Proposed Development Architectural Drawings

This architectural drawing issued for construction shows plans and elevations for a proposed development at Plot 21 Prince O.U. Utuk Street in Uyo, Akwa Ibom State, Nigeria. The development highlights include an area of site of 1,885.236 square meters, an area of development of 531 square meters, and percentages of developed and undeveloped area. The drawing schedule lists 14 drawings including site plan, floor plans, roof plan, sections, and elevations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views15 pages

Proposed Development Architectural Drawings

This architectural drawing issued for construction shows plans and elevations for a proposed development at Plot 21 Prince O.U. Utuk Street in Uyo, Akwa Ibom State, Nigeria. The development highlights include an area of site of 1,885.236 square meters, an area of development of 531 square meters, and percentages of developed and undeveloped area. The drawing schedule lists 14 drawings including site plan, floor plans, roof plan, sections, and elevations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ARCHITECTURAL

CONSTRUCTION
DRAWING
ISSUED FOR
CONSTRUCTION

PROJECT

A PROPOSED DEVELOPMENT
AT

PLOT 21 PRINCE O.U. UTUK STREET, UYO LGA, AKWA IBOM STATE
CLIENT

TEVOLI ENTERPRISES LIMITED


JUNE, TWENTY' 23

GSPublisherVersion0.0.100.100
DRAWING SCHEDULE REVISIONS

00 DRAWING SCHEDULE A001

01 SITE PLAN A002

02 DETAILED FLOOR PLAN A003

03 CLEAR FLOOR PLAN A004

04 ROOF PLAN A005 PROJECT

A PROPOSED
05 SECTION Y-Y A006 DEVELOPMENT
AT

06 SECTION X-X A007 PLOT 21 PRINCE O.U. UTUK STREET,


UYO LGA, AKWA IBOM STATE

07 ELEVATION A008 CLIENT

TEVOLI ENTERPRISES LIMITED


08 ELEVATION A009 PROJECT ARCHITECTS:

IKANKE ABU
DRAWN BY:

BASSEY, PRECIOUS H. (gmnia)


09 ELEVATION A010 CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)


NO. 40 NSEFIK EYO LAYOUT,

A011
CALABAR

10 ELEVATION APPROVAL NUMBER:

11 DETAILS A012
DRAWING TITLE:

DRAWING SCHEDULE
12 DETAILS A013
SCALE:

A001
SHEET NUMBER:

N/A
13 SCHEDULE A014 DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
AKH442

1
3,47
DEVELOPMENT HIGHLIGHTS

1,33
AREA OF SITE 1885.236 SQM

8
7m
35.1

1,80
AREA OF DEVELOPMENT A 531 SQM

0
REVISIONS
37

37m
% OF DEVELOPED AREA 28.16% 33,9

26.
% OF UNDEVELOPED AREA 71.84%

19,600
SEL 80871

23,6
85
K
TAN 10
TER 31,3
WA

17,90
AD
E
0m
LIN
HE
ER
17.4

0
OV

ED
POS ENT SEL 80849
O
PR LOPM
VE
AKH 441
DE

2m
7.6
7,0
1,176 79
0
1,80
11,170

14.1
7m
Insitu concrete floor slabs placed PROJECT

with 75mm offset to adjacent with AKA 7455

A PROPOSED
white pebbles set in offsets.
89

5,50
15,3

0
Fence work, @ 2700mm height,

DEVELOPMENT
comprising of 500mm masonry 0
upstand and 2200mm Stainless 2,50
Steel Grills with grills opening not
more than 100mm. NOTE:
RY
NE AT
EE OT
GR GL
Increte floor complete with all
KIN plot 21 prince o.u. utuk street, UYO
29,784

accessories set to Architect's R 1. REFERENCE LEVEL OF +000 TO BE ESTABLISHED


PA
57m

specification and to Client's Design ON SITE IN ACCORDANCE TO EXISTING SITE


Preference 00 TOPOGRAPHY LGA, AKWA IBOM STATE
20,0
4 0m
25.

52. 2. SPOT LEVELS ON THE DRAWINGS ARE INDICATIVE


OF
SPOT DIFFERENCES ONLY AND SHOULD BE SET OUT
58
31,4 IN RELATION TO EXISTING SITE TOPOGRAPHY CLIENT

EE
N TRY
2,24
8 3. SITE REFERNCES OF +000 MUST BE AT LEAST TEVOLI ENTERPRISES LIMITED
SIT 150MM HIGHER THAN THE EXISTING ROAD
S.T PROJECT ARCHITECTS:
AKH 4400
9
60

0
6,00 IKANKE ABU
19,

GENERAL NOTES
S.A
.P D
1. KERBS-100X45Omm TOP EDGED BEVELLED CONC.
R =2 A KERB TO
DRAWN BY:
,500
G O ARCHITECT'S DETAILS BASSEY, PRECIOUS H. (gmnia)
ILDIN R
BU
8m

2. CAR PARK AND DRIVEWAY CONC. INTERLOCKING CHECKED BY:


6.8

S PAVING STONES ON SAND BED TO ARCHITECT'S


S DETAILS EXCEPT ARC. JOE ESSESSIEN (Fnia)
OTHERWISE STATED NO. 40 NSEFIK EYO LAYOUT,

AGREEMENT 71 E
22,3 3. GARDEN WALKWAY-STAMPED CONCRETE FLOOR
CALABAR
C
RY FINISH OF 1000X1000MM SLABS TO SPECIALIST
NE C
APPROVAL NUMBER:

AKA 7456 REE DETAILS


G A
I...................................................... 4. GREEN-TOPSOIL AND GRASS TYPE AS SPECIFIED
BY SPECIALIST
DO HEREBY AGREE TO BUILD 5. CAR PARK MARKING-ENAMEL PAINT OF
ACCORDING TO PLAN AND APPROVED COLOUR DRAWING TITLE:

SPECIFICATION HERE IN SUBMITTED 6. ALL EXTERNAL WORKS DRAWINGS PROVIDED BY


OTHER CONSULTANTS MUST SHOW LOCATIONS,
SITE PLAN
DETAILS AND SPECIFICATIONS OF ALL EXTERNAL
FEATURES-LIGHT FITTINGS, MANHOLES, CAR PARK
ETC SCALE:

A002
SHEET NUMBER:

SIGN ...................................... 1:250


7. ALL EXTERNAL WORKS DRAWINGS PROVIDED BY
OTHER DATE:

CONSULTANTS MUST BE READ IN CONJUCTION WITH


JUNE
DATE...................................... THIS SITE
PLAN 2023

GSPublisherVersion0.0.100.100
6
A B C D

Y
E F
REVISIONS
6,230 6,230 6,230 6,230 6,160
31,310
31,310
Window Note
830 1,500 1,800 1,500 1,431 1,500
Aluminium window
panels fixed from sill
1,800 1,500 1,430 1,500 1,800 1,500 1,430 1,500 1,800 1,500 1,430 1,500 1,730 1,500 830
@ +900 to beam level
@ +2400 to architects
specifications.
W2 W2 W2 W2 W2 W2 W2 W2 W2 W2
7
1,500

1,270

600 1,500 1,800 1,500 600 600 1,500 1,800 1,500 600 600 1,500 1,800 1,500 600 600 1,500 1,800 1,500 600 600 1,500 1,730 1,500 600

ROOM06
1,500

1,500

ROOM02 ROOM04
4,200

4,200

4,200

4,200

4,200
4,660

4,660
4,660
A: 24.906 m2
W2

2
A: 25.304 m 2 A: 25.200 m
ROOM03
Wall Note:
ROOM05 +600
+600 200mm conc. block walls with blok-lok
joint reinforcing every 3-courses as +600 Window Note
Aluminium window
A: 25.200 m2 per engineer specifications A: 25.200 m2 panels fixed from sill
@ +900 to beam level
1,430

6,000 +600 6,000 6,000 +600 6,000 5,930 @ +2400 to architects


specifications.
2,640

D2 D2 D2 D2 D2

6 W2 W2 W2 W2 W2 W2 W2 W2
PROJECT
D2

1,570

1,570

1,570

1,570
Wall Note:

2.400
A PROPOSED

1.500
+600 1.500

2,100

2,100
2,100
200mm conc. block walls with blok-lok
2,330

joint reinforcing every 3-courses as D1


2.400
per engineer specifications W2 +450
1,680 230 D1 230
1,500

300
W2

750

715
W3
4,200 5,890 2,170 3,000 1,878 682 1,200 3,000

DEVELOPMENT
D2
1,500 1,350 1,800 1,050
5
W2

1,045
815
6,000

ROOM01
2,930

SERVERRM.
1,430

1,500
W2

D2
1,500
15,920

A: 25.200 m2 +100 A: 5.360 m2 AT


GENERALSTORE
X X
1100mm balustrade comprising of

2,830
W2

1,200

1,200
W3
+600 +600
3,070

ROOM08
PLOT 21 PRINCE O.U. UTUK STREET,

4,200
500mm masonry upstand and 600mm
stainless steel hand rail - balustrade A: 18.473 m2
750
17,900

17,900
715
openings not more than 100mm
A: 25.200 m2
7 +600 +600 6 UYO LGA, AKWA IBOM STATE
1,500

815
W2

1,055
4,200 1,680 6,120 6,000 2,400 3,000 6,530
W2

1,500

1,500

1,500
2.400
4

1.500

W5

900
W2 W2
1,198

D1
F.DESK STORE

2,110

300
CLIENT
D2 RECEPTION A: 4.434 m2
TEVOLI ENTERPRISES LIMITED
D3

Door Note A: 3.800 m2


A: 13.290 m2

W5

900
3,540

10,290
F. TOILET Double swing double acting wooden
3,760

1,200

2,170

door, complete with all assessories.

2,930
D2
+600
W4

2
A: 9.114 m PROJECT ARCHITECTS:
3,700

+450
4,200 1,570 6,000 8,400 3,000 4,130
TOI.
2,400 IKANKE ABU

1,200

1,660
A: 8.499 m2
1,352

4,800

D3
+450
DRAWN BY:
ROOM07
BASSEY, PRECIOUS H. (gmnia)
3 A: 28.800 m2
D3

MULTIPRPOSE HALL D1

600
M. TOILET +600
6,780

W3

W6
1.500
2.400
Window Note
A: 56.952 m2
2,400
1,200

D2
D2
Aluminium window panels fixed from CHECKED BY:
A: 10.080 m2

1,800
W4

+600

W6
sill @ +900 to beam level @ +2400 to
ARC. JOE ESSESSIEN (Fnia)
2,100

Window Note

W2
architects specifications.
+450 Aluminium window panels fixed

1,401
370 380
1,330

3,000

3,000
from sill @ +500 to beam level @ +
2400 to architects specifications. NO. 40 NSEFIK EYO LAYOUT,
830

4,200 1,570 1,800 1,650 1,800 8,400 3,000 2,470 1,200


TOI. 2,400 CALABAR

2 W2 W2
+450
M. C. RM
A: 7.411 m2 A: 1.942 m2 F. C. RM APPROVAL NUMBER:

999
+450 A: 7.200 m2

2,280
220 220
1,980

1,980
1,980

230

230
1,800 1,280 1,800 1,280 1,800 W3 W5 W1

850
850
1 W2 W2 W2
185 185 380 450 450 DRAWING TITLE:

4,660 1,200 600 1,800 1,650 1,800 1,800 1,280 1,800 1,280 1,800 750 1,500 750 835 1,200 1,195 900 1,730 1,130
12,460 8,860 9,990
FLOOR PLAN
31,310
SCALE:

A003
SHEET NUMBER:

1:100
DATE:

JUNE
6
Y

2023

GSPublisherVersion0.0.100.100
A B C D E F
REVISIONS

ROOM03 ROOM04 ROOM05 ROOM06


ROOM02
A: 25.200 m2 A: 25.200 m2 A: 25.200 m2 A: 24.906 m2
2
A: 25.304 m

6 PROJECT

A PROPOSED
5
SERVERRM.
DEVELOPMENT
AT

A: 5.360 m2
GENERALSTORE
PLOT 21 PRINCE O.U. UTUK STREET,
A: 18.473 m2 UYO LGA, AKWA IBOM STATE
ROOM01 ROOM08
4 A: 25.200 m2 A: 25.200 m2

F.DESK CLIENT
RECEPTION STORE
A: 13.290 m2
A: 3.800 m2
A: 4.434 m2
TEVOLI ENTERPRISES LIMITED
F. TOILET
2
A: 9.114 m PROJECT ARCHITECTS:

TOI. IKANKE ABU


A: 8.499 m2 DRAWN BY:

BASSEY, PRECIOUS H. (gmnia)


3 M. TOILET
CHECKED BY:
A: 10.080 m2 ROOM07
A: 28.800 m2
ARC. JOE ESSESSIEN (Fnia)
NO. 40 NSEFIK EYO LAYOUT,
CALABAR
TOI.
2 M. C. RM
A: 7.411 m2 A: 1.942 m2 F. C. RM APPROVAL NUMBER:

A: 7.200 m2
MULTIPRPOSE HALL
A: 56.952 m2

1
DRAWING TITLE:

FLOOR PLAN (clear)


SCALE:

A004
SHEET NUMBER:

1:100
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
6
A B C D

Y
E F
6,230 6,230 6,230 6,230 6,160 REVISIONS

31,450

6,711 13,756 2,388 8,595

7
4,660

6,600

8,595
6 PROJECT

A PROPOSED
2,330

5
DEVELOPMENT
2,330

X X
AT
3,070

PLOT 21 PRINCE O.U. UTUK STREET,


7 6
18,040

18,040
UYO LGA, AKWA IBOM STATE

4
CLIENT

TEVOLI ENTERPRISES LIMITED


3,760

PROJECT ARCHITECTS:
7,130

IKANKE ABU

8,595
DRAWN BY:

BASSEY, PRECIOUS H. (gmnia)


3
CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)


2,100

NO. 40 NSEFIK EYO LAYOUT,


CALABAR

2 APPROVAL NUMBER:
1,980

1,980

850
1
12,460 12,230 6,760
DRAWING TITLE:

12,460 12,230 6,760


ROOF PLAN
31,450 SCALE:

A005
SHEET NUMBER:

1:100
DATE:

JUNE
6
Y

2023

GSPublisherVersion0.0.100.100
1 2 3 4 5 6 7 REVISIONS

1,980 2,100 3,760 3,070 2,330 4,660

ROOF LEVEL
+9140
0.77 GUAGE Longspan Aluminium Roofing Sheets
50mm x 50mm Thick Hardwood Purlins @450 Centre Spacing
100mm x 75mm Thick Hardwood Rafter @ 1200mm Centre Spacing
150mm x 75mm Thick Hardwood Struts @ 1200mm Centre Spacing
150mm x 75mm Tie Beam @ 1200mm Centre Spacing
50mm x 50mm Thick Hardwood Noggings @600mm Centre Spacing
4,443

4,443
D-03
PG. 13 PROJECT

A PROPOSED
DEVELOPMENT
PARAPET LEVEL
9,518

+5100
900

900
AT
CEILING LEVEL
+4150 PLOT 21 PRINCE O.U. UTUK STREET,

1,100
1,050
UYO LGA, AKWA IBOM STATE

1,150
600

POP ceiling finish, herein


POP ceiling finish, herein represented flat, final deisgn shall
represented flat, final deisgn be to Architect's Specification
shall be to Architect's
D-01 Specification
3,600

ENTRY PORCH RECEPTION LOBBY ROOM 05


3,550

3,550
1,500

1,500
4,175

CLIENT
PG. 12
TEVOLI ENTERPRISES LIMITED
2,700

2,400

PROJECT ARCHITECTS:

IKANKE ABU

1,000

1,600
DRAWN BY:

GROUND FLOOR
+600
BASSEY, PRECIOUS H. (gmnia)
CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)


NO. 40 NSEFIK EYO LAYOUT,
Mass Concrete Cast to Architect's CALABAR
300mm Hardcore compacted to specification as per Structural Drawing
Rammed Earth Backfilled to Construction Detailing
APPROVAL NUMBER:

Suffit of Hardcore Architect's specification.

DRAWING TITLE:

SECTION

SECTION Y-Y SCALE:

A006
SHEET NUMBER:

1:75
SECTIONAL VIEW DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
REVISIONS

A B C D E F

6,230 6,230 6,230 6,230 6,160 ROOF LEVEL


+9140
0.77 GUAGE Longspan Aluminium Roofing Sheets
50mm x 50mm Thick Hardwood Purlins @450 Centre Spacing 0.77 GUAGE Longspan Aluminium Roofing Sheets
100mm x 75mm Thick Hardwood Rafter @ 1200mm Centre Spacing 50mm x 50mm Thick Hardwood Purlins @450 Centre Spacing
100mm x 75mm Thick Hardwood Rafter @ 1200mm Centre Spacing
2,700

150mm x 75mm Thick Hardwood Struts @ 1200mm Centre Spacing


150mm x 75mm Tie Beam @ 1200mm Centre Spacing 150mm x 75mm Thick Hardwood Struts @ 1200mm Centre Spacing PROJECT

50mm x 50mm Thick Hardwood Noggings @600mm Centre Spacing 150mm x 75mm Tie Beam @ 1200mm Centre Spacing

A PROPOSED
50mm x 50mm Thick Hardwood Noggings @600mm Centre Spacing

4,439
4,439
D-03
POP ceiling finish,
herein represented PG. 13

DEVELOPMENT
flat, final deisgn
shall be to
1,739

Architect's
Specification
AT
PARAPET LEVEL
+5100 PLOT 21 PRINCE O.U. UTUK STREET,
9,539
900

900
UYO LGA, AKWA IBOM STATE
1,500

CEILING LEVEL
+4150
1,100

1,100
1,050

1,050
100

100
SERVER CLIENT
1,750

5,100
ROOM 01 LOBBY COURT YARD ROOM 08 ROOM LOBBY GENERAL STORE
3,550

3,550

3,550

3,550

3,550
1,500

1,500

TEVOLI ENTERPRISES LIMITED


1,800

1,800
PROJECT ARCHITECTS:
500 600

IKANKE ABU
1,000

1,000
100

100
DRAWN BY:
GROUND FLOOR
1,100

1,100
+600 BASSEY, PRECIOUS H. (gmnia)
450

CHECKED BY:

Mass Concrete Cast to Architect's


specification as per Structural Drawing
Mass Concrete Cast to Architect's
specification as per Structural Drawing
ARC. JOE ESSESSIEN (Fnia)
Rammed Earth Backfilled to Rammed Earth Backfilled to 300mm Hardcore compacted to NO. 40 NSEFIK EYO LAYOUT,
Construction Detailing Architect's specification. Construction Detailing
Suffit of Hardcore Suffit of Hardcore CALABAR

APPROVAL NUMBER:

SECTION X-X D-04


PG. 13

SECTIONAL VIEW
DRAWING TITLE:

section
SCALE:

A007
SHEET NUMBER:

1:100
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
REVISIONS

A B C D E F

6,230 6,230 6,230 6,230 6,160


ROOF LEVEL PROJECT
+9140

A PROPOSED
DEVELOPMENT
AT

Parapet wall coping at 5o inward slope, PLOT 21 PRINCE O.U. UTUK STREET,
finished with coping flashing, see details
sheets for construction instructions. UYO LGA, AKWA IBOM STATE
PARAPET LEVEL
+5100

900
CEILING LEVEL
+4150

900
CLIENT

Pointing @ 75mm width and TEVOLI ENTERPRISES LIMITED

75
15mm deep, all to architect's
specification. PROJECT ARCHITECTS:

IKANKE ABU

4,200
DRAWN BY:

3,225
BASSEY, PRECIOUS H. (gmnia)
75 75
900 3,685 4,800 2,100 CHECKED BY:
GROUND FLOOR
+600 ARC. JOE ESSESSIEN (Fnia)
NO. 40 NSEFIK EYO LAYOUT,
CALABAR
Wall painting detail and Pointing @ 75mm width and
colour sectioning as 15mm deep, all to architect's APPROVAL NUMBER:

directed by Architect. specification.

FRONT VIEW
DRAWING TITLE:

ELEVATION
ELEVATION
SCALE:

A008
SHEET NUMBER:

1:100
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
REVISIONS

1 2 3 4 5 6 7

1,980 2,100 3,760 3,070 2,330 4,660


ROOF LEVEL
+9140

PROJECT

Parapet wall coping at 5o inward slope,


finished with coping flashing, see details
sheets for construction instructions.
A PROPOSED
DEVELOPMENT
AT

PARAPET LEVEL PLOT 21 PRINCE O.U. UTUK STREET,

150
+5100 UYO LGA, AKWA IBOM STATE

750
CEILING LEVEL
75 +4150
900

900
1,800 CLIENT

TEVOLI ENTERPRISES LIMITED


75

75
PROJECT ARCHITECTS:

Pointing @ 75mm width and IKANKE ABU


15mm deep, all to architect's DRAWN BY:
specification.
BASSEY, PRECIOUS H. (gmnia)
3,225

3,225
Wall painting detail and
colour sectioning as CHECKED BY:

directed by Architect. ARC. JOE ESSESSIEN (Fnia)


GROUND FLOOR NO. 40 NSEFIK EYO LAYOUT,
CALABAR
+600
APPROVAL NUMBER:

RIGHT VIEW
DRAWING TITLE:

ELEVATION
ELEVATION SCALE:

A009
SHEET NUMBER:

1:75
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
REVISIONS

7 6 5 4 3 2 1
4,660 2,330 3,070 3,760 2,100 1,980
ROOF LEVEL
+9140

PROJECT

Parapet wall coping at 5o inward slope,


A PROPOSED
finished with coping flashing, see details
sheets for construction instructions. DEVELOPMENT
AT

PLOT 21 PRINCE O.U. UTUK STREET,


UYO LGA, AKWA IBOM STATE
PARAPET LEVEL
+5100

CEILING LEVEL CLIENT

+4150
TEVOLI ENTERPRISES LIMITED
PROJECT ARCHITECTS:

IKANKE ABU
Pointing @ 75mm width and DRAWN BY:

15mm deep, all to architect's


specification. Wall painting detail and
BASSEY, PRECIOUS H. (gmnia)
colour sectioning as
directed by Architect.
CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)


NO. 40 NSEFIK EYO LAYOUT,
CALABAR

GROUND FLOOR APPROVAL NUMBER:

+600

Pointing @ 75mm width and


15mm deep, all to architect's

LEFT VIEW
specification.
DRAWING TITLE:

ELEVATION
ELEVATION SCALE:

A010
SHEET NUMBER:

1:75
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
REVISIONS

F E D C B A PROJECT

6,160 6,230 6,230 6,230 6,230 A PROPOSED


ROOF LEVEL
+9140
DEVELOPMENT
AT

PLOT 21 PRINCE O.U. UTUK STREET,


UYO LGA, AKWA IBOM STATE

CLIENT

PARAPET LEVEL TEVOLI ENTERPRISES LIMITED


+5100
PROJECT ARCHITECTS:

CEILING LEVEL IKANKE ABU


+4150
DRAWN BY:

BASSEY, PRECIOUS H. (gmnia)


CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)


NO. 40 NSEFIK EYO LAYOUT,
CALABAR

APPROVAL NUMBER:

GROUND FLOOR
+600

DRAWING TITLE:

ELEVATION
REAR VIEW SCALE:

A011
SHEET NUMBER:

1:100
ELEVATION
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
50MM HARDWOOD HANDRAIL
REVISIONS
12 MM DIA. STEEL ROD

75x10 STEEL FLAT RAILING BRICK WALL PLASTERED


50MM DIA.HARDWOOD HANDRAIL
75x16 STEEL FLAT SUPPORT
WELDED TO FIXING PLATE
15MM STEEL FIXING BRACKET
TO WALL AT APPROX .1000 CCs
AND RECESSED SADDLE FOR HANDRAIL
BOLTED TO WALL
STOVE ENAMELLED
500mm HEIGHT 225mm
SANDCRETE BLOCK UPSTART
STEEL COVER PLATE

SELECTED TILES
PROJECT

D-04 A PROPOSED
CONCRETE SLAB
BALUSTRADE DETAIL
DEVELOPMENT
AT

PLOT 21 PRINCE O.U. UTUK STREET,


UYO LGA, AKWA IBOM STATE

CLIENT

TEVOLI ENTERPRISES LIMITED


PROJECT ARCHITECTS:

0.77 GUAGE LONGSPAN ALUMINIUM ROOFING SHEETS IKANKE ABU


50mm x 50mm THICK HARDWOOD PURLINS @450 CENTRE SPACNIG
100mm x 75mm THICK HARDWOOD RAFTER @ 1200mm CENTRE SPACNIG MASS CONCRETE CAST TO ARCHITECT'S SPECIFICATION, DRAWN BY:

200
150mm x 75mm THICK HARDWOOD STRUTS @ 1200mm CENTRE SPACNIG
150mm x 75mm TIE BEAM @ 1200mm CENTRE SPACNIG
REFER TO STRUCTURAL DRAWING FOR CONSTRUCTION
DETAILING AND MIX-RATIO BASSEY, PRECIOUS H. (gmnia)
50mm x 50mm THICK HARDWOOD NOGGINGS @600mm CENTRE SPACING

450 450
CHECKED BY:
60MM THICK PRECAST CONCRETE COPING, 300mm HARDCORE COMPACTED TO
TO ARCHITECT'S SPECIFICATION. ARCHITECT'S SPECIFICATION
ARC. JOE ESSESSIEN (Fnia)
150 900 150

150

NO. 40 NSEFIK EYO LAYOUT,


100

REINFORCED CONC. SLAB CAST WITH WATERPROOFING CEMENT. SYN CALABAR


300
50
ROOF WATERPROOFING 1MM GROUTING TILING LIQUID GLASS REINFORCED CONCRETE
150
600

WATERPROOFING FASTENED WITH 100MM VERTICAL AND HORIZONTAL FOUNDATION WALL, SUSPENDED AT APPROVAL NUMBER:
300

FLASHING TO COVER JOINT 450MM


450

REINFORCED CONC.
CONTINUOUS BEAM 225mm SANDCRETE RAMMED EARTH BACKFILLED TO SUFFIT OF
HARDCORE
300 70 POP CEILNG FINISH, HEREIN REPRESENTED IN FLAT, FINAL
FOUNDATION WALL
DESIGN SHALL BE AS APPROVED BY CLIENT AND
SHALL BE TO ARC. KOMOLAFE OLATUNJIHITECT'S
SPECIFICATION DRAWING TITLE:

DETAILS
D-03 D-01 SCALE:

PARAPET DETAIL

A012
SHEET NUMBER:

ENTRY STEPS N.T.S


DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
REVISIONS

A
F L O O R P L A N (APPROACH)
notes

1 . 675 mm strip foundation footing


of225 mm thick@ approved depth

2. 225 mm solid blockwall for


foundation walls

A P P R OA C H E L E V A T I O N
PLAN OF SEPTIC TANK

S E C T I O N A- A

PROJECT

F L O O R P L A N (RIGHT-SIDE)
225mm THICK SANDCRETE
WITH 12 mm CEMENT
RENDERED BOTH SI DES
A PROPOSED
CONCRETE BASE150mm
THICK MIN .

INSPECTION CHAMBER DEVELOPMENT


AT

75mm REI NFORCED CONCRETE


325x25mm CAST IRON LIGHT PATTERN
INSPCTION CHAMBER SI NGLE SEAL
PLOT 21 PRINCE O.U. UTUK STREET,
SEPTIC TANK SOAKAWAY
PRECAST SLAB

UYO LGA, AKWA IBOM STATE


FITTED TUMBUKLESS AND KEYS

T Y P I C A L- S I D E E L E V A T I O N SIZES DIMENSIONS CAPACITY NO. OF SIZES INLET LEVEL TO BE DETERMINED ON SITE CONSOLIDATED BACKWALL

IN m2 USERS 225mm SOLID SANDCRETE


1 WALL ABOVE INLET LEVEL

2 2000 600 1200 1850 40 10 180x1800x1800 LOOSE RUBBLE OR BROKEN


BLOCKS FI LLING

3 2250 625 1200 1700 52.5 15 " 225mm HOLLOW BLOCKS ON EDGE

CLIENT
2250 650 1200 1900 60 20 " 150mm LAYER OR BROKEN STONE

5 2500 750 1200 2150 75 30 "


SOAKAWAY PIT SECTION
TEVOLI ENTERPRISES LIMITED
3000 1000 1200 2650 100 40 "
PROJECT ARCHITECTS:

F L O O R P L A N
IKANKE ABU
(REAR)
DRAWN BY:

50mm PRECAST CONCRETE OVER


REINFORCED WITH x.p.m 24
FALL IN LAST 3000mm
BEFORE S.T TO BE
(6-3000mm) BASSEY, PRECIOUS H. (gmnia)
G/L
300 450x450

WATER LEVEL
CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)


100mm PVC Pipe
INSPECTION CHAMBER ceramic ti les flush tank
C
500

D
PLAN OF SLAB NO. 40 NSEFIK EYO LAYOUT,
GROUND LEVEL
CALABAR
A

50mm PRECAST BAFFLE MANHOLE SECTION APPROVAL NUMBER:


SECTION OF WC THROUGH WALLS

SEPTIC TANK SECTION LAYED OR DOWELS

FENCE PLAN
SOAKAWAY DETAIL
DRAWING TITLE:

DETAILS
FENCE/ SOAK-AWAY DETAILS
SCALE:

A013
SHEET NUMBER:

N.T.S
DATE:

JUNE
2023

GSPublisherVersion0.0.100.100
DOORS AND WINDOWS SCHEDULE
REVISIONS

DOOR SCHEDULE

1,500 900 750

2,400
DOOR TYPE D1 - 1500 x 2400 D1 - 900 x 2400 D1 - 750 x 2400 PROJECT

NOS RQD 04 12 03 A PROPOSED


DEVELOPMENT
AT

PLOT 21 PRINCE O.U. UTUK STREET,


UYO LGA, AKWA IBOM STATE

CLIENT

TEVOLI ENTERPRISES LIMITED


PROJECT ARCHITECTS:

IKANKE ABU
DRAWN BY:

BASSEY, PRECIOUS H. (gmnia)


1,800 1,50 1,200 900 600
1,200 CHECKED BY:

ARC. JOE ESSESSIEN (Fnia)

450

450
NO. 40 NSEFIK EYO LAYOUT,

1,500
CALABAR
1,500
1,800

1,50

APPROVAL NUMBER:

DRAWING TITLE:

SCHEDULE
W1 - 900 x 1500 x 2nos W1 - 1800 x 1800 W2 - 1500 x 1500 W3 - 1200 x 1500 W4 - 900 x 450 W5 - 1200 x 450 W6 - 600 x 1500
SCALE:

WINDOW TYPE

A014
SHEET NUMBER:

N/A
DATE:

NOS. RQD. 01 07 23 04 02 02 02 JUNE