979 240 170 228
LAYER 1
FROM NEW BOILER PIPE 5" SS 304 SMLS Sch.10S (FEED WATER BOILER) PIPE 5" SS 304 SMLS Sch.10S (FEED WATER BOILER)
PIPE 2" CS WLD Sch.40 (COMPRESSOR) PIPE 2" CS WLD Sch.40 (COMPRESSOR)
PIPE 2" CS WLD Sch.40 (DISEL INCOMING) PIPE 2" CS WLD Sch.40 (DISEL INCOMING)
PIPA GAS (OUTOFSCOPE) PIPA 8" GAS (OUTOFSCOPE)
980 240 170 211
A LAYER 2
PIPE 1" SS 304 SMLS Sch.10S (CONDENSATE RETURN)
200 PIPE 1" CS WLD Sch.40 (PIPE BLOWDOWN)
TO PLANT
PIPE 8" CS SMLS Sch.40 (STEAM TO HEADER COAL BOILER)
PIPE 6" CS SMLS Sch.40 (STEAM TO TF1)
220 350 280 240 510
SECTION A LAYER 2 B
LAYER 3
220 350 280 240 511
PIPE 1" SS 304 SMLS Sch.10S (CONDENSATE RETURN)
PIPE 1" CS WLD Sch.40 (PIPE BLOWDOWN)
FROM NEW BOILER
PIPE 8" CS SMLS Sch.40 (STEAM TO HEADER COAL BOILER)
PIPE 6" CS SMLS Sch.40 (STEAM TO TF1)
SECTION PIPE RACK GSM
0 24/1/2024 GSM AAJ R0 FOR CONSTRUCTION
NO. DATE ISSUED BY ISSUED TO REV DESCRIPTION
FROM NEW BOILER
TO PLANT
PROJECT :
AAJ PROJECT
SECTION B LAYER 3
OWNER :
CONTRACTOR :
PT. GREGAH SUKSES MANDIRI ENGINEERING
PIPE 5" SS 304 SMLS Sch.10S (FEED WATER BOILER)
TO PLANT
THIS INFORMATION OR DATA CONTAINED HEREIN IS PROPRETARY TO PT.GSME
AND IS NOT TO BE COPIED. REPRODUCED, DUPLICATED, OR DISCLOSED TO OTHERS,
PIPE 2" CS WLD Sch.40 (COMPRESSOR)
IN WHICLE OR IN PART, WITHOUT PRICR WRITTEN CONSENT OF PT.GSME
PIPE 1" SS 304 SMLS Sch.10S (CONDENSATE RETURN) C:\Users\GSME\Downloads\LOGO KAN-.png C:\Users\GSME\Downloads\LOGO bsi.png
C:\Users\GSME\Downloads\LOGO bsi.png
350 280 130 110 130 170 PIPE 2" CS WLD Sch.40 (DISEL INCOMING)
PIPE 1" CS WLD Sch.40 (PIPE BLOWDOWN) SIGN DATE
DRAWN BY PT GREGAH SUKSES MANDIRI ENGINEERING
PIPE 8" CS SMLS Sch.40 (STEAM TO HEADER COAL BOILER)
DESIGN BY PT ASIANAGRO AGUNGJAYA
PIPE 6" CS SMLS Sch.40 (STEAM TO TF1)
CHECKED BY PT ASIANAGRO AGUNGJAYA
APPROVED BY PT ASIANAGRO AGUNGJAYA
350 280 130 110 130 170
APPROVED PT ASIANAGRO AGUNGJAYA
PLANNING :
SHOP DRAWING
DRAWING TITLE :
PIPE SECTION
PIPE RACK MPS BOILER
SECTION PIPERACK EXISTING
DRAWING NO. : SHEET
AAJ-PR-MPS-001 2 3
A3