ROASTER FOR AHU & MAU PREVENTIVE MAINTENANCE (2019)
JOB DESCRIPTION
MAU P-1 MAU P-2 AHU-P-1 & AHU-P-2
MONTH
TEAM TARGET DATE TEAM TARGET DATE TEAM TARGET DATE
JANUARY YUSOF/NAZRI 13.01.2019 YUSRI/SAIFUL 20.01.2019 SELAIMAN/DIN 27.01.2019
FEBUARY SELAIMAN/DIN 10.02.2019 YUSOF/NAZRI 17.02.2019 YUSRI/SAIFUL 24.02.2019
MARCH YUSRI/SAIFUL 10.03.2019 SELAIMAN/DIN 17.03.2019 YUSOF/NAZRI 24.03.2019
APRIL YUSOF/NAZRI 14.04.2019 YUSRI/SAIFUL 21.04.2019 SELAIMAN/DIN 28.04.2019
MAY SELAIMAN/DIN 12.05.2019 YUSOF/NAZRI 19.05.2019 YUSRI/SAIFUL 26.05.2019
JUNE YUSRI/SAIFUL 09.06.2019 SELAIMAN/DIN 16.06.2019 YUSOF/NAZRI 23.06.2019
JULY YUSOF/NAZRI 14.07.2019 YUSRI/SAIFUL 21.07.2019 SELAIMAN/DIN 28.07.2019
OGOS SELAIMAN/DIN 11.08.2019 YUSOF/NAZRI 18.08.2019 YUSRI/SAIFUL 25.08.2019
SEPTEMBER YUSRI/SAIFUL 15.09.2019 SELAIMAN/DIN 22.09.2019 YUSOF/NAZRI 29.09.2019
OCTOBER YUSOF/NAZRI 13.10.2019 YUSRI/SAIFUL 20.10.2019 SELAIMAN/DIN 27.10.2019
NOVEMBER SELAIMAN/DIN 10.11.2019 YUSOF/NAZRI 17.11.2019 YUSRI/SAIFUL 24.11.2019
DECEMBER YUSRI/SAIFUL 15.12.2019 SELAIMAN/DIN 22.12.2019 YUSOF/NAZRI 29.12.2019
JOB :
INCLUDED : :
a. Change new secondary filter.:
b. Tension check and physical condition of V-belt drives.
c. Physical check / cleaning and greasing of motor and pillow block.
d. Physical check and cleaning of centrifugal fan impeller, motorized valve, pressure / temperature gauge,
APPROVE BY : : VERIFIED BY : : PREPARED BY : :
APPROVE BY : MR HARUKI HOSODA APPROVE BY : MR MUHD RIDWAN APPROVE BY : MR MOHD NIZAM BIN TUMIJAN
POSITION : SR ENGINEERING MANAGER POSITION : ENGINEERING MANAGER POSITION : FACILITY SUPERVISOR
DATE : DATE : DATE :
ROASTER FOR AHU & MAU PREVENTIVE MAINTENANCE (2018)
JOB DESCRIPTION
MAU P-1 MAU P-2 AHU-P-1 & AHU-P-2
MONTH
TEAM TARGET DATE TEAM TARGET DATE TEAM TARGET DATE
JANUARY YUSOF/NAZRI 13.01.2018 YUSRI/SAIFUL 20.01.2018 SELAIMAN/DIN 27.01.2018
FEBUARY SELAIMAN/DIN 10.02.2018 YUSOF/NAZRI 17.02.2018 YUSRI/SAIFUL 24.02.2018
MARCH YUSRI/SAIFUL 10.03.2018 SELAIMAN/DIN 17.03.2018 YUSOF/NAZRI 24.03.2018
APRIL YUSOF/NAZRI 14.04.2018 YUSRI/SAIFUL 21.04.2018 SELAIMAN/DIN 28.04.2018
MAY SELAIMAN/DIN 12.05.2018 YUSOF/NAZRI 19.05.2018 YUSRI/SAIFUL 26.05.2018
JUNE YUSRI/SAIFUL 09.06.2018 SELAIMAN/DIN 16.06.2018 YUSOF/NAZRI 23.06.2018
JULY YUSOF/NAZRI 14.07.2018 YUSRI/SAIFUL 21.07.2018 SELAIMAN/DIN 28.07.2018
OGOS SELAIMAN/DIN 11.08.2018 YUSOF/NAZRI 18.08.2018 YUSRI/SAIFUL 25.08.2018
SEPTEMBER YUSRI/SAIFUL 08.09.2018 SELAIMAN/DIN 15.09.2018 YUSOF/NAZRI 22.09.2018
OCTOBER YUSOF/NAZRI 13.10.2018 YUSRI/SAIFUL 20.10.2018 SELAIMAN/DIN 27.10.2018
NOVEMBER SELAIMAN/DIN 10.11.2018 YUSOF/NAZRI 17.11.2018 YUSRI/SAIFUL 24.11.2018
DECEMBER YUSRI/SAIFUL 08.12.2018 SELAIMAN/DIN 15.12.2018 YUSOF/NAZRI 22.12.2018
JOB :
INCLUDED : :
a. Change new secondary filter.:
b. Tension check and physical condition of V-belt drives.
c. Physical check / cleaning and greasing of motor and pillow block.
d. Physical check and cleaning of centrifugal fan impeller, motorized valve, pressure / temperature gauge,
APPROVE BY : : VERIFIED BY : : PREPARED BY : :
APPROVE BY : MR HARUKI HOSODA APPROVE BY : MR MUSTAFA AMREE APPROVE BY : MR MOHD NIZAM BIN TUMIJAN
POSITION : ENGINEERING MANAGER POSITION : SR MAINTENANCE ENG POSITION : FACILITY SUPERVISOR
DATE : DATE : DATE :
JOB DESCRIPTION
MONTH
MONTH
Jan-18
Feb-18
Mar-18
Apr-18
May-18
Jun-18
Jul-18
Aug-18
Sep-18
Oct-18
Nov-18
Dec-18
ROASTER FOR AH
CUT THE FILTER
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
PREPARED BY :
:
:
APPROVE BY MR MOHD NIZAM BIN
TUMIJAN :
POSITION FACILITY SUPERVISOR
DATE:
FOR AHU & MAU FILTER
E FILTER
MAN/DIN
/NAZRI
/SAIFUL
MAN/DIN
/NAZRI
/SAIFUL
MAN/DIN
/NAZRI
/SAIFUL
MAN/DIN
/NAZRI
/SAIFUL
VERIFIED BY : :
:
APPROVE BY MR MUSTAFA AMREE
:
POSITION SR MAINTENANCE ENG
DATE:
PULL OUT DENT FILTER FROM FRAME
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
APPROVE B
:
APPROVE BY MR H
:
POSITION ENGINEE
DATE:
YEAR : 2018
OM FRAME
PROVE BY : :
:
OVE BY MR HARUKI HOSODA
:
ION ENGINEERING MANAGER
:
PUT NEW FILTER TO FRAME
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
YUSOF/NAZRI
YUSRI/SAIFUL
SELAIMAN/DIN
ROASTER FOR AHU & MAU PREVENTIVE MAINTENANCE (2017)
JOB DESCRIPTION
MAU P-1 MAU P-2 AHU-P-1 & AHU-P-2
MONTH
TEAM TARGET DATE TEAM TARGET DATE TEAM TARGET DATE
SEPTEMBER SELAIMAN/DIN (10.9.2017) YUSRI/SAIFUL (17.9.2017) YUSOF/NAZRI (24.9.2017)
OCTOBER YUSOF/NAZRI (15.10.2017) SELAIMAN/DIN (22.10.2017) YUSRI/SAIFUL (29.10.2017)
NOVEMBER SELAIMAN/DIN (12.11.2017) YUSRI/SAIFUL (19.11.2017) YUSOF/NAZRI (26.11.2017)
DECEMBER YUSRI/SAIFUL (10.12.2017) YUSOF/NAZRI (17.12.2017) SELAIMAN/DIN (24.12.2017)
JOB INCLUDED : :
a. Change new secondary filter.:
b. Tension check and physical condition of V-belt drives.
c. Physical check / cleaning and greasing of motor and pillow block.
d. Physical check and cleaning of centrifugal fan impeller, motorized valve, pressure / temperature gauge,
::
APPROVE BY : : VERIFIED BY : : PREPARED BY : :
:
APPROVE BY MR HARUKI HOSODA :
APPROVE BY MR MUSTAFA AMREE :
APPROVE BY MR MOHD NIZAM BIN TUMIJAN
:
POSITION ENGINEERING MANAGER :
POSITION SR MAINTENANCE ENG :
POSITION FACILITY SUPERVISOR
DATE: DATE: DATE: