TPPI Revamp Manhole Inspection Report

This document summarizes inspection reports for manhole closure, cleaning, and installation activities for the TPPI Revamp Project. The inspections verify that internal work is complete, the area is clean and free of debris, and the manhole was properly lifted and installed without damage and with all bolts and nuts tightened. Signoff is provided by inspection teams from PT. Guna Teguh Abadi, PT. Tripatra Engineering, and PT. TPPI.

Uploaded by

harisona09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
359 views9 pages

TPPI Revamp Manhole Inspection Report

This document summarizes inspection reports for manhole closure, cleaning, and installation activities for the TPPI Revamp Project. The inspections verify that internal work is complete, the area is clean and free of debris, and the manhole was properly lifted and installed without damage and with all bolts and nuts tightened. Signoff is provided by inspection teams from PT. Guna Teguh Abadi, PT. Tripatra Engineering, and PT. TPPI.

Uploaded by

harisona09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

MANHOLE CLOSURE (BOX UP)

Project Title : TPPI REVAMP PROJECT Date :

Company : PT. TRANS PACIFIC INDOTAMA Report No. :

Contractor : PT. TRIPATRA ENGINEERING Page :

Item No :
Location :

Result
ITEM OF INSPECTION GTA CONTRACTOR CPY DATE REMARKS
Accepted Rejected

1 All internal work completed

Housekeeping /cleaning completed. No instrument,


2
scaffold and other materials are left inside equipment.

Manhole opening faces are clean and free from


3
damage

No pending issues such as internal modification, NCR,


4
FQA, Vendor/ Licensor comment etc. are unclosed.

5 Correct gasket is used for the final closure

COMMENT

Prepared By. Witnessed By. Witnessed By.


PT. GUNA TEGUH ABADI PT . TRIPATRA ENGINEERING PT. TPPI

(PE)
CLEANING INSPECTION
Project Title : TPPI REVAMP PROJECT
Company : PT. TRANS PACIFIC INDOTAMA
Contractor : PT. TRIPATRA ENGINEERING

Item No :
Location :

Result
ITEM OF INSPECTION GTA CONTRACTOR
Accepted Rejected

1 Free from debris, scale and hydrocarbon residue

COMMENT
Prepared By. Witnessed By.
PT. GUNA TEGUH ABADI PT . TRIPATRA ENGINEERING

(PE)
ECTION
Date :

Report No. :

Page :

CONTRACTOR CPY DATE REMARKS


Witnessed By.
PT. TPPI
INSTALLATION INSPECTION
Project Title : TPPI REVAMP PROJECT
Company : PT. TRANS PACIFIC INDOTAMA
Contractor : PT. TRIPATRA ENGINEERING

Item No :
Location :

Result
ITEM OF INSPECTION GTA CONTRACTOR
Accepted Rejected

1 No found damage during lifting

2 Support, guide has been installed as per drawing

3 All bolt and nut has been tightened properly

COMMENT
Prepared By. Witnessed By.
PT. GUNA TEGUH ABADI PT . TRIPATRA ENGINEERING

(PE)
SPECTION
Date :

Report No. :

Page :

CONTRACTOR CPY DATE REMARKS


Witnessed By.
PT. TPPI