0% found this document useful (0 votes)
163 views19 pages

MM Weekend New

The document provides an overview of SAP S/4 HANA material management. It describes key concepts like master data, MRP, procurement cycles, pricing procedures, inventory management, subcontracting and integration with other SAP modules.

Uploaded by

Naveen Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views19 pages

MM Weekend New

The document provides an overview of SAP S/4 HANA material management. It describes key concepts like master data, MRP, procurement cycles, pricing procedures, inventory management, subcontracting and integration with other SAP modules.

Uploaded by

Naveen Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

SAP S/4 HANA MATERIAL MANAGEMENT

SAP S/4 HANA OVERVIEW

SAP – SYSTEMS APPLICATIONS PRODUCTS FOR DATA PROCESSING

R1
R2
R3
ECC – SUCCESSFUL PRODUCT – 20000
ERP CENTRAL COMPONENT
2025<SUNSET

DATABASE – SYBASE (FREE)


ECC – SYBASE ( IT CAN BE INSTALLED IN ANY DATABASE)
SAP  ORACLE

EHP’S
S/4 HANA – SAP BUSINESS SUITE 4 HIGH PERFORMANCE ANALYTIC
APPLIANCE

S/4 HANA  HANA DATABASE


IMD – IN MEMORY DATABASE  RAM – 128,256….
SAP S/4 HANA PROJECTS & METHODOLOGIES

1. GREEN FIELD IMPLEMENTATION -- FRESH

2. BROWN FIELD IMPLEMENTATION -- RESTART

3. ROLL OUT -- EXTENTION

4. SUPPORT – CUSTOMER CARE – ONLINE/OFFLINE

5. MIGRATION – ECC TO S/4 HANA

E2E EXPERIENCE

ECC –OLD – ASAP METHODOLOGY

ACCELERATED SAP METHODOLOGY

1. PROJECT PREPARATION – DECISION MAKER – AS IS TO BE

2. BLUEPRINT – PRESENT -- SIGNOFF

3. CONFIGURATION – SETUP + TEST

4. UAT – USER ACCEPTANCE TEST ( TRAINING + TEST CASES)

5. GO-LIVE -- HANDOVER
S/4 HANA -NEW – ACTIVATE METODOLOGY

1. PREPARE

2. EXPLORE

3. REALIZE

4. DEPLOY
SAP S/4 HANA ARCHITECTURE

SAP NAVIGATION

SAP --- PC –INSTALL COMPLETE PACKAGE OF SAP – 700GB

GUI – GRAPHICAL USER INTERFACE

SPRO – SAP PROJECT REF OBJECT


SAP REF IMG – SAP REF IMPLEMENTATION GUIDE
MASTER DATA’S OF SAP MM
 MATERIAL MASTER – RAW MATERIAL

MM01(CREATE)/MM02(CHANGE)/MM03(DISPLAY)

NUMBER RANGES 

INTERNAL  10005 TO 19999 (RAW MATERIAL)

EXTERNAL  RM00AS1012

BASIC UOM – STOCK -- NO

ORDER UOM – PO -- PAC

ISSUE UOM – PROD -- M

SALES UOM – BOX

HSN CODE – HARMONIZED SYSTEM NOMENCLATURE


MRP – MATERIAL REQUIREMENT PLANNING

CUSTOMER ORDER

-------------------MRP------------------------------

FG STOCK

PLANNED ORDER – PROD ORDER – MISSING PARTS

-------------------MRP---------------------------------

RM STOCK / EXISTING PO / EXISTING PR

PURCHASE REQUSITION – PO -- VENDOR

STANDARD PRICE – FG /SFG - 100

MOVING AVERAGE PRICE – 100+200/2=150 +150/2 = 150

100 --- 3 MONTHS --- 500

200

150
 BUSINESS PARTNER – VENDOR MASTER -- BP

VENDOR MASTER – MM – XK01

CUSTOMER MASTER – SD – XD01

EMPLOYEE MASTER – FI – FK01

MDG – MASTER DATA GOVERNANCE – ALL MASTER DATA

MDM – MASTER DATA MANAGEMENT

GENERAL DATA -- GENERAL

COMPANY CODE -- FINANCIAL

PURCHASING -- PURCHASE
 INFO RECORD – MATERIAL + VENDOR + PRICE

STANDARD – ME11 / ME12 / ME13

SUBCONTRACTING

CONSIGNMENT

PIPELINE

 SOURCE LIST – SOURCE DETERMINATION

ME01
P2P CYCLE (PROCUREMENT TO PAY)

PURCHASE REQUISTION – MANUAL / AUTO – ME51N/52N/53N

PR RELEASE (OPT)

CONVERT PR TO PO – MANUAL / AUTO ( NOT SUGGEST) (ME21N)

PO RELEASE (OPT) – RELEASE PROCEDURE

ACKNOWLEDGEMENT (OPT)

GOODS RECEIPT NOTE

QUALITY INSPECTION (OPT)

STOCK IN INVENTORY

-------------------------------------FICO…………………………………..

INVOICE VERIFICATION – 3 WAY MATCHING (PO+GRN+VI)

AP LEDGER

OUTGOING PAYMENT

SETTLEMENT / CLEARING

-------------------------------------------50%-------------------------------------------
RFQ
V1 -- QUOTE
V2 - Q
V3 – Q

ENTER ALL QUOTE DETAILS


RANKING METHOD  V1  10 RS

RFQ  PR  PO

ARIBA ??
CHRACTERISTICS
1 PLANT - 1000
2 DOC TYPE – DOMESTIC PO
3 NET PRICE -- >10000

CLASS – 1+2+3
SECOND HALF TOPICS

PRICING PROCEDURE

SCHEDULING AGREEMENT

CONTRACT

PHYSICAL INVENTORY MANAGEMENT

EXTERNAL SERVICE MANAGEMENT

MOVEMENT TYPES

SUBCONTRACTING

CONSIGNMENTS

PIPELINE

OUTPUT DETERMINATION - NACE

TEXT DETERMINATION

PARTNER DETERMINATION

INTEGRATIONS
PRICING PROCEDURE
CONDITION TABLES --
ACCESS SEQUENCE -- CONTROLLER
CONDITION TYPES – PRICE,DISCOUNT,P&F,INSURANCE…
CALCULATION SCHEMA -- STRUCTURE
SCHEMA GROUP -- KEY
SCHEMA DETERMINATION – KEY + PROCEDURE

OUTLINE AGREEMENT

CONTRACT – QUANTITY OR VALUE


ME31K,ME32K,ME33K

SCHEDULE AGREEMENT – QUANTITY OR VALUE / SCHEDULING


ME31L,ME32L,ME33L
PHYSICAL INVENTORY MANAGEMENT

SYSTEM STOCK VS PHYSICAL STOCK

MOTOR  10 NOS (PHYSICALLY)


MOTOR  15 NOS ( SYSTEM)  LEAD TIME  60 DAYS?

DEMAND  15 NOS  MRP RUN  STOCK IS AVAILABLE

PREREQUISTIES
STOP ALL MOVEMENTS ( IN,OUT,INTERNAL)
A PROPER PLAN

1. CREATE PI DOCUMENT – MI01

103821 – 9 nos

102945 – 0 nos

2. ENTER THE COUNT – MI04

3. DIFFERENCE POSTING – MI07


EXTERNAL SERVICE MANAGEMENT

MATERIAL MASTER ------ SERVICE MASTER (AC01)


BP ------------------------------- SAME
INFO RECORD --------------- CONDITION RECORD (ML51)
SOURCE LIST
|
|
MIGO ----------------------- ML81N ( SERVICE ENTRY SHEET)
|
|
MIRO --------------------- MIRO

PACKAGE SERVICES – MSS ( MODEL SERVICE SPECIFICATIONS)


SUBCONTRACTING / JOBWORK

NORMAL PURCHASE
PO  VENDOR  SEND  IN

JOBWORK
BODY OF THE CAR – SFG
STEEL PLATES - RM
RUBBER BEADINGS – RM

PP SIDE
BOM – CS03
ROUTING – CA03
PRODUCTION VERSION – C223
CONSIGNMENT PROCESS

PIPELINE PROCESS

MOVEMENT TYPES
RECEIPT – 101 , 501 , 561 , 701

ISSUE – 261 , 201 , 601

TRANSFER – 541 , 309 , SPECIAL MOVEMENTS

RETURN – 122 , 161


INTEGRATION WITH PP

 MRP

 Goods receipts / issues

 Stock availability check

INTEGRATION WITH SD

 TOR – Transfer of requirements

 Order delivery process

 Availability check

INTEGRATION WITH FICO

 Automatic Account determination

 Material costing  S OR MAP

 Material valuation class

INTEGRATION WITH QM

 Goods receipt inspection

 Stock transfer inspection

You might also like