Proposal
M & SONS PROFESSIONAL CONSTRUCTION INC.
Estimate No: 221
9 Springsteen Ave Date: 4/18/2021
Territory:
Haverstraw NY 10927
Salesperson: Martin
Project Start: / / 2021
General Contractor License: Project Completion: / /2021
H - 19044 - A6 Time Project Estimate________
Office: (845) 327 - 7802
FOR ALL YOUR REMODELING NEEDS
Cell & WhatsApp: (845) 598 - 7826
! KITCHE AND BATHROOMS SOLUTIONS
E-mail: MartinSonsGeneralContractors@[Link] FINISH BASEMENTS - PROFESSIONAL PAINTING
ADITTIONS
Bill To: DECKS - VINYL SIDING – ROOFING – GUTTERS
PAVERS,
_Ms. Marysol Zweig. WINDOWS/DOORS
AND MUCH, MUCH MORE...!!!!
7 Sasson Terrace Valley Cottage NY 10989
Marysolcarm@[Link] Full workers compensation coverage $2,000,000 General Liability Insurance
Web: [Link]
Facebook: [Link]
Qty/Hours Rate Amount
Description
M&SONS PROFESSIONAL CONSTRUCTION INC. HERE BY PROPOSES TO
FURNISH ALL MATERIAL AND LABOR AS SPECIFIED TO COMPLETE THE
FOLLOWING:
PROJECT: RE-ROOFING
Included:
• Remove existing shingles (two layer). Tarpaper and flashing
down to the roof sheeting.
• Along the ridge cut sheeting off on boat sides to create and air
space for ridge vent installation.
• Clean and cart away all job debris.
• Along all the eaves apply two rows, total six feet of GAF Ice and
water shield membrane.
• Install a new aluminum drip edging to seal Ice shield along the
facia boards.
• Apply Ice shield up the valleys around the base of the three sky
lights and along the walls.
• Apply synthetic Underlayment over the remaining roof area.
• Supply and install One new 45” X 45” SUPREME Pro series
skylight double one-inch-thick Insulated laminate low-E Argon
filled glass fixed flush cut, with 3” high 16 oz copper flashed
curb.
• Any inside small trim if needed is included.
Page 1 of 3
M & SONS PROFESSIONAL CONSTRUCTION INC.
Description: Qty/Hours Rate Amount
• Re-roof the entire roof with GAF Timberline HDZ or equal high-
Definition limited Lifetime warranty Fiberglass Shingles properly nailed
with electro galvanized roofing, nails.
• Reflash the vent pipes with lifetime custom made copper flashing.
• Reflash the flue pipe with type B gas vent flashing and new storm
collar, replace the eight-inch roof vent with a new one.
• Install new PVC Cora-A-vent ridge venting system capped with Seal-A-
ridge fiberglass caps.
This project as specified included all labor and material as a contract work for
The amount of: Twelve Thousand Dollars $12,000.00
Option:
• Remove the old gutters and leaders, cart away.
• Supply and install new TRIVENT high performance soffits solid and
vented, cap the wood with facia board with aluminum trim.
• Supply and install new five inch white 0.32 aluminum seamless gutters
fastened with internal hidden aluminum brackets with screws,
including all new 2” x 3” white aluminum down spouts, fastened with
pipe cleats.
LABOR AND MATERIAL $3,100.00
Note: if Some plywood sheeting is found deteriorate; To remove,
dispose, and Neal down CDX fir plywood, half inch thick
ADITIONAL COST: ONE HUNDRED DOLLARS (100.00) PER SHEET
• IF: All the plywood is found unfit to nail the new shingles and must be
replaced, to remove dispose supply and nail down new CDX Fir
plywood over the entire roof:
LABOR AND MATERIAL : SIX THOUSEND ONE HUNDRED $6,100.00
Page 2 of 3
YOUR HEALTHY AND SAFE HOME IS OUR FIRST PRIORITY
EACH DAY BRINGS NEW CHALLENGES FOR ALL OF OUR COSTUMERS, EMPLOYEES, AND
THE COMMUNITY.
M & Sons Professional Construction Inc. complies with safety and health standards and
regulations promulgated by OSHA or by a state with an OSHA-approved state plan. We
promote CDC guidelines to prevent the spread of the virus Sars-Cov-2 that causes Covid-19.
Notes/Misc.
Customer service Commitment:
The goal of this job is to provide the best customer experience possible.
This is accomplished by being friendly and courteous, by making the
clients feel part of the process with daily updates and excellent
communication by doing things right the first time and by respecting
their property.
We recognize that we are guests.
We warranty all our work for one year.
This is not just a handshake.
***REFERENCES AVAILABLE UPON REQUEST***
* Indicates non-taxable item We, appreciate your business!!
WE PROPOSE hereby to furnish material and labor-complete in accordance with Subtotal: $ 12000.00
above specifications, for the sum of twelve thousand_ _Dollars ($12000.00 ).
Discount: _______%__($_ )
Payment to made as follows:
Tax (8.875%): $
$6500.00 Due upon signing. Total: $12000.00
Payments to follow depending on order of work performed.
• 2500.00 when material delivery at house and star demolish.
•
• Balance when all Roof project is complete (customer agreement)
Above payment schedule is based upon work described in this original proposal.
Any additional work orders will not affect this payment schedule.
TERMS AND CONDITIONS: All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from
above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the Proposal.
All agreements contingents upon strikes, accidents, or delays beyond our control. The owner must carry fire, tornado and other necessary
insurance. This is a legal CONTRACT upon signing.
BY SIGNING BELOW, YOU AGREE TO THE MENTIONED ABOVE, INCLUDING AND NOT
LIMITED TO PRICING AND SERVICES RENDERED BY M & SONS PROFESSIONAL
CONSTRUCTION INC.
Date: ______________
Deposit $_____________
X__________________________ X__________________________ Balance $_____________
Customer Marysol Benz M & Sons Professional
Construction Inc.
Page 3 of 3