Copper Piping Checklist

This document is a checklist for copper piping that includes 18 items to verify that the copper piping meets specifications. It ensures the copper pipe is the approved make and specification, has proper documentation like invoices and test certificates, is undamaged, is installed according to specifications, has properly brazed joints, underwent required pressure testing, and had testing and commissioning completed by authorized personnel who submitted reports. The checklist is signed off on by representatives from the contractor and HLL organizations.

Uploaded by

Ananthu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

Copper Piping Checklist

This document is a checklist for copper piping that includes 18 items to verify that the copper piping meets specifications. It ensures the copper pipe is the approved make and specification, has proper documentation like invoices and test certificates, is undamaged, is installed according to specifications, has properly brazed joints, underwent required pressure testing, and had testing and commissioning completed by authorized personnel who submitted reports. The checklist is signed off on by representatives from the contractor and HLL organizations.

Uploaded by

Ananthu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

COPPER PIPING CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the technical submittal is


1.
submitted for approval/approved.

Whether the copper pipe supplied is of


3.
approved make.

Whether the copper pipe supplied is of


4.
approved specification.

Whether the copper pipe supplied is


5.
having proper invoice/delivery Chelan.

Whether the copper pipe supplied is


6.
having factory test certificate.

Whether the copper pipe is supplied


7.
without damage.

Whether the copper piping is done as


8.
per specification.

Whether the joints were properly


9.
brazed.

Whether the pressure testing of pipes


10.
were completed as per specification.

Whether the testing & commissioning is


17. done by authorised
engineers/technicians.

Whether the testing & commissioning


18.
report is submitted by testing authority.

HLL CONTRACTOR

NAME NAME

PLACE PLACE

Page 1 of 2
DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION

Page 2 of 2