01/2021 RA STAR Yard Activity Man Basket operation Project / Asset All Location STAR Yard Client All Date 7-Jun-21
N°
A B
Residual
Risk level Additional Controls
Risk Level
ID Activity Description Hazard release Consequences Standard Control Measures
L C R Action Responsible Comment L C R
Adhere to STAR HEALTH, SAFETY AND ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL (MAN-STAR-HSE-E)
Adhere to Lifting and Tranposrtation procedure, HIRA, Mthod Statements, Drawing and JSA.
Detailed Roles & Responsibilities / Exclusion Zone properly identified and implemented
All personnel involving in the job must have appropriate training, qualification and competent
All equipment shall be properly designed, Inspected and Certified (including 3rd Party Certificates, when required)
Clear communication must be carried out with STAR and client staff via E-mail, in advance.( with enclosed relevant documentation)
Incomplete / confusing information
Lifting notification shall be circulated within all conserned personnel
Unclear procedure, Inaccessible safe
Coordination meeting between all party (contractor and subcontractor) prior start the activity
system of work, personnel at work
Pre Job safety inspection to be carried out on site.
doing unsafe works and practices,
Chain of command extlablished and comunication channel identified and specified in the JSA Project Manager /
conflict of Lifting activity with other Injuries from minor to major category Proper
Prior to commence activities, Safety and job Supervisor will inspect working area (including all the DROPS Inspections), providing all the chec lists Lifting Engg./ Lifting
1 Preparation of Man Basket Operation activities Structure & equipment damages
correctly implemented and signed to be attached in the PTW.
C 3 C3 supervision
Supervisor/ Scaffolding
B 1 B1
Incompatible works in the near required
Ensure the crew involved in the activity is thoroughly briefed about the potential hazards and dangers through pre-job meeting & Tool Box Talk. Supervisor
vicinity.
Interpreters available to avoid communication breakdown
Unauthorized entry
Barricade the area to avoid unauthorized person movement into the area, access & egress to be controlled
unavailability of man riding system in
Any unsafe condition / action to be immediately reported and STOP Authority system to be implemented
cranes
All personnel involved in this operation shall be fully competent and trained as per Job Role and activities performed in line with the STAR Company
HSE Training Matrix.
Management of Change (MOC) shall be issued
Dedicated Emergency Rescue Plan shall be issued and attached to the PTW to make up for the absence of Man Riding System
Emergency Rescue Team should be trained and informed about the dedicated rescue plan
Secondary crane with secondary man basket to be available in case of emergency
Coordination meeting between all party (contractor and subcontractor) prior start the activity
Pre Job safety inspection to be carried out on site.
Miscommunication due to lack of Chain of command extlablished and comunication channel identified and specified in the JSA
understanding & misinterpretation Proper Communication to be maintained at all times during the activity being carried out.
Radio failure Continuos communication channel shall be mantain between crane Operators / Riggers / Man Basket crew
Proper Lifting Supt./ Lifting
Cross channel talk Injury to personnel Communication channle must be clarified (i.e. via Hand Signals, Verbal & Radio).
2 Communication
Duration of operation Damage to property Radios (if in use) charged and spare radios & batteries available C 4 C4 supervision Supervisor / Crane B 1 B1
required Operators/ Riggers /
Improper radio channels in use Radio communication (if in use) checked shall be performed prior to lifting operation
Imroper Hand Signal and Verbal Crane operators, Banksmen & monitors instructed at TBT to keep radio conversations to the work at hand & mobile phones switched off during
Communication operation
Crane operations stop, when radio communications fail. All manbasket / lifting operations to be held in safe mode until radio contact is re-establish
between all relevant parties
RA
01/2021 RA STAR Yard Activity Man Basket operation Project / Asset All Location STAR Yard Client All Date 7-Jun-21
N°
A B
Residual
Risk level Additional Controls
Risk Level
ID Activity Description Hazard release Consequences Standard Control Measures
L C R Action Responsible Comment L C R
PTW, Critical Lift plan, all relevant drawings to be followed, TBT and JSA to be discussed
Install barricade/isolation for lifting radius
Prestart check of crane, Manbasket and lifting gear or equipment before commencing activity
Gravity–suspended load
Inspection of the load to individuate loose item potential drop object before lifting operation
Failure of rigging
Proper communication between banksman and crane operator in place. High visibility vest rigger in order to be clear identified
Crane failure
Operator and rigger shall be qualified and have valid certificates to recognize responsibility & standards
Improper lifting
Avoid pinch points and Standard signals be used.
Bad weather condition
Use of damaged equipment/ tools is prohibited & Colour coding system for lifting gear
unbalanced loads
Lifting operation to be carried at slow speed, Lift suspended if wind exceeds 32 KPH
Overloading
Equipment must meet the SWL requirement.
Uncertified lifting tools & equipment
Locate the COG of structure prior to lift.
Faulty equipment
Good rigging practice use correct type of lifting gears or appliance must be in good condition & certified. Lifting Supt./ Lifting
Incompetent personnel Proper
Injury to personnel Prohibits working under suspended load , if there any requirement , pre approve required from competent person / supervisor Supervisor /
7 Lifting & Man Basket Operation Suspended loads
Damage to property /HSE/superintendent/facility in charge
C 3 C3 supervision
Operators /
B 1 B1
Loads striking to other structures required
Provide radio for proper communication, Provide interpreter if needed Banksman / Riggers
Pinch points
Certified Rigger 1 should be in place
Operator error
Unauthorized personnel should be removed during the activity
Mis understanding of signals used
Proper Communication with the Production team for avoid conflict between the activities
Uncoordinated signal
Hook load during lifting should not exceed 50% of Crane rated capacity. (as per GI 7.027)
Unsynchronized movements
All personnel in the basket must use Full body harness which should be connected to an external fall protection device while riding the man basket
Language barrier
Disembarking will only be allowed when basket is on top of the structure. NO disembarking allowed while the basket is still at the border of the landing
Drop object
platform
Person on the line of fire
Only when disembarked and there is no risk of Fall (platform fully fenced), Harness can be disconnected
Communication
Personnel working on mabasket should have working at Height training.
Use at least two tag lines, connected to the Man Basket, to avoid any swinging / pendular movements
6
PRODUCTION MANAGER Daniele Piroddi
7
8
COMPANY
9
10
Other
Doc. n. FORM-STAR-241
RA
01/2021 RA STAR Yard Activity Man Basket operation Project / Asset All Location STAR Yard Client All Date 7-Jun-21
N°
A B
Residual
Risk level Additional Controls
Risk Level
ID Activity Description Hazard release Consequences Standard Control Measures
L C R Action Responsible Comment L C R
Other
11
Doc. n. FORM-STAR-241
RA
Activity Project / Asset Location Client Date
N°
A B
Residual
Risk level Additional Controls
Risk Level
ID Activity Description Hazard release Consequences Standard Control Measures
L C R Action Responsible Comment L C R