Pipe Insulation Checklist

This document is a checklist for insulating pipes. It has 10 items to check that the pipe insulation received is the approved make and meets specifications, the factory test certificate is included, drawings are approved, insulation and adhesive are applied properly according to specifications, joints are insulated correctly, testing meets specifications, and commissioning is done according to specifications. Signatures from HLL and the contractor are required with names, places, dates, and designations.

Uploaded by

Ananthu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Pipe Insulation Checklist

This document is a checklist for insulating pipes. It has 10 items to check that the pipe insulation received is the approved make and meets specifications, the factory test certificate is included, drawings are approved, insulation and adhesive are applied properly according to specifications, joints are insulated correctly, testing meets specifications, and commissioning is done according to specifications. Signatures from HLL and the contractor are required with names, places, dates, and designations.

Uploaded by

Ananthu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • Pipe Insulation Checklist: A checklist for verifying the specifications, quality, and approval statuses of pipe insulation work, including details for HLL and the contractor.

PIPE INSULATION CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the material received is of


1.
approved make.

Whether the Factory test certificate is


2.
received with the material.

Whether the material received is as per


3.
specification.

4. Whether the drawing is approved.

Whether the insulation is done as per


5.
specification & drawing.

Whether the adhesive is done properly


6.
as per specification

Whether the joints were properly


7.
insulated.

Whether the testing is done as per


8.
specification.

Whether the commissioning is done as


10.
per specification

HLL CONTRACTOR

NAME NAME

PLACE PLACE

DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION