0% found this document useful (0 votes)
98 views3 pages

Ship Operations and Emission Records

Uploaded by

alekseyhandsome
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views3 pages

Ship Operations and Emission Records

Uploaded by

alekseyhandsome
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

REGISTRO DE OPERACIONES /

PUNTO FIRMA DE OFICIALES


FECHA CODIGO (LETRA)
(NUMERO) EMCARGADOS
Date Code (letter)
Item (number) Record of Operations/signature of
Officials in charge
10th Aug R-22 (2kg) leaked from Provision Fridge Compressor to the
PART III - A 1.3.2 atmosphere (not deliberately)Ships position: 35-23.0 N/150-38.0E
2010

//Signature of Engineer in Charge – Name / Rank // & //Date//


11th Aug Renewed discharging valve of Provision Fridge Compressor
PART III - A 1.2
2010 Ships position: 35-23.0 N/150-38.0E
11th Aug Charged R-22(4kg) to Provision Fridge Compressor
PART III - A 1.1
2010 Ships position: 35-23.0 N/150-38.0E Ozone
Discharged R-22 (1/2kg) from Provision Fridge Compressor to depleting
11th Aug
PART III - A 1.3.1 the atmosphere deliberately for purging substances
2010
Ships position: 35-23.0 N/150-38.0E

//Signature of Engineer in Charge – Name / Rank // & //Date//


15th Aug Discharged R-22(15Kg) to the shore facility
PART III - A 1.4
2010 Ships position: 35-23.0 N/150-38.0E
15th Aug Received R-22 (20kb) onboard
PART III - A 1.5
2010 Ships position: 35-23.0 N/150-38.0E
//Signature of Engineer in Charge – Name / Rank // & //Date//

16th Sept Singapore


H 26.1
2010
H 26.2 Started 0900 LT / Finished 1800 LT
IFO380 3500.00 MT
H 26.3 Bunkering
No. X FO Tank (P) 0 954.0 MT
No. X FO Tank (S) 0  986.0 MT
OUT SIDE
No. Y FO Tank (S) 0 1560.0 MT
Emission
16th Sept Ships position 1-16.5N, 103-52.4E Control
PART III - B 2 Area
2010 Type of fuel: RMG380, API: 12.89, Density@15°C: 980.0kg/m3
Sulphur content: 3.8%

//Signature of Engineer in Charge – Name / Rank // & //Date//


REGISTRO DE OPERACIONES /
PUNTO FIRMA DE OFICIALES
FECHA CODIGO (LETRA)
(NUMERO) EMCARGADOS
Date Code (letter)
Item (number) Record of Operations/signature of
Officials in charge
Change over HFOLSFO completed, 06 Oct, 1330 hrs
06th Oct 2010 PART III - B 5 >> 3
Ships position: xx-xx.xx N/yy-yy.yyE
Total LSFO - 700m3
Sett tk - 60 m3
FO switch
ENTERING
Serv tk - 60 m3
No X FO tank (P) - 280 m3 Emission
Control
No X FO tank (S) – 300 m3 Area.

//Signature of Engineer in Charge – Name / Rank // & //Date//

10th Oct 2010 H 26.1 Rotterdam

H 26.2 Started 0800 LT / Finished 2000LT


IFO380 4000.00 MT
H 26.3
No. X FO Tank (P) 0  1000.0 MT
No. X FO Tank (S) 0  1000.0 MT
No.Y FO Tank (P) 0 2000.0 MT
Ships position 51-55.0N, 4-30.0E Bunkering
10th Oct 2010 PART III - B 2
Type of fuel: RMG380, API: 12.89, Density@15°C: 980.0kg/m3
IN SIDE
Sulphur content: 3.8% Emission
Control
//Signature of Engineer in Charge – Name / Rank // & //Date// Area.

10th Oct 2010 PART III - B 3.1 Sulphur content of Fuel used does not exceed 1.0% m/m.
Confirm separate FO Tanks are available for storing Low &
Normal Sulphur FO (tank arrangement attached to ORB) and FO
10th Oct 2010 PART III - B 4
switching arrangement & procedure available on board ( attached
to ORB)
//Signature of Engineer in Charge – Name / Rank // & //Date//
REGISTRO DE OPERACIONES /
PUNTO FIRMA DE OFICIALES
FECHA CODIGO (LETRA)
(NUMERO) EMCARGADOS
Date Code (letter)
Item (number) Record of Operations/signature of
Officials in charge
16th Oct 2010 Change over LSFOHFO commenced, 16 Oct, 0845 hrs
PART III - B 5 >> 3
Ships position: xx-xx.xx N/yy-yy.yyE
Total LSFO - 300m3 FO switch
Sett tk - 40 m3 EXITING
Serv tk - 40 m3 Emission
No X FO tank (P) - 120 m3
Control
No X FO tank (S) – 100 m3 Area.

//Signature of Engineer in Charge – Name / Rank // & //Date//

20 Oct 2010 0.2m3, Solid sludge by Waste Oil Incinerator


C 12.3
1.0 hr (Started 0900 LT / Finished 1000 LT)
0.5m3 sludge from W.O Service tank by Waste Oil Incinerator
C 12.3
7.0 hrs (Started 1000 LT / Finished 1700 LT)

Retained in W.O. Service Tank (1.1 0.6m3)

//Signature of Engineer in Charge – Name / Rank // & //Date// Incinerator


operation
20 Oct 2010 Start: xx-xx.xx N / yy-yy.yyE Time XXXX hrs
Part III - D 7 >> 5
Stop: xx-xx.xxN / yy-yy.yyE Time XXXX hrs
Average O2 in combustion chamber = 8.7% (as per type approval
Part III - D 8 >> 6
cert if O2 meter not fitted to monitor O2 content continuously)
Part III - D 9 >> 7 Combustion chamber gas outlet temp = xxx deg. C

//Signature of Engineer in Charge – Name / Rank // & //Date//

You might also like