Report Week 13

The weekly safety statistics report summarizes safety performance for Week 13 of the Limak & Al-Ayuni Joint Venture project to construct the Neom Trojena Time Travel Tunnel and Depot. There were no reported injuries, fatalities, or high potential events during the week. A total of 348 workers were on site working 24,360 man-hours. 12 new safety observations were recorded during the week, with 10 closed and 2 remaining open. Safety training and engagement activities such as inductions, toolbox talks, and inspections were also conducted during the week.

Uploaded by

Farooq Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
307 views6 pages

Report Week 13

The weekly safety statistics report summarizes safety performance for Week 13 of the Limak & Al-Ayuni Joint Venture project to construct the Neom Trojena Time Travel Tunnel and Depot. There were no reported injuries, fatalities, or high potential events during the week. A total of 348 workers were on site working 24,360 man-hours. 12 new safety observations were recorded during the week, with 10 closed and 2 remaining open. Safety training and engagement activities such as inductions, toolbox talks, and inspections were also conducted during the week.

Uploaded by

Farooq Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

WEEKLY SAF

Contractor Name LAJV

Project Title Limak & Al-Ayuni Joint Venture – Neom Trojena Time Travel Tunnel, Depot

Department /Division HEALTH, SAFETY & ENVIRONMENT


PQP

Incidents Record FAT LTI MTC HPE

# of Incidents Recorded this Week 0 0 0 0

# of Incidents Recorded this Month 0 0 0 0

# of Incidents Recorded Year to Date (YTD) 0 0 0 0

# of Incidents Recorded Project to Date (PTD) 0 0 0 0

FAT - On-Job Fatality, LTI - Lost Time Injury/Illness Case, MTC - Medical Treatment Injury/Illness Case, HPE - H
Occupational Illness / Disease, , FAI - First Aid Injury Case, NM - Near Miss, UA - Unsafe Act, UC - U

Manpower / Manhours

Total Average Manpower this Week 348

Total Manhours this Week 24,360

Manhours this Month 131,400

Manhours Year to Date (YTD) 139,260

Manhours Project to Date (PTD) 139,260

Safe Manhours (without LTI) 139260


Contractor Site HS&E Staff Total HSE Manager

Number of Approved / Qualified HS&E Personnel On Site this


12 2
Week

Contractor Medical Staff Total Nurse Paramedic

Number of Approved / Qualified Medical Personnel On Site 11 2 4


this Week

Contractor Support Staff Total Traffic Coordinator Traffic Foreman

Number of Approved / Qualified traffic Personnel On Site this 0 0 0


Week

Safety Manager Mushtaq Ansari

Signature & Date #VALUE!

Note: This form (Weekly Safety Statistics Report [WSSR]) shall be completed/updated and signed by Con
WEEKLY SAFETY STATISTICS REPORT

Week No

Trojena Time Travel Tunnel, Depot & Vault Excavation Week Period

Contract/WO/SO

RWC OI/D FAI NM UA UC EI

0 0 0 0 2 10 0

0 0 0 0 2 10 0

0 0 0 0 2 10 0

0 0 0 0 2 10 0

tment Injury/Illness Case, HPE - High Potential Event, RWC - Restricted Work Case, OI/D -
Near Miss, UA - Unsafe Act, UC - Unsafe Condition, EI - Environmental Incident

This Week Average Head Count/ This Week Manhours / Worked


Manpower Hours

Manpower added 0
this week

Offsite 0 0

Site Directs 348 24,360

Site Indirects 0 0

Total 348 24,360


HSE Supervisor HSE Officer Environmental Manager

2 6 2

No of Ambulance
First Aid Room First Aiders Ambulance Driver

1 4
1 2

Mushtaq Ansari Contractor's Administrator M

#VALUE! Signature & Date #

completed/updated and signed by Contractor on weekly basis. It shall be submitted to NEOM/PMC safety representative every Friday before 5pm fo
13

Sat-Fri
03rd To 09th Feb 24

4800000946

Contractor Weekly Observations


New Observations Closed Open
Observations Observations
This Week
12 10 2

Human Development - This Week

No of Trainings No of Attendees No of Training


Conducted Hours

OSH Induction 8 83 332

Visitor induction 11 46 23

Trade/Technical 2 37 37
Management 0 0 0
Activity Briefing Forms 12 134 67
(ABF)

Tool Box Talks (TBT) 2 57 14

Contractor Engagement - This Week


# of OSH Inspection 11

# of OSH Meeting 1

# of OSH Audit 0

# Environmental 0
Monitoring
Mustafa

#VALUE!

sentative every Friday before 5pm for review and further handling.