0% found this document useful (0 votes)
37 views1 page

Bar Bending Schedule for Canopy Foundation

Bar Bending Schedule

Uploaded by

ahamedthousif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views1 page

Bar Bending Schedule for Canopy Foundation

Bar Bending Schedule

Uploaded by

ahamedthousif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT : MITTAL MAIN GATE - 1 CANOPY FOUNDATION

BAR BENDING SCHEDULE


DEVELOPMENT
BBS - FOUNDATION LENGTH
Reference Drawaing details
BBS Code
Location Mittal Main Gate-1 M25 54D S. No. 2

Level 1 M30 50D Drg. No. 2

Structure Details Canopy foundation M35 44D Particulars

Concrete Grade 35 M40 40D Revision

Dimension In MM standard Net


No. of Bars Per No. of Total Cutting
Location/G Dia Of Bar No Of No Of SHAPE lap Laps Nos of Bend Net Length in
S. No. Partiiculars Member Bars Per No. Shape Length in
RID NO. MM Member SET CODE Nos of length(IN length bend Deduction M=
(theortical) Member Of Bar a b c meter 16 22 25 32 RAMARKS
laps MM) (in mm)

Bottom With epoxy


1 200 22 2 6 10.00 10.00 120 200 560 1860 560 1100 2 88 2.89 347.04 - 347.04 - -
coated 22 mm rebar
Top With epoxy coated
2 201 16 2 6 10.00 10.00 120 200 560 1860 560 800 2 64 2.92 349.92 349.92 - - -
16 mm rebar

Connetion Bar (epoxy


3 202 16 6 6 4.00 4.00 144 201 100 200 100 800 2 64 0.34 48.38 48.38 - - -
coated 16mm)

Pedestal Bar ( Epoxy


4 203 25 1 6 12.00 12.00 72 111 400 1706 1250 1 50 2.06 148.03 - - 148.03 -
coated 25 mm)

Total Length (RM) 398.304 347.040 148.032 -

Unit Wt. 1.580 2.470 3.850 6.310

Total Weight in Kg 629.320 857.189 569.923 - 2056

Total Weight (In MT) = 2.06 2.056


Prepaired BY ( ) APPROVED BY ( )