................................................13-4
13.9.5 SEMI-FINAL INSPECTION .................................................................................13-4
13.9.6 UNFORESEEN OR CHANGED CONDITIONS .................................................13-4
13.9.7 CONSULTANT CONSTRUCTION SUPPORT...................................................13-5
13.9.8 AS-BUILT PLANS ................................................................................................13-5
13.10 CONTRACTOR SUBMISSIONS ............................................................................13-5
13.10.1 WORKING DRAWING SUBMISSIONS...........................................................13-6
13.10.2 MATERIAL SUBMISSIONS..............................................................................13-6
13.10.3 CONSTRUCTION LOADS.................................................................................13-6
13.11 PLAN CHANGES ....................................................................................................13-7
13.11.1 PLAN REVISIONS..............................................................................................13-7
13.11.2 FIELD CHANGES...............................................................................................13-7
13.11.3 COST ANALYSIS...............................................................................................13-7
13.11.4 CONSTRUCTION CLAIMS...............................................................................13-7
Chapter Fourteen RESERVED
Appendix A Design References
A.1 INTRODUCTION ........................................................................................................ A-1
A.2 DESIGN REFERENCES.............................................................................................. A-1

Table of Contents xiv

April 2009

DelDOT Bridge Design Manual

FIGURES
No. Title

Page

2-1
2-2
2-3
2-4
2-5
2-6
2-7
2-8
2-9

Example Evaluation Matrix ............................................................................ 2-6


Sample Construction Project Estimate Form ....................................2-18 to 2-24
Sample FS-1 Form Project Authorization and Funding............................. 2-25
Sample Combined Project Initiation and Project Number Request Form .... 2-26
Sample Survey Request Form....................................................................... 2-28
Sample CEE Report ..........................................................................2-36 to 2-47
Design Exception Request Form................................................................... 2-51
Project Design Control Checklist Form ........................................................ 2-52
Design Criteria Form..................................................................................... 2-53

3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8

Hydraulic Assessment Checklist for Drainage Design .........................3-4 to 3-7


Design Frequency Criteria ............................................................................ 3-11
Frequencies for Coincidental Occurrence..................................................... 3-11
Scupper Downspout Support Bracket Elevation........................................... 3-17
Scupper Downspout Support Bracket Details............................................... 3-18
Sample Scour Project Note ........................................................................... 3-21
Typical Riprap Detail.................................................................................... 3-23
Typical Section Along Stream ...................................................................... 3-26

4-1a
4-1b
4-2
4-3
4-4
4-5

Sample Load Rating Plan Sheet Note (Bridges Required To Be Rated) ........ 4-3
Sample Load Rating Plan Sheet Note (Bridges Not Required To Be Rated) . 4-3
Safe Load Posting Decision Flow Chart ......................................................... 4-4
Enforcement Levels ........................................................................................ 4-5
Typical BRASS Load Rating Data Set ........................................................... 4-9
Axle Loadings and Spacings.............................................................4-10 to 4-12

5-1
5-2
5-3
5-4
5-5
5-6
5-7
5-8
5-9
5-10
5-11
5-12
5-13
5-14
5-15
5-16
5-17a

Crashwall Details ............................................................................................ 5-4


Railroad Clearances ........................................................................................ 5-5
Stay-in-Place Form Details ............................................................................. 5-8
Typical Precast Deck Slab ............................................................................ 5-11
Typical Precast Panel to Beam Connections................................................. 5-12
Dimensions of Precast Deck Slab ................................................................. 5-12
Dimensions of Precast Deck Panels.............................................................. 5-13
Joint at Fixed Bearing ................................................................................... 5-15
Transverse Strip Seal Joint Details ...................................................5-17 to 5-18
Finger Joint Details ....................................................................................... 5-19
Longitudinal Strip Seal Joint Details ............................................................ 5-20
Cold Construction Joint Details .................................................................... 5-21
F-Shape Barrier Details................................................................................. 5-23
Pedestrian Railing with Tube Handrail Details............................................. 5-24
Open Ornamental Barrier Details.................................................................. 5-25
Aesthetic Stone-Faced Barrier without Handrail .......................................... 5-26
Handrail Design Guidelines .......................................................................... 5-27

May 2005

Table of Contents xv

DelDOT Bridge Design Manual


5-17b
5-18
5-19
5-20
5-21
5-22
5-23
5-24
5-25
5-26
5-27

Handrail Details ............................................................................................ 5-28


Screening Details ..............................................................................5-30 to 5-31
Shield Details ................................................................................................ 5-32
Shear Developer Steel Beams .................................................................... 5-36
Intermediate and Bearing Stiffener Details Steel Beams...............5-37 to 5-38
Cross Frame Details Steel Beam Example ................................................ 5-39
End Cross Frame Details Steel Beam Example .............................5-40 to 5-41
Connection Plate Details Steel Beam Example .............................5-42 to 5-43
Lateral Bracing Details Steel Beam Example............................................ 5-44
Rolled Beam Intermediate Diaphragm Detail Example....................5-45 to 5-46
Longitudinal/Transverse Stiffener Intersection Details
Steel Beams..............................................................................5-48 to 5-49
5-28 Typical Camber Diagram for Steel Beams .......................................5-51 to 5-52
5-29 Composite Details for Concrete Beams ........................................................ 5-55
5-30 Shear Connection Details for Adjacent Concrete Box Girders..................... 5-56
5-31 Typical Camber Diagram for Concrete Beams............................................. 5-58
5-32 Notes for Bearings ............................................................................5-60 to 5-61
5-33 Elastomeric Bearing Details..............................................................5-62 to 5-63
5-34 Neoprene Bearing Details ............................................................................. 5-64
5-35 Steel Bearings Expansion...............................................................5-65 to 5-66
5-36 Steel Bearings Fixed ......................................................................5-67 to 5-68
5-37a,b Expansion High-Load Multi-Rotational Bearing Detail Example....5-69 to 5-70
5-37c Fixed High-Load Multi-Rotational Bearing Detail Example........................ 5-71
5-37d High-Load Multi-Rotational Bearing Detail Example.................................. 5-72
5-38 Pot Bearing Details ....................................................................................... 5-73
5-39 Approach Slab Design Details ..........................................................5-76 to 5-78
6-1
6-2
6-3
6-4
6-5
6-6
6-7
6-8
6-9
6-10
6-11
6-12
6-13
6-14
6-15
6-16
6-17
6-18
6-19
6-20

Boring Request Form ...................................................................................... 6-3


N-Value Correction Factors for Granular Soils ....................................6-5 to 6-6
Relationship Between Corrected N-Values and .......................................... 67
Engineering Classification for In Situ Rock Quality ...................................... 6-8
Sample Boring Log ...........................................................................6-10 to 6-13
Sample Summary of Boring Log Soil Analysis Tests ......................6-14 to 6-15
AASHTO Soil Classification System ........................................................... 6-17
Foundation Types and Applicable Soils Conditions.................................... 6-20
Principal Situations Where Piles May Be Needed........................................ 6-22
Typical Precast-Prestressed Concrete Pile Details........................................ 6-24
Typical Splice Detail Fluted Steel Shell .................................................... 6-26
Typical Pile Reinforcement Pile Shell ....................................................... 6-27
Typical Splice Detail Pipe Pile Shell ......................................................... 6-28
Design Criteria for Piles Timber ................................................................ 6-31
Design Criteria for Piles Steel H-Sections ................................................. 6-32
Design Criteria for Piles Precast-Prestressed Concrete ............................. 6-33
Design Criteria for Piles Cast-in-Place Concrete....................................... 6-34
Design Criteria for Piles Drilled Shafts ..................................................... 6-35
Guide to Pile Type Selection for Subsurface Conditions ............................. 6-36
Guide to Pile Shape Effects .......................................................................... 6-36

Table of Contents xvi

May 2005

DelDOT Bridge Design Manual


6-21
6-22
6-23
6-24
6-25
6-26
6-27
6-28
6-29
6-30
6-31
6-32

Cantilever Abutment Detail Example ........................................................... 6-45


Stub Abutment Detail Example .................................................................... 6-46
Seismic Reinforcement for Columns ................................................6-49 to 6-50
Reinforced Concrete Pier Example...................................................6-51 to 6-53
Point of Fixity ............................................................................................... 6-55
Recommended K Values............................................................................... 6-55
Surcharge Settlement vs. Time ..................................................................... 6-59
Wick Drains .................................................................................................. 6-59
Circular Arc Failure ...................................................................................... 6-60
Sliding Block Failure .................................................................................... 6-61
Lateral Squeeze of Foundation Soil .............................................................. 6-61
Slope Stability Software Applications .......................................................... 6-62

7-1a
7-1b
7-2
7-3
7-4
7-5
7-6
7-7

Box Culvert Example Section...................................................................... 7-2


Box Culvert Example Elevation................................................................... 7-3
Wingwall to Culvert and Wingwall to Wingwall Connection Details............ 7-8
Typical CIP Cutoff Wall ................................................................................. 7-9
Typical Precast Cutoff Wall.......................................................................... 7-10
Post Tensioning Components Details ...............................................7-12 to 7-13
Rigid Frame Detail Example......................................................................... 7-14
Rigid Frame Shear Key Detail Example....................................................... 7-15

8-1
8-2
8-3
8-4
8-5a
8-5b,c
8-6a
8-6b,c
8-7
8-8a
8-8b
8-9
8-10a
8-10b

Typical Lumber Grade Mark .......................................................................... 8-6


Custom Glulam Product Quality Mark ........................................................... 8-9
Typical Lateral and Withdrawal Connections for Timber ............................ 8-15
Types of Fasteners Used for Timber Bridges ............................................... 8-15
Nailing and Uplift Spike Details ................................................................... 8-16
Allowable Withdrawal Load .............................................................8-17 to 8-18
Common Washer Types for Timber Connections ........................................ 8-19
Allowable Lateral Load.....................................................................8-20 to 8-21
Transverse Bending and Shear...................................................................... 8-22
Typical Timber Bridge Rail and Stressing Rod Layout Example................. 8-26
Typical Timber Bridge Rail .......................................................................... 8-27
Pile Supported Abutment Detail ................................................................... 8-28
Pile Supported Bent Example ....................................................................... 8-29
Typical Shear Developer Detail .................................................................... 8-30

9-1
9-2
9-3
9-4
9-5
9-6
9-7
9-8
9-9
9-10
9-11

Chloride Concentration Criteria...................................................................... 9-5


Corrosion Evaluation Criteria ......................................................................... 9-6
Bridge Deck Evaluation Criteria..................................................................... 9-8
Full Depth Deck Repair ................................................................................ 9-11
Concrete Beam Patching Details................................................................... 9-21
Post-Tensioning Method ............................................................................... 9-25
Internal Splicing ............................................................................................ 9-26
Metal Sleeve Splice....................................................................................... 9-27
Jacking Details ..................................................................................9-37 to 9-39
Substructure Repairs .........................................................................9-41 to 9-42
Pile Repairs ................................................................................................... 9-44

May 2005

Table of Contents xvii

DelDOT Bridge Design Manual


9-12
9-13
9-14
9-15
9-16
9-17
9-18
9-21

Timber Pile Repair Detail Example .............................................................. 9-45


Foundation Repairs Bagged Concrete........................................................ 9-47
Sheeting and Filling ...................................................................................... 9-48
Underpinning with Driven Piles and Needle Beams..................................... 9-49
Structural Frames Top Support .................................................................. 9-51
Structural Frames Bottom Support............................................................. 9-52
Jumper Bridge ............................................................................................... 9-53
Tie Backs and Deadmen................................................................................ 9-54

Table of Contents xviii

May 2005

You might also like