Environment Objectives & Planning EMP

The document outlines an environmental management plan (EMP) for Bidco Uganda Limited to reduce environmental impacts and meet objectives for hazardous waste disposal, power usage, water usage, waste water generation and treatment, and fuel utilization by the end of 2019. Key planned actions include minimizing chemical spills, investing in safe testing technology, installing engineering controls, and sensitizing workers. Progress will be monitored through various records and audits, with resources including budgets for equipment, hiring contractors, and maintenance.

Uploaded by

lpamgt_674780425
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
421 views6 pages

Environment Objectives & Planning EMP

The document outlines an environmental management plan (EMP) for Bidco Uganda Limited to reduce environmental impacts and meet objectives for hazardous waste disposal, power usage, water usage, waste water generation and treatment, and fuel utilization by the end of 2019. Key planned actions include minimizing chemical spills, investing in safe testing technology, installing engineering controls, and sensitizing workers. Progress will be monitored through various records and audits, with resources including budgets for equipment, hiring contractors, and maintenance.

Uploaded by

lpamgt_674780425
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Hazardous Chemicals Management
  • Energy Efficiency and Power Management
  • Water Usage Optimization
  • Waste Water Treatment and Release
  • Fuel Consumption Reduction
  • Steam Usage Efficiency
  • Rework Reduction Strategies
  • Compliance Obligations Management

Bidco Uganda Limited Document no: BUL/ER-04

Document Title ENVIRONMENT OBJECTIVES AND PLANNING (EMP)

S/N Significant Objectives PLANNED ACTIONS Resources


Aspects
What Who When Monitoring Verification Review
and evaluation

1 Hazardous Reduce -Minimize -Personnel -Daily -Hazardous -Monthly EMS -Annual -Finances to hire a
Waste generation of chemical spills -Supervisors Chemicals List inspection Ref. Management licenced hazardous
disposal hazardous through proper -Heads of Ref. BUL/ER-09 BUL/ER-50 review waste handler
waste 10% by handling department -Waste disposal minutes -Finances to secure a
the end of practices -Safety record Ref. BUL/ER-06 safe storage for
2019 -Invest in safe officer/ -End of BUL/ER-40 hazardous chemicals
alternative Project year 2019 - Hazardous - Budget for
testing engineer waste storage procurement and
technology -Environment record Ref. maintenance of
-Sensitize officer BUL/ER-03 testing equipment
workers on - Hazardous
chemical usage. Material
Register. Ref
BUL/ER-25
2 Power Reduce power -Installation of -Personnel -End of -Power meters -Maintenance -Bidco -Budget for
Usage consumption engineering -Engineers year 2019 -Maintenance records monthly procurement of
per tonne by controls e.g. -Supervisors Programs Ref. -Current meter Review Power Meters for all
5% by end of transparent -Heads of BUL/ENG/PR/09 readings log book meeting individual
2019 sheets, 24H department Mechanical & reports operations/processes.
electronic -Safety BUL/ENG/PR/10 -Electrical engineers
timers, VFDs officer/ Electrical to install Power
-Daily
Create Date 01/07/2018 Created Environment Officer Version 01

Revision Date 01/07/2019 Revision no. 00 Approved Factory Manager Page 1 of 6


Bidco Uganda Limited Document no: BUL/ER-04

Document Title ENVIRONMENT OBJECTIVES AND PLANNING (EMP)

- Project Meters and monitor


Implementation engineer consumption.
of process
SOPs to
optimize
production
-Installation of
capacitor banks
to increase
power factor.
3 Water Reduce water -Minimize -Personnel -Monthly -Water flow -Calibration/ -Annual -Budget for
Usage abstraction by water losses -Engineers meter performance Management procurement of
10% by End of through leaks, -Supervisors - Maintenance certificate review valve pedal taps,
2019 overflows and -Heads of Programs Ref. -Daily checklist BUL/ER-06 float valves, level
continuous department BUL/ENG/PR/09 for water systems sensors and water
running taps -Safety Mechanical & Ref. meters for individual
and flash officer/ BUL/ENG/PR/10 BUL/ENG/MNT- processes
toilets. Project Electrical R/03 -Electrical engineers
-Sensitize engineer -Surface Water (2) and Plumber for
workers on abstraction installation work.
good water use permit.
practices -Monthly
consumption
records.

Create Date 01/07/2018 Created Environment Officer Version 01

Revision Date 01/07/2019 Revision no. 00 Approved Factory Manager Page 2 of 6


Bidco Uganda Limited Document no: BUL/ER-04

Document Title ENVIRONMENT OBJECTIVES AND PLANNING (EMP)

4 Waste Reduction of -Channelling -Personnel -End of -ETP/STP daily -Calibrations/ -Annual -Budget for
water waste water any clean water -Supervisors 2019 operation performance Management procurement of
generation, generation by overflow to the -Engineers monitoring records review pipes, training
treatment 5% by end of storm water -Heads of logbook Ref. -ETP/STP BUL/ER-06 services and hiring a
& release year 2019. drains. department BUL/ER-ETP-01 External waste contractor for the
- -Logistics -Daily -ETP/STP daily water analysis. engineering works
Implementation officer operational Ref BUL/ER-12
of alternative Checks Ref. -Internal &
cleaning BUL/ER-ETP-02 external audit
techniques such reports
as dry cleaning. -Daily -Flow meter
-Minimize readings
chemical and
product -End of
spillages 2019
-Reduce live
steam usage in
offloading by
opting for
lagged trucks
for CPO
delivery

5 Fuel Reduction of -Schedule -Personnel -Daily -Consumption -Stocks records -Annual -Finances to procure
utilization diesel maintenance to -Supervisors trends -Internal & Management the fuel additives
consumption enhance -Engineers - Maintenance external audits review
by 5% efficiency Programs Ref. BUL/ER-06
Create Date 01/07/2018 Created Environment Officer Version 01

Revision Date 01/07/2019 Revision no. 00 Approved Factory Manager Page 3 of 6


Bidco Uganda Limited Document no: BUL/ER-04

Document Title ENVIRONMENT OBJECTIVES AND PLANNING (EMP)

-Addition of -Heads of BUL/ENG/PR/09 - BUL


fuel additives department Mechanical & Monthly
to decrease fuel BUL/ENG/PR/10 review
consumption Electrical meeting
records
Reduction of -Substitution of -Personnel -Daily -Consumption -Stocks records -Annual -Budget for the
furnace furnace oil with -Supervisors trends -Internal & Management extension of the fuel
consumption biomass -Engineers - Maintenance external audits review shade
by 50% (agricultural -Heads of Programs Ref. BUL/ER-06 -Hire a contractor for
waste) department BUL/ENG/PR/09 - BUL the works
Mechanical & Monthly -Increase the spend
BUL/ENG/PR/10 review budget for biomass
Electrical meeting
records
6 Steam Reduce steam -Minimize -Personnel End of -Steam -Calibration of -Annual -Finances for
usage consumption steam leakages -Supervisors 2019 flowmeter meters Management procurement of
by 2% by the -Reduce steam -Engineers readings & -Internal & review steam flow meters
end of 2019 consumption at -Heads of consumption Ref. external audits BUL/ER-06
offloading by department BUL/BOI/R/12 - BUL -Engineer (1) for
opting for Monthly monitoring.
lagged CPO Review
trucks Meeting
-Use of energy reports
economizers
(heat recovery)
in refinery

Create Date 01/07/2018 Created Environment Officer Version 01

Revision Date 01/07/2019 Revision no. 00 Approved Factory Manager Page 4 of 6


Bidco Uganda Limited Document no: BUL/ER-04

Document Title ENVIRONMENT OBJECTIVES AND PLANNING (EMP)

7 Rework Reduce total -Implement -Human End of -Job instructions -Rework records -Annual -Finances for
rework by 5% standard resource 2019 -Departmental -Departmental Management improvement of
by the end of operating -HODs Shift production Supervisory review pouch sealing
2019 procedures -Chief reports checks BUL/ER-06 technology
-Schedule engineers -Departmental - BUL
maintenance On job training Monthly -Time to sensitize
-Training of (OJT) Review workers on quality
employees -Departmental Meeting control at the source.
Process log reports
books

S/N Other Key Objectives PLANNED ACTIONS Resources


Aspects
What Who When Monitoring Verification Review
and evaluation

8 Training, Conduct at -Conduct needs -Human End of -BUL Training -Internal & -Annual -Financial resources
Competence least two assessment resource year 2019 Program Ref. external audits Management
& environment -Include these -HODs BUL/HR/05 -Training review -Training items and
awareness related trainings in the -Competence of evaluation. Ref. BUL/ER-06 facilities
trainings for approved contracted BUL/HR/R/08
personnel training trainers & service -Training
whose roles calendar providers payables
and -Allocate -Training needs
responsibilities budgets Matrix BUL/ER-
affect the EMS 07
by end of 2019
Create Date 01/07/2018 Created Environment Officer Version 01

Revision Date 01/07/2019 Revision no. 00 Approved Factory Manager Page 5 of 6


Bidco Uganda Limited Document no: BUL/ER-04

Document Title ENVIRONMENT OBJECTIVES AND PLANNING (EMP)

9 Compliance 100% -Access and -Top As per -Environmental - Internal & -Annual -Financial resources
Obligations compliance to implement all management the Compliance external Management to carry out Audits,
all relevant the relevant - regulation Audit report Ref. Compliance review Certificates and
legislative and compliance Environmental BUL/ER-38 records. Ref. BUL/ER-06 Permit Payments
statutory requirements officer/ BUL/ER-01
obligations -Implement the Engineer -Compliance
EMS as per Matrix. Ref.
ISO14001:2015 BUL/ER-39

Create Date 01/07/2018 Created Environment Officer Version 01

Revision Date 01/07/2019 Revision no. 00 Approved Factory Manager Page 6 of 6

Bidco Uganda Limited 
Document no: BUL/ER-04 
Document Title 
ENVIRONMENT OBJECTIVES AND PLANNING (EMP) 
 
 
 
Create Date
Bidco Uganda Limited 
Document no: BUL/ER-04 
Document Title 
ENVIRONMENT OBJECTIVES AND PLANNING (EMP) 
 
 
 
Create Date
Bidco Uganda Limited 
Document no: BUL/ER-04 
Document Title 
ENVIRONMENT OBJECTIVES AND PLANNING (EMP) 
 
 
 
Create Date
Bidco Uganda Limited 
Document no: BUL/ER-04 
Document Title 
ENVIRONMENT OBJECTIVES AND PLANNING (EMP) 
 
 
 
Create Date
Bidco Uganda Limited 
Document no: BUL/ER-04 
Document Title 
ENVIRONMENT OBJECTIVES AND PLANNING (EMP) 
 
 
 
Create Date
Bidco Uganda Limited 
Document no: BUL/ER-04 
Document Title 
ENVIRONMENT OBJECTIVES AND PLANNING (EMP) 
 
 
 
Create Date