Daily Report - 1

The document summarizes a night shift report from a construction project of the Jigjiga bypass road. It lists 3 dump trucks and 1 loader that were working between 12:00-2:00 removing waste from stations 5+800 to an unspecified location. It also lists the operator and data collector assigned to the night shift. A second document provides a daily report on masonry work done by a subcontractor. It details the station locations, quantities, and materials used for concrete masonry work. A total of 5.44 cubic meters of work was completed using stone, cement, sand, and a concrete mixer for 3 hours. 4 masons and 1 data logger were assigned.

Uploaded by

Akli Ale Man
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views6 pages

Daily Report - 1

The document summarizes a night shift report from a construction project of the Jigjiga bypass road. It lists 3 dump trucks and 1 loader that were working between 12:00-2:00 removing waste from stations 5+800 to an unspecified location. It also lists the operator and data collector assigned to the night shift. A second document provides a daily report on masonry work done by a subcontractor. It details the station locations, quantities, and materials used for concrete masonry work. A total of 5.44 cubic meters of work was completed using stone, cement, sand, and a concrete mixer for 3 hours. 4 masons and 1 data logger were assigned.

Uploaded by

Akli Ale Man
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Yirgalem construction Date 02/03/2015Ec, Friday

construction work of Jigjiga bypass road project


Night shift report
Assigned equipment and plate working Hr Activity loc/station Activity Total quantity Idle case
No. Equipment Typplate No Night
staring ending From To
1 Loader ZL50G 12:00 2:00 5+800 loading waste 9 Trip
1 DT 75785 12:00 2:00 waste 3 Trip
2 DT 75789 12:00 2:00 waste 3 Trip
3 DT 75787 12:00 2:00 waste 3 Trip

Assigned Man power


Operator 1 mark
Data Colector 1 Aklilu
[email protected]

Ake man
Yirgalem construction
construction work of jigjiga bypass road projec
daily report
Date
Assigned Equipment type and plate no
Equipment type plate no
galem construction
k of jigjiga bypass road project

working hours
Yirgalem construction plc Date 17/02/2015 Ec Thursd
Masonry work @RHS by subcontractor :- Lulaco Subcontractor

station Quantity T/quantity


From To course Length (m) width (m) height (m) (m3)
1+950 1+960 1st,2nd CRHS 10 0.58 0.8 4.64
1+950 1+960 3rd CRHS 6.5 0.35 0.35 0.79625
0

Sum T/Q 5.43625

Equipment plate no work hr Materials type item


T/mixer 66089 3:00-3:30 stone m3
cement pcs
Assigned manpower sand m3
mason 4
DL 1
ate 17/02/2015 Ec Thursday

Quantity
5.44
13.6
1.632
From
1+950
2+270
Grand Total