Quality Performance:
Factory Visit done for Vishnu spun Pipes 1000mm dia NP4 Pipes and conducted required
tests in the factory.
Pile dynamic load test conducted for P4-R6 Pile at ch.39+000 MJB-3
Joint sampling done for Ushamartin 15.2mm dia HT strands, Maha OPC 53 grade &
Ultra tech OPC 53 grade & SAIL Steel dia 20 mm, Borrow area soil and sent to external
lab for testing.
Pond Ash Frequency testing in progress at Thulluru Laboratory.
Plate load test conducted at ch.40+480 Box culvert location for SBC Borrow area-12 soil
testing completed at Thulluru Laboratory
Safety:
Regular Assessment of Site execution work to evaluate the safety arrangements. Regular
toolboxes and pep talks are being organized to educate the labor and
Supervisory/Management personals.
Achieved 5.82 million Safe Man Hours till Apr-2023
18 batches conducted of safety training in Apr-2023
300 no. of employees are trained in Apr-2023
152 no. batches conducted of TBT.
2180 no. of workers, covered in TBT.
47 no's employees are conducted of safety Induction.