AHU & MAU Maintenance Schedule

Uploaded by

nizam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

ROASTER FOR AHU & MAU PREVENTIVE MAINTENANCE (2019)

JOB DESCRIPTION
MAU P-1 MAU P-2 AHU-P-1 & AHU-P-2
MONTH
TEAM TARGET DATE TEAM TARGET DATE TEAM TARGET DATE

JANUARY YUSOF/NAZRI 13.01.2019 YUSRI/SAIFUL 20.01.2019 SELAIMAN/DIN 27.01.2019

FEBUARY SELAIMAN/DIN 10.02.2019 YUSOF/NAZRI 17.02.2019 YUSRI/SAIFUL 24.02.2019

MARCH YUSRI/SAIFUL 10.03.2019 SELAIMAN/DIN 17.03.2019 YUSOF/NAZRI 24.03.2019

APRIL YUSOF/NAZRI 14.04.2019 YUSRI/SAIFUL 21.04.2019 SELAIMAN/DIN 28.04.2019

MAY SELAIMAN/DIN 12.05.2019 YUSOF/NAZRI 19.05.2019 YUSRI/SAIFUL 26.05.2019

JUNE YUSRI/SAIFUL 09.06.2019 SELAIMAN/DIN 16.06.2019 YUSOF/NAZRI 23.06.2019

JULY YUSOF/NAZRI 14.07.2019 YUSRI/SAIFUL 21.07.2019 SELAIMAN/DIN 28.07.2019

OGOS SELAIMAN/DIN 11.08.2019 YUSOF/NAZRI 18.08.2019 YUSRI/SAIFUL 25.08.2019

SEPTEMBER YUSRI/SAIFUL 15.09.2019 SELAIMAN/DIN 22.09.2019 YUSOF/NAZRI 29.09.2019

OCTOBER YUSOF/NAZRI 13.10.2019 YUSRI/SAIFUL 20.10.2019 SELAIMAN/DIN 27.10.2019

NOVEMBER SELAIMAN/DIN 10.11.2019 YUSOF/NAZRI 17.11.2019 YUSRI/SAIFUL 24.11.2019

DECEMBER YUSRI/SAIFUL 15.12.2019 SELAIMAN/DIN 22.12.2019 YUSOF/NAZRI 29.12.2019

JOB :

INCLUDED : :
a. Change new secondary filter.:
b. Tension check and physical condition of V-belt drives.
c. Physical check / cleaning and greasing of motor and pillow block.
d. Physical check and cleaning of centrifugal fan impeller, motorized valve, pressure / temperature gauge,

APPROVE BY : : VERIFIED BY : : PREPARED BY : :

APPROVE BY : MR HARUKI HOSODA APPROVE BY : MR MUHD RIDWAN APPROVE BY : MR MOHD NIZAM BIN TUMIJAN
POSITION : SR ENGINEERING MANAGER POSITION : ENGINEERING MANAGER POSITION : FACILITY SUPERVISOR
DATE : DATE : DATE :
ROASTER FOR AHU & MAU PREVENTIVE MAINTENANCE (2018)

JOB DESCRIPTION
MAU P-1 MAU P-2 AHU-P-1 & AHU-P-2
MONTH
TEAM TARGET DATE TEAM TARGET DATE TEAM TARGET DATE

JANUARY YUSOF/NAZRI 13.01.2018 YUSRI/SAIFUL 20.01.2018 SELAIMAN/DIN 27.01.2018

FEBUARY SELAIMAN/DIN 10.02.2018 YUSOF/NAZRI 17.02.2018 YUSRI/SAIFUL 24.02.2018

MARCH YUSRI/SAIFUL 10.03.2018 SELAIMAN/DIN 17.03.2018 YUSOF/NAZRI 24.03.2018

APRIL YUSOF/NAZRI 14.04.2018 YUSRI/SAIFUL 21.04.2018 SELAIMAN/DIN 28.04.2018

MAY SELAIMAN/DIN 12.05.2018 YUSOF/NAZRI 19.05.2018 YUSRI/SAIFUL 26.05.2018

JUNE YUSRI/SAIFUL 09.06.2018 SELAIMAN/DIN 16.06.2018 YUSOF/NAZRI 23.06.2018

JULY YUSOF/NAZRI 14.07.2018 YUSRI/SAIFUL 21.07.2018 SELAIMAN/DIN 28.07.2018

OGOS SELAIMAN/DIN 11.08.2018 YUSOF/NAZRI 18.08.2018 YUSRI/SAIFUL 25.08.2018

SEPTEMBER YUSRI/SAIFUL 08.09.2018 SELAIMAN/DIN 15.09.2018 YUSOF/NAZRI 22.09.2018

OCTOBER YUSOF/NAZRI 13.10.2018 YUSRI/SAIFUL 20.10.2018 SELAIMAN/DIN 27.10.2018

NOVEMBER SELAIMAN/DIN 10.11.2018 YUSOF/NAZRI 17.11.2018 YUSRI/SAIFUL 24.11.2018

DECEMBER YUSRI/SAIFUL 08.12.2018 SELAIMAN/DIN 15.12.2018 YUSOF/NAZRI 22.12.2018

JOB :

INCLUDED : :
a. Change new secondary filter.:
b. Tension check and physical condition of V-belt drives.
c. Physical check / cleaning and greasing of motor and pillow block.
d. Physical check and cleaning of centrifugal fan impeller, motorized valve, pressure / temperature gauge,

APPROVE BY : : VERIFIED BY : : PREPARED BY : :

APPROVE BY : MR HARUKI HOSODA APPROVE BY : MR MUSTAFA AMREE APPROVE BY : MR MOHD NIZAM BIN TUMIJAN
POSITION : ENGINEERING MANAGER POSITION : SR MAINTENANCE ENG POSITION : FACILITY SUPERVISOR
DATE : DATE : DATE :
JOB DESCRIPTION
MONTH

MONTH

Jan-18

Feb-18

Mar-18
Apr-18

May-18

Jun-18

Jul-18

Aug-18
Sep-18

Oct-18

Nov-18

Dec-18
ROASTER FOR AH

CUT THE FILTER

SELAIMAN/DIN

YUSOF/NAZRI

YUSRI/SAIFUL
SELAIMAN/DIN

YUSOF/NAZRI

YUSRI/SAIFUL

SELAIMAN/DIN

YUSOF/NAZRI
YUSRI/SAIFUL

SELAIMAN/DIN

YUSOF/NAZRI

YUSRI/SAIFUL

PREPARED BY :
:
:
APPROVE BY MR MOHD NIZAM BIN
TUMIJAN :
POSITION FACILITY SUPERVISOR
DATE:
FOR AHU & MAU FILTER

E FILTER

MAN/DIN

/NAZRI

/SAIFUL
MAN/DIN

/NAZRI

/SAIFUL

MAN/DIN

/NAZRI
/SAIFUL

MAN/DIN

/NAZRI

/SAIFUL

VERIFIED BY : :
:
APPROVE BY MR MUSTAFA AMREE
:
POSITION SR MAINTENANCE ENG
DATE:
PULL OUT DENT FILTER FROM FRAME

YUSRI/SAIFUL

SELAIMAN/DIN

YUSOF/NAZRI
YUSRI/SAIFUL

SELAIMAN/DIN

YUSOF/NAZRI

YUSRI/SAIFUL

SELAIMAN/DIN
YUSOF/NAZRI

YUSRI/SAIFUL

SELAIMAN/DIN

YUSOF/NAZRI

APPROVE B
:
APPROVE BY MR H
:
POSITION ENGINEE
DATE:
YEAR : 2018

OM FRAME
PROVE BY : :
:
OVE BY MR HARUKI HOSODA
:
ION ENGINEERING MANAGER
:
PUT NEW FILTER TO FRAME

YUSOF/NAZRI

YUSRI/SAIFUL

SELAIMAN/DIN
YUSOF/NAZRI

YUSRI/SAIFUL

SELAIMAN/DIN

YUSOF/NAZRI

YUSRI/SAIFUL
SELAIMAN/DIN

YUSOF/NAZRI

YUSRI/SAIFUL

SELAIMAN/DIN
ROASTER FOR AHU & MAU PREVENTIVE MAINTENANCE (2017)

JOB DESCRIPTION
MAU P-1 MAU P-2 AHU-P-1 & AHU-P-2

MONTH
TEAM TARGET DATE TEAM TARGET DATE TEAM TARGET DATE

SEPTEMBER SELAIMAN/DIN (10.9.2017) YUSRI/SAIFUL (17.9.2017) YUSOF/NAZRI (24.9.2017)

OCTOBER YUSOF/NAZRI (15.10.2017) SELAIMAN/DIN (22.10.2017) YUSRI/SAIFUL (29.10.2017)

NOVEMBER SELAIMAN/DIN (12.11.2017) YUSRI/SAIFUL (19.11.2017) YUSOF/NAZRI (26.11.2017)

DECEMBER YUSRI/SAIFUL (10.12.2017) YUSOF/NAZRI (17.12.2017) SELAIMAN/DIN (24.12.2017)

JOB INCLUDED : :
a. Change new secondary filter.:
b. Tension check and physical condition of V-belt drives.
c. Physical check / cleaning and greasing of motor and pillow block.
d. Physical check and cleaning of centrifugal fan impeller, motorized valve, pressure / temperature gauge,

::

APPROVE BY : : VERIFIED BY : : PREPARED BY : :

:
APPROVE BY MR HARUKI HOSODA :
APPROVE BY MR MUSTAFA AMREE :
APPROVE BY MR MOHD NIZAM BIN TUMIJAN
:
POSITION ENGINEERING MANAGER :
POSITION SR MAINTENANCE ENG :
POSITION FACILITY SUPERVISOR
DATE: DATE: DATE: