Earth Work Excavation Calculations

The document contains calculations for the quantity of materials needed for constructing long and short walls of an L wall and H wall. For the L wall, it calculates the earthwork excavation, foundation and plinth, and brick work and superstructure quantities for long and short walls. Similarly for the H wall, it calculates the earthwork excavation, PCC bed, masonry in foundation using stone, and brick work in superstructure quantities for long and short walls. Total quantities are provided at the end.

Uploaded by

Aakash Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views2 pages

Earth Work Excavation Calculations

The document contains calculations for the quantity of materials needed for constructing long and short walls of an L wall and H wall. For the L wall, it calculates the earthwork excavation, foundation and plinth, and brick work and superstructure quantities for long and short walls. Similarly for the H wall, it calculates the earthwork excavation, PCC bed, masonry in foundation using stone, and brick work in superstructure quantities for long and short walls. Total quantities are provided at the end.

Uploaded by

Aakash Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

L WALL CALCULATION

SL NO PARTICULARS UNIT NUMBER LENGTH BREADTH DEPTH


1 EARTH WORK EXCAVATION
LONG WALL m^3 1 2.5 0.4 0.5
SHORT WALL m^3 1 1 0.4 0.5
TOTAL
2 FOUNDATION AND PLINTH
LONG WALL m^3 1 2.5 0.4 0.8
SHORT WALL m^3 1 1 0.4 0.8
TOTAL
3 BRICK WORK AND SUPER STRUCTURE
LONG WALL m^3 1 2.4 0.3 1.5
SHORT WALL m^3 1 1 0.3 1.5
TOTAL

H WALL CALCULATION
SL NO PARTICULARS UNIT NUMBER LENGTH BREADTH DEPTH
1 EARTH WORK EXCAVATION
LONG WALL m^3 2 5.6 1 0.9
SHORT WALL m^3 1 2.4 1 0.9
TOTAL
2 PCC BED
LONG WALL m^3 2 5.6 1 0.3
SHORT WALL m^3 1 2.4 1 0.3
TOTAL
3 MASONARY IN FOUNDATION(STONE)
FIRST FOOTING
LONG WALL m^3 2 5.3 0.7 0.2
SHORT WALL m^3 1 2.7 0.7 0.2
SECOND FOOTING
LONG WALL m^3 2 5.2 0.6 0.2
SHORT WALL m^3 1 2.8 0.6 0.2
THIRD FOOTING
LONG WALL m^3 2 5.1 0.5 0.2
SHORT WALL m^3 1 2.9 0.5 0.2
TOTAL
4 BRICK WORK IN SUPER STRUCTURE
LONG WALL m^3 2 5 0.4 4.5
SHORT WALL m^3 1 3 0.4 4.5
TOTAL
TOTAL EXPLAINATION

0.5 1X2.5X0.4X0.5X0.5
0.2 1X1X0.4X0.5X0.2
0.7

0.8 1X2.5X0.4X0.8X0.8
0.32 1X1X0.4X0.8X0.32
1.12

1.08 1X2.4X0.3X1.5X1.08
0.45 1X1X0.3X1.5X0.45
1.53

TOTAL EXPLAINATION

10.8 2X5.6X1X0.9X10.8
2.16 1X2.4X1X0.9X2.16
12.46

3.36 2X5.6X1X0.3X3.36
0.72 1X2.4X1X0.3X0.72
4.08

1.486 2X5.3X0.7X0.2X1.486
0.378 2X2.7X0.7X0.2X0.378

1.248 2X5.2X0.6X0.2X1.248
0.336 1X2.8X0.6X0.2X0.336

1.02 2X5.1X0.5X0.2X1.02
0.29 1X2.9X0.5X0.2X0.29
4.756

18 2X5X0.4X4.5X18
5.4 1X3X0.4X4.5X5.4
23.4