JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: November 26,2022
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply and installation
of aluminum and glass windows/doors with the specification of the following:
Description Unit price Total Price
24 SETS SLIDING DOOR / CARGILL TECH
( SERIES 1000 FOR FLAT SILL) 43,942.44 1,054,618.60
(SERIES 2000 FOR EXPOSE SILL)
Specification:
VAT 12% 126,554.23
Using 6mm Bronze Tempered Glass in powder coated
finished without screen
Grand Total 1,181,172.83
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: November 26,2022
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply and installation
of aluminum and glass windows/doors with the specification of the following:
Description Unit price Total Price
24 SETS SD SLIDING DOOR 21,609.07 518,617.68
Specification:
VAT 12% 62,234.12
Using 6mm Bronze Tempered Glass in powder
coated finished without screen
Grand Total 580,851.80
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: November 26,2022
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply and installation
of aluminum and glass windows/doors with the specification of the following:
DESCRIPTION Unit price Total Amount
68,000.00 612,000.00
9 SETS LWI LANDING STAIRS VAT 12% 73,440.00
WINDOWS
Grand Total
685,440.00
SPECIFICATION:
ALUMINUM - SERIES 50 FOR AWNING
AND FIX GLASS
ANALOK BROWN COLOR
GLASS - 6mm BROZE TEMPERE4D GLASS
SEALANT - STRUCTURAL AND WEATHER SEALANT
HARDWARE - 304 HINGES
ACCESSORIES - CALMLOCK
__________________________ 2.70 _____________________
0.595
1.80
0.595
0.595
0.50 0.85 0.85 0.50
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation of GROUND FLOOR FRONT FIX GLASS AND DOORS.
DESCRIPTION
33 UNITS FIX GLASS
3 UNITS DOUBLE SWING DOOR
1 UNIT SINGLE SWING DOOR
4 UNITS TRANSOM
19 UNITS GLASS RIB
PRICE 2,298,250.00
12%VAT 275,790.00
TOTAL PRICE 2,574,040.00
Specification of Materials
1.) USING 12mm TEMPERED CLEAR GLASS
2.) 24" H TYPE STAINLESS HANDLE
3.) FLOOR HINGE DOOR CLOSER
4.) PATCH HINGES TOP AND BOTTOM
NOTE: MAIN ENTRANCE NOT INCLUDED
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
GLASS RIB PICTURE
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation as specified below;
DESCRIPTION
SUPPLY FABRICATION AND INSTALLATION OF MEZZANINE RALINGS
1.) 44 PCS. BALUSTER POST
2.) 3" ROUND STAINLESS PIPE FOR TOP
3.) ( HAND) RAILING
4.) 18 PCS. 12mm CLEAR LAMINATED GLASS
5.) 6" SUKALO AND PLAIN STAINLESS SHEET COVER
PRICE 1,995,711.00
12%VAT 239,485.32
TOTAL PRICE 2,235,196.32
Specification of Materials
1.) 12mm LAMINATED CLEAR GLASS FILM (SAFETY GLASS)
2.) 5"RECTANGULAR TUBE BALUSTER (STEEL)
3.) 3" STAINLESS PIPE FOR TOP
4.) EXPANSION BOLT WITH BRACKET
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation as specified below;
DESCRIPTION
2 SINGLE DOOR FOR 3RD TO 14TH FLOOR WITH FROSTED TINT AND STRIPE
OPTION 1
24 UNITS FRAMELESS PATCH DOOR USING 12mm TEMPERED CLEAR GLASS
WITH FLOOR HINGE DOOR CLOSER 12" C HANDLE
UNIT PRICE 28,780.00
PRICE 690,720.00
12%VAT 82,886.40
TOTAL PRICE 773,606.40
DESCRIPTION
2 SINGLE DOOR FOR 3RD TO 13TH FLOOR WITH FROSTED TINT AND STRIPE
OPTION 2
24 UNITS FD 100 SWING DOOR WITH THRESHOLD, SPLIT TUBE AND OVERHEAD
DOOR CLOSER 12mm TEMPRED GLASS, 12" C HANDLE AND POWDER COATED
COLOR
UNIT PRICE 23,498.00
PRICE 562,512.00
12%VAT 67,501.44
TOTAL PRICE 630,013.44
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation as specified below;
DESCRIPTION
2 SINGLE DOOR FOR 3RD TO 14TH FLOOR WITH FROSTED TINT AND STRIPE
OPTION 1
24 UNITS FRAMELESS PATCH DOOR USING 12mm TEMPERED CLEAR GLASS
WITH FLOOR HINGE DOOR CLOSER 12" C HANDLE
UNIT PRICE 28,780.00
PRICE 690,720.00
12%VAT 82,886.40
TOTAL PRICE 773,606.40
DESCRIPTION
2 SINGLE DOOR FOR 3RD TO 13TH FLOOR WITH FROSTED TINT AND STRIPE
OPTION 2
24 UNITS FD 100 SWING DOOR WITH THRESHOLD, SPLIT TUBE AND
OVERHEAD DOOR CLOSER 12mm TEMPRED GLASS, 12" C HANDLE AND
POWDER COATED COLOR
UNIT PRICE 23,498.00
PRICE 562,512.00
12%VAT 67,501.44
TOTAL PRICE 630,013.44
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation as specified below;
DESCRIPTION
2 SINGLE DOOR FOR 3RD TO 13TH FLOOR WITH FROSTED TINT AND STRIPE
OPTION 2
24 UNITS FD 100 SWING DOOR WITH THRESHOLD, SPLIT TUBE AND
OVERHEAD DOOR CLOSER 12mm TEMPRED GLASS, 12" C HANDLE AND
POWDER COATED COLOR
UNIT PRICE 23,498.00
PRICE 562,512.00
12%VAT 67,501.44
TOTAL PRICE 630,013.44
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation as specified below;
DESCRIPTION
SUPPLY FABRICATION AND INSTALLATION OF MEZZANINE RALINGS
1.) 44 PCS. BALUSTER POST
2.) 3" ROUND STAINLESS PIPE FOR TOP
3.) ( HAND) RAILING
4.) 22 PCS. 12mm CLEAR LAMINATED GLASS
5.) 6" SUKALO AND PLAIN STAINLESS SHEET COVER
PRICE 1,995,711.00
12%VAT 239,485.32
TOTAL PRICE 2,235,196.32
Specification of Materials
1.) 12mm LAMINATED CLEAR GLASS FILM (SAFETY GLASS)
2.) 5"RECTANGULAR TUBE BALUSTER (STEEL)
3.) 3" STAINLESS PIPE FOR TOP
4.) EXPANSION BOLT WITH BRACKET
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: March 26,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation of GROUND FLOOR FRONT FIX GLASS AND DOORS.
DESCRIPTION
33 UNITS FIX GLASS
3 UNITS DOUBLE SWING DOOR
1 UNIT SINGLE SWING DOOR
4 UNITS TRANSOM
19 UNITS GLASS RIB
PRICE 2,298,250.00
12%VAT 275,790.00
TOTAL PRICE 2,574,040.00
Specification of Materials
1.) USING 12mm TEMPERED CLEAR GLASS
2.) 24" H TYPE STAINLESS HANDLE
3.) FLOOR HINGE DOOR CLOSER
4.) PATCH HINGES TOP AND BOTTOM
NOTE: MAIN ENTRANCE NOT INCLUDED
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: May 3,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation of ELEVATOR LOBBY
OPTION 1
3RD FLR.
2 UNITS DOUBLES SWING DOOR (PATIO TYPE) AND FIX GLASS POWDER COATED
MAIN MULLION ALUMINUM ( CURTAIN WALL) WITH 6mm TEMPERED BRONZE
GLASS
13 UNITS
4 TH TO 16TH GLASS
FLR
WALL
CURTAIN WALL / MAIN MULLION ALUMINUM FRAMING, POWDER COATED
WITH 6mm TEMPERED BRONZE GLASS
PRICE ₱ 4,600,000.00
TOTAL PRICE
(VAT INCLUSIVE) ₱ 4,600,000.00
Note: Job turn over within 60 working days after signing of contract.
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: June 19,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation of SHOWER ENCLOSURE of TOILETS.
SUPPLY AND INSTALLATION OF SHOWER ENCLOSURE USING 3/8 CLEAR
TEMPERED FROSTED STICKER
Description Measurement
SHOWER ENCLOSURE FROM 3RD FLOOR TO 15TH FLOOR
171 sets W 93" x H 71"
SHOWER ENCLOSURE 15TH FLOOR
23 SETS W 59" x H 71"
PRICE (VAT INCLUSIVE) ₱ 7,500,000.00
(INCLUDED FROSTED TINT)
Note: Job turn over within 90 working days after signing of contract.
Prepared By:
Glena D. Frasco Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: June 16,2023
Dear Sir/Madam,
Greetings:
We are pleased to present to you the price quotation for the supply
and installation of AWNING WINDOW FOR ELIVATOR LOBBY.
SMC 50 SERIES ALUMINUM, SEAMLESS AWNING WINDOW WITH 6mm TEMPERED
SPECIFICATION
BRONZE GLASS AND POWDER COATED ALUMINUM FINISH
Description Measurement
28 SETS AWNING WINDOW FOR ELIVATOR LOBBY FROM 3RD TO 16TH FLOOR
PRICE ₱ 3,000,000.00
ACCESORIES AND REVISED AWNING MATERIALS PLAN ₱ 187,452.00
PRICE (VAT INCLUSIVE) ₱ 2,812,548.00
Note: Job turn over within 90 working days after signing of contract.
Prepared By:
Glena D. Frasco Edrico R. Frasco
Manager
JSU GLASS AND ALUMINUM SUPPLY
LEYSON ST. TALAMBAN, CEBU CITY
CONTACT NO.: 09283160647
To: Mrs. Elizabeth G. Go
Contact No.:
Project Site: TREEWOOD RESIDENCE
IT PARK APAS, LAHUG CEBU CITY
Subject Price Quotation
Date: July 5, 2023
Dear Sir/Madam,
Greetings!
We are pleased to present to you the price quotation for the supply
and installation of AL PRESCO RAILINGS.
USING STAINLESS BALUSTER POST WITH 10MM TEMPERED
SPECIFICATION CLEAR GLASS WITH 3" STAINLESS ROUND TUBE HAND
SUPPORT AND 12" PLAIN STAINLESS SUKALO COVER
DESCRIPTION
33 UNITS AL PRESCO RAILINGS
PRICE ₱ 2,453,250.00
12% VAT ₱ 294,390.00
TOTAL PRICE ₱ 2,747,640.00
Prepared By:
Glena D. Frasco
Edrico R. Frasco
Manager