Aly Monir Hamza Jeddah, Saudi Arabia
Planning Engineer +96654 896 4366
[email protected]PROFESSIONAL PROFILE:
• Have a BSc degree in Civil Engineering.
• Have 13 years of experience in the construction industry including Project Management, Construction
Management in mega projects, high-rise buildings, and steel structures - Stadium -.
• Have solid project management experience as I was Deputy project manager in the last project, which
considered a special project as I manage 7 main contractors and coordinate the work between them.
• Time management, multitasking, teamwork skills, detail -oriented, and proactive.
• AutoCAD, Revit, Primavera 6, MS Office.
Education:
• Bachelor’s Degree in Civil Engineering, Helwan University, Egypt. (2010)
• Project: Project Management
PROFESSIONAL EXPERIENCE:
Talal Kurdi Consultants, Jeddah, Saudi Arabia. March 2022 till now
Senior Planning Engineer
Project: ALJ compound Dari II Jeddah, KSA (Project Budget ≅ SAR 100 million)
Client: Abdul Latif Jamel
• Manage and oversee the day-to-day construction management of the project.
• Preparation of WBS & project coding structures and schedule baselines
• Insert the Resource loaded schedule for design, procurement, execution and project closure..
• Updating time schedule according to project progress for the client.
• Initiate and supervise periodic progress measurement and forecasting cycle for the project.
• Set a target goal required for all projects to be completed.
• Control the critical path and near critical path on the project.
• Issue detailed weekly reports for all projects present the weekly works status.
• Prepares project reports for Top Management, client, or others.
• Support the Project Manager for the preparation of the Projects Close-out Reports.
EHAF Consulting Engineers, Jeddah, Saudi Arabia. May 2018 March 2022
Planning Engineer.
Project: Prince Abdullah Al-Faisal Stadium expansion and renovation, KSA (Project Budget ≅ SAR 800 million)
Client: Ministry of Sports
• Preparing Baseline schedule for the entire Project Scope Approved from the client.
• Preparing Recovery schedule for the entire Project Scope Approved from client.
• Updating time schedule according to project progress for the client.
• Direct and manage the site team with short team plans with aggressive targets to catch up the baseline dates
• Review and monitor all relevant activities against separate Shop drawings, Procurement and Construction Programs as prepared by
contractors which are compatible with the approved Baseline schedule.
• Verify any technical changes required in variation orders prepared during the implementation of the projects, by preparing a special
report attached with the variation orders.
• Coordinate work between 7 main contractors in the same project which consider a great challenge to
keep the work going without disturbance.
• Prepare Delay Analysis for Extension of Time (EOT) and preparing recommendations to the top management Advise and assist
Project Director on the time impacts of instigating a change request and project issues.
• Ensuring the contractors are using materials and carrying out the work accordin g to the standards,
drawings, and project specifications.
• Monitoring the construction site for compliance with HSE regulations and standards.
EHAF Consulting Engineers, Makkah, Saudi Arabia.
Civil Engineer Jan 2015 – March 2018
Project: Jabal Omar Hotels, Central Area, Makkah, KSA (Project Budget ≅ SAR 3.5 billion)
Client: Jabal Omar for Development Company.
• Review all articles and clauses on the contract related to Time and Cost to be considered in preparing the
Baseline Schedule.
• Review schedules provided by the contractor.
• Updating time schedule according to project progress for the client
• Estimate cost for project resources.
• Reviewed& Approved the Design Drawings and submitted RFI’s to the Client if needed.
• Provided daily coordination between shop drawings.
• Monitored site work to ensure compliance with applicable plans, specification s, standards, codes,
regulations, requirements.
• Inspected the construction materials after supplying it to the project.
• Managed the inspections for the site activities with my managers.
• Carefully prepared daily oversight inspection reports.
Development Works Company
Senior Site Civil Engineer April 2014 - Dec.2014
Project: ALWASET School at TAIF, Saudi Arabia (Budget $ 12 Million)
Client: Ministry of Education.
• Sought out sites and organized facilities.
• Diligently checked and prepared site reports.
• Kept Inventory of the project quantities
• Strategically arranged the given task between the contractors.
• Handled concrete works and finishing.
• Prepared and submitted the shop drawings to the consultant for approval.
Site Engineer
Project: Housing for Electricity Co. Employee Riyadh, Saudi Arabia (Budget SAR 81.8 million)
Client: Ministry of Electricity.
• Oversaw all of the building work processes.
Oct 2013 – April 2014
• Consistently sought out sites and organized facilities.
• Kept inventory of the project quantities
• Appropriately arranged designated tasks between the contractors
• Managed concrete works & Finishing.
DETAC
Site Engineer May 2013 ـــOct. 2013
Project: Etisalat Misr Smart Village, Giza, Egypt (Budget $ 50 Million)
Client: Etisalat Egypt Company.
• Site Engineer (Etisalat Misr Headquarter - at Smart Village) / post-tension slab.
• Oversaw the setting out, leveling, and surveying of the site.
• Handled Concrete Works.
• Held responsibility for safety measures on-site.
• Established a perfect schedule for the purchase of equipment and raw materials.
• Oversaw the day-to-day management of the site, including supervising and monitoring of the site labor
force and the work of any subcontractors.
• Efficiently resolved any unexpected technical difficulties and ot her problems that may arise.
Me’mar AL Morshidy
Site Engineer & Technical Office Oct 2010 - May 2013
Project: Crystal Plaza Maadi, Egypt (9 Towers and Mall) (Budget $ 116 Million)
Client: Me’mar Al Morshidy
• Spearheaded the day-to-day management of the site, including supervising and monitoring the site labor
force and the work of any subcontractors.
• Planned the work and efficiently organized the plant and si te facilities and met agreed deadlines.
• Prepared reports as required. • Resolved any unexpected technical difficulties and other problems that
may arise.
• Sought out, leveled, and surveyed the site.
• Managed concrete Works.
• Ensured all materials and work performed met the required specifications.
• Checked plans, leveled sites and monitored contract design.
_____________________________________________________________________
Technical Skills:
• Autodesk AutoCAD.
• Autodesk Revit.
• Primavera 6.
• MS Office.