0% found this document useful (0 votes)
162 views6 pages

Cleanroom Design & Build Services

The document provides information about a company that designs, builds, and maintains cleanrooms. It requests cleanroom design information from the customer to fully understand their project requirements. The company offers a turnkey package that includes cleanroom design and cost options, construction, commissioning, staff training, and ongoing maintenance and support. They aim to partner with customers to design facilities that meet their operational needs.

Uploaded by

Tanveer Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views6 pages

Cleanroom Design & Build Services

The document provides information about a company that designs, builds, and maintains cleanrooms. It requests cleanroom design information from the customer to fully understand their project requirements. The company offers a turnkey package that includes cleanroom design and cost options, construction, commissioning, staff training, and ongoing maintenance and support. They aim to partner with customers to design facilities that meet their operational needs.

Uploaded by

Tanveer Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Thank you for requesting our Cleanroom Design Data Form.

Our approach to the market is as a partner directly with the end user of the Cleanroom. This allows
us to design a facility that will meet the operational requirements of the owner. We are a Design /
Build and Maintain Full Service Contractor. We would consult with you to fully understand your
requirements and budget. After this consultation we would offer a complete turnkey package,
including:

1. Provide a design, with various options, their benefits, and cost comparison.
2. Complete construction and management, including contractor protocol training,
3. Commissioning, including all applicable testing as per ISO 14644
4. Protocol training for staff, including suggestions for gowning, cleaning and Cleanroom use,
and budget cost estimates for these items.
5. Provide ongoing maintenance and support, and guarantee conformance to the requirements.

The successful Cleanroom starts with the design and planning process. Our initial on site
consultation is offered at no cost or obligation. The earlier we can come on board with the team, the
easier it is for us to assist in design tuning that may save initial or operational cost.

We have prepared this to assist us in having a compete understanding of your existing facility, and
the conditions under which the construction will take place. Please feel free to contact our office,
and we can send you instructions on how to complete the Cleanroom Design Forms.

We look forward to working with you.

Vernon Solomon, President

122F Commerce Park Drive, Barrie, ON L4N 9A8, Canada


Phone: 705 797 8877 / Toll Free: 1 866 565 7055
Email: info@e(s([Link]
Date:

Project Name:

Project Coordinator:

Decision Maker:

Company:

Address:

Phone #

Fax #

Email:

Are Drawings Available ? No Yes AutoCAD or ReVIT Format

Date Proposal Required:

Desired Completion Date:

122F Commerce Park Drive, Barrie, ON L4N 9A8, Canada


Phone: 705 797 8877 / Toll Free: 1 866 565 7055
Email: info@e(s([Link]
Cleanroom Design Data

Required Cleanroom Conditions

Room # Room #

Name:

Dimensions:

Cleanliness Class:

Temperature Set Point:

Temperature Range:

Humidity Set Point:

Humidity Range:

Exhaust Required:
Total Process Equipment Heat Load:
(kW, HP, or BTUH)

Maximum Number of People:

Other Latent Heat Sources:

Required Ceiling Height:

Sprinkler Protection Required:

Other Fire Protection Required:

Lighting Level:

Pressure Difference to Ambient:

Toxic Gas Use:


Cleanroom Design Data
Site Data
Demolition Required?

Concrete or Steel Joist Structure?

Clear Height from Floor to Bottom of Joists:

Joist Depth Spacing Alignment N/S or E/W

Roof Membrane Material Tar & Gravel Rubber Membrane Steel

Condition of Existing Roof Age

Contractor for Roof Warranty

Cleanroom(s) to be Self Supporting:

Building Interior Peak Ambient Temperature Summer (High) Winter(Low)

Building Peak Ambient Humidity Summer(High) Winter(Low)

Make Up Air to be taken from: Building Ambient Outdoors

Inside the Adjacent to


Preferred Air Conditioning Heat Rejection Equipment Location: Roof
Building Building
HVAC Equipment Distance Distance In from Distance Out from
Hoisting Up Roof Edge Wall to Crane

Loading Dock Height From Ground Clear Opening Size

Drive In Door Clear Opening Size

Overhead Crane Available Max Weight Max Height

Fork Lift Available Max Weight Max Height

Is there additional area outside the Cleanroom Envelope for material staging?
o o
Unit of Measure for Temperature Display C F

Additional Notes:
Cleanroom Design Data

Available Utilities

Chilled Water Yes No

Temperature GPM Line Size Pressure

Condenser Water Yes No

Temperature GPM Line Size Pressure

Hot Water Yes No

Temperature GPM Line Size Pressure

Steam Yes No

# / Hour Available Line Size Pressure

Compressed Air Yes No

CFH Line Size Pressure

Natural Gas Yes No

CFH Line Size Pressure

Domestic Water Yes No

GPM Line Size Pressure

Electrical Power Voltage Amperage 3 or 4 Wire

Existing Panels Panels Required


MFG & Model # Distance to Main Distribution

Building Drainage Yes No

GPM Line Size

Sprinkler System Yes No

GPM Line Size Pressure

DI or RO Water Yes No

Purity GPM Line Size Pressure


Process Equipment Data Sheet Customer Name:

Project Name : Project Number: Date:

4. Plant Steam: Lbs/hr@ PSI Pipe Size: Type: Please state what the measurement units are in the box:

5. Condensate Return: Lbs/hr @ PSI Pipe Size: Type:


Service
Equipment Name: 6. Clean Steam: Lbs/hr @ PSI Pipe Size: Type: Dimension

Manufacturer: 7. Compressed Air: CFM PSI Pipe Size: Type:


Equipment
Model Number: 8. Medical Air: CFM PSI Pipe Size: Type:
Service Dimensions Service
Dimension Dimension
I.D. or Serial Number: 9. Nitrogen: CFM PSI Pipe Size: Type:

Location (Room or Zone): 10. Other Gas: CFM PSI Pipe Size: Type:

Equipment Heat Load to Room: Btu/hr 11. Process Vacuum: CFM [Link]. Pipe Size: Type: Service
Dimension
Are the peak loads and running loads different? For example: What is the 12. House Vacuum: CFM " WC Pipe Size: Type:
amp draw or gpm of the equipment as it comes up or down to operating
temperature as opposed to the amp draw or gpm once operational? If these are Front of Equipment or Loading End
different for any of the services please place peak load first and running load The following GPMs are in: U.S. Imperial
Place the corresponding service number on the appropriate side that the
separated by a slash. service enters the equipment. Example: Place a (1) on the rear of the
Example: 20/4 gpm 13. Chilled Water or Glycol: Pipe Size: Type: equipment if the electrical connector is at the back of the unit.

1. Electrical Power: Disconnect Required: Yes No Deg. F Deg. C Max Temp: Min Temp: Are there any special requirements such as pressure relief valves or
venting pipes required? If so please add details in the Notes section.
Voltage/Phase: Amperage: Plug In Req'd BTU or Temp Rise: GPM: Pressure:
Equipment Height: Service Height:
Electrical Source required: Normal Emergency UPS 14. Boiler Water: Pipe Size: Type:
Notes:
Are there electrical panels or displays to be remote mounted from unit? Is there Deg. F Deg. C Max Temp: Min Temp:
special grounding to be used or is an electrical starter required? If so please
add details in the note section. BTU or Temp Rise: GPM: Pressure:

2. Exhaust Air: Duct Size CFM @ " WC SP 15. Hot Domestic Water: GPM Pipe Size: Type:

Flammable Solvent Acid Toxic 16. Cold Domestic Water: GPM Pipe Size: Type:
Dusts Powders HEPA Containment
17. Domestic Drain: GPM Pipe Size: Type:
Other please detail:

Max Temp: Deg. F Deg. C 18. D.I. / R.O. Water GPM Pipe Size: Type:

3. Supply Air: Duct Size CFM @ " WC SP Quality: Usage

Normal HEPA ULPA 19. Water for Injection (WFI) GPM Pipe Size: Type:

Deg. F Deg. C Max Temp: Min Temp: 20. Purified Water (PW) GPM Pipe Size: Type:

Max RH: Min RH: 21. Other GPM Pipe Size: Type:

You might also like