Rieco Pneumatic System Meeting Minutes

The minutes document the meeting between Meraki Projects and Rieco Industries regarding Rieco's pneumatic conveying system for Orifood And Beverages Pvt. Ltd. The minutes note several mechanical and instrumentation related deviations from the original plans, including changes to feed equipment, silo configurations, distances, and heights. Meraki requested that Rieco provide an I/O list, instrument data sheets, a separate I/O panel, and suggested using Ethernet/Profinet for weighing and VFD communication. The minutes will be considered confirmed unless a response is received within 48 hours.

Uploaded by

Prince Rajpoot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views3 pages

Rieco Pneumatic System Meeting Minutes

The minutes document the meeting between Meraki Projects and Rieco Industries regarding Rieco's pneumatic conveying system for Orifood And Beverages Pvt. Ltd. The minutes note several mechanical and instrumentation related deviations from the original plans, including changes to feed equipment, silo configurations, distances, and heights. Meraki requested that Rieco provide an I/O list, instrument data sheets, a separate I/O panel, and suggested using Ethernet/Profinet for weighing and VFD communication. The minutes will be considered confirmed unless a response is received within 48 hours.

Uploaded by

Prince Rajpoot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

ME R A K I P R OJ E C T S I NDI A P V T . L T D.

ARCHITECTS, ENGINEERS & INTERIOR DESIGNERS


A, 405-406, Kailas Business Park, Park Site, Vikhroli (West) Mumbai - 400079

Minutes of Meeting

Prepared by: Date: 20/10/2021


Priyanka Shivalkar (Manager Mechanical & Piping)
------------
Prepared for:
Orifood And Beverages Pvt. Ltd.

Sr. Prepared By Approved By Dated Revision Project No.


No. No.
1 Priyanka Mr. Manish Saxena 20th October 2021 R0 PSM- 21028
Shivalkar

CAPABALE, CONFIDENT & COMMITMENT


ME R A K I P R OJ E C T S I NDI A P V T . L T D.
ARCHITECTS, ENGINEERS & INTERIOR DESIGNERS
A, 405-406, Kailas Business Park, Park Site, Vikhroli (West) Mumbai - 400079

Project Orifood And Beverages Pvt. Ltd.


Subject Rieco-Pneumatic Conveying System

Recorded by Vishal Agnihotri

Company Discipline Name

Meraki Projects (INDIA) Pvt. Ltd. Consultant Mr. Vishal Agnihotri


Mrs. Priyanka Shivalkar
Mr. Vijay Katke
Mr. Mahamuni

Rieco Industries Ltd. Supplier Mr. Ashwin Jadhav


Mr. Sahajad

CAPABALE, CONFIDENT & COMMITMENT


ME R A K I P R OJ E C T S I NDI A P V T . L T D.
ARCHITECTS, ENGINEERS & INTERIOR DESIGNERS
A, 405-406, Kailas Business Park, Park Site, Vikhroli (West) Mumbai - 400079

No. Minutes Action by & Date

A review meeting was arranged in Meraki Office for approval of


Pneumatic Layout for Rieco – following deviations have been noted.

A MECHANICAL RELATED

1. Feed will be through screw conveyor & vibro sieve to day silo
Rieco
instead of Sack tip booth.

2. Fluidisation will be provided for Day Silo SMP & Day Silo WP. Rieco

3. Rieco is providing single feed screw conveyor instead of two feed


Rieco
screw conveyors for sachet feed silo to Multitrack sachet packing.

4. Blender to Blender distance changed to 1m instead of 1.4m. Rieco

5. FCS, SMP and WP dump hopper height is 1.1m instead of 0.6m. Rieco

B Instrumentation Related

1. MPIPL requested to share IO List based on P&ID’S. Rieco

2. MPIPL requested to share Instrument data sheets. Rieco

3. MPIPL suggested to have separate IO panel. Rieco

MPIPL Suggested to have Weighing system and VFD on


4. Rieco
Ethernet/Profinet communication.

Note: These minutes are official and automatically confirms if do not


responded. For any suggestions, additions, alterations,
interpretations, within 48hours to priyankas@[Link]

CAPABALE, CONFIDENT & COMMITMENT

You might also like