This project aims to improve the Overall Equipment Effectiveness (OEE) of Assembly Line A from its current baseline of 45% to 65% over the next six months. This is expected to result in $10,000 savings in production costs and $5,000 savings from reduced quality rejections. Key activities include defining the process, measuring current performance, analyzing causes of low OEE, improving the process, and implementing controls. The project scope is limited to Assembly Line A and runs from May 11, 2021 to August 30, 2021.

Uploaded by

Hamza Sibai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
621 views4 pages

Lean Six Sigma Project Charter Template

This project aims to improve the Overall Equipment Effectiveness (OEE) of Assembly Line A from its current baseline of 45% to 65% over the next six months. This is expected to result in $10,000 savings in production costs and $5,000 savings from reduced quality rejections. Key activities include defining the process, measuring current performance, analyzing causes of low OEE, improving the process, and implementing controls. The project scope is limited to Assembly Line A and runs from May 11, 2021 to August 30, 2021.

Uploaded by

Hamza Sibai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Lean Six Sigma Projec

Project No.: 001 Date: 5/11/2021 Rev. No.:


Project Title: OEE Improvement at Assembly Line A Project Leader:
Process Owner: Mr. Raja R. Project Sponsor:
Businesss Case: Process & Sub Proc
The improvement in OEE by 20% will reduce the manufacturing
Process: Manufactu
cost per product by 25% that will improve our profitability by 25%
Sub Process: Assem
directly.
Problem Statement: Goal Statement:

To Improve the OEE


The last 4 month's OEE of line A is 45%. So the manufacturing cost
of the product is higher 65% in the next six
USD

Business Matrix: Primary Matrix:


Sr No Description UOM Base Line Target Sr No
1 OEE % 45 65 1
2
3
Project Team: Support Personnel
Name Role Name
Boby Process Owner Piyush
Raju Mechanical Mainntenance Vihan
Kamalesh Electrical Maintenance
Jyorge Tooling Modification

Project Scope: Estimated Financia


The Project Scope includes only manufacturing assembly line A. 10K USD sa
All other line excluded from the project 5K USD co

Project Start Date: 11-05-2021 Estimate Project Co


Project Milestones Define Measure Analyse
Target Date: 5/20/2021 6/10/2021 7/10/2021
Review Date:
Completion Date:
Approval of the Project Charter
Name & Sig
Project Leader: Mr. Jack R.
Project Sponsor / Champion: Mr. Patel P.
Process Owner: Mr. Raja R.
Financial Advisor: Mr. Harry
Project Charter
000 Rev. Date: 5/11/2021
Project Leader: Mr. Jack R.
Project Sponsor: Mr. Patel P.
ocess & Sub Process:

ocess: Manufacturing Process


b Process: Assembly Line A

al Statement:

Improve the OEE of Line A from the current baseline of 45% to


% in the next six months. It will give the tangible benefits of 10K
D

mary Matrix:
Description UOM Base Line Target
Rate of Availability % 70 82
Rate of Performance % 70 80
Rate of Quality % 92 99
pport Personnel:
me Role
ush HR Support
han NPD Support

timated Financial Benefits:


10K USD saving in production processing cost saving
5K USD cost saving due to quality rejection on line

timate Project Completion Date: 30-08-2021


Analyse Improve Control
7/10/2021 8/10/2021 8/25/2021

roject Charter
Name & Signature Date
5/11/2021
5/11/2021
5/11/2021
5/11/2021

You might also like