Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Schedule 1: Design, Drawings and Documentation
Sr. No. Description Unit
1.0 Design Engineering and Drawings including:
Design basis report, complete design calculations, (hydraulic calculations,
HVAC calculations (Pressure drop, insulation heat gain, TES tank cooling
loads, pipe sizing, valve sizing, water requirement, power requirement,
TES tank diffuser flow calculations etc.) software simulated hydraulic
analysis, TES Tank CFD analysis, stress analysis), Material submittals of
complete items, Technical Datasheets, material Shop Drawings, General
arrangement drawings, Good for construction (GFC) drawings, As built
drawings, Process flow diagrams, P & ID, electrical single line drawings
(SLD), earthing & lighting calculations, lightening calculations,
Instrumentation & Control Diagrams, instruments hook up drawings, Flow
Charts, Auto logic and control philosophy, SCADA network architecture,
graphics integration and programming in existing PLC, Single line
Diagram, complete mechanical, electrical and instrumentation and control
L.S.
system integration philosophy with existing system and any other
calculation, reports and drawings as required for successful
establishment of scope of works.
Preparation of Quality Assurance Plan, SHE plan, construction procedure
manua for individual as well as whole
system/systems, WPS methods & certificates, Method statements for
testing and commissioning of entire TES Tank system, Method
statements for installation, Insulation, pressure testing, chemical flushing
and commissioning of TES Tank and piping network, Method segment for
installation of complete electrical systems, INC systems, civil and allied
works etc. Training Program and Manuals, Project Schedule, earned
value analysis , daily weekly and monthly project progress documents
etc.
CONTRACTOR Section 12 Page 2 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Grand Total of Schedule 1 (Carry over to Grand Summary i.e.
Schedule 6)
Schedule 2: MECHANICAL SYSTEM
Sr. No. Description Unit
A Thermal Storage Tank-2 of 20,000 TR-Hr capacity system complete
with:
MS Tank (above ground vertical TES tank):
Supply, construct, erection, integration to existing DCS plant and TES
tank -1, testing and commissioning of new 20,000 TR-Hr Thermal
energy storage tank (TES Tank-2) at district cooling plant (DCP-1)
location in DTA Area.
Complete with above ground welded MS Tank as per the codes and
standards, Diffuser assembly and support pipe/columns, diffuser and
accessories, inside chilled water piping & valves, water level Balancing
piping and valves between the tanks, pipe supports, drain and overflow
piping and valves, flanges, staircase for TES Tank, railing at roof, air
vents, bird screens and other accessories complete as per scope of L.S.
work and specification.
Thermal Storage Tank Insulation & cladding complete with supply,
B
construction, testing and commissioning as per the scope of work,
technical specifications etc.
C VFD Compatible Inline/Double Suction/end suction Horizontal Split
Casing TES Pumps:
Complete with all components and accessories like pump body, bronze
CONTRACTOR Section 12 Page 3 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Sr. No. Description Unit
impeller, SS Shaft, Ball Bearings, Shaft Seals, electrical motor,
Coupling, Coupling Guards Including valves, flexible connections with tie
rods, Check valves, pressure gauges, temperature gauges, all ball
valves, air vents, accessories, vibration isolators, safety devices, control
panels, strainers, foundations, Insulation and cladding for TES pumps &
accessories as above and electrical connections to local outlets as
shown on drawings and as specified.
a. Thermal Storage Water system (1W+1S)
Chilled water Piping with supports and fittings:
D
Supply, installation, testing and commissioning of Pre-insulated Chilled
Water pipes (Supply / Return) from existing system supply and return
header to TES tank and pumps, including all necessary supports,
gauges and accessories etc. Also it includes modification, dismantling
and re installation of any pipe/equipment as required to install chilled
water piping with existing system as per the scope of works, technical
specifications and tender drawings etc.
E Valves & fittings
Supply, installation, testing and commissioning of various duty valves
and accessories such as manual and motorized valves, modulating
valves, check valves, drain valves, strainers, pressure and temperature
gauges, thermowells, associated fittings, flanges, nut bolts, gaskets etc.
and any other type of valve as required as per the scope of works,
technical specifications and tender drawings compete with Insulation &
cladding for above Valve & Fittings:
F Factory inspection for the items as mentioned in the scope of work
G Complete testing and commissioning of TES Tank and piping system
with required water, chemicals for treatment & passivation to be
CONTRACTOR Section 12 Page 4 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Sr. No. Description Unit
achieved with TRAC-115 or equivalent product of NALCO make and
performance testing and establishment of the new 20,000 TR-Hr TES
Tank 2 as per the scope of works, technical specifications and tender
drawing
Grand Total of Schedule 2 (Carry over to Grand Summary i.e.
Schedule 6)
Schedule 3: Electrical System
Sr. Description Unit
No.
A Electrical System for TES Tank-2 augmentation at DCP-1 :
Supply, Installation, testing and commissioning of the Complete Electrical
Distribution system inside the plant as per Specifications, Data sheets &
Single Line Diagram, as per following and below said items:
Scope of works covers design, supply installation testing and
commissioning of following, but not limited to;
Electrical panel and feeders complete with breaker and assembly. L.S.
Note-The Contractor shall upgrade some of the existing spare
ings as highlighted in
the 0.415kV single line diagram.
Refer to 0.415kV single-line diagram for further details.
a. panels
b. Power supply arrangement for all Motorized valves & Modulating
CONTRACTOR Section 12 Page 5 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Sr. Description Unit
No.
valves and Instrumentation and control Instruments, RIO panels etc.
c. Area lighting around TES tank-2
Supply, installation, testing and commissioning of the complete LT cabling
system as per technical specification, data sheets & single line diagram
including following items:
a. LT Power & Control cables & terminations with necessary glands &
B
lugs.
b. Cable trays with supports
Earthing System:
Design, Supply, installation, testing and commissioning of Earthing system
C as per the scope of works, technical specifications and tender drawings.
Lightning arrester System:
Design, Supply, installation, testing and commissioning of complete
lightning arrester system for New 20,000 TR-Hr TES tank-2. as per the
scope of works, technical specifications, and tender drawings
D
Grand Total of Schedule 3 (Carry over to Grand Summary i.e.
Schedule 6)
CONTRACTOR Section 12 Page 6 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Schedule 4: Instrumentation & Control System
Sr. Description Unit
No.
Instrumentation & Control System for TES Tank-2 augmentation at
DCP-1
Design, supply, installation, integration, testing and commissioning of
complete instrumentation and control systems required for successful
operation and integration 20,000 TR-hr TES tank-2 with existing DCS
Plant and TES Tank-1 SCADA system as per the scope of work, technical
specifications, tender drawings etc.
In general, The Contractor shall provide minimum following works under
the scope of instrumentation and control systems but not limited to;
a. Field sensors/ gauges/ level switches/ temperature detectors (RTD) /
Temperature transmitters/pressure transmitter/Flow meter/BTU L.S.
meter/Level transmitters etc.
b. PLC based control system & peripherals; RIO panels as applicable.
c. Field instruments impulse piping/ tubes, fittings.
d. Field accessories namely junction boxes, transmitter racks
e. Instrumentation & Control cables, communication data cable, supply &
installation of cable trays
f. Synchronization and integration with existing SCADA based PLC
system which may include changes or modification in existing system.
g. Loop testing, calibration of field instruments & its PLC interfacing etc
Grand Total of Schedule 4 (Carry over to Grand Summary i.e.
Schedule 6)
CONTRACTOR Section 12 Page 7 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Schedule 5: Civil and Allied Works
Sr. No. Description Unit
5 Civil & Allied Works
a) Excavation, soil and sand filling, compaction, backfilling, and
construction of RCC Foundation for 20,000 TR-hr new TES Tank-2.
b) Proper foundations/mounting arrangement for TES tank pumps, VFD
panels, electrical panels etc. L.S.
c) Construction of RCC trenches with open able RCC precast covers at
intervals for laying chilled water pipes, control and power cables, FO
cables etc. from DCP building up to TES tank-2 location.
d) Construction of RCC saddle supports, and MS supports in the utility
trenches as well as in the existing trenches inside plant room as may
be required.
e) Dismantling existing road and providing new paver road as mentioned
in scope of work and tender drawings
f) Permanent paving of TES tank-2 surrounding area
g) Provide drain channel around TES tank to connect to nearest main
drain channel, providing Water drains points inside the Utility trench
with proper slope of the trench to avoid any water gathering inside the
trench.
h) -Providing/ Supplying & Installing of 5 Ton suitable capacity monorail
with chain pulley block for TES tank pumps at DCS plant ground floor
with sufficient lift height.
CONTRACTOR Section 12 Page 8 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Sr. No. Description Unit
i) Design and provide illuminated glow sign boards for display of both
existing TES Tank-1 and TES Tank-2 details like name, capacity,
dimensions etc. to be installed on roof i.e top of the tank.
j) The Contractor shall be liable for any damages to property caused by
planting and transplanting operations. All areas and construction
disturbed shall be restored to their original condition to the satisfaction
of the Engineer.
k) Work shall be performed and supervised at all times by Engineer /
ive.
l) Dismantling and reinstallation of existing solar panels within DCP
area as per the scope of works, technical specifications and tender
drawings
Grand Total of Schedule 5 (Carry over to Grand Summary i.e.
Schedule 6)
CONTRACTOR Section 12 Page 9 of 14 GIFTCL
Engineering, procurement and construction of 20,000 Tr-Hr TES tank at
existing district cooling plant 1 in DTA Area of GIFT City
Volume 4 SECTION 12-Schedule of Prices
Schedule 6: Grand Summary for Contract Value Determination
Total Amount
Item Description
1 Design, Drawings and Documentation (Schedule-1)
2 HVAC & Control System (Schedule-2)
3 Electrical System (Schedule-3)
4 Instrumentation & Controls for DCS Plant & Distribution
Network (Schedule-4)
5 Civil and allied Works (Schedule-5)
6 Grand Total Contract Cost Offered (Schedule-6)
Note: 1. Total Contract Cost O - 6 by the Bidder
should be final and binding on the Bidder.
2. In case of any discrepancy, Tender shall be liable to be rejected.
3. Price to be quoted in electronic form over N-Procure Portal.
CONTRACTOR Section 12 Page 10 of 14 GIFTCL