Construction Project Timeline and Coordination

Uploaded by

desinestudio9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views3 pages

Construction Project Timeline and Coordination

Uploaded by

desinestudio9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

24.08.

2022 Gas connection


26.0.2022
3.09.2022 paint work
4.9.2022 smoke detection system
6.10.2022
HVAC procurement
9.9.2022 Mandir flooring work
30.9.2022 Stone return
9.10.2022
12.10.2022
9.10.2022 Main door opening
11.10.2022 Slab return
16.10.2022 Vanity Stone work

18.10.2022 Painter work


19.10.2022 Security
21.10.2022 HVAC coordination
30.10.2022 Door fixing
Livspace supply
18.11.2022 verification
12.12.2022 wooden flooring installa
11.1.2023 Tubelight installation
16.1.2023 Vanity Stone work
19.1.2023 Renders submission
10.2.2023 Soldering LED Strips
11.2.2023 Balcony broken glass re
17.2.2023 Jet spray modification
27.2.2023 Fixing of geysers
1.4.2023
5.4.2023
7.3.2023 Plumber service
17.3.2023 Universal socket installa
Client scope as piped gas will be available there.
Client appreciation
Paint was already part of from initial stage. After start of work, we had to demobilize site upon Client
We secured 3 quotation, negotiated and requested client to finalize and place order

We secured 3 quotations, negotiated and requested client to finalize and place order
Corrected
Client Scope. Coordination work for return material done by us.

Coordination with Builder


Client Scope. Coordination work for return material done by us.
Client Scope. Coordination work for inspection and corrective action done by us.
Client Scope. Messy work. Putty all over flooring. While cleaning at final stages put scratches on
tiles
Multiple agencies at work. Painter (Client vendor) did not report damage to door and left entry open
We coordinated HVAC (client vendor) asking to get the ac grills painted black by Painter(client vendor
Coordination with Builder
Client requested us to verify the contents of Livspace deliveries. We politely suggested it is packed
and Livspace responsibility
Client scope. Coordination done by us
Extra Work done by us
We coordinated with Stone(Client Vendor) for installation despite delays.
Requested by Client during later part of execution, politely declined by us.
Done by our Electrician
Coordination with Builder
Extra Work done by us
By fabrication vendor for 2 geysers in shaft area

Additional pipe material used for welding bracket of 2 geysers in shaft as walls are weak
Coordination with Builder
Extra Work done by us
Cost incurred. Not reimbursed
Out of Scope Service

Out of Scope Service.

Out of Scope Service

Out of Scope Service


Out of Scope Service
Out of Scope Service

Out of Scope Service


Corrected by us.
Out of Scope Service
Out of Scope Service

Out of Scope Service


Out of Scope Service
Out of Scope Service
Out of Scope
Out of Scope Service
Out of Scope Service
Out of Scope Service

Cost incurred. Not reimbursed


Out of Scope Service
Out of Scope Service