0% found this document useful (0 votes)
57 views1 page

AC Installation Quotation by APM

The document provides a quotation for dismantling and installing an AC unit including preparation, materials, and labor. It lists the materials needed, quantities, unit prices, and total costs. The total cost is Rp 232,434,000 with payment required within 30 days of project completion.

Uploaded by

yayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

AC Installation Quotation by APM

The document provides a quotation for dismantling and installing an AC unit including preparation, materials, and labor. It lists the materials needed, quantities, unit prices, and total costs. The total cost is Rp 232,434,000 with payment required within 30 days of project completion.

Uploaded by

yayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GENERAL SUPPLIER, MAINT. SERVICE, SPARE PART.

APM
PT ARIFA PERDANA MANDIRI
www.arifaperdanamandiri.co.id
Alamat

Email
Telepon
: JL. PILAR IMANAN DESA SERANG RT 008 RW 002 KEC. CIKARANG SELATAN
KAB. BEKASI, JAWA BARAT
: [email protected]
: 0895 3604 1762 1

QUOTATION
Project : Bongkar Pasang Instalasi Unit AC QTY : 1 LOT
Draw : Customer PIC : Eko Ari Wibowo
Cust : PT SAMATOR TAIYO NIPPO SANSO INDONESIA PROVIDER : PT. ARIFA PERDANA MANDIRI
PIC. : Mrs
: Silvana Purnamasari DATE : 29 Agustus 2023
Telp. : +62 21 29568064 NO : QUO2023/APM-STNSI/VIII/063
Email : [email protected]

QTY MATERIAL COST


NO DESCRIPTION
VOL SAT U/PRICE AMOUNT ( IDR )
A Preparation

Persiapan untuk safety dan alat equipment 1 lot Rp 5.000.000 Rp 5.000.000


Mob Demob 1 lot Rp 5.000.000 Rp 5.000.000
Finishing 1 lot Rp 4.800.000 Rp 4.800.000

Sub Total A Rp 14.800.000

QTY MATERIAL COST


B MATERIAL SUPPORT
VOL SAT U/PRICE AMOUNT

1 Pipa Hoda 1/4 + 5/8 175 m Rp 225.000 Rp 39.375.000


2 Kabel EXTRANA 3x1,5 5 Roll Rp 1.250.000 Rp 6.250.000
3 Unit AC Daikin 1 PK Made in Thailand 2 Pcs Rp 6.125.000 Rp 12.250.000
4 Unit AC Daikin 2 PK Made in Thailand 11 Pcs Rp 9.106.250 Rp 100.168.750
5 Duck Tape 80 Pcs Rp 8.750 Rp 700.000
6 Paku Beton 1 Box Rp 112.500 Rp 112.500
7 Dynabolt 13 Pcs Rp 18.750 Rp 243.750
8 Bracket 13 Pcs Rp 187.500 Rp 2.437.500
9 Armaflex 70 Pcs Rp 62.500 Rp 4.375.000
Sub Total B Rp 165.912.500

QTY MATERIAL COST


C OTHER SUPPORT
UNIT VOL U/PRICE AMOUNT ( IDR )
1 Pekerjaan Bongkar Unit AC 1 Lot Rp 10.000.000 Rp 10.000.000

2 Pekerjaan pemasangan AC 1 Lot Rp 18.687.500 Rp 18.687.500

3 PICK UP & DELIVERY 1 Lot FREE FREE


Free Pengiriman
Sub Total C Rp 28.687.500

GRAND TOTAL A+B+C Rp 209.400.000


PPN 11% Rp 23.034.000

TOTAL Rp 232.434.000
NOTE :

1. Mode Of Payment
TRANSFER TO Bank, any Bank changes borne by customer
2. Payment

Upon PROJECT Complete 30 Days


3. DELIVERY

1 Weeks after PO
4. VAT

Not Included
5. QUOTATION VALIDITY

2 Weeks And Quotation Will Review Upon Comfirm Project

PLEASE COMFIRM YOUR ACCEPTANCE BY PT ARIFA PERDANA MANDIRI


RETURN EMAIL OR INDICATE P/O NUMBER

EKO ARIWIBOWO
COMPANY STAMP & SIGNATURE Marketing Div

You might also like