PowerChina Company Profile 2021
Topics covered
PowerChina Company Profile 2021
Topics covered
PA RTN E RI N G
FO R S USTA I N A BL E
D EVE LO PME N T
PowerChina in Indonesia 2 2X250MW Coal-f ired Power Plant Power Construction Corporation of China (POWERCHINA) is a wholly
35
in Weda Bay Industrial Park
Construction Projects in Indonesia 4 state-owned company established on September 29, 2011 on the basis
PLTA Indonesia Embalut 2X100MW
36 of 14 provincial (municipal, regional) electric power survey and design,
Power Plant Extension Project
Jatigede Hydroelectric
Power Plant Project 2x55 MW
6
2X30MW High Temperature High engineering and equipment manufacturing enterprises.
Pressure Fluidized Bed Power Plant 37
Asahan No. 1 Hydropower Plant 2x90 MW 8
Project in Obi Island POWERCHINA is an integrated construction group that provides investment
Batang Toru 510 MW Hydroelectric
10
Power Plant Project
Jatim 1 - Pacitan 2x315 MW
38 and f inancing, planning design, engineering construction, equipment
Coal-Fired Power Plant Project
Jatigede Dam Project 11 manufacturing and operation management for hydropower, thermal
Sulawesi Selatan 2x50 MW
Air Putih Hydropower Project 3x7 MW 39
14 Coal-Fired Power Plant Project power, new and renewable energy, inf rastructure and transportation
(Civil & Metal Structure Work)
Riau 2x110 MW projects.
Remedial Work on Jatiluhur Dam 40
16 Coal-Fired Power Plant Project
Contract Package C-01 Main Dam
The Upper Cisokan Pumped Storage
Kaltim Teluk Balikpapan 2x110 MW
41
POWERCHINA currently employs 210,000 people. In 2020, PowerChina
17 Coal-Fired Power Plant Project
Project Ranking no.107 among Fortune Global 500; Ranked no.5 among ENR 2020
Nagan Raya NAD 2x110 MW
Bah Karai Hydropower Station Project
18 Coal-Fired Power Plant Project
42 Top 250 Global Contractor; and No.1 among top 150 Global Design Firms.
2X6.3 MW
Pangkalan Susu 3&4 2x200 MW
N EW & R E NEWAB L E E N E R GY 44 PowerChina International Group Limited (PowerChina INTL) was
Coal-Fired Power Plant Project
Sorik Marapi 240 MW
Banten 3x315 MW established by Power Construction Corporation of China for the integration
Geothermal Power Plant Substation 20 46
Coal-Fired Power Plant Project
and Transmission Line Project and group-oriented management of its international operations.
Jambi 1x100 MW
Cirata Floating Solar Project 192 MWP 21 47
Coal-Fired Power Plant Project
IN FRASTRUCTUR E POWERCHINA INTL is in charge of all overseas brands of POWERCHINA
Tjiwi Kimia TK-4 1x90 MW
Jakarta - Bandung High-Speed Railway 22
Coal-Fired Power Plant Project
48 including SINOHYDRO, HYDROCHINA, HYPEC, SEPCO and SEPC and has
China - Indonesia Friendship Village been actively involved in Indonesia’s construction industry since 1995.
24 Perawang 670T/H CFB Boiler Project 49
Housing Project
WHW 2XC30 MW + 4XB25 MW
Mamuju Jetty Project 26 50
Thermal Power Plant Project
PLTU
Muara Jawa 2x27.5 MW
51
Sumatera Utara 2x150 MW Coal-Fired Power Plant
28
Coal-Fired Power Plant Project
Bengkulu 2x110 MW
52
Sulut-3 2X50 MW Coal-Fired Power Plant Project
29
Coal-Fired Power Plant Project
Kalteng-1 2x100 MW
54
Thermal Power Plant in Bintan Island 30 Coal-Fired Power Plant Project
1×250MW Thermal Power Plant Project M IN IN G
31
of Indonesia Morowali Power Co., Ltd.
Kendari Nickel Mining and
56
Sulbagut-1 2X50 MW Logistics Land Transportation Project
32
Coal-Fired Power Plant Project
Konawe Nickel Mining and
56
Kalbar-1 2X100 MW Ultra-High Pressure Logistics Land Transportation Project
33
Coal-Fired Unit Project
TAS Nickel Mining Exploration Project 57
Soil Improvement Works, Batching Plant
KKU Nickel Mining Project 58
O&M and Concrete Supply for PLTU 34
PBI Nickel Mining Project 59
Cilacap 1x660 MW
Power Construction Corporation of China and PowerChina Limited Today, PowerChina INTL has 160 branches in 101 countries and
commissioned and authorized PowerChina INTL to exercise unif ied business presence in 116 countries, with total contract value of projects
management and control over the international business of all member under construction surpassing USD 100 billion. It has more than 800
enterprises, and to carry out the international operations of Power employees spread over 6 market-oriented regional headquarters. : In
Construction Corporation of China and PowerChina Limited. 2020, PowerChina Ranking no.107 among Fortune Global 500; Ranked
no.5 among ENR 2020 Top 250 Global Contractor; and No.1 among top
With the electric power business as its core strength, PowerChina 150 Global Design Firms.
INTL adheres to the “double-barreled drive” of project contracting
and investment & development, focusing on f ive business segments: PowerChina INTL is grateful for the support of local government,
hydropower and water affairs, thermal power and power grid, traff ic communities and people. We are committed to sustainable development
engineering, new energy, and equipment operation. in Indonesia and will continue to work more closely and share our
capabilities with our Indonesian partners and local communities.
2
8 7
3
13
17
20 19
1 18
14
22
3 23
11 9 4
12
24
16
3
1 17
3
21
4
15 2 5
1
2
8
2 2
6
4 7
5 10
6
1
A S A H A N NO. 1 HYDR OP OWER PL AN T 2 X90 MW 2 JAKARTA - B AN DUN G H IG H - S PEED RAILWAY 2 SU L AWE SI SE L ATA N 2 X5 0 MW TJ IWI K I M I A T K-4 1X9 0 MW KA L B A R -1 2 X 1 00 MW
2 10
COA L-F I R E D P OWE R PL A NT PR OJ ECT COA L-F I R E D P OWE R PL A NT PR OJ ECT U LT R A-HI GH PR E SSU R E 19
COA L-F I R E D U N I T PR OJECT
B ATA N G TOR U 5 1 0 MW HYDROELECTRIC POWER PROJECT 3 MAMUJ U J ET TY PROJ ECT 3
R I AU 2 X 110 MW PE R AWA NG 670T/ H
3 11
COA L-F I R E D P OWE R PL A NT PR OJ ECT C F B B O I L E R PR OJ ECT T HE R M A L POWE R PL A N T
JATI G EDE DA M PR OJECT 4 20
MINING I N B I NTA N I SL A N D I N D ON E SI A
KA LT I M T E LU K B A L I K PA PA N 2 X 110 MW WHW 2 XC3 0 MW + 4XB 2 5 MW T HE R M A L
JATI G EDE HYDR O E LECTRIC POWER PLANT PROJECT 2X55 MW 5 12
COA L-F I R E D 4 P OWE R PL A NT 1X2 5 0 MW T H E R MA L POWE R PL A N T
KEN DARI N ICKEL MIN IN G AN D
1 P OWE R PL A NT PR OJ ECT PR OJ ECT OF I N D ON E SI A MOR OWA LI 21
LO G ISTICS L AN D TRAN S P O RTATIO N PROJ ECT
R E M EDI A L WOR K O N JAT ILUHUR DAM CON T RACT PACKAGE SU M AT E R A UTA R A 2 X 15 0 MW P OWE R CO. , LT D. (MPM)
6 13
C- 01 MAI N DA M NAG A N R AYA NA D 2 X 110 MW COA L-F I R E D P OWE R PL A NT
KO N AWE N ICKEL MIN IN G AN D 5
2 COA L-F I R E D P OWE R PL A NT PR OJ ECT 2 X2 5 0 MW
LO G ISTICS L AN D TRAN S P O RTATIO N PROJ ECT
TH E U PPE R CI S OKAN PUM PED STORAGE PROJECT 7 M UA R A JAWA 2 X27.5 MW COA L-F I R E D POWE R PL A N T I N 22
14
SO I L I M PR OVE M E NT WO R KS , COA L-F I R E D P OWE R PL A NT PR OJ ECT WE DA B AY I N D U ST R I A L PA R K
TAS N ICKEL MIN IN G EXPLO RATIO N PROJ ECT 3
B A H KA R A I HYDR O POWER STAT ION PROJECT 2 X6 . 3 MW 8 B ATC HI NG PL A NT O & M A ND CO NC R E T E
6
SU PPLY FO R B E NG KU LU 2 X 110 MW I ND O NE SIA E MB A LUT 2 X 1 00MW
KKU N ICKEL MIN IN G PROJ ECT 4 15 23
PLTU C I L ACA P 1X6 6 0 MW COA L-F I R E D P OWE R PL A NT PR OJ ECT P OWE R PL A N T EXT E N SI ON PR OJECT
NEW & RENEWABLE ENERGY
PB I N ICKEL MIN IN G PROJ ECT 5 PA NGKA L A N SU SU 3 & 4 2 X20 0 MW KA LT E NG -1 2 X 10 0 MW 2 X3 0 MW H I G H T E MPE R ATU R E
7 16
S O R I K MA R A PI 24 0 MW GEOT HERM AL POWER PL ANT COA L-F I R E D P OWE R PL A NT PR OJ ECT COA L-F I R E D P OWE R PL A NT PR OJ ECT HI G H PR ESSU R E FLU I D I Z E D B E D 24
1
S UB STATI ON AND TR A NSM ISSION LINE PROJECT P OWE R PL A N T PR OJECT I N OB I I SL A N D
B A NT E N 3X3 15 MW SU LUT-3 2 X5 0 MW
8 17
C I R ATA FLOATI NG S OL AR PROJECT 192 MWP 2 COA L-F I R E D P OWE R PL A NT PR OJ ECT COA L-F I R E D P OWE R PL A NT PR OJ ECT
On December 19, 2014, PLN and Sinohydro signed This project is scheduled to be f inished on March 24,
JATIGEDE HYDROELECT RI C a contract for the construction of the Jatigede 2022.
A IR PUTIH HYDROPOWER Sinohydro was invited to submit bids for the horizontal tunnel, surge tank, inclined shaft, lower
Construction Contract of Civil and Metal Structure horizontal tunnel, powerhouse and stepping-up
PROJECT 3X7 MW Works on July 25, 2012. Construction started in August substation, etc.
(CIVI L & METAL STRU CTURE WO RK ) 2012 and was completed in October 2015.
This project is designed for power generation, with a
The head works of Air Putih Hydropower Station catchment area of 1045 km2, design discharge of 66.6
PR OJ ECT BY S IN O H YD RO is located 10 km f rom Ladang Palembang, 160 km m 3/s and design head of 36 m, installed capacity of
f rom Bengkulu and about 160 km f rom the port. As a 3×7 MW, and an annual electrical energy output of
run-of-river hydropower plant, Air Putih Hydropower 144 million kWh.
Station consists of retaining structures, intake, upper
Powerhouse
Lower reservoir
It is located 150 km southeast of Jakarta at the upstream The development consists of new upper and lower
Jatiluhur Dam is located in West Java Province, Indonesia, and was end of the Cisokan River Basin, one of the tributaries of dams, both constructed of roller-compacted concrete:
the largest water conservancy project of its time. the Citarum River in West Java Province. There are two (i) an upper dam with a maximum height of 75 m and
existing hydropower stations in its vicinity: Saguling, a 375 m long crest; (ii) a lower dam with a maximum
about 15 km to the east, and Cirata, about 30 km to the height of 98 m and a 294 m long crest. Both dams
The Jatiluhur dam in West Java Province was built north, both constructed in the 1980s. will impound reservoirs of about 10 million m 3. The
in the 1960s and was the largest water conservation waterways connecting the two dams consist of two
project in Indonesia at the time. Sinohydro won the The project site was identif ied in the mid 1980s and the intakes, two headrace tunnels each about 1.2 km
bid for Remedial Works on Jatiluhur Dam on June feasibility study of the project was carried out between long, two restricted orif ice surge tanks, two inclined
29, 1995. Construction agreement was signed on July 1992 – 1995. Between 1999 – 2002, a detailed engineering steel lined penstocks and four tailrace tunnels and
28, 1995 and the project was completed on March 15, design was undertaken followed by a supplementary outlet structures. The underground powerhouse is 51
1998. The total contract value was USD 4.64 million. design engineering phase in 2006 and 2007. Between m high, 26 m wide and 156.6 m long, and will house
The project was f inanced by the World Bank and 2009 – 2010, a consolidated environmental impact four pump turbine units with a nominal capacity of
owned by the Indonesian Ministry of Public Works. assessment report (EIA), including the environmental 260 MW (generating), and a total capacity of 1040
management and monitoring plan (EMP), was MW. PowerChina provides engineering, design, and
The scope of work included dredging the reservoir completed. At the same time, the land acquisition supervision for this project.
and repairing the side slope. and resettlement plans (LARAPs) for the project were
developed.
BA H KARAI The Bah Karai Hydropower Station is a water diversion Sinohydro undertakes the civil engineering, metal
H YDROPOWER STAT I O N PROJECT type power station. Water intake is f rom the low dam, structure and electromechanical installation
then through culvert with top-f ill, grit chamber, fore engineering with a total contract value of USD
2X6 . 3 MW bay in cave, tunnel, and transported by the penstock 12.379.650. The total construction period is 23 months,
to the powerhouse at the confluence of Karai River commencing on April 3, 2018 and concluding on
PR OJ ECT BY S IN O H YD RO for power generating. The total installed capacity of December 31, 2022.
the power station is 2x6.3 MW, and the total capacity
is 12.6 MW.
NEW & RENEWABLE ENERGY ONGOING COMPLETED NEW & RENEWABLE ENERGY ONGOING COMPLETED
The project is located The Sorik Marapi Geothermal Power (SMGP) project has a total Cirata floating solar project, located in West Java, Indonesia,
installed capacity of 240 MW, with a total investment of USD 800 on the 130km Cirata hydroelectric dam reservoir southeast of
in Mandailing Natal million. Our company reached a strategic cooperation agreement Jakarta, installed capacity is 192MWp. The owner is a project
with project owner Kaishan Group. PowerChina worked as company jointly established by Masdar and PJB.
District, North Sumatera the EPC contractor of power energy output in this project and
Province, Indonesia. successfully achieved the power delivery requirement. The project The scope of the project includes the design, procurement,
was completed on February 18, 2019. construction of the photovoltaic plant f ield, set-up station,
transmission line, and the expansion bays of the opposite
exisiting substation, as well as the operation and maintenance
in the f irst two years.
The Jakarta-Bandung High-Speed Railway connecting Jakarta and Total investment in the project is USD 5.135 billion.
The ownership is 5 : 4 (China : Indonesia).
Bandung is the f irst high-speed railway in Indonesia. It can shorten
travel time between the two cities f rom 2-3 hours to 36 minutes. The Chinese shareholders consist of the following
companies: China Railway International Co. Ltd.
(CRIC), CRRC Qingdao Sifang Co., Ltd (CRRC SIFANG),
China Railway Signal & Communication Corporation
Limited (CRSC), China railway Group Limited (CREC)
INFRASTRUCTURE ONGOING COMPLETED
and Sinohydro Corporation Limited (SINOHYDRO).
This project was for the construction of a new 10,000 The quay line of this jetty disposed in -7m bathymetric
M A MU JU ton jetty and its supporting facilities, with a planned line, jetty azimuth angle is 47 ° ~ 227 °, as a whole
JET TY PROJ ECT annual amount of coal unloading of 300,000 tons. appears “T” type. The berth length is 154 m. Jetty
The project included a terminal hydraulic structure, surface elevation is 5.0m. Design elevation of berthing
access bridge, substation, 1# RTS civil work, steel quay waters is -5.0 m. The jetty includes a working
structures, water supply and drainage, f iref ighting, platform, 2 mooring piers, 1 berthing pier and steel
environmental protection, HVAC, navigation aids, bridges for two sides of the jetty.
PR OJ ECT BY S IN O H YD R O
anti-collision facilities, water supply pump house and
other construction projects, equipment installation The project was completed on January 18, 2018.
of unloader handling process and commissioning
monomer.
2×150 MW Coal-Fired Steam Power Plant Sumatera This project is a joint operation between Sinohydro Sinohydro in Indonesia. The company has formed
Corporation Limited and PT Teknik Lancar Mandiri a joint venture with PT Toba Bara Sejahtera Tbk, a
Utara is located in Deli Serdang County (near the city of as EPC Contractor. They signed the contract with the publicly listed company in Indonesia, to invest in this
Employer, PT Minahasa Cahaya Lestari (MCL) on July IPP Project.
Medan), North Sumatera Province, Indonesia. 10, 2018. MCL is invested in by PT Toba Bara Energi
and Sinohydro Corporation Limited, with f inancing Sinohydro holds a 10% share in MCL. After the
f rom Bank Mandiri, Indonesia. completion of the project, MCL will have a 25-year
Currently underway is phase 1 of the project, with a while IPP will buy back a certain proportion of power
operation period of the project.
capacity of 2×150 MW and a construction period of generated f rom PLN.
The project was to build a new coal-f ired power plant
33+3 months (f rom the date of the close of f inancing).
equipped with 2 units of 50 MW steam turbines with The COD of unit 1 is February 21, 2021, and the COD of
The COD of unit 1 is December 31, 2019, while the COD The project owner is PT MABAR ELEKTRINDO, whereby
Sinohydro undertaking engineering and design, unit 2 is July 1, 2021.
of unit 2 is March 31, 2020. China Oceanwide Holdings Group Co. Ltd holds 60%
procurement, construction of 2 years of operation
of shares, Shanghai Electric Power Construction Co.
works. Sulut-3 is the f irst IPP investment project of
This project is an IPP model, whereby power will be Ltd. 20%, and PT Garda Sayap Garuda 20%.
transmitted to Kawasan Industrial Medan Clients,
This project unit capacity is 4x25MW (back pressure units)+ 2x30MW (extraction 1×250MW thermal power plant project, the project system, automatic control system, electrical system,
condensing units). It is captive power plant owned by Nanshan Aluminum (PT. owner is Indonesia Morowali Power Co., Ltd. (MPM). The heat treatment and welding, anti-corrosion, coating,
BINTAN ALUMINA INDONESIA). It will be built in two stages. The f irst stage is 1 scope of the project includes: boiler body installation, cable, paint, all pipeline production and installation
million tons of alumina (def ined as the f irst stage project), which is supported by boiler auxiliary equipment installation; Installation of the above system. The commencement date of this
2xB25MW back pressure unit + 1xC30MW extraction unit + 3x220t/h pulverized of turbine generator, hoisting of generator stator; project is April 10, 2019, and the completion date is
coal boiler; the corresponding capacity of the generator is 2x30MW + 1x33MW, Installation of auxiliary equipment of turbo generator February 28, 2020. The total construction period is 325
and the second stage (def ined as extension project) is of the same capacity. The set; Coal-burning system, ventilation system, days.
total construction period of the f irst three units is 28 months. The expansion of chemical water system, water supply and drainage
the three units shall be built in sequence with an interval of two months.
SULBAGUT-1 (2×50 MW) coal-f ired power station project is the second IPP Kalbar-1 project is a new 2×100 MW ultra-high pressure coal-
project invested in by Shanghai Electric Power Construction Co. Ltd with 20% f ired unit project, a co-investment by China GCL Smart Energy
shares. PT Toba Bara Sejahtera Tbk (PT TBS), PT Toba Sejahtera ( PT TS) and Co., Ltd. and PT Indonesia Power (Indonesian National Power
Shanghai Electric Power Construction Co. Ltd (SEPC) jointly established the Company PLN subsidiary). The EPC contract was signed with the
project company called PT Gorontalo Listrik Perdana (PT GLP). The scope of work owner in Jakarta in November, 2016. The project off icially started
included full responsibility for the inf rastructure and operation of the project. in August 2017 and completed in August 2021.
The project was launched on August 7, 2017. The f irst unit is scheduled to be put
into commercial operation on July 30, 2021, and the second unit on October 30,
2021.
This IPP project is located in the city of Cilacap, Central Java Province 2×250MW super-critical primary reheat condensing steam turbine and its
of Indonesia, and is owned by PT Sumber Segara Primadaya. supporting public auxiliary facilities installation , the project owner is Weda
bay Energy Co. Ltd. Unit #1 is scheduled to start construction in February
The subcontract for the soil improvement works was signed on 2019 and put into production in February 2020. Unit #2 will be put into
June 15, 2013, and it included design and construction of stone production in sequence one month apart, the total construction period of
columns with 120,000 m 3
capacity. Field test was f inished in 13 months.
July 2013 while the main work started in August 2013 and was
completed on April 15, 2015.
Indonesia EMBALUT 2×100MW Power Plant Extension Project is 2×30MW High Temperature High Pressure Fluidized Bed Power Plant
Located at East Kalimantan Province,Indonesia. JEPCC signed Project, the project is located at Obi island, North Maluku,Indonesia.
a project with project owner PT.INDONESIA ENERGI DINAMIK,
Jiangxi Jiusheng International Power Engineering Co,.LTD is the POWER CHINA JIANGXI ELECTRIC POWER CONSTRUCTIONCO.,LTD was
contractor, our company is responsible for Civil work,Installation contracted by project owner PT. HALMAHERA PERSADA LYGEND to win
wok and commissioning wok of 2×100MW Coal-f ired Power Plant. the PC work, the total contract value is CNY 99.000.000, Our company is
Construction started on September 30, 2017 and was completed responsible for Civil work, Installation work and commissioning work of
on August 15, 2019. 2×30MW Coal-f ired power plant. The project is entering the f inal stage.
The PLTU Pacitan Power Plant is The PLTU Sulawesi Selatan Power Plant is located in Lampoko
located in Pacitan, East Java Province. Village, Barru County in South Sulawesi Province, Indonesia.
PowerChina Hubei Engineering Co., Ltd signed the PowerChina Hubei Engineering Co., Ltd and PT Bagus
Construction Contract with EPC Contractor Dongfang Karya won this project through PT PLN (Persero)
Electric Corporation on October 18, 2007. The total international public tender and the EPC contract
contract value was USD 130 million. The employer of the was signed on July 21, 2008. The work scope included
project was PLN, the Indonesian National Power Company. engineering, procurement, construction, testing &
Construction commenced in November 2007 and the commissioning, and O&M. The total contract value
plant was synchronized to the national grid on September was USD 120 million. The project employer was PT
6, 2012. PLN. Work commenced in October 2008 and was
completed in December 2011.
Unit 1 of the project was completed on June 24, 2013 and
Unit 2 on August 21, 2013.
This PLTU Riau Power Plant Powerchina Hubei Engineering Co. Ltd., through PT PLN
PLTU Kaltim Teluk In partnership with PT Adhi Karya, a state-owned company of
(Persero) international public tender, won the bid for the Indonesia, Sinohydro as EPC contractor signed the contract with
is located in the Tenayan contract for the construction of this coal-f ired power Balikpapan 2x110 MW is the employer, PLN, on December 21, 2010, with f inancing f rom
plant. The plant was to consist of 2 units, with a coal- an Indonesian local bank. The project was to build a new coal-
Industrial Park, Sail Village, generated output of 2x100 MW and a Circulating Cooling
located in Balikpapan, f ired power plant equipped with 2 units of 110 MW steam turbine
Tenayan Raya Sub-District, Water System f rom Siak River. East Kalimantan sets where Sinohydro would undertake engineering and design,
procurement of M&E, transportation and customs clearance.
Pekanbaru District, Riau The EPC Contract was signed between the consortium of
Province of Indonesia.
Province. PowerChina Hubei Engneering Co., Ltd and PT Rekayasa The project started on March 4, 2011 and was completed on January
Industri with the Employer, PLN (Indonesia State 27, 2017. Unit 1 and Unit 2 were off icially taken over on March 1, 2017.
Electricity Company) on December 21, 2010. This project
was completed on October 16, 2018.
K EY F E ATU R E S
E A RT H R O C K EXCAVAT I O N
( M 3)
1,130,400
B A C K F I L L ( M 3)
193,210
C O N C R E T E ( M 3)
6 9, 475
2X110MW COAL FIRED POWER
PLANT
DOUBLE CYLINDER
A I R CO O L I N G G E N E R ATO R
Sinohydro, as the EPC contractor, signed the contract On January 7, 2011, Sinohydro was awarded the
N AGA N RAYA NAD with the employer - Indonesia National Electricity “Excellent Performance Contractor of 2010” by the
2X 110 MW COAL- FIRE D Company (PLN) on April 25, 2008. The scope of work
included engineering and design, procurement of all
project employer, PLN, which made Sinohydro the
f irst Chinese contractor to be given such an award.
POWE R PL ANT PROJECT equipment and construction and erection of a new 2
x 110 MW coal-fired power plant. The project, f inanced Unit 1 of this project was off icially taken over on April
by China Exim Bank utilising Export Buyer’s Credit 25, 2014 and unit 2 on August 20, 2014.
PR OJ ECT BY S IN O H YD R O
Loan, is currently the largest energy project ever
undertaken in Aceh Province. Today this power plant
delivers 1.37 billion kWh of electricity, suff icient for
670,000 Acehnese households.
Sinohydro as EPC contractor with its local partner commissioning service for this new coal-f ired power
PA NGKAL AN SUSU 3& 4 PT Nusantara Energi Mandiri (NEM), signed the plant with total capacity of 400 MW.
2X 200 MW COAL- FIR ED contract with the employer PLN on July 15, 2013. This
project was f inanced by China Eximbank utilising the Unit 3 of this project started to generate electricity on
POWE R PL ANT PROJECT Preferential Export Buyer’s Credit Loan, making it the April 18, 2019, and Unit 4 on July 18, 2019.
second project loan of its kind for Sinohydro projects
in Indonesia (the f irst one was Jatigede Dam Project). On August 23, 2019, Sinohydro was once again awarded
PR OJ ECT BY S IN O H YD R O
the honor of “Excellent Performance Contractor of
The scope of work for Sinohydro encompassed 2019” by the project owner PLN. This award is a high
engineering and design, procurement of all recognition of Sinohydro’s ability to perform contract
equipment, construction and erection and by PLN.
PR OJ ECT BY P OWE R C H IN A N U C L E A R E NG I NE E RI NG CO., LTD. PR OJECT BY POWER CH IN A N UCL EAR EN GIN EER IN G CO., LTD.
( PR EVI OU S LY K N OWN A S S E P CO II) (PR EVIOUS LY KN OWN AS S EPCO II)
The project is located in The project is owned by PT PLN (PERSERO), with Dongfang The PowerChina Nuclear Engineering Co., Ltd. (previously known as
Electric Corporation as EPC Contractor and PowerChina SEPCO II) was contracted by PT Lontar Papyrus Pulp & Paper Industry to
Kronjo, Banten Province, Nuclear Engineering Co., Ltd. (previously known as SEPCO II) undertake all EPC work including commissioning, except pile work and
as the main contractor. civil construction. The total contract value was USD 101 million.
Indonesia.
After a total of 36 months, construction of all 3 units was The project took 25 months to complete and the f inal acceptance
completed in April 2012. certif icate was issued on April 17, 2017.
PR OJ ECT BY P OWE R C H IN A N U C L E A R E NG I NE E RI NG CO., LTD. PR OJECT BY POWER CH IN A N UCL EAR EN GIN EER IN G CO., LTD.
( PR EVI OU S LY K N OWN A S S E P CO II) (PR EVIOUS LY KN OWN AS S EPCO II)
The project is located The PowerChina Nuclear Engineering Co., Ltd. (previously
This project is The PowerChina Nuclear Engineering Co., Ltd. (previously known as
known as SEPCO II) was contracted by PT Pabrik Kertas SEPCO II) was contracted by project owner PT Indah Kiat Pulp & Paper
in Mojokerto, East Java Tjiwi Kimia Tbk. to undertake all EPC work including located in Perawang, Tbk. to undertake all EPC work including commissioning, except pile
commissioning, except pile work and civil construction. The work and civil construction. The total contract value was USD 81 million.
Province, Indonesia. total contract value was USD 98.3 million.
Riau Province,
Indonesia. The project is scheduled to be completed in 24 months. On November
The project took 23 months to complete and is now ready for 21, 2018, the entire boiler unit was started, and the unit performance
Final Acceptance Certif icate. test was completed on June 27, 2019. Maintenance, operation guidance
and elimination are currently underway.
This project is located The PowerChina Nuclear Engineering Co., Ltd. (previously Sepco III (a subsidiary of PowerChina) signed a Since its establishment in 1985, SEPCO III has
known as SEPCO II) was contracted by project owner Hongfa contract with project owner PT Indo Ridlatama Power constructed a variety of power plants with a single unit
in Ketapang, West Winning Aluminum Oxide Co to undertake all turnkey EPC (a wholly-owned subsidiary of PT Indonesia Power) on ranging f rom 12 MW to 1000 MW for a total installed
work. The total contract value was USD 244 million. July 21, 2014 to be the sole and main EPC contractor of capacity of 86000 MW. Its customer base is spread
Kalimantan Province, the project. This is the f irst power plant to be operated in countries throughout the world, including South
Indonesia. The project is scheduled to be completed in 51 months. by PT Indo Ridlatama Power. The plant’s gross output Af rica, Mozambique, Nigeria, Egypt, Morocco, Bosnia
is 2x33 MW, and net output is 2x27.5 MW. and Herzegovina, Jordan, Bahrain, Saudi Arab, Oman,
Kuwait, Iraq, Pakistan, India, Bangladesh, Myanmar,
Construction started on October 1, 2015 and was Vietnam, Singapore, Indonesia.
completed in November 2018.
KA LTENG-1
2X 100 MW COAL- FIRED
POWE R PL ANT PROJECT
PR OJ ECT BY P OWE R C H IN A H U B E I E NG I NE E RI NG CO., LTD (HYPEC)
Sinohydro Corporation Limited-KKU nickel mining Sinohydro Corporation Limited is the prime contractor The project is located in Molawe County, Konawe Utara
projec.The project is located in the town of Langgikima, for the 50-hectare Phase I project, which will begin District, Southeast Sulawesi . The total area of the
Landawe County, Konawe Utara, Southeast Sulawesi construction in April 2021. The total amount of mining mining area is 6000 hectare, the scope of works included
Province, Indonesia. and stripping is 6 million tons/year, the high grade mining, transportation, construction and maintenance
nickel ore is 2 million tons/year, and the stripping is 4 of road transportation. The total contract of the project is
Konawe Utara region is an important nickel million tons/year. The f irst phase of the contract, with $179,677,211.
mineralization region in Indonesia. The nickel mines a total contract value of US $184 million, includes:
are scattered all over the region. The Kku nickel mine intensive geological exploration, ore transport road
area is 3,105 hectares, with huge ore reserves and a renovation, high-grade nickel ore mining assistance
wide variety of ores, with a potential value of billions (including stripping), transportation and loading, and
of dollars. stripping material transportation and loading.
en.powerchina.cn
62 P OWER CHI NA
The Sorik Marapi Geothermal Power Plant reflects PowerChina's adaptation to renewable energy advancements by expanding its project portfolio into geothermal energy, a clean and sustainable source. This plant, with a capacity of 240 MW, demonstrates PowerChina's commitment to harnessing Indonesia's geothermal potential. By leveraging local resources and collaborating with strategic partners, PowerChina is progressively aligning its operations with global trends towards renewable energy .
PowerChina's completed projects in Indonesia provide substantial socio-economic benefits by enhancing infrastructure, creating employment opportunities, and boosting energy security. Projects like the high-speed railway and power plants improve connectivity and industrial capabilities, facilitating economic growth. The employment generated during construction and operation phases contributes to local economies. Furthermore, improved access to electricity supports business operations and improves quality of life, demonstrating PowerChina's role in supporting Indonesia's socio-economic development .
The Jatigede Dam Project highlights international collaboration through the partnership between the Indonesian government and the joint operation of Sinohydro and CIC, supported by financial backing from China Eximbank. The project was supervised by a consortium of Indonesian design institutes, demonstrating governmental and foreign enterprise cooperation. The project's successful completion, providing significant water resources and irrigation area benefits, reflects the capability of international partnerships to achieve large-scale infrastructure objectives .
PowerChina INTL is responsible for the integrated management of PowerChina's international operations, focusing on sustainable development through project contracting and investment in hydropower, thermal power, traffic engineering, new energy, and equipment operation. In Indonesia, PowerChina INTL has been actively involved in various projects, including the construction of hydropower plants and improvements in infrastructure, which show its commitment to sustainable development by collaborating with local communities and the government. The company's involvement in large-scale projects, such as the Jatigede Hydroelectric Power Plant and the Cirata Floating Solar Project, underscores its dedication to renewable energy and sustainable practices .
PowerChina's thermal power projects, predominantly coal-fired, pose significant environmental implications, including greenhouse gas emissions and local air pollution, which may hinder sustainable development efforts. These projects may compromise air quality and impact local ecosystems, conflicting with sustainability goals. However, in parallel, PowerChina's investments in renewable energy, like solar and geothermal projects, aim to mitigate such negative impacts and align with broader sustainability efforts. Balancing these contrasting initiatives is crucial for achieving comprehensive sustainable development outcomes .
The Cirata Floating Solar Project contributes to Indonesia's renewable energy goals by adding a significant capacity of 192 MWp to the country's power grid, using an innovative approach of floating solar panels on a dam reservoir. This project not only utilizes space efficiently but also reduces water evaporation and boosts solar efficiency. However, challenges might include maintenance of floating structures, integration with existing infrastructure, and potential environmental impacts on aquatic ecosystems. These factors require careful consideration to ensure the project's long-term success and sustainability .
The Jakarta-Bandung High-Speed Railway project embodies sustainable infrastructure advancement by significantly reducing travel time between Jakarta and Bandung from 2-3 hours to 36 minutes, thereby enhancing regional connectivity. It involves substantial engineering works, including bridges and tunnels, and is designed to support growth while minimizing environmental impact. The project promotes efficient transportation and serves as a model for future sustainable infrastructure developments in Indonesia .
Sinohydro's infrastructure projects in Indonesia, particularly in dam construction, play a crucial role in water resource management by providing essential water storage, flood control, and irrigation capabilities. Projects like the Jatigede Dam enhance water availability for agricultural and domestic use, contributing significantly to regional water security. These projects help optimize water usage, support local agriculture development, and reduce flood risks, thus vital in managing Indonesia's water resources effectively .
The Upper Cisokan Pumped Storage Project significantly impacts Indonesia's energy infrastructure by providing a reliable energy storage solution that enhances grid stability and supports renewable integration. As the first of its kind in Indonesia, it enables efficient energy use by storing excess energy generated during low demand and releasing it during peak demand periods. This project is a critical step towards modernizing Indonesia's energy grid and fostering a more resilient and sustainable energy infrastructure .
PowerChina has gained significant strategic advantages in Indonesia's energy sector by establishing extensive expertise in renewable and non-renewable energy projects. Their involvement in various segments, such as geothermal, hydropower, and coal-fired power plants, has strengthened their industry leadership and diversified their energy portfolio. This extensive footprint fosters solid partnerships with local stakeholders and enhances their competitive edge in the global market through diversified project funding, management, and execution capability .