0% found this document useful (0 votes)
148 views7 pages

Solar Net Metering Application Form

This document is an application for net metering and grid connectivity of a rooftop solar photovoltaic system. [1] It provides details of the applicant such as name, address, electricity account information, solar PV plant capacity, and documents enclosed. [2] The applicant is requesting net metering connection for their solar energy system and provides technical specifications of the solar inverter and generation meter. [3] Upon approval, the application will be acknowledged with registration number and details of the solar plant capacity.

Uploaded by

Harish Jangid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
148 views7 pages

Solar Net Metering Application Form

This document is an application for net metering and grid connectivity of a rooftop solar photovoltaic system. [1] It provides details of the applicant such as name, address, electricity account information, solar PV plant capacity, and documents enclosed. [2] The applicant is requesting net metering connection for their solar energy system and provides technical specifications of the solar inverter and generation meter. [3] Upon approval, the application will be acknowledged with registration number and details of the solar plant capacity.

Uploaded by

Harish Jangid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Annexure

Application for Net Metering and Gird


To Date
Connectivitv of Grid Connected Rooftop Solar Photovoltaic System
The AEN (O&M)

IWe herewith apply for solar


which details are given below. energy Net-Metering connection at the corvice connection and for the solar PV plant of
1 Name of Applicant.

2 Address of Applicant.

Service Connection Numberl Account


Number
Single Phase/Three Phase.
Sanction Load (KWyContract
Demand (KVA).
Category (DS/NDS. .etc.)
Telephone
E Mail ld.
Number(s)
Solar PV Plant Capacity (KW)
0. Solar Grid Inverter
1 Make and
Solar Gird inverter has Type.
automatic
lsolation protection (Y/N).
2 Has a Solar
Generation Meter
Installed (YIN).
Expected date of
Solar PV System. Commissioning of
Detail of test certificates of Solar PV
Plant/Inverter for standards required
under the Regulation.
.
Whether applicant wish to
.
MNRE subsidy( YES/ NO) avail
Whether MNRE subsidy is
(YES/NO) sanctioned
bcuments Enclosed:
Copy of latest Electricity Bill.
Copy of subsidy sanction letter from
MNRE.
Self-certification for not availing MNRE subsidy.
ertificate: -The above stated
information
is true to the best of my
knowledge.
ace: -
Name:
te: -

Signature atter
4352436. tit..,
Keceived
Rs....Soo
25
JAN
2023
deposit Sr
No
No.
Amount security
A9
loew|DL 3¢Sl
the
Rs.100/KW
Rs.200/KW Vide PCCB
No
Rs. 1000
Rs. .2000
Rs of The
owner
Rs. 500
200
above.
the
than
mentioned
Schedule
of
Charges
other
Plant
PV Consumer
as
Solar
amount
Description
LT
Single
Phase
LT
Three
Phase
for Eligible
the
HT-11 Domestic
KV HT-33KVDeposit Non-Domestic
(b)
of
Fee
Application fordoubled
interest.:
Security security
be any
(a) Permises,shall
Annexure-l| |. i.
IV. of
amount
bear
not
[Link].
1 2. The shall
ANNEXURE- 1|
NET METERING APPLICATION ACKNOWLEDGEMENT

Received an application for a Solar Energy Net-Metering Connection from.

Name:

Date:

Service Connection Number:

Application registration No:

Solar Plant Capacity :

Name of Officer

Date Signature

Designation
ANNEXUREV
PERFORMA FOR TECHNICAL FEASIBILITY REPORT

[Link]. PARAMETERS DISCOM OBSERVATION


A.
APPLICANT DETAILS;
1. Name of the applicant

2. Address of the applicant

3 Application Registration Number


4 Category(DS/NDS...etc)
5. Type of connection: 1Ph LT or 3Ph
LTIHT
6. Size and typeof LT Cable (1Phasel3
Phase)
7. Phone/Mobile Number
8. E-Mail ld
9. Sanctioned Loadin KW/Contract
demand in KVA
B. DISTRIBUTION TRANSFORMER
DETAIL:
1. Location
2. Capacity in KVA
3 Total Connected Load in KW
|4. Tongtester reading of current in all 3
phases and neutral 20
5. SRTPV already
Proposed/Connected in KW
6. Proposed SRTPV capacity in KW
7. Total Generation capacity (5+6) in
kw
8. Size of LT cable
9 Whether the transport capacity is
adequate to deliver the proposed
SRTPV system in addition to
Solar RTPV system
Notethe transformer shall be
existing
up to 30% of capacity) loaded
FEEDER DETAIL
C. Name of the 11KV Feeder
1 the 33/11KV Sub-Station
Name ofth
2 Typeof Conductor/cable
3. (size)
Total connectedload on the feeder
4
inKVA

5
Total Capacity (KWp) of SRTP
system connected on feeder.
6 Peak Load on the feeder in Amps
7 Whether proposed SRTPV YES/NO(If it is not feasible, state
installation is technically feasible or reasons)
Not

Enclosure: - 11KV feeder &LT Distribution Single line díagram of


transformer
It is certify that the above said SRTPV installation is technically Feasible
Note:- You are advised to furnish the test certificates of equipment's
of roof top Solar PV system.
4

aud Nlet Medesg

cu Net Meter No. yo0084 (30)


Sol mete No.3991993 )
2Sot2502-Sa/

Solla& Net ett


Melerpeciee

4742828468
2S0
2S0

Roceived Rs...S09.k..
...1334}oy.
VideA9 No.
10FEB2023

SrNo
PCCB No

You might also like