PROPOSED CONSTRUCTION OF OFFICE BUILDING FOR MUFT OF ZANZIBAR
INTERIM CERTIFICATE NR 1
Client: THE PRESIDENT'S OFFICE, CONSTITUTION, LEGAL AFFAIRS, PUBLIC SERVICIES AND
GOOD GOVERNANCE.
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
A GENERAL MATTERS
TOTAL CARRIED -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
The Contractor's
attention is drawn to the
requirements for the
Samples
Samples of proposed
materials and
workmanship shall, if
required by the Project
Manager, be submitted for
approval, and those
samples will be left on
site by the Project Manager
who shall have power to
reject all such materials and
condemn such
workmanship that does not
correspond with the
approved samples. Samples
will include all types of
finishes, articles of
ironmongery and sanitary
A12 fittings
A13 Trade names
A14 All references in these
TOTAL CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
TOTAL CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
A18 Overtime - -
The Contractor shall
allow in his tender for any
A19 extra
to thecosts for only
extent overtime
of the - -
A20 additional net cost of
A21 unproductive time
payable over and above
the basic hourly rates
as laid down in the
regulations affecting the
wages and conditions of
employment, etc. in the
construction industry
but excluding any bonuses,
profits and overheads.
Housing labour on site
No labour, with the
exception of watchmen,
may be housed on the site
and the Contractor must
allow for all costs in
moving labour to and
from the site at such
times and by routes
approved by the Police and
Local Authorities.
TOTAL CARRIED - -
FORWARD TO
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
TOTAL CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
B TEMPORARY WORKS
TOTAL CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
C WORK BY PUBLIC
BODIES OR
NOMINATED
SUBCONTRACTORS
C1 OR GOODS
Prime AND
cost (P.C.) items - -
The words “Prime Cost”
(or the initials “P.C.")
Wherever appearing in
these Bills of Quantities,
shall mean net cost
exclusive of any trade,
cash or other discount
whatsoever but inclusive of
necessary to show the - -
details of the sums actually
paid.
C2 Any sum added by the
Contractor in these Bills of
Quantities in respect of
profit upon any Prime Cost
sum will be deducted at the
All such invitations shall - -
contain a stipulation that
the quotations must state a
guaranteed time for
delivery or fixing, as the
case may be, from the date
when the particulars are
supplied. In the case of
materials to be delivered
on the site in bulk, the
person, firm or company
quoting must guarantee
the delivery of the
TOTAL CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
C3 Nominated subcontractors - -
The Contractor shall be
responsible for supplying
all Nominated
Subcontractors with
sufficient information to
enable themSubcontractors
Nominated to prepare
- -
shall be responsible for
(unless specifically
mentioned under Special
Attendance):-
The cost of any
necessary alteration to
or re-erection of
the Contractor’s ordinary
scaffolding which may
be required by them to
carry out their work.
Special scaffolding
Provision, erection and
removal of workshops,
sheds, etc., for the
storage of materials or
plant where the nature of
the materials or plant are
such that they may be
damaged by inclement
weather, or other
buildings for their
employees, workmen and
materials.
Provision of all necessary
TOTAL CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
C4 Nominated suppliers - -
The Contractor shall be
responsible for placing all
C5 having received them in - -
good order and
condition. He shall load,
transport to
site, unload, return any
packing materials if
required, hoist, provide
safe storage and be
responsible for any loss or
damage or replacement
of any such lost or
damaged articles at his own
expense.
Provision is made in
these Bills of Quantities
following each
appropriate P.C. Sums for
the cost of the foregoing
services against items
reading "Take delivery
and fix only".
General Attendance on
Nominated
Subcontractors, local
authorities and public
undertakings
The Contractor shall
provide "general
attendance" which shall
be deemed to include
arranging with Local
Authorities,
TOTAL Public
CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
C6 General Attendance on - -
Nominated
Subcontractors, local
authorities and public
undertakings
The Contractor shall allow
for all costs arising from
no contiguous work by the - -
Contractor for which
scaffolding would
generally be used.
Notwithstanding the
absence of a reference
to special scaffolding, the
Contractor is to allow in
the item for attendance for
the provision of
scaffolding for the
Subcontractor if the
method of scaffolding he
C7 proposes to use for
contiguous work
would not provide
adequate scaffolding
for the Subcontractor's
work described, due
consideration being given
to the period of the
contract at which the
Subcontractors work will
be carried out.
Power shall include for
the provision of a single
phase electric power
supply, with
TOTAL socket outlets
CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
C8 Fixing only - -
Fixing only items to be
supplied under Provisional
and fixing by methods
required for each particular
item
D PROTECTION AND
CLEANING THE
WORKS
D1 Protection of works - -
The Contractor shall
allow for and provide
and/or maintain during
the execution of the
Works all shoring,
Any damage and/or - -
settlement that may be
caused arising out of or
directly or indirectly
consequent upon the
aforesaid protective
measures or the lack
thereof or the carrying out
of the Works is to be
made good by the
Contractor at his own
expense to the
satisfaction of the Project
Manager and all other
parties concerned.
The Contractor shall
cover up and protect all
finished work liable to
damage including
provision of temporary
roofs, gutters, drains,
etc., until
TOTAL the
CARRIED - -
FORWARD TO
COLLECTION
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
D2 Removal of plant, rubbish, - -
etc
The Contractor shall,
upon completion of the
D3 Works removeofand
Final cleaning clear a
building - -
nd site
Before handing over any
building the Contractor
shall properly clean all
floors and finished
surfaces, clean glass
inside and outside and
leave all sanitary and
other appliances in full
working order. He shall
also cut and weed all
grassed areas clean down
external steps, paths and
roads and leave the
whole in perfect
condition ready for
occupation.
TOTAL CARRIED - -
FORWARD TO
ITEM DESCRIPTION UNIT TENDER PREVIO TO TO RATE E TENDER AXE PREVIOUS TO DAY CXE TO DATE DXE
US B DAY C DATE BXE
D
COLLECTION 3,000,000
Page 1/1
Page 1/3 -
Page 1/4 -
-
-
Page 1/5 -
-
Page 1/6 -
Page 1/7 -
-
Page 1/8 --
-
Page 1/9 -
Page 1/10 -
-
Page 1/11 -
-
Page 1/12 11,000,000
-
Page 1/13 -
-
Page 1/14 -
Page 1/15 --
-
Page 1/16 -
-
Page 1/17 -
-
Page 1/18 -
-
TOTAL CARRIED - - 15,000,000
FORWARD TO
GENERAL SUMMARY
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
ELEMENT NO. 1
Carefully demolish, remove existing parapet wall
A Item 1 0 1 1 5,000,000 5,000,000 - 5,000,000 5,000,000
and prepare the surface to receive new works.
Overall area 88 sqm
TO SUMMARY 5,000,000
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
ELEMENT no 2
FRAMES
TO SUMMARY 8,986,600
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
ELEMENT no. 4 0 - - - - -
WALLING AND PARTITION
Solid concrete blockwork to BS 6073
type 'A" bedded and jointed in
- 1
cement and sand mortar (1:4 )
100mm Thick wall
A M2 45,000
D Window capping in instu concrete M 182 0 182 1 100,000 18,200,000 - 18,200,000 18,200,000
grade '20' weathered; once throated;
reinforced as necessary; including
formworks
TO SUMMARY 100,246,000
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
H 15 x 25mm; fixing with screws, one m 146 0 146 1 50,000 7,300,000 - 7,300,000 7,300,000
labour
Architraves -
TO COLLECTION 144,390,000
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
ELEMENT no. 5
DOORS Cont'd
IRONMONGERY; SUPPLY AND `
FIX; AS PER HAFELE
Door closer with matching screws
Adjustable door closer DCL 110 (with Nr 0 56 100,000 5,600,000 - 5,600,000 5,600,000
standard arm) [Link].931.84.229 56 1
A
Floor door stop
102 x 76 x3mm stainless steel butt Nr 198 0 198 100,000 19,800,000 - 19,800,000 19,800,000
C 1
hinges. [Link].926.90.203
[Link] 75mm; Gentlemen Nr 0 6 50,000 300,000 - 300,000 300,000
[Link]. 987.20.010 6 1
D
[Link] 75mm; Ladies Nr 0 4 50,000 200,000 - 200,000 200,000
[Link]. 987.20.020 4 1
E
Two lever mortice Dead lock set with Nr 0 56 100,000 5,600,000 - 5,600,000 5,600,000
56 1
F escucheon plates
Barrel bolt [Link] 102mm Nr 0 132 50,000 6,600,000 - 6,600,000 6,600,000
132 1
G [Link]. 911.62.704
[Link] 75mm; Nr 0 10 50,000 500,000 - 500,000 500,000
Handicapped [Link].987.20.040 10 1
H
Baithroom/toilet lockset; with Nr 0 10 100,000 1,000,000 - 1,000,000 1,000,000
10 1
J indicator bolt. CAT. No.911.22.511
Supply and fix complete set - - - -
aluminium door including frames
size 100 x 60mm, 6mm thick clear
Overall size 750mm x 2600mm high Nr 0 - 700,000 - - - -
- 1
K
Metal grill
TO COLLECTION 42,900,000
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
Collection
D
O
C
O
PAGE 2/5 144,390,000
TO SUMMARY - 187,290,000
ITEM DESCRIPTION UNIT PREVIO TO DAY C RATE E TENDER AXE PREVIO TO DAY CXE TO DATE DXE
US B TO US BXE
TENDER A
DATE D
C
O
PRELIMINARIES 15,000,000
DEMOLITION - 5,000,000
FRAME 210,356,600
DOORS 187,290,000