Environmental Monitoring Report 2023-2024

The environmental monitoring report summarizes compliance status from August 2023 to February 2024. Testing of soil, borewell water, drinking water, air, and vibration levels were conducted at locations in Saphale, Kelve, and Palghar. The results for all environmental components were within permissible limits for all months tested.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views1 page

Environmental Monitoring Report 2023-2024

The environmental monitoring report summarizes compliance status from August 2023 to February 2024. Testing of soil, borewell water, drinking water, air, and vibration levels were conducted at locations in Saphale, Kelve, and Palghar. The results for all environmental components were within permissible limits for all months tested.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

ENVIRONMENTAL MONITORING COMPILED REPORT

Environmental Monitoring Compliance Status (Aug-2023, Nov-2023, Feb-


2024) RIL
Sr.
Environmental Month, Year of
No Locations Status
Component Monitoring
.
Results are within the
August-2023 Saphale, Kelve
permissible limit
Kelve- Type III, Palghar Results are within the
1 Soil November-2023
Type II permissible limit
Results are within the
February-2024 Saphale, Kelve, Palghar
permissible limit
Results are within the
August-2023 Saphale, Kelve
permissible limit
Results are within the
2 Borewell Water November-2023 Saphale
permissible limit
Results are within the
February-2024 Saphale
permissible limit
Results are within
August-2023 Saphale, Kelve,
permissible limits
Kelve- Type III, Palghar- Results are within the
3 Drinking Water November-2023
Type II permissible limit
Kelve- Type III, Palghar- Results are within the
February-2024
Type II permissible limit
Results are within the
August-2023 Saphale, Kelve,
permissible limit
Kelve- Type III, Palghar- Results are within the
4 Air November-2023
Type II permissible limit
Saphale, Kelve- Type III, Results are within the
February-2024
Palghar- Type II permissible limit
Results are within the
August-2023 Saphale, Kelve
permissible limit
Saphale, Kelve- Type III, Results are within the
5 Vibration November-2023
Palghar-Type II permissible limit
Saphale, Kelve- Type III, Results are within the
February-2024
Palghar-Type II permissible limit